Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
May 2022
Wed 18 Thu 19 Fri 20 Sat 21 Sun 22 Mon 23 Tue 24 Wed 25 Thu 26 Fri 27 Sat 28 Sun 29 Mon 30 Tue 31
Bełchatów 5102
B02 370
B03 380
B04 380
B05 380 380 380 380 380 380 380 380 380 380 380 380 380 380 380
B06 394
B07 390
B08 390
B09 390
B10 390
B11 390
B12 390 390
B14 858 128 128 258
Chorzów 226
B1 113 113 113 113 113 113 113 113
B2 113
Dolna Odra 900
B5 222 222 23
B6 222
B7 224 224 224
B8 232
Dychów 85
H1 28
H2 29
H3 28
EC Białystok 154
BIA_1-01 50
BIA_1-02 52
BIA_1-03 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52
EC Gorzów 138
GOR2 138
EC Rzeszów 120
ECR 120
EC Siekierki 595
WSIB 07 106 106 106 106 106 106 106 106 106 106 106 106 106 106 106
WSIB 08 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125
WSIB 09 102
WSIB 10 102
WSIK 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160
EC Stalowa Wola 450
Stalowa Wola BGP 450
EC Włocławek 465
B1 465 50
EC Wrotków 231
ECW 231
EC Żerań 299
WZE 299 235 235 100 100 100 100 100 100 100 100 100 100 100 100
EC Żerań 2 497
B20 497
Elektrociepłownia "Zielona Góra" S.A. 188
ZG BPG 188 188 188 188 188 188 188 188 188 188 188 188 188 188 188
EW Włocławek 168
H01 28 28 28 28
H02 28
H03 28
H04 28
H05 28
H06 28
FW Biały Bór 145
BBFW 145
FW Marszewo 100
FMA 100
Grupa Azoty Zakłady Azotowe „Puławy” S.A. 94
ZAPK 94
Jaworzno 2 910
JWCD B7 910 910
Jaworzno 3 1345
B1 225 225 225 225 225 225
B2 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B3 225
B4 225
B5 220 220 220 220
B6 225
Karolin 212
B2 100
B3 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112
Katowice 135
B1 135
Kozienice 1 1821
B1 228
B2 228
B3 225
B4 228 228 228
B5 228 228 228
B6 228 228 228 228 228 228 228 228 228 228 228 228 228 228 228
B7 228 220 220
B8 228
Kozienice 2 2195
B09 560
B10 560 246 246 123
B11 1075 1075 1075 1075 1075 1075 1075 1075 1075 1075 1075
Łagisza 460
B10 460 460 460 460 460 460 460 460 460 460 460 460 460 460 460
Łaziska 3 905
B09 230 230 230 230
B10 225
B11 225 225 225 225
B12 225 225 225 225
Opole 3342
B1 386 386 386 386 386 386
B2 383 183 203 203 203 203
B3 383 203 383 383 383 383
B4 380 380
B5 905 405 405 405
B6 905 905 905 905 905 905 905 905 905 905 905 905 905 905 905
Ostrołęka B 690
B01 230
B02 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230
B03 230
Pątnów 644
B1 222 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B2 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B5 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
Pątnów B9 474
B9 474
Płock 630
B01 630 125 160
Połaniec 1899
B1 225
B2 242
B3 242
B4 242
B5 242
B6 242
B7 239
B9 225
Porąbka Żar 540
H1 135 138
H2 135 138 138
H3 135 138
H4 135 138
Rybnik 1350
B3 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B4 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B5 225
B6 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B7 225
B8 225
Siersza 306
B1 153 153 153 153 153 153 153 153 153 153 153 153 153 153 153
B2 153
Skawina 330
Tg3 110 60 60 60 60 60 60 60 60 60 60 60 60 60 60
Tg5 110 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Tg6 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Solina 198
H1 68
H2 68
H3 31
H4 31
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158
Turów 2029
B01 250 250 250 250 250 250 250 250 250
B02 250 50 50 50 50 50 50
B03 250 50 50 50 50 50 50
B04 261
B05 261 261 261 261
B06 261
B11 496 198 74
Veolia Energia Łódź EC4 105
B03 105 105 105 105 105 105 105 105 105 105 105 105 105 105 105
Windfarm Polska III sp. z o.o. 126
WINDFARM 126
Żarnowiec 716
H1 179
H2 179
H3 179
H4 179
Żydowo 167
H1 55
H2 55
H3 57
Planned 13010 9729 9044 5474 5474 4705 4705 4592 4342 4342 4342 4342 5023 5023
Unplanned 5587 4420 1127 999 2074 1871 1771 1771 1771 1771 1771 1771 1991 1991
Total outages 18597 14149 10171 6473 7548 6576 6476 6363 6113 6113 6113 6113 7014 7014

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 09-05-2022 00:01
Event end: 19-05-2022 00:00
Source: Active - Planned - Porąbka Żar H3

Outage information

Unit Porąbka Żar H1
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 09-05-2022 00:01
Event end: 19-05-2022 00:00
Source: Active - Planned - Porąbka Żar H1

Outage information

Unit Jaworzno 3 B1
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 30-05-2022 00:01
Event end: 29-07-2022 00:00
Source: Active - Planned - Jaworzno 3 B1

Outage information

Unit Jaworzno 3 B2
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 09-05-2022 00:01
Event end: 07-08-2022 00:00
Source: Active - Planned - Jaworzno 3 B2

Outage information

Unit EC Białystok BIA_1-03
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Unplanned
Event start: 22-04-2022 00:01
Event end: 14-06-2022 23:45
Source: Active - Unplanned - EC Białystok BIA_1-03

Outage information

Unit Rybnik B6
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 12-02-2022 00:01
Event end: 07-07-2022 00:00
Source: Active - Planned - Rybnik B6

Outage information

Unit Bełchatów B05
Achievable generation capacity: 380 MW
Outage size: 380 MW
Event type: Planned
Event start: 19-03-2022 02:15
Event end: 17-07-2022 18:00
Source: Active - Planned - Bełchatów B05

Outage information

Unit Ostrołęka B B02
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 14-05-2022 00:01
Event end: 27-06-2022 00:00
Source: Active - Planned - Ostrołęka B B02

Outage information

Unit EC Siekierki WSIK
Achievable generation capacity: 160 MW
Outage size: 160 MW
Event type: Planned
Event start: 10-04-2022 17:56
Event end: 03-06-2022 23:59
Source: Active - Planned - EC Siekierki WSIK

Outage information

Unit Kozienice 1 B4
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned
Event start: 30-05-2022 00:01
Event end: 13-06-2022 00:00
Source: Active - Planned - Kozienice 1 B4

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned
Event start: 30-05-2022 00:01
Event end: 13-06-2022 00:00
Source: Active - Planned - Kozienice 1 B5

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 220 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 30-05-2022 00:01
Event end: 13-06-2022 00:00
Source: Active - Unplanned - Kozienice 1 B7

Outage information

Unit Chorzów B1
Achievable generation capacity: 113 MW
Outage size: 113 MW
Event type: Planned
Event start: 23-04-2022 02:00
Event end: 24-05-2022 16:00
Source: Active - Planned - Chorzów B1

Outage information

Unit Kozienice 1 B6
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned
Event start: 04-04-2022 00:01
Event end: 13-06-2022 00:00
Source: Active - Planned - Kozienice 1 B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 905 MW
Event type: Planned
Event start: 19-04-2022 00:01
Event end: 01-06-2022 00:00
Source: Active - Planned - Opole B6

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 460 MW
Event type: Planned
Event start: 30-04-2022 00:20
Event end: 04-06-2022 00:00
Source: Active - Planned - Łagisza B10

Outage information

Unit Turów B01
Achievable generation capacity: 250 MW
Outage size: 250 MW
Event type: Planned
Event start: 04-05-2022 01:07
Event end: 25-05-2022 08:00
Source: Active - Planned - Turów B01

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 09-05-2022 00:01
Event end: 19-05-2022 00:00
Source: Active - Planned - Porąbka Żar H4

Outage information

Unit EC Siekierki WSIB 07
Achievable generation capacity: 106 MW
Outage size: 106 MW
Event type: Planned
Event start: 06-05-2022 23:01
Event end: 23-07-2022 00:00
Source: Active - Planned - EC Siekierki WSIB 07

Outage information

Unit EW Włocławek H01
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 09-05-2022 06:01
Event end: 20-05-2022 17:00
Source: Active - Planned - EW Włocławek H01

Outage information

Unit Veolia Energia Łódź EC4 B03
Achievable generation capacity: 105 MW
Outage size: 105 MW
Event type: Planned
Event start: 09-05-2022 06:20
Event end: 30-09-2022 23:59
Source: Active - Planned - Veolia Energia Łódź EC4 B03

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 12-04-2022 22:01
Event end: 31-05-2022 23:59
Source: Active - Planned - Skawina Tg6

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 60 MW
Event type: Planned
Event start: 27-04-2022 14:01
Event end: 31-05-2022 23:59
Source: Active - Planned - Skawina Tg3

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 20 MW
Event type: Planned
Event start: 26-04-2022 15:01
Event end: 31-05-2022 23:59
Source: Active - Planned - Skawina Tg5

Outage information

Unit EC Siekierki WSIB 08
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Planned
Event start: 13-05-2022 12:01
Event end: 16-07-2022 00:00
Source: Active - Planned - EC Siekierki WSIB 08

Outage information

Unit Porąbka Żar H2
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 09-05-2022 00:01
Event end: 19-05-2022 23:59
Source: Active - Planned - Porąbka Żar H2

Outage information

Unit Siersza B1
Achievable generation capacity: 153 MW
Outage size: 153 MW
Event type: Planned
Event start: 11-04-2022 00:01
Event end: 16-06-2022 00:00
Source: Active - Planned - Siersza B1

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 405 MW
Event type: Planned
Event start: 17-05-2022 23:01
Event end: 18-05-2022 00:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 386 MW
Event type: Planned
Event start: 20-05-2022 00:01
Event end: 21-05-2022 00:00
Source: Active - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 386 MW
Event type: Planned
Event start: 19-05-2022 00:01
Event end: 20-05-2022 00:00
Source: Active - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 386 MW
Event type: Planned
Event start: 21-05-2022 00:01
Event end: 22-05-2022 00:00
Source: Active - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 386 MW
Event type: Planned
Event start: 22-05-2022 00:01
Event end: 23-05-2022 00:00
Source: Active - Planned - Opole B1

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 19-05-2022 00:01
Event end: 20-05-2022 00:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 21-05-2022 00:01
Event end: 22-05-2022 00:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 20-05-2022 00:01
Event end: 21-05-2022 00:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 22-05-2022 00:01
Event end: 23-05-2022 00:00
Source: Active - Planned - Opole B3

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 910 MW
Event type: Planned
Event start: 13-05-2022 22:03
Event end: 18-05-2022 04:00
Source: Inactive - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Elektrociepłownia "Zielona Góra" S.A. ZG BPG
Achievable generation capacity: 188 MW
Outage size: 188 MW
Event type: Planned
Event start: 14-05-2022 20:01
Event end: 11-09-2022 08:00
Source: Active - Planned - Elektrociepłownia "Zielona Góra" S.A. ZG BPG

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 138 MW
Event type: Unplanned
Event start: 17-05-2022 00:01
Event end: 18-05-2022 00:00
Source: Inactive - Unplanned - Bełchatów B14

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 75 MW
Event type: Unplanned
Event start: 17-05-2022 23:01
Event end: 18-05-2022 00:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 40 MW
Event type: Unplanned
Event start: 17-05-2022 23:01
Event end: 18-05-2022 00:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit Rybnik B3
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 17-05-2022 02:01
Event end: 06-06-2022 00:00
Source: Active - Planned - Rybnik B3

Outage information

Unit Rybnik B4
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 17-05-2022 02:01
Event end: 06-06-2022 00:00
Source: Active - Planned - Rybnik B4

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 261 MW
Event type: Planned
Event start: 17-05-2022 00:01
Event end: 21-05-2022 00:00
Source: Active - Planned - Turów B05

Outage information

Unit Turów B02
Achievable generation capacity: 250 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 17-05-2022 00:01
Event end: 18-05-2022 00:00
Source: Inactive - Unplanned - Turów B02

Outage information

Unit Karolin B3
Achievable generation capacity: 112 MW
Outage size: 112 MW
Event type: Planned
Event start: 07-05-2022 00:01
Event end: 21-06-2022 23:59
Source: Active - Planned - Karolin B3

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 222 MW
Outage size: 23 MW
Event type: Planned
Event start: 19-05-2022 08:01
Event end: 19-05-2022 20:00
Source: Active - Planned - Dolna Odra B5

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 222 MW
Outage size: 11 MW
Event type: Planned
Event start: 19-05-2022 20:01
Event end: 19-05-2022 21:00
Source: Active - Planned - Dolna Odra B5

Outage information

Unit Turów B11
Achievable generation capacity: 496 MW
Outage size: 148 MW
Event type: Planned
Event start: 17-05-2022 18:01
Event end: 18-05-2022 00:00
Source: Inactive - Planned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 496 MW
Outage size: 148 MW
Event type: Planned
Event start: 18-05-2022 00:01
Event end: 18-05-2022 18:00
Source: Active - Planned - Turów B11

Outage information

Unit Bełchatów B04
Achievable generation capacity: 380 MW
Outage size: 380 MW
Event type: Planned
Event start: 14-05-2022 00:01
Event end: 18-05-2022 00:00
Source: Inactive - Planned - Bełchatów B04

Outage information

Unit Jaworzno 3 B5
Achievable generation capacity: 220 MW
Outage size: 220 MW
Event type: Planned
Event start: 17-05-2022 06:01
Event end: 21-05-2022 00:00
Source: Active - Planned - Jaworzno 3 B5

Outage information

Unit Łaziska 3 B09
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 17-05-2022 06:01
Event end: 21-05-2022 00:00
Source: Active - Planned - Łaziska 3 B09

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 128 MW
Event type: Planned
Event start: 19-05-2022 08:01
Event end: 19-05-2022 18:00
Source: Active - Planned - Bełchatów B14

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 128 MW
Event type: Planned
Event start: 18-05-2022 10:01
Event end: 18-05-2022 18:00
Source: Active - Planned - Bełchatów B14

Outage information

Unit Łaziska 3 B12
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 17-05-2022 06:01
Event end: 21-05-2022 00:00
Source: Active - Planned - Łaziska 3 B12

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 128 MW
Event type: Unplanned
Event start: 18-05-2022 18:01
Event end: 19-05-2022 00:00
Source: Active - Unplanned - Bełchatów B14

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 128 MW
Event type: Unplanned
Event start: 18-05-2022 00:01
Event end: 18-05-2022 10:00
Source: Active - Unplanned - Bełchatów B14

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 128 MW
Event type: Unplanned
Event start: 19-05-2022 00:01
Event end: 19-05-2022 08:00
Source: Active - Unplanned - Bełchatów B14

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 128 MW
Event type: Unplanned
Event start: 19-05-2022 18:01
Event end: 20-05-2022 00:00
Source: Active - Unplanned - Bełchatów B14

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 566 MW
Outage size: 61 MW
Event type: Planned
Event start: 18-05-2022 17:01
Event end: 18-05-2022 18:00
Source: Active - Planned - Kozienice 2 B10

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 566 MW
Outage size: 161 MW
Event type: Planned
Event start: 18-05-2022 10:01
Event end: 18-05-2022 11:00
Source: Active - Planned - Kozienice 2 B10

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 566 MW
Outage size: 246 MW
Event type: Planned
Event start: 18-05-2022 11:01
Event end: 18-05-2022 15:00
Source: Active - Planned - Kozienice 2 B10

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 1075 MW
Event type: Unplanned
Event start: 22-05-2022 00:01
Event end: 05-06-2022 00:00
Source: Active - Unplanned - Kozienice 2 B11

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 224 MW
Outage size: 224 MW
Event type: Planned
Event start: 16-05-2022 12:31
Event end: 20-05-2022 00:00
Source: Active - Planned - Dolna Odra B7

Outage information

Unit Turów B11
Achievable generation capacity: 496 MW
Outage size: 99 MW
Event type: Planned
Event start: 18-05-2022 21:01
Event end: 18-05-2022 22:00
Source: Active - Planned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 496 MW
Outage size: 185 MW
Event type: Planned
Event start: 18-05-2022 18:01
Event end: 18-05-2022 19:00
Source: Active - Planned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 496 MW
Outage size: 198 MW
Event type: Planned
Event start: 18-05-2022 19:01
Event end: 18-05-2022 20:00
Source: Active - Planned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 496 MW
Outage size: 136 MW
Event type: Planned
Event start: 18-05-2022 20:01
Event end: 18-05-2022 21:00
Source: Active - Planned - Turów B11

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 299 MW
Outage size: 100 MW
Event type: Planned
Event start: 19-05-2022 18:31
Event end: 24-06-2022 00:00
Source: Active - Planned - EC Żerań WZE

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 299 MW
Outage size: 235 MW
Event type: Unplanned
Event start: 13-05-2022 16:04
Event end: 19-05-2022 18:30
Source: Active - Unplanned - EC Żerań WZE

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 380 MW
Event type: Planned
Event start: 18-05-2022 18:01
Event end: 18-05-2022 19:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 405 MW
Event type: Planned
Event start: 18-05-2022 23:01
Event end: 19-05-2022 00:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 405 MW
Event type: Planned
Event start: 18-05-2022 00:01
Event end: 18-05-2022 18:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 205 MW
Event type: Planned
Event start: 18-05-2022 19:01
Event end: 18-05-2022 22:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 380 MW
Event type: Planned
Event start: 18-05-2022 22:01
Event end: 18-05-2022 23:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 405 MW
Event type: Planned
Event start: 19-05-2022 00:01
Event end: 19-05-2022 18:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 405 MW
Event type: Planned
Event start: 19-05-2022 23:01
Event end: 20-05-2022 00:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 380 MW
Event type: Planned
Event start: 19-05-2022 18:01
Event end: 19-05-2022 19:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 205 MW
Event type: Planned
Event start: 19-05-2022 19:01
Event end: 19-05-2022 22:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 380 MW
Event type: Planned
Event start: 19-05-2022 22:01
Event end: 19-05-2022 23:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 380 MW
Event type: Planned
Event start: 20-05-2022 18:01
Event end: 20-05-2022 19:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 405 MW
Event type: Planned
Event start: 20-05-2022 23:01
Event end: 21-05-2022 00:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 405 MW
Event type: Planned
Event start: 20-05-2022 00:01
Event end: 20-05-2022 18:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 380 MW
Event type: Planned
Event start: 20-05-2022 22:01
Event end: 20-05-2022 23:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 205 MW
Event type: Planned
Event start: 20-05-2022 19:01
Event end: 20-05-2022 22:00
Source: Active - Planned - Opole B5

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 183 MW
Event type: Unplanned
Event start: 17-05-2022 22:01
Event end: 18-05-2022 00:00
Source: Inactive - Unplanned - Opole B2

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 183 MW
Event type: Unplanned
Event start: 17-05-2022 22:01
Event end: 18-05-2022 00:00
Source: Inactive - Unplanned - Opole B3

Outage information

Unit Jaworzno 3 B1
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 17-05-2022 00:01
Event end: 21-05-2022 00:00
Source: Active - Planned - Jaworzno 3 B1

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 18-05-2022 00:01
Event end: 18-05-2022 01:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 18-05-2022 01:01
Event end: 18-05-2022 02:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 18-05-2022 02:01
Event end: 18-05-2022 03:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 18-05-2022 03:01
Event end: 18-05-2022 04:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 18-05-2022 04:01
Event end: 18-05-2022 05:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 18-05-2022 05:01
Event end: 18-05-2022 06:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 18-05-2022 06:01
Event end: 18-05-2022 07:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 18-05-2022 07:01
Event end: 18-05-2022 08:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 18-05-2022 08:01
Event end: 18-05-2022 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 18-05-2022 09:01
Event end: 18-05-2022 10:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 18-05-2022 10:01
Event end: 18-05-2022 11:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 18-05-2022 11:01
Event end: 18-05-2022 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 18-05-2022 19:01
Event end: 18-05-2022 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 18-05-2022 22:01
Event end: 18-05-2022 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 18-05-2022 20:01
Event end: 18-05-2022 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 18-05-2022 23:01
Event end: 19-05-2022 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 18-05-2022 12:01
Event end: 18-05-2022 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 18-05-2022 13:01
Event end: 18-05-2022 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 18-05-2022 14:01
Event end: 18-05-2022 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 18-05-2022 15:01
Event end: 18-05-2022 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 18-05-2022 17:01
Event end: 18-05-2022 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 18-05-2022 18:01
Event end: 18-05-2022 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 18-05-2022 21:01
Event end: 18-05-2022 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 18-05-2022 16:01
Event end: 18-05-2022 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Pątnów B1
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 17-05-2022 01:01
Event end: 30-06-2022 16:00
Source: Active - Unplanned - Pątnów B1

Outage information

Unit Pątnów B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 17-05-2022 05:01
Event end: 30-06-2022 16:00
Source: Active - Unplanned - Pątnów B5

Outage information

Unit Łaziska 3 B11
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 18-05-2022 06:01
Event end: 21-05-2022 00:00
Source: Active - Planned - Łaziska 3 B11

Outage information

Unit Bełchatów B12
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Unplanned
Event start: 17-05-2022 07:08
Event end: 19-05-2022 00:00
Source: Active - Unplanned - Bełchatów B12

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 18-05-2022 03:01
Event end: 18-05-2022 04:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 18-05-2022 04:01
Event end: 18-05-2022 05:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 18-05-2022 01:01
Event end: 18-05-2022 02:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 18-05-2022 02:01
Event end: 18-05-2022 03:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 18-05-2022 00:01
Event end: 18-05-2022 01:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 40 MW
Event type: Unplanned
Event start: 18-05-2022 20:01
Event end: 18-05-2022 21:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 18-05-2022 22:01
Event end: 18-05-2022 23:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 18-05-2022 23:01
Event end: 19-05-2022 00:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 18-05-2022 21:01
Event end: 18-05-2022 22:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 40 MW
Event type: Unplanned
Event start: 18-05-2022 19:01
Event end: 18-05-2022 20:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 18-05-2022 18:01
Event end: 18-05-2022 19:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 18-05-2022 17:01
Event end: 18-05-2022 18:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 18-05-2022 16:01
Event end: 18-05-2022 17:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 18-05-2022 15:01
Event end: 18-05-2022 16:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 18-05-2022 14:01
Event end: 18-05-2022 15:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 18-05-2022 13:01
Event end: 18-05-2022 14:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 18-05-2022 12:01
Event end: 18-05-2022 13:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 18-05-2022 11:01
Event end: 18-05-2022 12:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 40 MW
Event type: Unplanned
Event start: 18-05-2022 10:01
Event end: 18-05-2022 11:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 40 MW
Event type: Unplanned
Event start: 18-05-2022 09:01
Event end: 18-05-2022 10:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 40 MW
Event type: Unplanned
Event start: 18-05-2022 08:01
Event end: 18-05-2022 09:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 18-05-2022 07:01
Event end: 18-05-2022 08:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 18-05-2022 06:01
Event end: 18-05-2022 07:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 18-05-2022 05:01
Event end: 18-05-2022 06:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit Turów B02
Achievable generation capacity: 250 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 18-05-2022 00:01
Event end: 24-05-2022 00:00
Source: Active - Unplanned - Turów B02

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 180 MW
Event type: Planned
Event start: 18-05-2022 18:01
Event end: 19-05-2022 00:00
Source: Active - Planned - Opole B4

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 128 MW
Event type: Unplanned
Event start: 20-05-2022 06:01
Event end: 21-05-2022 00:00
Source: Active - Unplanned - Bełchatów B14

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 258 MW
Event type: Planned
Event start: 20-05-2022 00:01
Event end: 20-05-2022 06:00
Source: Active - Planned - Bełchatów B14

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 380 MW
Event type: Planned
Event start: 04-04-2022 00:01
Event end: 18-05-2022 18:00
Source: Active - Planned - Opole B4

Outage information

Unit Pątnów B2
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 19-05-2022 01:01
Event end: 30-06-2022 16:00
Source: Active - Unplanned - Pątnów B2

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 136 MW
Event type: Planned
Event start: 18-05-2022 06:01
Event end: 18-05-2022 07:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 318 MW
Event type: Planned
Event start: 18-05-2022 05:01
Event end: 18-05-2022 06:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 546 MW
Event type: Planned
Event start: 18-05-2022 04:01
Event end: 18-05-2022 05:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Turów B03
Achievable generation capacity: 250 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 17-05-2022 00:01
Event end: 24-05-2022 00:00
Source: Active - Unplanned - Turów B03

Outage information

Unit Turów B11
Achievable generation capacity: 496 MW
Outage size: 74 MW
Event type: Planned
Event start: 19-05-2022 05:01
Event end: 19-05-2022 17:00
Source: Active - Planned - Turów B11

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Unplanned
Event start: 22-05-2022 00:01
Event end: 23-05-2022 00:00
Source: Active - Unplanned - Opole B2

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Unplanned
Event start: 19-05-2022 00:01
Event end: 20-05-2022 00:00
Source: Active - Unplanned - Opole B2

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Unplanned
Event start: 20-05-2022 00:01
Event end: 21-05-2022 00:00
Source: Active - Unplanned - Opole B2

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Unplanned
Event start: 21-05-2022 00:01
Event end: 22-05-2022 00:00
Source: Active - Unplanned - Opole B2

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Unplanned
Event start: 18-05-2022 00:01
Event end: 18-05-2022 18:00
Source: Active - Unplanned - Opole B3

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 183 MW
Event type: Unplanned
Event start: 18-05-2022 00:01
Event end: 18-05-2022 18:00
Source: Active - Unplanned - Opole B2

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Unplanned
Event start: 18-05-2022 22:01
Event end: 19-05-2022 00:00
Source: Active - Unplanned - Opole B3

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 183 MW
Event type: Unplanned
Event start: 18-05-2022 22:01
Event end: 19-05-2022 00:00
Source: Active - Unplanned - Opole B2

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 566 MW
Outage size: 246 MW
Event type: Planned
Event start: 19-05-2022 11:01
Event end: 19-05-2022 15:00
Source: Active - Planned - Kozienice 2 B10

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 566 MW
Outage size: 161 MW
Event type: Planned
Event start: 19-05-2022 10:01
Event end: 19-05-2022 11:00
Source: Active - Planned - Kozienice 2 B10

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 566 MW
Outage size: 61 MW
Event type: Planned
Event start: 19-05-2022 17:01
Event end: 19-05-2022 18:00
Source: Active - Planned - Kozienice 2 B10

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 566 MW
Outage size: 123 MW
Event type: Planned
Event start: 20-05-2022 12:01
Event end: 20-05-2022 13:00
Source: Active - Planned - Kozienice 2 B10

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 386 MW
Event type: Planned
Event start: 15-05-2022 00:01
Event end: 19-05-2022 00:00
Source: Active - Planned - Opole B1

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 19-05-2022 06:01
Event end: 19-05-2022 07:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 19-05-2022 05:01
Event end: 19-05-2022 06:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 19-05-2022 04:01
Event end: 19-05-2022 05:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 19-05-2022 03:01
Event end: 19-05-2022 04:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 19-05-2022 02:01
Event end: 19-05-2022 03:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 19-05-2022 01:01
Event end: 19-05-2022 02:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 19-05-2022 00:01
Event end: 19-05-2022 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 145 MW
Event type: Unplanned
Event start: 19-05-2022 12:01
Event end: 19-05-2022 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 19-05-2022 11:01
Event end: 19-05-2022 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 19-05-2022 10:01
Event end: 19-05-2022 11:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 19-05-2022 09:01
Event end: 19-05-2022 10:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 19-05-2022 08:01
Event end: 19-05-2022 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 19-05-2022 07:01
Event end: 19-05-2022 08:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 19-05-2022 20:01
Event end: 19-05-2022 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 150 MW
Event type: Unplanned
Event start: 19-05-2022 13:01
Event end: 19-05-2022 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 19-05-2022 14:01
Event end: 19-05-2022 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 160 MW
Event type: Unplanned
Event start: 19-05-2022 15:01
Event end: 19-05-2022 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 160 MW
Event type: Unplanned
Event start: 19-05-2022 16:01
Event end: 19-05-2022 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 145 MW
Event type: Unplanned
Event start: 19-05-2022 19:01
Event end: 19-05-2022 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 19-05-2022 23:01
Event end: 20-05-2022 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 19-05-2022 22:01
Event end: 19-05-2022 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 160 MW
Event type: Unplanned
Event start: 19-05-2022 17:01
Event end: 19-05-2022 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 150 MW
Event type: Unplanned
Event start: 19-05-2022 18:01
Event end: 19-05-2022 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 19-05-2022 21:01
Event end: 19-05-2022 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned
Event start: 17-05-2022 06:08
Event end: 18-05-2022 04:00
Source: Inactive - Planned - Dolna Odra B5

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.