Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
February 2023
Thu 9 Fri 10 Sat 11 Sun 12 Mon 13 Tue 14 Wed 15 Thu 16 Fri 17 Sat 18 Sun 19 Mon 20 Tue 21 Wed 22
Bełchatów 5102
B02 370 370 370 370 370 370 370 370 370 370 370
B03 380
B04 380 100 100
B05 380 100
B06 394 100 244 394 394 394 394 394 394 394
B07 390 390 390 390 390 390 390 390 390 390 390 390 390 390 390
B08 390
B09 390 90
B10 390 100 100 90
B11 390 100 100 390 390 390 390
B12 390 100 100
B14 858 138 138
Chorzów 226
B1 113
B2 113
Dolna Odra 900
B5 222 222 222 222 222 222 222 222
B6 222
B7 224
B8 232 232 232 232 232 232 232 232 232 232 232 232 232 232 232
Dychów 85
H1 28
H2 29
H3 28
EC Białystok 154
BIA_1-01 50
BIA_1-02 52
BIA_1-03 52
EC Gorzów 138
GOR2 138
EC Rzeszów 120
ECR 120
EC Siekierki 595
WSIB 07 106
WSIB 08 125
WSIB 09 102
WSIB 10 102
WSIK 160
EC Stalowa Wola 450
Stalowa Wola BGP 450
EC Włocławek 465
B1 465 30 30 465 465 465 465 465 465 465 465
EC Wrotków 231
ECW 231
EC Żerań 299
WZE 299
EC Żerań 2 497
B20 497 217 217 217 217 217 217 217 217 217 217 217 217 217 217
Elektrociepłownia "Zielona Góra" S.A. 188
ZG BPG 188
EW Włocławek 168
H01 28
H02 28
H03 28
H04 28
H05 28
H06 28
FW Biały Bór 145
BBFW 145
FW Marszewo 100
FMA 100
Grupa Azoty Zakłady Azotowe „Puławy” S.A. 128
EC Puławy 128
Jaworzno 2 910
JWCD B7 910
Jaworzno 3 1345
B1 225
B2 225
B3 225
B4 225
B5 220
B6 225
Karolin 212
B2 100
B3 112
Katowice 135
B1 135
Kozienice 1 1800
B1 228 228 228 228 228
B2 228 88 88
B3 220 80 80 220 220
B4 228 88 88
B5 228 228 228 228 228
B6 228 88 88
B7 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220
B8 220 80 80
Kozienice 2 2207
B09 566 566 566 566 566
B10 566 250 250 566 566
B11 1075 615 615 510 510 510
Łagisza 460
B10 460
Łaziska 3 905
B09 230
B10 225
B11 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B12 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
Opole 3342
B1 386
B2 383 383
B3 383 383 383 383 383 383 383
B4 380 380 380 380 380 380 380 380 380 380 380 380 380 380 380
B5 905
B6 905
Ostrołęka B 690
B01 230 230 230 230 230
B02 230 90
B03 230
Pątnów 644
B1 222
B2 222 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B5 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
Pątnów B9 474
B9 474 474 474 474 474 474 474 474 474 474 474 474 474 474 474
Płock 630
B01 630 65 70
Połaniec 1899
B1 225
B2 242 242 242 242 242
B3 242 242 242
B4 242
B5 242 242
B6 242 242 242
B7 239
B9 225
Porąbka Żar 540
H1 135
H2 135 138 138 138 138 138 138 138 138 138 138 138 138 138 138
H3 135 138
H4 135 138
Rybnik 1350
B3 225
B4 225
B5 225
B6 225 225 225
B7 225
B8 225
Siersza 306
B1 153
B2 153 153 153
Skawina 330
Tg3 110 110 110 110 110 110 110
Tg5 110 40 40 40 40 40 40 40 40 40 40 40 40 40 40
Tg6 110 45 45 45 45 45 45 45 45 45 45 45 45 45 45
Solina 198
H1 68
H2 68
H3 31
H4 31
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158 80 80 80 80 80 80 80 80 80 80 80 80 80 80
Turów 2029
B01 250 250 250 250
B02 250
B03 250 70 70 70
B04 261 141
B05 261
B06 261
B11 496
Veolia Energia Łódź EC4 105
B03 105
Windfarm Polska III sp. z o.o. 126
WINDFARM 126
Żarnowiec 716
H1 179
H2 179
H3 179
H4 179
Żydowo 167
H1 55 55 55
H2 55 55
H3 57 57 57

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 220 MW
Outage size: 220 MW
Event type: Planned
Event start: 16-01-2023 00:01
Event end: 17-03-2023 00:00
Source: Active - Planned - Kozienice 1 B7

Outage information

Unit Bełchatów B11
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned
Event start: 19-02-2023 00:01
Event end: 26-03-2023 18:00
Source: Active - Planned - Bełchatów B11

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 17-02-2023 00:01
Event end: 27-02-2023 00:00
Source: Active - Planned - Opole B3

Outage information

Unit Pątnów B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 07-12-2022 00:01
Event end: 01-01-2024 00:00
Source: Active - Unplanned - Pątnów B5

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 380 MW
Event type: Planned
Event start: 27-12-2022 00:01
Event end: 06-04-2023 00:00
Source: Active - Planned - Opole B4

Outage information

Unit TAMEH Polska sp. z o. o. Elektrownia Blachownia
Achievable generation capacity: 158 MW
Outage size: 80 MW
Event type: Planned
Event start: 04-08-2022 00:00
Event end: 31-12-2023 23:59
Source: Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 465 MW
Event type: Unplanned
Event start: 15-02-2023 00:01
Event end: 23-02-2023 12:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit Bełchatów B07
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned
Event start: 07-01-2023 01:26
Event end: 07-05-2023 18:00
Source: Active - Planned - Bełchatów B07

Outage information

Unit Pątnów B2
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 09-01-2023 20:22
Event end: 01-01-2024 00:00
Source: Active - Unplanned - Pątnów B2

Outage information

Unit Pątnów B9 B9
Achievable generation capacity: 474 MW
Outage size: 474 MW
Event type: Unplanned
Event start: 23-01-2023 22:01
Event end: 01-01-2024 00:00
Source: Active - Unplanned - Pątnów B9 B9

Outage information

Unit Porąbka Żar H2
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Unplanned
Event start: 27-01-2023 18:31
Event end: 07-05-2023 23:59
Source: Active - Unplanned - Porąbka Żar H2

Outage information

Unit Dolna Odra B8
Achievable generation capacity: 232 MW
Outage size: 232 MW
Event type: Planned
Event start: 27-01-2023 00:00
Event end: 01-03-2023 00:00
Source: Active - Planned - Dolna Odra B8

Outage information

Unit EC Żerań 2 B20
Achievable generation capacity: 497 MW
Outage size: 217 MW
Event type: Planned
Event start: 30-01-2023 11:55
Event end: 01-04-2023 00:00
Source: Active - Planned - EC Żerań 2 B20

Outage information

Unit Żydowo H1
Achievable generation capacity: 55 MW
Outage size: 55 MW
Event type: Planned
Event start: 13-02-2023 08:01
Event end: 13-02-2023 09:00
Source: Active - Planned - Żydowo H1

Outage information

Unit Żydowo H3
Achievable generation capacity: 57 MW
Outage size: 57 MW
Event type: Planned
Event start: 13-02-2023 08:01
Event end: 13-02-2023 09:00
Source: Active - Planned - Żydowo H3

Outage information

Unit Żydowo H1
Achievable generation capacity: 55 MW
Outage size: 55 MW
Event type: Planned
Event start: 20-02-2023 08:01
Event end: 20-02-2023 10:00
Source: Active - Planned - Żydowo H1

Outage information

Unit Żydowo H2
Achievable generation capacity: 55 MW
Outage size: 55 MW
Event type: Planned
Event start: 20-02-2023 08:01
Event end: 20-02-2023 10:00
Source: Active - Planned - Żydowo H2

Outage information

Unit Żydowo H3
Achievable generation capacity: 57 MW
Outage size: 57 MW
Event type: Planned
Event start: 20-02-2023 08:01
Event end: 20-02-2023 10:00
Source: Active - Planned - Żydowo H3

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 125 MW
Event type: Planned
Event start: 09-02-2023 07:01
Event end: 09-02-2023 10:00
Source: Inactive - Planned - Kozienice 2 B11

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 325 MW
Event type: Planned
Event start: 09-02-2023 10:01
Event end: 09-02-2023 14:00
Source: Active - Planned - Kozienice 2 B11

Outage information

Unit Turów B01
Achievable generation capacity: 250 MW
Outage size: 250 MW
Event type: Planned
Event start: 04-02-2023 00:14
Event end: 12-02-2023 00:00
Source: Active - Planned - Turów B01

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 225 MW
Event type: Planned
Event start: 09-02-2023 14:01
Event end: 09-02-2023 15:00
Source: Active - Planned - Kozienice 2 B11

Outage information

Unit Bełchatów B02
Achievable generation capacity: 370 MW
Outage size: 370 MW
Event type: Planned
Event start: 05-02-2023 00:46
Event end: 18-02-2023 18:00
Source: Active - Planned - Bełchatów B02

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 40 MW
Event type: Planned
Event start: 05-02-2023 21:00
Event end: 28-02-2023 23:59
Source: Active - Planned - Skawina Tg5

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 45 MW
Event type: Planned
Event start: 05-02-2023 21:00
Event end: 28-02-2023 23:59
Source: Active - Planned - Skawina Tg6

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 138 MW
Event type: Unplanned
Event start: 08-02-2023 00:01
Event end: 11-02-2023 00:00
Source: Active - Unplanned - Bełchatów B14

Outage information

Unit Połaniec B6
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Unplanned
Event start: 05-02-2023 19:01
Event end: 10-02-2023 19:00
Source: Active - Unplanned - Połaniec B6

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned
Event start: 13-02-2023 06:01
Event end: 15-02-2023 22:00
Source: Active - Planned - Dolna Odra B5

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 07-02-2023 00:01
Event end: 14-02-2023 23:59
Source: Active - Planned - Skawina Tg3

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 08-02-2023 23:01
Event end: 09-02-2023 00:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 81 MW
Event type: Planned
Event start: 10-02-2023 07:01
Event end: 10-02-2023 13:00
Source: Active - Planned - Kozienice 2 B11

Outage information

Unit Turów B03
Achievable generation capacity: 250 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 22:01
Event end: 11-02-2023 06:00
Source: Active - Unplanned - Turów B03

Outage information

Unit Turów B03
Achievable generation capacity: 250 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 08-02-2023 22:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Turów B03

Outage information

Unit Turów B03
Achievable generation capacity: 250 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 09-02-2023 22:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Turów B03

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 394 MW
Event type: Planned
Event start: 11-02-2023 00:01
Event end: 18-02-2023 00:00
Source: Active - Planned - Bełchatów B06

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 08-02-2023 23:01
Event end: 09-02-2023 00:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 33 MW
Event type: Unplanned
Event start: 08-02-2023 00:01
Event end: 09-02-2023 00:00
Source: Inactive - Unplanned - Opole B2

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned
Event start: 08-02-2023 00:22
Event end: 13-02-2023 06:00
Source: Active - Planned - Dolna Odra B5

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 09-02-2023 00:01
Event end: 09-02-2023 01:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 55 MW
Event type: Unplanned
Event start: 09-02-2023 11:01
Event end: 09-02-2023 12:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 55 MW
Event type: Unplanned
Event start: 09-02-2023 10:01
Event end: 09-02-2023 11:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 12:01
Event end: 09-02-2023 13:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 13:01
Event end: 09-02-2023 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 09-02-2023 14:01
Event end: 09-02-2023 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 09-02-2023 15:01
Event end: 09-02-2023 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 09-02-2023 16:01
Event end: 09-02-2023 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 09-02-2023 17:01
Event end: 09-02-2023 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 09-02-2023 18:01
Event end: 09-02-2023 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 19:01
Event end: 09-02-2023 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 09-02-2023 20:01
Event end: 09-02-2023 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 09-02-2023 21:01
Event end: 09-02-2023 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 22:01
Event end: 09-02-2023 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 23:01
Event end: 10-02-2023 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Ostrołęka B B01
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Unplanned
Event start: 08-02-2023 05:01
Event end: 12-02-2023 00:01
Source: Active - Unplanned - Ostrołęka B B01

Outage information

Unit Rybnik B6
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 09-02-2023 00:01
Event end: 11-02-2023 00:00
Source: Active - Planned - Rybnik B6

Outage information

Unit Kozienice 1 B1
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Unplanned
Event start: 09-02-2023 00:01
Event end: 13-02-2023 00:00
Source: Active - Unplanned - Kozienice 1 B1

Outage information

Unit Kozienice 1 B3
Achievable generation capacity: 220 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 08-02-2023 22:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Kozienice 1 B3

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 88 MW
Event type: Unplanned
Event start: 08-02-2023 22:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 88 MW
Event type: Unplanned
Event start: 09-02-2023 22:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B3
Achievable generation capacity: 220 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 09-02-2023 22:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Kozienice 1 B3

Outage information

Unit Kozienice 1 B4
Achievable generation capacity: 228 MW
Outage size: 88 MW
Event type: Unplanned
Event start: 09-02-2023 22:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Kozienice 1 B4

Outage information

Unit Kozienice 1 B6
Achievable generation capacity: 228 MW
Outage size: 88 MW
Event type: Unplanned
Event start: 09-02-2023 22:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Kozienice 1 B6

Outage information

Unit Kozienice 1 B6
Achievable generation capacity: 228 MW
Outage size: 88 MW
Event type: Unplanned
Event start: 08-02-2023 22:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Kozienice 1 B6

Outage information

Unit Kozienice 1 B4
Achievable generation capacity: 228 MW
Outage size: 88 MW
Event type: Unplanned
Event start: 08-02-2023 22:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Kozienice 1 B4

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 220 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 08-02-2023 22:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Kozienice 1 B8

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 566 MW
Outage size: 250 MW
Event type: Unplanned
Event start: 09-02-2023 22:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Kozienice 2 B10

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 566 MW
Outage size: 250 MW
Event type: Unplanned
Event start: 08-02-2023 22:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Kozienice 2 B10

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 615 MW
Event type: Unplanned
Event start: 08-02-2023 22:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Kozienice 2 B11

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 220 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 09-02-2023 22:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Kozienice 1 B8

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 615 MW
Event type: Unplanned
Event start: 09-02-2023 22:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Kozienice 2 B11

Outage information

Unit Bełchatów B11
Achievable generation capacity: 390 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 09-02-2023 00:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Bełchatów B11

Outage information

Unit Bełchatów B10
Achievable generation capacity: 390 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 09-02-2023 00:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Bełchatów B10

Outage information

Unit Bełchatów B04
Achievable generation capacity: 380 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 09-02-2023 00:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Bełchatów B04

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 09-02-2023 00:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Bełchatów B06

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 00:01
Event end: 09-02-2023 01:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 05:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 01:01
Event end: 09-02-2023 02:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 02:01
Event end: 09-02-2023 03:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 03:01
Event end: 09-02-2023 04:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 07:01
Event end: 09-02-2023 08:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 06:01
Event end: 09-02-2023 07:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 04:01
Event end: 09-02-2023 05:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 08:01
Event end: 09-02-2023 09:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 12:01
Event end: 09-02-2023 13:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 09:01
Event end: 09-02-2023 10:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 10:01
Event end: 09-02-2023 11:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 11:01
Event end: 09-02-2023 12:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 13:01
Event end: 09-02-2023 14:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 14:01
Event end: 09-02-2023 15:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 15:01
Event end: 09-02-2023 16:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 16:01
Event end: 09-02-2023 17:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 17:01
Event end: 09-02-2023 18:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 18:01
Event end: 09-02-2023 19:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 19:01
Event end: 09-02-2023 20:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 20:01
Event end: 09-02-2023 21:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 21:01
Event end: 09-02-2023 22:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 22:01
Event end: 09-02-2023 23:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-02-2023 23:01
Event end: 10-02-2023 00:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit Bełchatów B05
Achievable generation capacity: 380 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 08-02-2023 19:01
Event end: 09-02-2023 00:00
Source: Inactive - Unplanned - Bełchatów B05

Outage information

Unit Ostrołęka B B02
Achievable generation capacity: 230 MW
Outage size: 90 MW
Event type: Planned
Event start: 08-02-2023 21:01
Event end: 10-02-2023 00:00
Source: Active - Planned - Ostrołęka B B02

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 20 MW
Event type: Unplanned
Event start: 08-02-2023 19:01
Event end: 09-02-2023 00:00
Source: Inactive - Unplanned - Bełchatów B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 566 MW
Outage size: 566 MW
Event type: Unplanned
Event start: 08-02-2023 19:46
Event end: 13-02-2023 00:00
Source: Active - Unplanned - Kozienice 2 B09

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 09-02-2023 02:01
Event end: 10-02-2023 00:00
Source: Active - Planned - Opole B2

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 02:01
Event end: 09-02-2023 03:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 05:01
Event end: 09-02-2023 06:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 03:01
Event end: 09-02-2023 04:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 55 MW
Event type: Unplanned
Event start: 09-02-2023 01:01
Event end: 09-02-2023 02:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 04:01
Event end: 09-02-2023 05:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 06:01
Event end: 09-02-2023 07:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 08:01
Event end: 09-02-2023 09:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 10-02-2023 00:01
Event end: 10-02-2023 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 10-02-2023 01:01
Event end: 10-02-2023 02:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 10-02-2023 02:01
Event end: 10-02-2023 03:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 07:01
Event end: 09-02-2023 08:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 09-02-2023 09:01
Event end: 09-02-2023 10:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 10-02-2023 05:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 10-02-2023 06:01
Event end: 10-02-2023 07:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 10-02-2023 07:01
Event end: 10-02-2023 08:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 10-02-2023 08:01
Event end: 10-02-2023 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 65 MW
Event type: Unplanned
Event start: 10-02-2023 09:01
Event end: 10-02-2023 10:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 10:01
Event end: 10-02-2023 11:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 11:01
Event end: 10-02-2023 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 12:01
Event end: 10-02-2023 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 13:01
Event end: 10-02-2023 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 14:01
Event end: 10-02-2023 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 15:01
Event end: 10-02-2023 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 16:01
Event end: 10-02-2023 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 17:01
Event end: 10-02-2023 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 18:01
Event end: 10-02-2023 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 19:01
Event end: 10-02-2023 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 20:01
Event end: 10-02-2023 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 21:01
Event end: 10-02-2023 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 22:01
Event end: 10-02-2023 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 10-02-2023 23:01
Event end: 11-02-2023 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 10-02-2023 04:01
Event end: 10-02-2023 05:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 10-02-2023 03:01
Event end: 10-02-2023 04:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Połaniec B5
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Unplanned
Event start: 06-02-2023 17:05
Event end: 09-02-2023 03:00
Source: Inactive - Unplanned - Połaniec B5

Outage information

Unit Bełchatów B12
Achievable generation capacity: 390 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 09-02-2023 00:01
Event end: 09-02-2023 06:02
Source: Inactive - Unplanned - Bełchatów B12

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 194 MW
Event type: Planned
Event start: 10-02-2023 22:01
Event end: 10-02-2023 23:00
Source: Active - Planned - Bełchatów B06

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 90 MW
Event type: Planned
Event start: 11-02-2023 07:01
Event end: 11-02-2023 12:00
Source: Active - Planned - Bełchatów B09

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 244 MW
Event type: Planned
Event start: 10-02-2023 23:01
Event end: 11-02-2023 00:00
Source: Active - Planned - Bełchatów B06

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 144 MW
Event type: Planned
Event start: 10-02-2023 21:01
Event end: 10-02-2023 22:00
Source: Active - Planned - Bełchatów B06

Outage information

Unit Bełchatów B10
Achievable generation capacity: 390 MW
Outage size: 90 MW
Event type: Planned
Event start: 12-02-2023 07:01
Event end: 12-02-2023 12:00
Source: Active - Planned - Bełchatów B10

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 94 MW
Event type: Planned
Event start: 10-02-2023 20:01
Event end: 10-02-2023 21:00
Source: Active - Planned - Bełchatów B06

Outage information

Unit Kozienice 1 B3
Achievable generation capacity: 220 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 11-02-2023 00:01
Event end: 13-02-2023 00:00
Source: Active - Unplanned - Kozienice 1 B3

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Unplanned
Event start: 08-02-2023 00:12
Event end: 12-02-2023 18:00
Source: Active - Unplanned - Kozienice 1 B5

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 566 MW
Outage size: 566 MW
Event type: Unplanned
Event start: 11-02-2023 00:01
Event end: 12-02-2023 18:00
Source: Active - Unplanned - Kozienice 2 B10

Outage information

Unit Łaziska 3 B11
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 21-11-2022 00:01
Event end: 13-05-2023 00:00
Source: Active - Planned - Łaziska 3 B11

Outage information

Unit Łaziska 3 B12
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 28-11-2022 00:01
Event end: 09-05-2023 00:00
Source: Active - Planned - Łaziska 3 B12

Outage information

Unit Połaniec B3
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Unplanned
Event start: 06-02-2023 10:21
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Połaniec B3

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 01:01
Event end: 10-02-2023 02:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 00:01
Event end: 10-02-2023 01:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 19:01
Event end: 10-02-2023 20:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 22:01
Event end: 10-02-2023 23:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 07:01
Event end: 10-02-2023 08:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 23:01
Event end: 11-02-2023 00:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 05:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 06:01
Event end: 10-02-2023 07:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 03:01
Event end: 10-02-2023 04:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 18:01
Event end: 10-02-2023 19:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 02:01
Event end: 10-02-2023 03:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 17:01
Event end: 10-02-2023 18:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 16:01
Event end: 10-02-2023 17:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 15:01
Event end: 10-02-2023 16:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 14:01
Event end: 10-02-2023 15:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 13:01
Event end: 10-02-2023 14:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 12:01
Event end: 10-02-2023 13:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 11:01
Event end: 10-02-2023 12:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 10:01
Event end: 10-02-2023 11:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 09:01
Event end: 10-02-2023 10:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 08:01
Event end: 10-02-2023 09:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 20:01
Event end: 10-02-2023 21:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 21:01
Event end: 10-02-2023 22:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 10-02-2023 04:01
Event end: 10-02-2023 05:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit Bełchatów B04
Achievable generation capacity: 380 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 10-02-2023 00:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Bełchatów B04

Outage information

Unit Bełchatów B10
Achievable generation capacity: 390 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 10-02-2023 00:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Bełchatów B10

Outage information

Unit Bełchatów B11
Achievable generation capacity: 390 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 10-02-2023 00:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Bełchatów B11

Outage information

Unit Bełchatów B05
Achievable generation capacity: 380 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 10-02-2023 00:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Bełchatów B05

Outage information

Unit Bełchatów B12
Achievable generation capacity: 390 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 10-02-2023 00:01
Event end: 10-02-2023 06:00
Source: Active - Unplanned - Bełchatów B12

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 09-02-2023 13:30
Event end: 09-02-2023 13:45
Source: Active - Planned - Porąbka Żar H4

Outage information

Unit Siersza B2
Achievable generation capacity: 153 MW
Outage size: 153 MW
Event type: Planned
Event start: 11-02-2023 06:01
Event end: 13-02-2023 00:00
Source: Active - Planned - Siersza B2

Outage information

Unit Turów B04
Achievable generation capacity: 261 MW
Outage size: 141 MW
Event type: Unplanned
Event start: 11-02-2023 10:01
Event end: 11-02-2023 14:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 88 MW
Event type: Planned
Event start: 10-02-2023 13:01
Event end: 10-02-2023 14:00
Source: Active - Planned - Kozienice 1 B2

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 510 MW
Event type: Unplanned
Event start: 12-02-2023 22:01
Event end: 13-02-2023 06:00
Source: Active - Unplanned - Kozienice 2 B11

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 510 MW
Event type: Unplanned
Event start: 10-02-2023 22:01
Event end: 11-02-2023 06:00
Source: Active - Unplanned - Kozienice 2 B11

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 510 MW
Event type: Unplanned
Event start: 11-02-2023 22:01
Event end: 12-02-2023 06:00
Source: Active - Unplanned - Kozienice 2 B11

Outage information

Unit Połaniec B2
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Unplanned
Event start: 09-02-2023 09:25
Event end: 12-02-2023 19:00
Source: Active - Unplanned - Połaniec B2

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 09-02-2023 12:02
Event end: 09-02-2023 12:15
Source: Inactive - Planned - Porąbka Żar H4

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 09-02-2023 12:02
Event end: 09-02-2023 13:45
Source: Active - Planned - Porąbka Żar H3

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.