Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
April 2019 May 2019
Thu 25 Fri 26 Sat 27 Sun 28 Mon 29 Tue 30 Wed 1 Thu 2 Fri 3 Sat 4 Sun 5 Mon 6 Tue 7 Wed 8
Bełchatów 5472
B01 370
B02 370 370 370 370 370 370 370 370 370 370 370 370 370 370 370
B03 380
B04 380
B05 380
B06 394
B07 390 390 390
B08 390
B09 390
B10 390
B11 390
B12 390
B14 858
Chorzów 226
B1 113
B2 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113
Dolna Odra 1357
B1 222
B2 232
B5 222 22 22
B6 222 42 42
B7 227 36 27
B8 232 232 232 232 232 232 232 232 232 232 232 232 232 232 232
Dychów 85
H1 28
H2 29 29 29 29 29 29 29 29 29
H3 28
EC Białystok 154
BIA_1-01 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
BIA_1-02 52
BIA_1-03 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52
EC Gorzów 138
GOR2 138
EC Rzeszów 130
ECR 130
EC Siekierki 591
WSIB 07 102 102 102 102 102 102 102 102 102 102 102 102 102 102 102
WSIB 08 120 120 120 120
WSIB 09 102 102 102 102
WSIB 10 102
WSIK 165
EC Włocławek 485
B01 485
EC Wrotków 231
ECW 231
EC Żerań 373
WZE 373 100 140 140 140 140 140 140 230 230 230 180 180 180 180
EW Włocławek 168
H01 28
H02 28
H03 28
H04 28
H05 28
H06 28
FW Marszewo 100
FMA 100 100
Jaworzno 3 1345
B1 225
B2 225
B3 225
B4 225
B5 220
B6 225
Karolin 212
B2 100
B3 112 112 112 112
Katowice 135
B1 135
Kozienice 1 1821
B1 228
B2 228 228 228 228 228 228 228 228 228 228 228 228 228 228 228
B3 225 225 225 225
B4 228
B5 228
B6 228
B7 228
B8 228
Kozienice 2 2195
B09 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560
B10 560 560 560
B11 1075 1075 1075 1075 1075
Łagisza 700
B10 460 460 460 460 460 460 460 460 460 460 460 460 460 460 460
B6 120
B7 120
Łaziska 2 250
B1 125
B2 125
Łaziska 3 905
B09 230 230 230 230
B10 225
B11 225
B12 225
Opole 1532
B1 386 386 386 386 386 386 386 386 386 386 386 386 386 386 386
B2 383
B3 383 383 383 383 383 383 383 383 383 383 383 383 383 383 383
B4 380
Ostrołęka B 690
B01 230
B02 230 230 230 230 230 230 230
B03 230
Pątnów 1 1244
B1 222 222 222 222
B2 222
B3 200
B4 200 200
B5 200
B6 200
Pątnów 2 474
B9 474
Połaniec 1882
B1 225
B2 242
B3 242
B4 242
B5 225
B6 242
B7 239
B9 225 225 225 225 225 225 225 225 225 225 225 225 225
Porąbka Żar 540
H1 135
H2 135
H3 135
H4 135
Rybnik 1790
B1 225
B2 225
B3 225
B4 225
B5 215
B6 225
B7 225 225 225 225 225 225 225 225 225
B8 225
Siersza 557
B1 153 153 153 153
B2 153 153 153 153 153 153 153 153 153 153 153 153 153 153 153
B3 123 123 123 123
B6 128
Skawina 330
Tg3 110
Tg5 110
Tg6 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Solina 198
H1 68
H2 68
H3 31
H4 31 31 31 31
Stalowa Wola 3 250
B7 125
B8 125
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158 55 55 55 55 55 55 55 55 55 55 55 55 55 55
Turów 1488
B01 235 235 235 235 235 235 235 235 235 235 235 235 235 235 235
B02 235
B03 235 235 235 235 235 235 235 235 235 235 235 235 235 235 235
B04 261 261 261 261 261 261
B05 261 261 261 261 261 261
B06 261
Veolia Energia Łódź EC4 105
B03 105
Żarnowiec 716
H1 179
H2 179
H3 179
H4 179
Żydowo 167
H1 55
H2 55
H3 57
Planned 4254 4488 4397 4397 4167 4167 4344 4434 4434 4803 4753 5586 5361 5361
Unplanned 1014 1304 644 152 152 152 152 1227 1227 1227 1227 152 152 152
Total outages 5268 5792 5041 4549 4319 4319 4496 5661 5661 6030 5980 5738 5513 5513

Outage information

Unit Karolin B3
Achievable generation capacity: 112 MW
Outage size: 112 MW
Event type: Planned (RS)
Event start: 06-05-2019 00:00
Event end: 29-05-2019 00:00
Source: PKR

Outage information

Unit Turów B04
Achievable generation capacity: 261 MW
Outage size: 261 MW
Event type: Planned (RS)
Event start: 04-05-2019 00:00
Event end: 13-05-2019 00:00
Source: PKR

Outage information

Unit Solina H4
Achievable generation capacity: 31 MW
Outage size: 31 MW
Event type: Planned (RS)
Event start: 06-05-2019 00:00
Event end: 13-05-2019 00:00
Source: PKR

Outage information

Unit Pątnów 1 B1
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned (RS)
Event start: 06-05-2019 00:00
Event end: 26-05-2019 00:00
Source: PKR

Outage information

Unit Dychów H2
Achievable generation capacity: 29 MW
Outage size: 29 MW
Event type: Planned (RK)
Event start: 01-05-2019 00:00
Event end: 30-11-2019 00:00
Source: PKR

Outage information

Unit Siersza B3
Achievable generation capacity: 123 MW
Outage size: 123 MW
Event type: Planned
Event start: 06-05-2019 00:01
Event end: 13-05-2019 00:00
Source: Active - Planned - Siersza B3

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 386 MW
Event type: Planned
Event start: 29-12-2018 00:01
Event end: 27-06-2019 00:00
Source: Active - Planned - Opole B1

Outage information

Unit Kozienice 1 B3
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 06-05-2019 00:01
Event end: 20-05-2019 00:00
Source: Active - Planned - Kozienice 1 B3

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 560 MW
Event type: Planned
Event start: 01-05-2018 00:01
Event end: 01-06-2019 00:00
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit EC Białystok BIA_1-03
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Planned
Event start: 01-04-2019 07:01
Event end: 17-10-2019 23:45
Source: Active - Planned - EC Białystok BIA_1-03

Outage information

Unit Rybnik B7
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 01-05-2019 00:01
Event end: 27-11-2019 23:45
Source: Active - Planned - Rybnik B7

Outage information

Unit EC Siekierki WSIB 08
Achievable generation capacity: 120 MW
Outage size: 120 MW
Event type: Planned
Event start: 06-05-2019 00:01
Event end: 18-07-2019 23:59
Source: Active - Planned - EC Siekierki WSIB 08

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 140 MW
Event type: Planned
Event start: 26-04-2019 00:01
Event end: 01-05-2019 23:59
Source: Active - Planned - EC Żerań WZE

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 230 MW
Event type: Planned
Event start: 02-05-2019 00:01
Event end: 04-05-2019 23:59
Source: Active - Planned - EC Żerań WZE

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 180 MW
Event type: Planned
Event start: 05-05-2019 00:01
Event end: 30-08-2019 23:59
Source: Active - Planned - EC Żerań WZE

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned
Event start: 25-02-2019 00:01
Event end: 25-06-2019 00:00
Source: Active - Planned - Kozienice 1 B2

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 261 MW
Event type: Planned
Event start: 04-05-2019 00:01
Event end: 13-05-2019 08:00
Source: Active - Planned - Turów B05

Outage information

Unit Ostrołęka B B02
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 01-03-2019 00:01
Event end: 30-04-2019 23:59
Source: Active - Planned - Ostrołęka B B02

Outage information

Unit Bełchatów B02
Achievable generation capacity: 370 MW
Outage size: 370 MW
Event type: Planned
Event start: 28-02-2019 23:50
Event end: 27-10-2019 18:00
Source: Active - Planned - Bełchatów B02

Outage information

Unit Dolna Odra B8
Achievable generation capacity: 232 MW
Outage size: 232 MW
Event type: Planned
Event start: 23-03-2019 00:05
Event end: 22-05-2019 00:00
Source: Active - Planned - Dolna Odra B8

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 460 MW
Event type: Planned
Event start: 23-03-2019 00:40
Event end: 29-07-2019 00:00
Source: Active - Planned - Łagisza B10

Outage information

Unit TAMEH Polska sp. z o. o. Elektrownia Blachownia
Achievable generation capacity: 158 MW
Outage size: 55 MW
Event type: Planned
Event start: 25-03-2019 00:01
Event end: 07-06-2019 23:59
Source: Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia

Outage information

Unit Turów B03
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 01-04-2019 00:15
Event end: 26-01-2020 00:00
Source: Active - Planned - Turów B03

Outage information

Unit Siersza B2
Achievable generation capacity: 153 MW
Outage size: 153 MW
Event type: Planned
Event start: 20-10-2018 00:01
Event end: 16-05-2019 00:00
Source: Active - Planned - Siersza B2

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 1075 MW
Event type: Unplanned
Event start: 02-05-2019 22:01
Event end: 06-05-2019 00:00
Source: Active - Unplanned - Kozienice 2 B11

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 23-04-2019 00:01
Event end: 13-05-2019 00:00
Source: Active - Planned - Opole B3

Outage information

Unit EC Siekierki WSIB 07
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Unplanned
Event start: 25-03-2019 05:15
Event end: 09-05-2019 23:59
Source: Active - Unplanned - EC Siekierki WSIB 07

Outage information

Unit Połaniec B9
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 21-04-2019 00:01
Event end: 06-05-2019 23:45
Source: Active - Planned - Połaniec B9

Outage information

Unit Łaziska 3 B09
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 26-04-2019 06:01
Event end: 29-04-2019 00:00
Source: Active - Planned - Łaziska 3 B09

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 100 MW
Event type: Planned
Event start: 21-04-2019 00:01
Event end: 25-04-2019 23:59
Source: Active - Planned - EC Żerań WZE

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 222 MW
Outage size: 22 MW
Event type: Planned
Event start: 25-04-2019 07:01
Event end: 25-04-2019 19:00
Source: Active - Planned - Dolna Odra B5

Outage information

Unit Chorzów B2
Achievable generation capacity: 113 MW
Outage size: 113 MW
Event type: Planned
Event start: 21-04-2019 02:01
Event end: 21-05-2019 16:00
Source: Active - Planned - Chorzów B2

Outage information

Unit EC Białystok BIA_1-01
Achievable generation capacity: 50 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 28-03-2019 23:46
Event end: 09-05-2019 23:45
Source: Active - Unplanned - EC Białystok BIA_1-01

Outage information

Unit FW Marszewo FMA
Achievable generation capacity: 100 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 26-04-2019 07:15
Event end: 26-04-2019 08:45
Source: Active - Unplanned - FW Marszewo FMA

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 222 MW
Outage size: 42 MW
Event type: Planned
Event start: 25-04-2019 07:01
Event end: 25-04-2019 19:00
Source: Active - Planned - Dolna Odra B6

Outage information

Unit Siersza B1
Achievable generation capacity: 153 MW
Outage size: 153 MW
Event type: Planned
Event start: 01-05-2019 06:01
Event end: 04-05-2019 00:00
Source: Active - Planned - Siersza B1

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 222 MW
Outage size: 22 MW
Event type: Planned
Event start: 26-04-2019 07:01
Event end: 26-04-2019 19:00
Source: Active - Planned - Dolna Odra B5

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 227 MW
Outage size: 27 MW
Event type: Planned
Event start: 25-04-2019 07:01
Event end: 25-04-2019 19:00
Source: Active - Planned - Dolna Odra B7

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 222 MW
Outage size: 42 MW
Event type: Planned
Event start: 26-04-2019 07:01
Event end: 26-04-2019 19:00
Source: Active - Planned - Dolna Odra B6

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 227 MW
Outage size: 27 MW
Event type: Planned
Event start: 26-04-2019 07:01
Event end: 26-04-2019 19:00
Source: Active - Planned - Dolna Odra B7

Outage information

Unit Pątnów 1 B2
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 17-04-2019 00:01
Event end: 25-04-2019 00:00
Source: Inactive - Unplanned - Pątnów 1 B2

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 24-04-2019 00:01
Event end: 01-06-2019 00:01
Source: Active - Planned - Skawina Tg6

Outage information

Unit EC Siekierki WSIB 09
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Unplanned
Event start: 25-04-2019 00:01
Event end: 27-04-2019 23:59
Source: Active - Unplanned - EC Siekierki WSIB 09

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 01-05-2018 00:11
Event end: 19-06-2019 10:00
Source: Active - Planned - Turów B01

Outage information

Unit Pątnów 1 B4
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 25-04-2019 00:01
Event end: 26-04-2019 00:00
Source: Active - Unplanned - Pątnów 1 B4

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 227 MW
Outage size: 36 MW
Event type: Planned
Event start: 25-04-2019 06:01
Event end: 25-04-2019 07:00
Source: Inactive - Planned - Dolna Odra B7

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 560 MW
Outage size: 560 MW
Event type: Unplanned
Event start: 25-04-2019 09:01
Event end: 27-04-2019 00:00
Source: Active - Unplanned - Kozienice 2 B10

Outage information

Unit Bełchatów B07
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Unplanned
Event start: 26-04-2019 00:01
Event end: 28-04-2019 00:00
Source: Active - Unplanned - Bełchatów B07

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.