Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
February 2020 March 2020
Mon 24 Tue 25 Wed 26 Thu 27 Fri 28 Sat 29 Sun 1 Mon 2 Tue 3 Wed 4 Thu 5 Fri 6 Sat 7 Sun 8
Bełchatów 5102
B02 370
B03 380
B04 380
B05 380
B06 394
B07 390
B08 390
B09 390
B10 390
B11 390
B12 390
B14 858 858 858 858 858 858 858 858
Chorzów 226
B1 113
B2 113
Dolna Odra 1350
B1 222
B2 232 232 232 232 232 232 232
B5 215 105
B6 222 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B7 227 107
B8 232
Dychów 85
H1 28
H2 29
H3 28
EC Białystok 154
BIA_1-01 50
BIA_1-02 52
BIA_1-03 52 52 52 52 52 52 52 52 52
EC Gorzów 138
GOR2 138
EC Rzeszów 120
ECR 120
EC Siekierki 591
WSIB 07 102 102 102 102
WSIB 08 120
WSIB 09 102
WSIB 10 102
WSIK 165
EC Wrotków 231
ECW 231
EC Żerań 373
WZE 373
EW Włocławek 168
H01 28
H02 28
H03 28
H04 28
H05 28
H06 28
FW Marszewo 100
FMA 100
Jaworzno 3 1345
B1 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B2 225
B3 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B4 225
B5 220
B6 225
Karolin 212
B2 100
B3 112
Katowice 135
B1 135
Kozienice 1 1821
B1 228 228 228 228 228 228 228 228 228 228 228 228 228 228 228
B2 228
B3 225
B4 228 228 228 228 228 228 228 228 228 228 228 228 228 228 228
B5 228
B6 228
B7 228
B8 228
Kozienice 2 2195
B09 560
B10 560
B11 1075 1075 1075 1075 1075 1075
Łagisza 700
B10 460
B6 120
B7 120
Łaziska 2 250
B1 125
B2 125
Łaziska 3 905
B09 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230
B10 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B11 225
B12 225
Opole 3342
B1 386
B2 383 383 383 383 383 383 383 383 383 383 383 383 383 383 383
B3 383
B4 380
B5 905
B6 905 543 226
Ostrołęka B 690
B01 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230
B02 230
B03 230
Pątnów 1 1244
B1 222
B2 222 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B3 200
B4 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
B5 200
B6 200
Pątnów 2 474
B9 474
Połaniec 1882
B1 225
B2 242 242 242 242 242 242 242 242 242 242 242 242 242 242 242
B3 242
B4 242
B5 225 35 35
B6 242 242 242 242 242 242 242 242 242 242 242 242 242 242 242
B7 239 239 239 239 239 239 239 239 239 239 239 239 239 239 239
B9 225
Porąbka Żar 540
H1 135
H2 135
H3 135
H4 135
Rybnik 1800
B1 225
B2 225
B3 225 225 225 225 225 225 225 225 225
B4 225
B5 225 225
B6 225
B7 225
B8 225
Siersza 557
B1 153
B2 153
B3 123
B6 128 128 128 128 128 128 128 128
Skawina 330
Tg3 110 110 110 110 110 110 110 110
Tg5 110
Tg6 110
Solina 198
H1 68
H2 68
H3 31
H4 31
Stalowa Wola 3 250
B7 125
B8 125
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158
Turów 1488
B01 235 235 235 235
B02 235 235 235 235 235 235 235
B03 235 235 235 235 235 235 235 235 235 235 235 235 235 235 235
B04 261 11 11 11
B05 261
B06 261
Veolia Energia Łódź EC4 105
B03 105
Żarnowiec 716
H1 179
H2 179
H3 179
H4 179
Żydowo 167
H1 55
H2 55
H3 57
Planned 5683 5142 5209 4793 4793 3718 3711 4587 4587 4587 4587 4587 4822 4822
Unplanned 1274 835 835 498 252 252 252 252 200 200 200 200 200 200
Total outages 6957 5977 6044 5291 5045 3970 3963 4839 4787 4787 4787 4787 5022 5022

Outage information

Unit Rybnik B3
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned (RS)
Event start: 01-03-2020 00:00
Event end: 30-07-2020 00:00
Source: PKR

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 858 MW
Event type: Planned
Event start: 02-03-2020 00:01
Event end: 11-04-2020 18:00
Source: Active - Planned - Bełchatów B14

Outage information

Unit Łaziska 3 B10
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 13-01-2020 00:01
Event end: 11-06-2020 00:00
Source: Active - Planned - Łaziska 3 B10

Outage information

Unit Łaziska 3 B09
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 13-01-2020 00:01
Event end: 11-06-2020 00:00
Source: Active - Planned - Łaziska 3 B09

Outage information

Unit Połaniec B2
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Planned
Event start: 15-02-2020 00:01
Event end: 24-06-2020 00:00
Source: Active - Planned - Połaniec B2

Outage information

Unit Połaniec B7
Achievable generation capacity: 239 MW
Outage size: 239 MW
Event type: Planned
Event start: 08-02-2020 00:01
Event end: 17-06-2020 00:00
Source: Active - Planned - Połaniec B7

Outage information

Unit Jaworzno 3 B1
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 03-02-2020 00:01
Event end: 02-07-2020 00:00
Source: Active - Planned - Jaworzno 3 B1

Outage information

Unit Jaworzno 3 B3
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 28-10-2019 00:01
Event end: 26-03-2020 00:00
Source: Active - Planned - Jaworzno 3 B3

Outage information

Unit Kozienice 1 B4
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned
Event start: 24-02-2020 00:01
Event end: 24-05-2020 00:00
Source: Active - Planned - Kozienice 1 B4

Outage information

Unit Kozienice 1 B1
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned
Event start: 13-01-2020 00:01
Event end: 12-04-2020 00:00
Source: Active - Planned - Kozienice 1 B1

Outage information

Unit Dolna Odra B2
Achievable generation capacity: 232 MW
Outage size: 232 MW
Event type: Planned
Event start: 17-02-2020 00:01
Event end: 01-03-2020 00:00
Source: Active - Planned - Dolna Odra B2

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 08-10-2019 23:59
Event end: 01-03-2020 23:59
Source: Active - Planned - Skawina Tg3

Outage information

Unit Pątnów 1 B4
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 01-01-2020 00:01
Event end: 01-01-2021 00:00
Source: Active - Unplanned - Pątnów 1 B4

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 25-01-2020 00:01
Event end: 30-07-2020 00:00
Source: Active - Planned - Opole B2

Outage information

Unit Ostrołęka B B01
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 18-11-2019 00:01
Event end: 25-03-2020 00:00
Source: Active - Planned - Ostrołęka B B01

Outage information

Unit Siersza B6
Achievable generation capacity: 128 MW
Outage size: 128 MW
Event type: Planned
Event start: 02-03-2020 00:01
Event end: 09-03-2020 00:00
Source: Active - Planned - Siersza B6

Outage information

Unit Połaniec B6
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Planned
Event start: 22-02-2020 00:01
Event end: 01-07-2020 00:00
Source: Active - Planned - Połaniec B6

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned
Event start: 30-09-2019 00:03
Event end: 17-06-2020 00:00
Source: Active - Planned - Dolna Odra B6

Outage information

Unit Turów B02
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 07-03-2020 00:01
Event end: 24-03-2020 08:00
Source: Active - Planned - Turów B02

Outage information

Unit EC Białystok BIA_1-03
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Unplanned
Event start: 15-02-2020 08:01
Event end: 02-03-2020 23:45
Source: Active - Unplanned - EC Białystok BIA_1-03

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Unplanned
Event start: 16-02-2020 00:01
Event end: 27-02-2020 00:00
Source: Active - Unplanned - Turów B01

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 1075 MW
Event type: Planned
Event start: 08-02-2020 00:08
Event end: 28-02-2020 18:00
Source: Active - Planned - Kozienice 2 B11

Outage information

Unit EC Siekierki WSIB 07
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Unplanned
Event start: 23-02-2020 07:00
Event end: 26-02-2020 17:00
Source: Active - Unplanned - EC Siekierki WSIB 07

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 543 MW
Event type: Planned
Event start: 23-02-2020 21:01
Event end: 24-02-2020 00:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Połaniec B5
Achievable generation capacity: 225 MW
Outage size: 35 MW
Event type: Planned
Event start: 24-02-2020 10:01
Event end: 24-02-2020 13:00
Source: Active - Planned - Połaniec B5

Outage information

Unit Turów B02
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Unplanned
Event start: 23-02-2020 00:50
Event end: 25-02-2020 00:00
Source: Active - Unplanned - Turów B02

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 190 MW
Event type: Planned
Event start: 26-02-2020 22:01
Event end: 26-02-2020 23:00
Source: Active - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 26-02-2020 23:01
Event end: 27-02-2020 00:00
Source: Active - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 312 MW
Event type: Planned
Event start: 24-02-2020 06:01
Event end: 24-02-2020 07:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 543 MW
Event type: Planned
Event start: 24-02-2020 00:01
Event end: 24-02-2020 06:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Połaniec B5
Achievable generation capacity: 225 MW
Outage size: 35 MW
Event type: Planned
Event start: 25-02-2020 08:01
Event end: 25-02-2020 12:00
Source: Active - Planned - Połaniec B5

Outage information

Unit Pątnów 1 B2
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned
Event start: 24-02-2020 00:01
Event end: 09-04-2020 00:00
Source: Active - Planned - Pątnów 1 B2

Outage information

Unit Rybnik B5
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 21-02-2020 06:01
Event end: 24-02-2020 08:01
Source: Inactive - Unplanned - Rybnik B5

Outage information

Unit Turów B04
Achievable generation capacity: 261 MW
Outage size: 11 MW
Event type: Unplanned
Event start: 25-02-2020 00:01
Event end: 27-02-2020 18:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 227 MW
Outage size: 107 MW
Event type: Planned
Event start: 25-02-2020 08:01
Event end: 25-02-2020 11:00
Source: Active - Planned - Dolna Odra B7

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 227 MW
Outage size: 57 MW
Event type: Planned
Event start: 25-02-2020 11:01
Event end: 25-02-2020 14:00
Source: Active - Planned - Dolna Odra B7

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 215 MW
Outage size: 45 MW
Event type: Planned
Event start: 25-02-2020 11:01
Event end: 25-02-2020 14:00
Source: Active - Planned - Dolna Odra B5

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 215 MW
Outage size: 105 MW
Event type: Planned
Event start: 25-02-2020 08:01
Event end: 25-02-2020 11:00
Source: Active - Planned - Dolna Odra B5

Outage information

Unit Turów B02
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Unplanned
Event start: 25-02-2020 00:01
Event end: 28-02-2020 00:00
Source: Active - Unplanned - Turów B02

Outage information

Unit Turów B03
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 01-04-2019 00:15
Event end: 15-07-2020 00:00
Source: Active - Planned - Turów B03

Outage information

Unit Rybnik B5
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 24-02-2020 10:26
Event end: 24-02-2020 22:00
Source: Active - Unplanned - Rybnik B5

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.