Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
April 2026
Tue 14 Wed 15 Thu 16 Fri 17 Sat 18 Sun 19 Mon 20 Tue 21 Wed 22 Thu 23 Fri 24 Sat 25 Sun 26 Mon 27
Bełchatów 4680
B02 341
B03 347
B04 349
B05 348
B06 360
B07 357
B08 358
B09 362
B10 361 361 361 361 361 361 361 361 361 361 361 361 361 361 361
B11 358
B12 358
B14 781 221
Chorzów 226
B1 113
B2 113
Dolna Odra 429
B6 210
B7 219 219 219 219
Dychów 85
H1 28
H2 29
H3 28 30 30 30 30 30 30 30 30 30 30 30 30 30 30
EC Białystok 154
BIA_1-01 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
BIA_1-02 52
BIA_1-03 52
EC Gorzów 138
GOR2 138
EC Mielec 33
ECM 33 4 4 4 4 4 4 4 4 4 4 4 4 4 4
EC Rzeszów 94
ECR 94
EC Siekierki 539
WSIB 07 91
WSIB 08 109 109 109 109 109 109 109 109 109 109 109 109 109 109 109
WSIB 09 91
WSIB 10 91
WSIK 157 116
EC Stalowa Wola 450
Stalowa Wola BGP 450
EC Włocławek 465
B1 465 39 49
EC Wrotków 231
ECW 231
EC Żerań 184
WZE 184 92 92 92 92 92 92 92 92 92 92 92 92 92 92
EC Żerań 2 488
B20 488
Elektrociepłownia "Zielona Góra" S.A. 188
ZG BPG 188
Eolos Novo Sp. z o.o. 16
FW Czarnożyły 16 2 2
Eolos Polska Sp. z o.o. 32
FW Gorzkowice 12
FW Krzyżanów 20
EWP European Wind Power Krasin Sp. z o.o. 30
FW Krasin 30
EW Włocławek 168
H01 28
H02 28
H03 28
H04 28
H05 28 28 28 28 28 28 28 28 28 28
H06 28 28 28 28 28 28 28 28 28 28
Farma Wiatrowa Bogoria Sp. z o.o. 20
FW Bogoria 20
FW Banie 12 106
FW Banie 12 106
FW Banie 3 81
FW Banie 3 81
FW Banie 4 56
FW Banie 4 56
FW Biały Bór 145
BBFW 145
FW Iława 13
FW Iława 13
FW Marszewo 100
FMA 100
FW Sępopol 44
FW Sępopol 44
Grupa Azoty Zakłady Azotowe „Puławy” SA 128
EC Puławy 128
Jaworzno 2 910
JWCD B7 910 260
Jaworzno 3 1345
B1 225
B2 225 210 210 210 210 210 210 210 210 210 210 210 210 210 210
B3 225 210 210 210 210 210 210 210 210 210 210 210 210 210 210
B4 225 211
B5 220 206 206 206 206 206 206 206 206
B6 225 211 211 211 211 211 211 211 211
JSW KOKS S.A. 114
EC Koksownia Przyjaźń G1 6
EC Koksownia Przyjaźń G2 15
EC Koksownia Przyjaźń G3 21
EC Koksownia Przyjaźń G4 71
Karolin 317
B2 100
B3 112
B4 105
Katowice 135
B1 135
KOGENERACJA S.A. 385
CZN_1S01 177
WROB1-02 104
WROB1-03 104
Kowalewo Wind Sp. z o.o. 24
FW Piątkowo 24
Kozienice 1 1800
B1 228 213 213
B2 228 210 210
B3 220 206 206 206 206 206 206 206 206 206 206 206 206 206 206
B4 228
B5 228 213 213
B6 228
B7 220
B8 220
Kozienice 2 2207
B09 566
B10 566
B11 1075 550
Kraków Łęg 451
KLE_1-01 122
KLE_1-02 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
KLE_1-03 102
KLE_1-04 107
Lichnowy Windfarm Sp. z o.o. 20
FW Lichnowy 20
Łagisza 460
B10 460 430 430 430 430 430 430 430 430 430 430 430 430 430 430
Łaziska 3 905
B09 230 215
B10 225 211 211
B11 225
B12 225
Mashav Management Sp. z o.o. 256
PEAST 101
PSOUT 37
PWEST 118
Nowa Energia 1 Sp. z o.o. 49
FW Kozłowo 49
Opole 3090
B1 357
B2 358
B3 358 358 358 358 358 358 358 358
B4 355 355 355 355 355 355 355 355 355 355 355
B5 829
B6 833
Ostrołęka B 625
B01 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230
B02 230
B03 165 165 165 165 165
PAK-PCE BIOPALIWA I WODÓR 110
Elektrownia Konin 110
PAK-PCE CZŁUCHÓW 73
FW Ględowo 73 4 4 2
PAK-PCE FOTOWOLTAIKA 63
PV Brudzew 63
PAK-PCE KAZIMIERZ BISKUPI 18
FW Kazimierz Biskupi 18
PAK-PCE MIŁOSŁAW 10
FW Pałczyn 10
PAK-PCE PRZYRÓW 42
FW Przyrów 42
Park Wiatrowy 12 Sp. z o.o. 45
FW Słupca-Kołaczkowo 45
Park Wiatrowy 1 Sp. z o.o. 42
FW Jarocin-Koźmin 42
Park Wiatrowy 9 Sp. z o.o 12
FW Jarocin Pilot II 6
FW Potarzyca 6
Pątnów 474
B9 474
PGE Gryfino Dolna Odra Sp. z o.o. 1340
Gryfino blok 10 670
Gryfino blok 9 670
Płock 630
B01 630 125 145
Polenergia Farma Fotowoltaiczna 16 Sp. z o.o. 20
FF16 20
Polenergia Farma Wiatrowa 1 Sp. z o.o. 48
FW Gawłowice 48
Polenergia Farma Wiatrowa 3 Sp. z o.o. 121
FW Dębsk 121
Polenergia Farma Wiatrowa Mycielin Sp. z o.o. 46
FW Mycielin 46
Polenergia Farma Wiatrowa Namysłów Sp. z o.o. 47
FW Namysłów 47
Polenergia Farma Wiatrowa Szymankowo Sp. z o.o. 38
FW Szymankowo 38
Polenergia FF Strzelino Sp. z o.o. 45
FF Strzelino 45
Polenergia FF Sulechów Sp. z o.o. 20
FF Sulechów 20
Połaniec 1899
B1 225
B2 242
B3 242 226 226 226 226 226 226 226 226 226 226 226 226 226 226
B4 242
B5 242 224 224 224 224 224 224 224 224 224 224
B6 242 226 226 226 226 226 226 226 226 226 226
B7 239 221 221 221 221 221 221
B9 225
Porąbka Żar 540
H1 135 138 138 138 138 138 138 138 138 138 138 138
H2 135
H3 135 137 137 137 137 137 137 137 137 137 137 137 137 137 137
H4 135 138 138
QPV 5 Sp. z o.o. 15
QPV 5 15
QPV DS3 Sp. z o.o. 16
QPV DS3 16
QPV Golczewo Sp. z o.o. 80
QPV Golczewo 80
QPV Kalisz Pomorski Sp. z o.o. 60
QPV Kalisz Pomorski 60
QPV KP1 Sp. z o.o. 10
QPV KP1 10
QPV KP2 Sp. z o.o. 12
QPV KP2 12
QPV Rokietnica Sp. z o.o. 31
QPV Rokietnica 31
QPV Stoszowice Sp. z o.o. 12
QPV Stoszowice 12
QPV Zimnodół Sp. z o.o. 35
QPV Zimnodół 35
QWP Linowo Sp. z o.o. 48
QWP Linowo 48
QWP Olszówka Sp. z o.o. 14
QWP Olszówka 14
QWP Rychwał Sp. z o.o. 19
QWP Rychwał 19
QWP Rzepin Sp. z o.o. 58
QWP Rzepin 58
QWP Udanin Sp. z o.o. 51
QWP Udanin 51
QWP Wądroże Sp. z o.o. 23
QWP Wądroże 23
QWP Wisznice Sp. z o.o. 40
QWP Wisznice 40
Rybnik 835
B5 209 45 45 45
B6 209
B7 209
B8 208
Siersza 306
B1 153
B2 153 139 139 139 139 139 139 139 139 139 139 139 139 139 139
Skawina 330
Tg3 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg5 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg6 110 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Solina 198
H1 68 13 13 13 13 13 13 13 13 13 13 13 13 13 13
H2 68 68
H3 31
H4 31 31 31 31 31 31 31 31 31
Synthos Dwory 7 170
GT1 72
TG10 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
TG7 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28
TG8 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
TG9 31
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158 80 80 80 80 80 80 80 80 80 80 80 80 80 80
Turów 1830
B01 226 226 226 226 226 226 226
B02 226 125
B03 226 226 226 226 226 226 226 226 226 226 226 226 226 226 226
B04 236 132
B05 236 146
B06 236 133
B11 444 247
Veolia Energia Łódź EC4 105
B03 105 105 105 105 105 105 105 105 105 105 105 105 105 105 105
Windfarm Markowice Sp. z o.o. 26
Windfarm Markowice 26
Windfarm Polska III sp. z o.o. 126
WINDFARM 126
Windfarm Pruszcz Sp. z o.o. 70
Windfarm Pruszcz 70
Żarnowiec 716
H1 179 170 170 170 170 170 170 170 170 170 170 170 170
H2 179 170 170 170 170 170 170 170 170 170 170 170 170
H3 179 178 178 178 178 178 178 178
H4 179 195 195 195 195 195 195 195 195 195 195 195 195
Żydowo 165
H1 55
H2 55
H3 55 55 55 55
Planned 5203 5135 5474 4894 5146 4953 5725 4639 4639 4583 4283 4145 4726 4726
Unplanned 2077 522 668 623 849 849 628 628 628 628 628 628 628 628
Total outages 7280 5657 6142 5517 5995 5802 6353 5267 5267 5211 4911 4773 5354 5354

Outage information

Unit Synthos Dwory 7 TG8
Achievable generation capacity: 20 MW
Outage size: 20 MW
Event type: Planned
Event start: 22-03-2024 00:01
Event end: 22-03-2027 23:59
Source: Active - Planned - Synthos Dwory 7 TG8

Outage information

Unit Żarnowiec H1
Achievable generation capacity: 195 MW
Outage size: 170 MW
Event type: Unplanned
Event start: 16-04-2026 00:01
Event end: 15-06-2026 23:45
Source: Active - Unplanned - Żarnowiec H1

Outage information

Unit Żarnowiec H2
Achievable generation capacity: 195 MW
Outage size: 170 MW
Event type: Unplanned
Event start: 16-04-2026 00:01
Event end: 15-06-2026 23:45
Source: Active - Unplanned - Żarnowiec H2

Outage information

Unit Żarnowiec H4
Achievable generation capacity: 195 MW
Outage size: 195 MW
Event type: Planned
Event start: 16-04-2026 00:01
Event end: 15-06-2026 23:45
Source: Active - Planned - Żarnowiec H4

Outage information

Unit Opole B3
Achievable generation capacity: 358 MW
Outage size: 358 MW
Event type: Planned
Event start: 07-04-2026 00:00
Event end: 21-04-2026 00:00
Source: Active - Planned - Opole B3

Outage information

Unit Siersza B2
Achievable generation capacity: 139 MW
Outage size: 139 MW
Event type: Planned
Event start: 01-03-2026 00:00
Event end: 25-05-2026 00:00
Source: Active - Planned - Siersza B2

Outage information

Unit Ostrołęka B B01
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 30-03-2026 00:01
Event end: 01-07-2026 00:00
Source: Active - Planned - Ostrołęka B B01

Outage information

Unit EC Białystok BIA_1-01
Achievable generation capacity: 50 MW
Outage size: 50 MW
Event type: Planned
Event start: 30-03-2026 00:01
Event end: 27-04-2026 23:45
Source: Active - Planned - EC Białystok BIA_1-01

Outage information

Unit EC Mielec ECM
Achievable generation capacity: 33 MW
Outage size: 4 MW
Event type: Planned
Event start: 01-11-2025 00:00
Event end: 01-01-2030 00:00
Source: Active - Planned - EC Mielec ECM

Outage information

Unit Kozienice 1 B3
Achievable generation capacity: 206 MW
Outage size: 206 MW
Event type: Planned
Event start: 29-03-2026 00:01
Event end: 28-05-2026 00:00
Source: Active - Planned - Kozienice 1 B3

Outage information

Unit Kozienice 1 B1
Achievable generation capacity: 213 MW
Outage size: 213 MW
Event type: Planned
Event start: 26-04-2026 00:01
Event end: 26-05-2026 00:00
Source: Active - Planned - Kozienice 1 B1

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 213 MW
Outage size: 213 MW
Event type: Planned
Event start: 26-04-2026 00:01
Event end: 26-05-2026 00:00
Source: Active - Planned - Kozienice 1 B5

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 26-04-2026 00:01
Event end: 22-05-2026 00:00
Source: Active - Planned - Kozienice 1 B2

Outage information

Unit TAMEH Polska sp. z o. o. Elektrownia Blachownia
Achievable generation capacity: 158 MW
Outage size: 80 MW
Event type: Planned
Event start: 04-03-2024 12:00
Event end: 31-12-2026 23:59
Source: Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia

Outage information

Unit Solina H1
Achievable generation capacity: 68 MW
Outage size: 13 MW
Event type: Unplanned
Event start: 06-02-2025 16:20
Event end: 30-06-2026 23:45
Source: Active - Unplanned - Solina H1

Outage information

Unit Solina H2
Achievable generation capacity: 68 MW
Outage size: 68 MW
Event type: Planned
Event start: 07-04-2026 00:01
Event end: 15-04-2026 00:00
Source: Active - Planned - Solina H2

Outage information

Unit Solina H4
Achievable generation capacity: 31 MW
Outage size: 31 MW
Event type: Planned
Event start: 20-04-2026 00:01
Event end: 28-04-2026 00:00
Source: Active - Planned - Solina H4

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 137 MW
Outage size: 137 MW
Event type: Planned
Event start: 22-10-2024 00:01
Event end: 10-02-2030 23:45
Source: Active - Planned - Porąbka Żar H3

Outage information

Unit Synthos Dwory 7 TG10
Achievable generation capacity: 19 MW
Outage size: 19 MW
Event type: Unplanned
Event start: 12-01-2026 07:28
Event end: 30-06-2026 15:00
Source: Active - Unplanned - Synthos Dwory 7 TG10

Outage information

Unit Jaworzno 3 B2
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 02-01-2026 00:00
Event end: 09-05-2026 00:00
Source: Active - Planned - Jaworzno 3 B2

Outage information

Unit Synthos Dwory 7 TG7
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 03-03-2026 13:00
Event end: 30-09-2026 23:59
Source: Active - Planned - Synthos Dwory 7 TG7

Outage information

Unit Kraków Łęg KLE_1-02
Achievable generation capacity: 120 MW
Outage size: 120 MW
Event type: Planned
Event start: 18-03-2026 00:00
Event end: 16-05-2026 00:00
Source: Active - Planned - Kraków Łęg KLE_1-02

Outage information

Unit Opole B4
Achievable generation capacity: 355 MW
Outage size: 355 MW
Event type: Planned
Event start: 23-03-2026 00:01
Event end: 24-04-2026 00:00
Source: Active - Planned - Opole B4

Outage information

Unit Jaworzno 3 B3
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 01-12-2025 00:01
Event end: 26-05-2026 00:00
Source: Active - Planned - Jaworzno 3 B3

Outage information

Unit Łagisza B10
Achievable generation capacity: 430 MW
Outage size: 430 MW
Event type: Planned
Event start: 06-04-2026 00:01
Event end: 02-05-2026 00:00
Source: Active - Planned - Łagisza B10

Outage information

Unit Dychów H3
Achievable generation capacity: 30 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 26-03-2026 14:30
Event end: 31-05-2026 23:00
Source: Active - Unplanned - Dychów H3

Outage information

Unit Żydowo H3
Achievable generation capacity: 55 MW
Outage size: 55 MW
Event type: Planned
Event start: 24-04-2026 07:00
Event end: 25-04-2026 19:00
Source: Active - Planned - Żydowo H3

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 05-02-2026 11:13
Event end: 30-04-2026 23:59
Source: Active - Planned - Skawina Tg3

Outage information

Unit Porąbka Żar H1
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 08-04-2026 05:00
Event end: 24-04-2026 23:45
Source: Active - Planned - Porąbka Żar H1

Outage information

Unit EW Włocławek H06
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 08-04-2026 06:01
Event end: 22-04-2026 17:00
Source: Active - Planned - EW Włocławek H06

Outage information

Unit EW Włocławek H05
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 16-03-2026 06:01
Event end: 22-04-2026 17:00
Source: Active - Planned - EW Włocławek H05

Outage information

Unit Veolia Energia Łódź EC4 B03
Achievable generation capacity: 105 MW
Outage size: 105 MW
Event type: Planned
Event start: 03-04-2026 06:17
Event end: 22-05-2026 00:00
Source: Active - Planned - Veolia Energia Łódź EC4 B03

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 184 MW
Outage size: 92 MW
Event type: Planned
Event start: 05-04-2026 00:00
Event end: 30-06-2026 00:00
Source: Active - Planned - EC Żerań WZE

Outage information

Unit Żarnowiec H3
Achievable generation capacity: 178 MW
Outage size: 178 MW
Event type: Planned
Event start: 09-04-2026 22:01
Event end: 20-04-2026 23:45
Source: Active - Planned - Żarnowiec H3

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 20 MW
Event type: Planned
Event start: 08-04-2026 04:01
Event end: 30-04-2026 23:59
Source: Active - Planned - Skawina Tg6

Outage information

Unit Rybnik B5
Achievable generation capacity: 209 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 10-04-2026 00:00
Event end: 17-04-2026 00:00
Source: Active - Unplanned - Rybnik B5

Outage information

Unit Turów B03
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Planned
Event start: 28-03-2026 00:00
Event end: 01-06-2026 00:00
Source: Active - Planned - Turów B03

Outage information

Unit Bełchatów B10
Achievable generation capacity: 361 MW
Outage size: 361 MW
Event type: Planned
Event start: 13-04-2026 00:00
Event end: 27-04-2026 18:00
Source: Active - Planned - Bełchatów B10

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Planned
Event start: 10-04-2026 01:22
Event end: 20-04-2026 00:00
Source: Active - Planned - Turów B01

Outage information

Unit PAK-PCE CZŁUCHÓW FW Ględowo
Achievable generation capacity: 73 MW
Outage size: 4 MW
Event type: Planned
Event start: 14-04-2026 08:00
Event end: 14-04-2026 16:00
Source: Inactive - Planned - PAK-PCE CZŁUCHÓW FW Ględowo

Outage information

Unit PAK-PCE CZŁUCHÓW FW Ględowo
Achievable generation capacity: 73 MW
Outage size: 4 MW
Event type: Planned
Event start: 15-04-2026 08:00
Event end: 15-04-2026 16:00
Source: Active - Planned - PAK-PCE CZŁUCHÓW FW Ględowo

Outage information

Unit PAK-PCE CZŁUCHÓW FW Ględowo
Achievable generation capacity: 73 MW
Outage size: 2 MW
Event type: Planned
Event start: 16-04-2026 08:00
Event end: 16-04-2026 12:00
Source: Active - Planned - PAK-PCE CZŁUCHÓW FW Ględowo

Outage information

Unit Połaniec B3
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Planned
Event start: 11-04-2026 00:32
Event end: 09-07-2026 23:00
Source: Active - Planned - Połaniec B3

Outage information

Unit EC Siekierki WSIB 08
Achievable generation capacity: 109 MW
Outage size: 109 MW
Event type: Planned
Event start: 11-04-2026 01:04
Event end: 10-10-2026 00:00
Source: Active - Planned - EC Siekierki WSIB 08

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 18-04-2026 16:00
Event end: 18-04-2026 18:00
Source: Active - Planned - Porąbka Żar H4

Outage information

Unit Bełchatów B14
Achievable generation capacity: 781 MW
Outage size: 221 MW
Event type: Planned
Event start: 13-04-2026 00:00
Event end: 14-04-2026 00:00
Source: Inactive - Planned - Bełchatów B14

Outage information

Unit Łaziska 3 B10
Achievable generation capacity: 211 MW
Outage size: 211 MW
Event type: Planned
Event start: 01-01-2026 00:01
Event end: 15-04-2026 00:00
Source: Active - Planned - Łaziska 3 B10

Outage information

Unit Ostrołęka B B03
Achievable generation capacity: 165 MW
Outage size: 165 MW
Event type: Planned
Event start: 13-04-2026 00:00
Event end: 18-04-2026 00:00
Source: Active - Planned - Ostrołęka B B03

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 14-04-2026 08:00
Event end: 14-04-2026 09:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Bełchatów B14
Achievable generation capacity: 781 MW
Outage size: 221 MW
Event type: Planned
Event start: 16-04-2026 00:00
Event end: 17-04-2026 00:00
Source: Active - Planned - Bełchatów B14

Outage information

Unit Żydowo H3
Achievable generation capacity: 55 MW
Outage size: 55 MW
Event type: Planned
Event start: 18-04-2026 07:00
Event end: 18-04-2026 12:00
Source: Active - Planned - Żydowo H3

Outage information

Unit Łaziska 3 B10
Achievable generation capacity: 211 MW
Outage size: 211 MW
Event type: Planned
Event start: 15-04-2026 00:00
Event end: 15-04-2026 14:00
Source: Active - Planned - Łaziska 3 B10

Outage information

Unit Łaziska 3 B10
Achievable generation capacity: 211 MW
Outage size: 184 MW
Event type: Planned
Event start: 15-04-2026 15:00
Event end: 15-04-2026 15:15
Source: Active - Planned - Łaziska 3 B10

Outage information

Unit Łaziska 3 B10
Achievable generation capacity: 211 MW
Outage size: 206 MW
Event type: Planned
Event start: 15-04-2026 14:00
Event end: 15-04-2026 14:15
Source: Active - Planned - Łaziska 3 B10

Outage information

Unit Łaziska 3 B10
Achievable generation capacity: 211 MW
Outage size: 196 MW
Event type: Planned
Event start: 15-04-2026 14:30
Event end: 15-04-2026 14:45
Source: Active - Planned - Łaziska 3 B10

Outage information

Unit Łaziska 3 B10
Achievable generation capacity: 211 MW
Outage size: 118 MW
Event type: Planned
Event start: 15-04-2026 16:30
Event end: 15-04-2026 16:45
Source: Active - Planned - Łaziska 3 B10

Outage information

Unit Łaziska 3 B10
Achievable generation capacity: 211 MW
Outage size: 146 MW
Event type: Planned
Event start: 15-04-2026 16:00
Event end: 15-04-2026 16:15
Source: Active - Planned - Łaziska 3 B10

Outage information

Unit Łaziska 3 B10
Achievable generation capacity: 211 MW
Outage size: 168 MW
Event type: Planned
Event start: 15-04-2026 15:30
Event end: 15-04-2026 15:45
Source: Active - Planned - Łaziska 3 B10

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 27 MW
Event type: Unplanned
Event start: 14-04-2026 16:45
Event end: 14-04-2026 17:00
Source: Inactive - Unplanned - Turów B06

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 247 MW
Event type: Unplanned
Event start: 14-04-2026 00:00
Event end: 14-04-2026 05:00
Source: Inactive - Unplanned - Turów B11

Outage information

Unit Turów B02
Achievable generation capacity: 226 MW
Outage size: 13 MW
Event type: Unplanned
Event start: 14-04-2026 18:00
Event end: 14-04-2026 19:00
Source: Inactive - Unplanned - Turów B02

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 10 MW
Event type: Unplanned
Event start: 14-04-2026 06:00
Event end: 14-04-2026 06:15
Source: Inactive - Unplanned - Turów B06

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 158 MW
Event type: Unplanned
Event start: 14-04-2026 23:45
Event end: 15-04-2026 00:00
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 104 MW
Event type: Unplanned
Event start: 14-04-2026 23:45
Event end: 15-04-2026 00:00
Source: Active - Unplanned - Turów B06

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 132 MW
Event type: Unplanned
Event start: 14-04-2026 23:30
Event end: 15-04-2026 00:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Turów B02
Achievable generation capacity: 226 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 14-04-2026 23:45
Event end: 15-04-2026 00:00
Source: Active - Unplanned - Turów B02

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 131 MW
Event type: Unplanned
Event start: 14-04-2026 09:15
Event end: 14-04-2026 09:45
Source: Inactive - Unplanned - Turów B11

Outage information

Unit Turów B02
Achievable generation capacity: 226 MW
Outage size: 108 MW
Event type: Unplanned
Event start: 14-04-2026 09:00
Event end: 14-04-2026 09:30
Source: Inactive - Unplanned - Turów B02

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 94 MW
Event type: Unplanned
Event start: 14-04-2026 09:30
Event end: 14-04-2026 09:45
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 55 MW
Event type: Unplanned
Event start: 14-04-2026 09:30
Event end: 14-04-2026 09:45
Source: Inactive - Unplanned - Turów B06

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 66 MW
Event type: Unplanned
Event start: 14-04-2026 22:45
Event end: 14-04-2026 23:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 104 MW
Event type: Unplanned
Event start: 14-04-2026 05:00
Event end: 14-04-2026 05:15
Source: Inactive - Unplanned - Turów B06

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 132 MW
Event type: Unplanned
Event start: 14-04-2026 10:00
Event end: 14-04-2026 16:00
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 162 MW
Event type: Unplanned
Event start: 14-04-2026 05:15
Event end: 14-04-2026 05:30
Source: Inactive - Unplanned - Turów B11

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 133 MW
Event type: Unplanned
Event start: 14-04-2026 12:00
Event end: 14-04-2026 16:00
Source: Inactive - Unplanned - Turów B06

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 247 MW
Event type: Unplanned
Event start: 14-04-2026 10:15
Event end: 14-04-2026 10:30
Source: Inactive - Unplanned - Turów B11

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 133 MW
Event type: Unplanned
Event start: 14-04-2026 00:00
Event end: 14-04-2026 05:00
Source: Inactive - Unplanned - Turów B05

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 75 MW
Event type: Unplanned
Event start: 14-04-2026 05:15
Event end: 14-04-2026 05:30
Source: Inactive - Unplanned - Turów B05

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 75 MW
Event type: Unplanned
Event start: 14-04-2026 21:45
Event end: 14-04-2026 22:30
Source: Active - Unplanned - Turów B05

Outage information

Unit Połaniec B7
Achievable generation capacity: 221 MW
Outage size: 221 MW
Event type: Unplanned
Event start: 19-03-2026 14:00
Event end: 19-04-2026 19:00
Source: Active - Unplanned - Połaniec B7

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 219 MW
Outage size: 219 MW
Event type: Planned
Event start: 13-04-2026 00:00
Event end: 16-04-2026 15:00
Source: Active - Planned - Dolna Odra B7

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 13-04-2026 12:00
Event end: 30-04-2026 23:59
Source: Active - Planned - Skawina Tg5

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 981 MW
Outage size: 550 MW
Event type: Planned
Event start: 20-04-2026 08:00
Event end: 20-04-2026 18:00
Source: Active - Planned - Kozienice 2 B11

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 34 MW
Event type: Unplanned
Event start: 14-04-2026 01:00
Event end: 14-04-2026 02:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 34 MW
Event type: Unplanned
Event start: 14-04-2026 04:00
Event end: 14-04-2026 05:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 39 MW
Event type: Unplanned
Event start: 14-04-2026 13:00
Event end: 14-04-2026 14:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 34 MW
Event type: Unplanned
Event start: 14-04-2026 07:00
Event end: 14-04-2026 08:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 39 MW
Event type: Unplanned
Event start: 14-04-2026 11:00
Event end: 14-04-2026 12:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 39 MW
Event type: Unplanned
Event start: 14-04-2026 17:00
Event end: 14-04-2026 18:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 39 MW
Event type: Unplanned
Event start: 14-04-2026 19:00
Event end: 14-04-2026 20:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 39 MW
Event type: Unplanned
Event start: 14-04-2026 21:00
Event end: 14-04-2026 22:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 34 MW
Event type: Unplanned
Event start: 13-04-2026 23:00
Event end: 14-04-2026 00:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 15-04-2026 22:00
Event end: 15-04-2026 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 15-04-2026 00:00
Event end: 15-04-2026 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 15-04-2026 10:00
Event end: 15-04-2026 11:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 15-04-2026 07:00
Event end: 15-04-2026 08:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 145 MW
Event type: Unplanned
Event start: 15-04-2026 14:00
Event end: 15-04-2026 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 15-04-2026 05:00
Event end: 15-04-2026 06:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Jaworzno 3 B4
Achievable generation capacity: 211 MW
Outage size: 211 MW
Event type: Unplanned
Event start: 14-04-2026 04:23
Event end: 14-04-2026 04:44
Source: Inactive - Unplanned - Jaworzno 3 B4

Outage information

Unit Łaziska 3 B09
Achievable generation capacity: 215 MW
Outage size: 215 MW
Event type: Unplanned
Event start: 11-04-2026 15:47
Event end: 14-04-2026 12:00
Source: Inactive - Unplanned - Łaziska 3 B09

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 44 MW
Event type: Unplanned
Event start: 15-04-2026 11:00
Event end: 15-04-2026 12:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 49 MW
Event type: Unplanned
Event start: 15-04-2026 16:00
Event end: 15-04-2026 17:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Siekierki WSIK
Achievable generation capacity: 157 MW
Outage size: 116 MW
Event type: Unplanned
Event start: 09-04-2026 18:45
Event end: 15-04-2026 00:00
Source: Active - Unplanned - EC Siekierki WSIK

Outage information

Unit Połaniec B6
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Unplanned
Event start: 18-04-2026 00:01
Event end: 03-05-2026 23:00
Source: Active - Unplanned - Połaniec B6

Outage information

Unit Jaworzno 3 B6
Achievable generation capacity: 211 MW
Outage size: 211 MW
Event type: Planned
Event start: 20-04-2026 00:00
Event end: 12-05-2026 00:00
Source: Active - Planned - Jaworzno 3 B6

Outage information

Unit Jaworzno 3 B5
Achievable generation capacity: 206 MW
Outage size: 206 MW
Event type: Planned
Event start: 20-04-2026 00:00
Event end: 12-05-2026 00:00
Source: Active - Planned - Jaworzno 3 B5

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 16-04-2026 08:00
Event end: 16-04-2026 10:00
Source: Active - Planned - Porąbka Żar H4

Outage information

Unit Eolos Novo Sp. z o.o. FW Czarnożyły
Achievable generation capacity: 16 MW
Outage size: 2 MW
Event type: Planned
Event start: 14-04-2026 09:10
Event end: 14-04-2026 11:17
Source: Inactive - Planned - Eolos Novo Sp. z o.o. FW Czarnożyły

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 34 MW
Event type: Unplanned
Event start: 15-04-2026 09:00
Event end: 15-04-2026 10:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 34 MW
Event type: Unplanned
Event start: 15-04-2026 02:00
Event end: 15-04-2026 03:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 34 MW
Event type: Unplanned
Event start: 15-04-2026 07:00
Event end: 15-04-2026 08:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 34 MW
Event type: Unplanned
Event start: 15-04-2026 05:00
Event end: 15-04-2026 06:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 834 MW
Outage size: 260 MW
Event type: Unplanned
Event start: 14-04-2026 12:00
Event end: 14-04-2026 15:30
Source: Inactive - Unplanned - Jaworzno 2 JWCD B7

Outage information

Unit Eolos Novo Sp. z o.o. FW Czarnożyły
Achievable generation capacity: 16 MW
Outage size: 2 MW
Event type: Planned
Event start: 15-04-2026 09:00
Event end: 15-04-2026 13:00
Source: Active - Planned - Eolos Novo Sp. z o.o. FW Czarnożyły

Outage information

Unit Połaniec B5
Achievable generation capacity: 224 MW
Outage size: 224 MW
Event type: Planned
Event start: 18-04-2026 00:01
Event end: 17-05-2026 23:45
Source: Active - Planned - Połaniec B5

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 146 MW
Event type: Unplanned
Event start: 14-04-2026 08:15
Event end: 14-04-2026 16:00
Source: Inactive - Unplanned - Turów B05

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.