Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
February 2024 March 2024
Thu 29 Fri 1 Sat 2 Sun 3 Mon 4 Tue 5 Wed 6 Thu 7 Fri 8 Sat 9 Sun 10 Mon 11 Tue 12 Wed 13
Bełchatów 5102
B02 370 130 130
B03 380 380 380 380 380 380 380 380 380 380 380 380 380 380 380
B04 380
B05 380
B06 394 100
B07 390
B08 390
B09 390 390 390 190
B10 390 390 390 390
B11 390 100 100
B12 390 100 100
B14 858
Chorzów 226
B1 113
B2 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113
Dolna Odra 900
B5 222
B6 222
B7 224
B8 232
Dychów 85
H1 28
H2 29
H3 28 30
EC Białystok 154
BIA_1-01 50
BIA_1-02 52
BIA_1-03 52
EC Gorzów 138
GOR2 138
EC Mielec 33
ECM 33 4 4 4 4 4 4 4 4 4 4 4 4 4 4
EC Rzeszów 120
ECR 120
EC Siekierki 595
WSIB 07 106
WSIB 08 125
WSIB 09 102
WSIB 10 102 102
WSIK 160
EC Stalowa Wola 450
Stalowa Wola BGP 450
EC Włocławek 465
B1 465 25
EC Wrotków 231
ECW 231 31 31 31 31 31 31 31 31 31 31 31 31 31 31
EC Żerań 299
WZE 299 105 105 105 105 105 105 105 105 105 105 105 105 105 105
EC Żerań 2 497
B20 497
Elektrociepłownia "Zielona Góra" S.A. 188
ZG BPG 188
Eolos Novo Sp. z o.o. 16
FW Czarnożyły 16
Eolos Polska Sp. z o.o. 32
FW Gorzkowice 12
FW Krzyżanów 20 10
EW Włocławek 168
H01 28
H02 28
H03 28
H04 28
H05 28
H06 28
FW Biały Bór 145
BBFW 145
FW Marszewo 100
FMA 100
Grupa Azoty Zakłady Azotowe „Puławy” SA 128
EC Puławy 128
Jaworzno 2 910
JWCD B7 910 546 546 546
Jaworzno 3 1345
B1 225
B2 225
B3 225
B4 225
B5 220 220 220 220 220 220 220 220 220 220 220 220
B6 225
Karolin 212
B2 100
B3 112
Katowice 135
B1 135
KOGENERACJA S.A. 208
WROB1-02 104
WROB1-03 104 104 104
Kozienice 1 1800
B1 228
B2 228
B3 220
B4 228
B5 228 228 228
B6 228 225 225
B7 220
B8 220
Kozienice 2 2207
B09 566 226 73
B10 566
B11 1075
Kraków Łęg 451
KLE_1-01 122
KLE_1-02 120
KLE_1-03 102
KLE_1-04 107
Łagisza 460
B10 460
Łaziska 3 905
B09 230
B10 225 225 225
B11 225
B12 225
Opole 3342
B1 386 46
B2 383
B3 383
B4 380 40
B5 905 905 905 905 905 905 905 905 905 905 905
B6 905
Ostrołęka B 690
B01 230
B02 230
B03 230
Pątnów 644
B1 222 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B2 222 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B5 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
Pątnów B9 474
B9 474
Płock 630
B01 630 140 145
Połaniec 1899
B1 225 225 225 225 225
B2 242
B3 242
B4 242
B5 242
B6 242 40
B7 239
B9 225
Porąbka Żar 540
H1 135
H2 135
H3 135 138
H4 135 138
Rybnik 900
B5 225
B6 225
B7 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B8 225
Siersza 306
B1 153 153
B2 153 153 153 153
Skawina 330
Tg3 110 110
Tg5 110 110
Tg6 110 40
Solina 198
H1 68
H2 68
H3 31
H4 31
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158
Turów 2029
B01 250 100 250 250 250 250 250 250
B02 250 100 50 50 50 50 50 50 50 50 50 50 50 50 50
B03 250 250 70 70
B04 261 261 261 261 261 261 261 261
B05 261
B06 261
B11 496 196
Veolia Energia Łódź EC4 105
B03 105
Windfarm Polska III sp. z o.o. 126
WINDFARM 126
Żarnowiec 716
H1 179 16 16 16 16 16 16 16 16 16 16 16 16 16 16
H2 179 16 16 16 16 16 16 16 16 16 16 16 16 16 16
H3 179 16 16 16 16 16 16 16 16 16 16 16 16 16 16
H4 179 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Żydowo 167
H1 55
H2 55
H3 57
Planned 3445 2791 2720 1834 2193 2193 2193 1932 2182 2182 2182 2335 2335 2335
Unplanned 2407 2357 1104 1034 809 809 809 809 809 809 809 589 589 589
Total outages 5852 5148 3824 2868 3002 3002 3002 2741 2991 2991 2991 2924 2924 2924

Outage information

Unit Siersza B2
Achievable generation capacity: 153 MW
Outage size: 153 MW
Event type: Planned
Event start: 11-03-2024 00:01
Event end: 01-04-2024 00:00
Source: Active - Planned - Siersza B2

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 905 MW
Event type: Planned
Event start: 06-03-2024 00:01
Event end: 30-03-2024 00:00
Source: Active - Planned - Opole B5

Outage information

Unit Żarnowiec H3
Achievable generation capacity: 195 MW
Outage size: 16 MW
Event type: Unplanned
Event start: 09-06-2023 22:01
Event end: 05-04-2024 22:00
Source: Active - Unplanned - Żarnowiec H3

Outage information

Unit Żarnowiec H2
Achievable generation capacity: 195 MW
Outage size: 16 MW
Event type: Unplanned
Event start: 03-11-2023 19:25
Event end: 30-03-2024 12:00
Source: Active - Unplanned - Żarnowiec H2

Outage information

Unit Żarnowiec H1
Achievable generation capacity: 195 MW
Outage size: 16 MW
Event type: Unplanned
Event start: 05-11-2023 22:01
Event end: 30-03-2024 12:00
Source: Active - Unplanned - Żarnowiec H1

Outage information

Unit Turów B01
Achievable generation capacity: 250 MW
Outage size: 250 MW
Event type: Planned
Event start: 08-03-2024 00:01
Event end: 28-04-2024 10:00
Source: Active - Planned - Turów B01

Outage information

Unit Żarnowiec H4
Achievable generation capacity: 195 MW
Outage size: 16 MW
Event type: Unplanned
Event start: 28-12-2023 10:01
Event end: 10-04-2024 07:00
Source: Active - Unplanned - Żarnowiec H4

Outage information

Unit Rybnik B7
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 10-01-2024 00:01
Event end: 20-03-2024 00:00
Source: Active - Planned - Rybnik B7

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 380 MW
Event type: Planned
Event start: 11-01-2024 00:17
Event end: 10-05-2024 18:00
Source: Active - Planned - Bełchatów B03

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 16-12-2023 14:08
Event end: 29-02-2024 23:59
Source: Active - Planned - Skawina Tg3

Outage information

Unit Pątnów B1
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 05-02-2024 00:01
Event end: 01-01-2025 00:00
Source: Active - Unplanned - Pątnów B1

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 05-02-2024 17:30
Event end: 29-02-2024 23:59
Source: Active - Planned - Skawina Tg5

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 40 MW
Event type: Planned
Event start: 11-02-2024 02:54
Event end: 01-03-2024 00:00
Source: Active - Planned - Skawina Tg6

Outage information

Unit Pątnów B2
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 13-02-2024 19:01
Event end: 01-01-2025 00:00
Source: Active - Unplanned - Pątnów B2

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 905 MW
Event type: Planned
Event start: 04-03-2024 00:01
Event end: 06-03-2024 00:00
Source: Active - Planned - Opole B5

Outage information

Unit Jaworzno 3 B5
Achievable generation capacity: 220 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 16-01-2024 00:00
Event end: 11-03-2024 00:00
Source: Active - Unplanned - Jaworzno 3 B5

Outage information

Unit Siersza B1
Achievable generation capacity: 153 MW
Outage size: 153 MW
Event type: Planned
Event start: 05-02-2024 00:01
Event end: 01-03-2024 00:00
Source: Active - Planned - Siersza B1

Outage information

Unit EC Mielec ECM
Achievable generation capacity: 33 MW
Outage size: 4 MW
Event type: Planned
Event start: 20-02-2024 14:01
Event end: 31-12-2024 23:59
Source: Active - Planned - EC Mielec ECM

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 02-03-2024 05:01
Event end: 02-03-2024 23:45
Source: Active - Planned - Porąbka Żar H4

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 02-03-2024 05:01
Event end: 02-03-2024 05:15
Source: Active - Planned - Porąbka Żar H3

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 02-03-2024 23:31
Event end: 02-03-2024 23:45
Source: Active - Planned - Porąbka Żar H3

Outage information

Unit Chorzów B2
Achievable generation capacity: 113 MW
Outage size: 113 MW
Event type: Planned
Event start: 20-02-2024 22:00
Event end: 31-03-2024 23:45
Source: Active - Planned - Chorzów B2

Outage information

Unit EC Wrotków ECW
Achievable generation capacity: 231 MW
Outage size: 31 MW
Event type: Unplanned
Event start: 20-02-2024 13:51
Event end: 10-04-2024 23:59
Source: Active - Unplanned - EC Wrotków ECW

Outage information

Unit Pątnów B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Planned
Event start: 01-01-2024 00:01
Event end: 01-04-2024 00:00
Source: Active - Planned - Pątnów B5

Outage information

Unit Połaniec B1
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 01-01-2024 00:01
Event end: 04-03-2024 00:00
Source: Active - Unplanned - Połaniec B1

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 394 MW
Event type: Planned
Event start: 26-02-2024 00:01
Event end: 29-02-2024 00:00
Source: Inactive - Planned - Bełchatów B06

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 566 MW
Outage size: 30 MW
Event type: Planned
Event start: 29-02-2024 18:01
Event end: 29-02-2024 19:00
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 566 MW
Outage size: 226 MW
Event type: Planned
Event start: 29-02-2024 10:01
Event end: 29-02-2024 14:00
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 566 MW
Outage size: 73 MW
Event type: Planned
Event start: 01-03-2024 18:01
Event end: 01-03-2024 19:00
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Bełchatów B10
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned
Event start: 24-02-2024 00:37
Event end: 03-03-2024 00:00
Source: Active - Planned - Bełchatów B10

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 566 MW
Outage size: 30 MW
Event type: Planned
Event start: 29-02-2024 07:01
Event end: 29-02-2024 08:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Dychów H3
Achievable generation capacity: 30 MW
Outage size: 30 MW
Event type: Planned
Event start: 02-03-2024 07:01
Event end: 02-03-2024 15:00
Source: Active - Planned - Dychów H3

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 28-02-2024 23:01
Event end: 29-02-2024 00:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Unplanned
Event start: 25-02-2024 19:02
Event end: 01-03-2024 22:00
Source: Active - Unplanned - Kozienice 1 B5

Outage information

Unit Turów B03
Achievable generation capacity: 250 MW
Outage size: 250 MW
Event type: Planned
Event start: 26-02-2024 00:01
Event end: 01-03-2024 00:00
Source: Active - Planned - Turów B03

Outage information

Unit Turów B04
Achievable generation capacity: 261 MW
Outage size: 261 MW
Event type: Planned
Event start: 07-02-2024 00:17
Event end: 07-03-2024 00:00
Source: Active - Planned - Turów B04

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 546 MW
Event type: Planned
Event start: 01-03-2024 22:01
Event end: 02-03-2024 00:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 248 MW
Event type: Planned
Event start: 01-03-2024 21:01
Event end: 01-03-2024 22:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 546 MW
Event type: Planned
Event start: 02-03-2024 00:01
Event end: 02-03-2024 06:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 496 MW
Event type: Planned
Event start: 02-03-2024 15:01
Event end: 02-03-2024 16:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 448 MW
Event type: Planned
Event start: 02-03-2024 07:01
Event end: 02-03-2024 08:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 248 MW
Event type: Planned
Event start: 02-03-2024 16:01
Event end: 02-03-2024 17:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 546 MW
Event type: Planned
Event start: 02-03-2024 17:01
Event end: 03-03-2024 00:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 288 MW
Event type: Planned
Event start: 02-03-2024 06:01
Event end: 02-03-2024 07:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 546 MW
Event type: Planned
Event start: 02-03-2024 08:01
Event end: 02-03-2024 15:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 409 MW
Event type: Planned
Event start: 03-03-2024 10:01
Event end: 03-03-2024 11:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 546 MW
Event type: Planned
Event start: 03-03-2024 03:01
Event end: 03-03-2024 10:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 448 MW
Event type: Planned
Event start: 03-03-2024 02:01
Event end: 03-03-2024 03:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 296 MW
Event type: Planned
Event start: 03-03-2024 01:01
Event end: 03-03-2024 02:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 546 MW
Event type: Planned
Event start: 03-03-2024 00:01
Event end: 03-03-2024 01:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Kozienice 1 B6
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 27-02-2024 23:14
Event end: 02-03-2024 00:00
Source: Active - Unplanned - Kozienice 1 B6

Outage information

Unit KOGENERACJA S.A. WROB1-03
Achievable generation capacity: 104 MW
Outage size: 104 MW
Event type: Planned
Event start: 27-02-2024 00:01
Event end: 01-03-2024 23:45
Source: Active - Planned - KOGENERACJA S.A. WROB1-03

Outage information

Unit Turów B03
Achievable generation capacity: 250 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 01-03-2024 13:01
Event end: 02-03-2024 05:00
Source: Active - Unplanned - Turów B03

Outage information

Unit Bełchatów B11
Achievable generation capacity: 390 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 29-02-2024 00:01
Event end: 29-02-2024 06:00
Source: Inactive - Unplanned - Bełchatów B11

Outage information

Unit Bełchatów B12
Achievable generation capacity: 390 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 29-02-2024 00:01
Event end: 29-02-2024 06:00
Source: Inactive - Unplanned - Bełchatów B12

Outage information

Unit Bełchatów B02
Achievable generation capacity: 370 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 29-02-2024 00:01
Event end: 29-02-2024 06:00
Source: Inactive - Unplanned - Bełchatów B02

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 29-02-2024 07:01
Event end: 29-02-2024 08:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 29-02-2024 00:01
Event end: 29-02-2024 01:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 29-02-2024 01:01
Event end: 29-02-2024 02:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 29-02-2024 06:01
Event end: 29-02-2024 07:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 29-02-2024 02:01
Event end: 29-02-2024 03:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 29-02-2024 03:01
Event end: 29-02-2024 04:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 29-02-2024 04:01
Event end: 29-02-2024 05:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 29-02-2024 05:01
Event end: 29-02-2024 06:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 40 MW
Event type: Planned
Event start: 29-02-2024 17:01
Event end: 29-02-2024 20:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 46 MW
Event type: Planned
Event start: 29-02-2024 17:01
Event end: 29-02-2024 20:00
Source: Active - Planned - Opole B1

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned
Event start: 10-02-2024 00:46
Event end: 01-03-2024 13:00
Source: Active - Planned - Bełchatów B09

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 190 MW
Event type: Planned
Event start: 01-03-2024 21:01
Event end: 02-03-2024 00:00
Source: Active - Planned - Bełchatów B09

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 290 MW
Event type: Planned
Event start: 01-03-2024 14:01
Event end: 01-03-2024 17:00
Source: Active - Planned - Bełchatów B09

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 340 MW
Event type: Planned
Event start: 01-03-2024 13:01
Event end: 01-03-2024 14:00
Source: Active - Planned - Bełchatów B09

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 240 MW
Event type: Planned
Event start: 01-03-2024 17:01
Event end: 01-03-2024 21:00
Source: Active - Planned - Bełchatów B09

Outage information

Unit Łaziska 3 B10
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 28-02-2024 17:26
Event end: 02-03-2024 00:00
Source: Active - Unplanned - Łaziska 3 B10

Outage information

Unit Turów B11
Achievable generation capacity: 496 MW
Outage size: 196 MW
Event type: Planned
Event start: 28-02-2024 18:01
Event end: 29-02-2024 00:00
Source: Inactive - Planned - Turów B11

Outage information

Unit Eolos Polska Sp. z o.o. FW Krzyżanów
Achievable generation capacity: 20 MW
Outage size: 2 MW
Event type: Planned
Event start: 29-02-2024 08:00
Event end: 29-02-2024 16:00
Source: Active - Planned - Eolos Polska Sp. z o.o. FW Krzyżanów

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 28-02-2024 23:01
Event end: 29-02-2024 00:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 29-02-2024 05:01
Event end: 29-02-2024 06:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 29-02-2024 04:01
Event end: 29-02-2024 05:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 29-02-2024 03:01
Event end: 29-02-2024 04:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 29-02-2024 02:01
Event end: 29-02-2024 03:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 29-02-2024 00:01
Event end: 29-02-2024 01:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 29-02-2024 01:01
Event end: 29-02-2024 02:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 29-02-2024 08:01
Event end: 29-02-2024 09:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 29-02-2024 09:01
Event end: 29-02-2024 10:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 29-02-2024 06:01
Event end: 29-02-2024 07:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 29-02-2024 07:01
Event end: 29-02-2024 08:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 29-02-2024 10:01
Event end: 29-02-2024 11:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 29-02-2024 12:01
Event end: 29-02-2024 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 29-02-2024 11:01
Event end: 29-02-2024 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 299 MW
Outage size: 105 MW
Event type: Planned
Event start: 28-02-2024 20:01
Event end: 02-04-2024 00:00
Source: Active - Planned - EC Żerań WZE

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 29-02-2024 13:01
Event end: 29-02-2024 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 29-02-2024 14:01
Event end: 29-02-2024 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 29-02-2024 16:01
Event end: 29-02-2024 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 29-02-2024 15:01
Event end: 29-02-2024 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 29-02-2024 17:01
Event end: 29-02-2024 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 29-02-2024 19:01
Event end: 29-02-2024 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 29-02-2024 18:01
Event end: 29-02-2024 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 29-02-2024 23:01
Event end: 01-03-2024 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 29-02-2024 21:01
Event end: 29-02-2024 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 29-02-2024 22:01
Event end: 29-02-2024 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 29-02-2024 20:01
Event end: 29-02-2024 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit EC Siekierki WSIB 10
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Planned
Event start: 26-02-2024 06:01
Event end: 29-02-2024 06:00
Source: Inactive - Planned - EC Siekierki WSIB 10

Outage information

Unit Turów B02
Achievable generation capacity: 250 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 28-02-2024 11:01
Event end: 29-02-2024 00:00
Source: Inactive - Unplanned - Turów B02

Outage information

Unit Turów B01
Achievable generation capacity: 250 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 28-02-2024 08:01
Event end: 29-02-2024 00:00
Source: Inactive - Unplanned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 250 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 29-02-2024 00:01
Event end: 29-02-2024 08:00
Source: Inactive - Unplanned - Turów B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 01-03-2024 01:01
Event end: 01-03-2024 02:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 01-03-2024 02:01
Event end: 01-03-2024 03:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 01-03-2024 00:01
Event end: 01-03-2024 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 01-03-2024 20:01
Event end: 01-03-2024 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 01-03-2024 19:01
Event end: 01-03-2024 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 01-03-2024 18:01
Event end: 01-03-2024 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 01-03-2024 17:01
Event end: 01-03-2024 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 01-03-2024 16:01
Event end: 01-03-2024 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 145 MW
Event type: Unplanned
Event start: 01-03-2024 15:01
Event end: 01-03-2024 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 145 MW
Event type: Unplanned
Event start: 01-03-2024 14:01
Event end: 01-03-2024 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 01-03-2024 13:01
Event end: 01-03-2024 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 01-03-2024 22:01
Event end: 01-03-2024 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 01-03-2024 11:01
Event end: 01-03-2024 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 01-03-2024 10:01
Event end: 01-03-2024 11:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 01-03-2024 09:01
Event end: 01-03-2024 10:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 01-03-2024 08:01
Event end: 01-03-2024 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 01-03-2024 07:01
Event end: 01-03-2024 08:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 01-03-2024 06:01
Event end: 01-03-2024 07:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 01-03-2024 05:01
Event end: 01-03-2024 06:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 01-03-2024 12:01
Event end: 01-03-2024 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 01-03-2024 21:01
Event end: 01-03-2024 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 01-03-2024 23:01
Event end: 02-03-2024 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 01-03-2024 04:01
Event end: 01-03-2024 05:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 01-03-2024 03:01
Event end: 01-03-2024 04:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Eolos Polska Sp. z o.o. FW Krzyżanów
Achievable generation capacity: 20 MW
Outage size: 10 MW
Event type: Unplanned
Event start: 29-02-2024 02:08
Event end: 29-02-2024 03:55
Source: Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Krzyżanów

Outage information

Unit Eolos Polska Sp. z o.o. FW Krzyżanów
Achievable generation capacity: 20 MW
Outage size: 2 MW
Event type: Unplanned
Event start: 29-02-2024 03:56
Event end: 29-02-2024 07:59
Source: Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Krzyżanów

Outage information

Unit Połaniec B6
Achievable generation capacity: 242 MW
Outage size: 40 MW
Event type: Unplanned
Event start: 29-02-2024 07:16
Event end: 29-02-2024 09:00
Source: Inactive - Unplanned - Połaniec B6

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 140 MW
Event type: Planned
Event start: 02-03-2024 15:01
Event end: 03-03-2024 00:00
Source: Active - Planned - Bełchatów B09

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 170 MW
Event type: Planned
Event start: 02-03-2024 06:01
Event end: 02-03-2024 15:00
Source: Active - Planned - Bełchatów B09

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 190 MW
Event type: Planned
Event start: 02-03-2024 00:01
Event end: 02-03-2024 06:00
Source: Active - Planned - Bełchatów B09

Outage information

Unit Turów B02
Achievable generation capacity: 250 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 29-02-2024 10:01
Event end: 16-03-2024 00:00
Source: Active - Unplanned - Turów B02

Outage information

Unit Turów B02
Achievable generation capacity: 250 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 29-02-2024 00:01
Event end: 29-02-2024 10:00
Source: Active - Unplanned - Turów B02

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 01-03-2024 00:01
Event end: 01-03-2024 06:00
Source: Active - Unplanned - Bełchatów B06

Outage information

Unit Bełchatów B11
Achievable generation capacity: 390 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 01-03-2024 00:01
Event end: 01-03-2024 06:00
Source: Active - Unplanned - Bełchatów B11

Outage information

Unit Bełchatów B02
Achievable generation capacity: 370 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 01-03-2024 00:01
Event end: 01-03-2024 06:00
Source: Active - Unplanned - Bełchatów B02

Outage information

Unit Bełchatów B12
Achievable generation capacity: 390 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 01-03-2024 00:01
Event end: 01-03-2024 06:00
Source: Active - Unplanned - Bełchatów B12

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 08:01
Event end: 29-02-2024 09:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 10:01
Event end: 29-02-2024 11:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 09:01
Event end: 29-02-2024 10:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 17:01
Event end: 29-02-2024 18:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 16:01
Event end: 29-02-2024 17:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 15:01
Event end: 29-02-2024 16:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 14:01
Event end: 29-02-2024 15:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 13:01
Event end: 29-02-2024 14:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 12:01
Event end: 29-02-2024 13:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 11:01
Event end: 29-02-2024 12:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 20:01
Event end: 29-02-2024 21:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 19:01
Event end: 29-02-2024 20:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 18:01
Event end: 29-02-2024 19:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 22:01
Event end: 29-02-2024 23:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 21:01
Event end: 29-02-2024 22:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 29-02-2024 23:01
Event end: 01-03-2024 00:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit Turów B11
Achievable generation capacity: 496 MW
Outage size: 96 MW
Event type: Planned
Event start: 29-02-2024 13:01
Event end: 01-03-2024 00:00
Source: Active - Planned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 496 MW
Outage size: 196 MW
Event type: Planned
Event start: 29-02-2024 00:01
Event end: 29-02-2024 13:00
Source: Active - Planned - Turów B11

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.