Generation capacity outages
Generation capacity outages - help- Legend
- no outages
- all outages
- planned
- unplanned
Power producer | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Power plant | Unit | Achievable generation capacity (MW) | October 2024 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sat 12 | Sun 13 | Mon 14 | Tue 15 | Wed 16 | Thu 17 | Fri 18 | Sat 19 | Sun 20 | Mon 21 | Tue 22 | Wed 23 | Thu 24 | Fri 25 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned | 7801 | 7580 | 6764 | 6375 | 6899 | 6873 | 6821 | 6870 | 6870 | 6979 | 6979 | 6748 | 6553 | 6553 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Unplanned | 2197 | 2035 | 1576 | 946 | 786 | 674 | 674 | 674 | 674 | 674 | 674 | 674 | 674 | 674 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total outages | 9998 | 9615 | 8340 | 7321 | 7685 | 7547 | 7495 | 7544 | 7544 | 7653 | 7653 | 7422 | 7227 | 7227 |
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
Outage information
Unit | Dychów H3 |
Achievable generation capacity: | 30 MW |
Outage size: | 30 MW |
Event type: | Planned |
Event start: | 07-10-2024 00:01 |
Event end: | 14-10-2024 23:45 |
Source: | Active - Planned - Dychów H3 |
Outage information
Unit | Żarnowiec H3 |
Achievable generation capacity: | 195 MW |
Outage size: | 195 MW |
Event type: | Planned |
Event start: | 08-10-2024 22:01 |
Event end: | 23-10-2024 23:45 |
Source: | Active - Planned - Żarnowiec H3 |
Outage information
Unit | EC Siekierki WSIB 08 |
Achievable generation capacity: | 125 MW |
Outage size: | 125 MW |
Event type: | Planned |
Event start: | 16-08-2024 00:01 |
Event end: | 14-11-2024 00:00 |
Source: | Active - Planned - EC Siekierki WSIB 08 |
Outage information
Unit | TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Achievable generation capacity: | 158 MW |
Outage size: | 80 MW |
Event type: | Planned |
Event start: | 04-03-2024 12:00 |
Event end: | 31-12-2024 23:59 |
Source: | Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Outage information
Unit | Synthos Dwory 7 TG8 |
Achievable generation capacity: | 20 MW |
Outage size: | 20 MW |
Event type: | Planned |
Event start: | 22-03-2024 00:01 |
Event end: | 22-03-2027 23:59 |
Source: | Active - Planned - Synthos Dwory 7 TG8 |
Outage information
Unit | Pątnów B1 |
Achievable generation capacity: | 222 MW |
Outage size: | 222 MW |
Event type: | Unplanned |
Event start: | 07-05-2024 08:01 |
Event end: | 01-01-2025 00:00 |
Source: | Active - Unplanned - Pątnów B1 |
Outage information
Unit | EC Białystok BIA_1-02 |
Achievable generation capacity: | 52 MW |
Outage size: | 52 MW |
Event type: | Planned |
Event start: | 27-09-2024 00:01 |
Event end: | 17-10-2024 23:45 |
Source: | Active - Planned - EC Białystok BIA_1-02 |
Outage information
Unit | EC Białystok BIA_1-03 |
Achievable generation capacity: | 52 MW |
Outage size: | 52 MW |
Event type: | Planned |
Event start: | 21-10-2024 00:01 |
Event end: | 10-11-2024 23:45 |
Source: | Active - Planned - EC Białystok BIA_1-03 |
Outage information
Unit | KOGENERACJA S.A. WROB1-02 |
Achievable generation capacity: | 104 MW |
Outage size: | 104 MW |
Event type: | Planned |
Event start: | 24-06-2024 00:00 |
Event end: | 31-10-2024 23:45 |
Source: | Active - Planned - KOGENERACJA S.A. WROB1-02 |
Outage information
Unit | EC Siekierki WSIB 09 |
Achievable generation capacity: | 102 MW |
Outage size: | 102 MW |
Event type: | Planned |
Event start: | 20-04-2024 01:14 |
Event end: | 19-12-2024 00:00 |
Source: | Active - Planned - EC Siekierki WSIB 09 |
Outage information
Unit | EC Wrotków ECW |
Achievable generation capacity: | 231 MW |
Outage size: | 231 MW |
Event type: | Planned |
Event start: | 22-04-2024 00:01 |
Event end: | 22-10-2024 23:45 |
Source: | Active - Planned - EC Wrotków ECW |
Outage information
Unit | Ostrołęka B B03 |
Achievable generation capacity: | 230 MW |
Outage size: | 230 MW |
Event type: | Planned |
Event start: | 01-06-2024 00:01 |
Event end: | 01-02-2025 00:00 |
Source: | Active - Planned - Ostrołęka B B03 |
Outage information
Unit | Siersza B1 |
Achievable generation capacity: | 139 MW |
Outage size: | 139 MW |
Event type: | Planned |
Event start: | 02-09-2024 00:00 |
Event end: | 26-11-2024 00:00 |
Source: | Active - Planned - Siersza B1 |
Outage information
Unit | Veolia Energia Łódź EC4 B03 |
Achievable generation capacity: | 105 MW |
Outage size: | 105 MW |
Event type: | Planned |
Event start: | 21-08-2024 00:00 |
Event end: | 18-10-2024 12:00 |
Source: | Active - Planned - Veolia Energia Łódź EC4 B03 |
Outage information
Unit | EC Rzeszów ECR |
Achievable generation capacity: | 101 MW |
Outage size: | 101 MW |
Event type: | Planned |
Event start: | 01-07-2024 00:01 |
Event end: | 03-12-2024 23:45 |
Source: | Active - Planned - EC Rzeszów ECR |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 833 MW |
Outage size: | 833 MW |
Event type: | Planned |
Event start: | 16-10-2024 00:01 |
Event end: | 22-11-2024 00:00 |
Source: | Active - Planned - Opole B6 |
Outage information
Unit | Bełchatów B02 |
Achievable generation capacity: | 341 MW |
Outage size: | 341 MW |
Event type: | Planned |
Event start: | 24-08-2024 00:01 |
Event end: | 22-12-2024 18:00 |
Source: | Active - Planned - Bełchatów B02 |
Outage information
Unit | Dolna Odra B7 |
Achievable generation capacity: | 210 MW |
Outage size: | 210 MW |
Event type: | Planned |
Event start: | 24-08-2024 00:01 |
Event end: | 22-11-2024 00:00 |
Source: | Active - Planned - Dolna Odra B7 |
Outage information
Unit | Bełchatów B10 |
Achievable generation capacity: | 361 MW |
Outage size: | 361 MW |
Event type: | Planned |
Event start: | 29-09-2024 00:01 |
Event end: | 18-12-2024 18:00 |
Source: | Active - Planned - Bełchatów B10 |
Outage information
Unit | Karolin B3 |
Achievable generation capacity: | 112 MW |
Outage size: | 112 MW |
Event type: | Unplanned |
Event start: | 31-08-2024 00:01 |
Event end: | 17-10-2024 00:00 |
Source: | Active - Unplanned - Karolin B3 |
Outage information
Unit | Kozienice 1 B5 |
Achievable generation capacity: | 228 MW |
Outage size: | 228 MW |
Event type: | Planned |
Event start: | 03-06-2024 00:00 |
Event end: | 13-12-2024 00:00 |
Source: | Active - Planned - Kozienice 1 B5 |
Outage information
Unit | EC Żerań WZE |
Achievable generation capacity: | 299 MW |
Outage size: | 299 MW |
Event type: | Planned |
Event start: | 01-07-2024 00:01 |
Event end: | 25-11-2024 00:00 |
Source: | Active - Planned - EC Żerań WZE |
Outage information
Unit | Turów B06 |
Achievable generation capacity: | 236 MW |
Outage size: | 236 MW |
Event type: | Planned |
Event start: | 28-08-2024 00:03 |
Event end: | 01-11-2024 00:00 |
Source: | Active - Planned - Turów B06 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 981 MW |
Outage size: | 981 MW |
Event type: | Planned |
Event start: | 18-09-2024 00:01 |
Event end: | 13-11-2024 00:00 |
Source: | Active - Planned - Kozienice 2 B11 |
Outage information
Unit | Jaworzno 3 B5 |
Achievable generation capacity: | 206 MW |
Outage size: | 206 MW |
Event type: | Unplanned |
Event start: | 01-09-2024 00:00 |
Event end: | 28-10-2024 00:00 |
Source: | Active - Unplanned - Jaworzno 3 B5 |
Outage information
Unit | Pątnów B9 B9 |
Achievable generation capacity: | 474 MW |
Outage size: | 474 MW |
Event type: | Planned |
Event start: | 19-08-2024 00:00 |
Event end: | 14-10-2024 00:00 |
Source: | Active - Planned - Pątnów B9 B9 |
Outage information
Unit | Pątnów B2 |
Achievable generation capacity: | 222 MW |
Outage size: | 222 MW |
Event type: | Planned |
Event start: | 15-10-2024 00:00 |
Event end: | 01-01-2025 00:00 |
Source: | Active - Planned - Pątnów B2 |
Outage information
Unit | Kraków Łęg KLE_1-04 |
Achievable generation capacity: | 107 MW |
Outage size: | 107 MW |
Event type: | Planned |
Event start: | 19-06-2024 00:01 |
Event end: | 28-11-2024 00:00 |
Source: | Active - Planned - Kraków Łęg KLE_1-04 |
Outage information
Unit | Pątnów B5 |
Achievable generation capacity: | 200 MW |
Outage size: | 200 MW |
Event type: | Planned |
Event start: | 22-09-2024 00:00 |
Event end: | 01-01-2025 00:00 |
Source: | Active - Planned - Pątnów B5 |
Outage information
Unit | EW Włocławek H06 |
Achievable generation capacity: | 28 MW |
Outage size: | 28 MW |
Event type: | Planned |
Event start: | 19-08-2024 06:01 |
Event end: | 31-10-2024 17:00 |
Source: | Active - Planned - EW Włocławek H06 |
Outage information
Unit | Chorzów B1 |
Achievable generation capacity: | 113 MW |
Outage size: | 113 MW |
Event type: | Planned |
Event start: | 01-09-2024 00:00 |
Event end: | 15-10-2024 23:00 |
Source: | Active - Planned - Chorzów B1 |
Outage information
Unit | Skawina Tg5 |
Achievable generation capacity: | 110 MW |
Outage size: | 110 MW |
Event type: | Planned |
Event start: | 13-07-2024 23:59 |
Event end: | 31-10-2024 23:59 |
Source: | Active - Planned - Skawina Tg5 |
Outage information
Unit | Skawina Tg6 |
Achievable generation capacity: | 110 MW |
Outage size: | 34 MW |
Event type: | Planned |
Event start: | 13-09-2024 20:00 |
Event end: | 31-10-2024 23:59 |
Source: | Active - Planned - Skawina Tg6 |
Outage information
Unit | Skawina Tg3 |
Achievable generation capacity: | 110 MW |
Outage size: | 110 MW |
Event type: | Planned |
Event start: | 02-04-2024 13:34 |
Event end: | 31-10-2024 23:59 |
Source: | Active - Planned - Skawina Tg3 |
Outage information
Unit | Synthos Dwory 7 TG10 |
Achievable generation capacity: | 19 MW |
Outage size: | 19 MW |
Event type: | Planned |
Event start: | 04-04-2024 13:30 |
Event end: | 02-01-2025 12:00 |
Source: | Active - Planned - Synthos Dwory 7 TG10 |
Outage information
Unit | Porąbka Żar H1 |
Achievable generation capacity: | 195 MW |
Outage size: | 195 MW |
Event type: | Planned |
Event start: | 30-09-2024 23:46 |
Event end: | 14-10-2024 23:45 |
Source: | Active - Planned - Porąbka Żar H1 |
Outage information
Unit | Porąbka Żar H2 |
Achievable generation capacity: | 194 MW |
Outage size: | 194 MW |
Event type: | Planned |
Event start: | 30-09-2024 23:46 |
Event end: | 14-10-2024 23:45 |
Source: | Active - Planned - Porąbka Żar H2 |
Outage information
Unit | Porąbka Żar H4 |
Achievable generation capacity: | 137 MW |
Outage size: | 137 MW |
Event type: | Planned |
Event start: | 30-09-2024 23:46 |
Event end: | 14-10-2024 23:45 |
Source: | Active - Planned - Porąbka Żar H4 |
Outage information
Unit | Żydowo H1 |
Achievable generation capacity: | 55 MW |
Outage size: | 55 MW |
Event type: | Planned |
Event start: | 14-10-2024 08:00 |
Event end: | 14-10-2024 12:00 |
Source: | Active - Planned - Żydowo H1 |
Outage information
Unit | Żydowo H2 |
Achievable generation capacity: | 55 MW |
Outage size: | 55 MW |
Event type: | Planned |
Event start: | 14-10-2024 07:01 |
Event end: | 18-10-2024 20:00 |
Source: | Active - Planned - Żydowo H2 |
Outage information
Unit | Żydowo H3 |
Achievable generation capacity: | 57 MW |
Outage size: | 57 MW |
Event type: | Planned |
Event start: | 21-10-2024 07:01 |
Event end: | 25-10-2024 20:00 |
Source: | Active - Planned - Żydowo H3 |
Outage information
Unit | Turów B04 |
Achievable generation capacity: | 236 MW |
Outage size: | 142 MW |
Event type: | Unplanned |
Event start: | 06-10-2024 12:30 |
Event end: | 09-11-2024 00:00 |
Source: | Active - Unplanned - Turów B04 |
Outage information
Unit | EC Mielec ECM |
Achievable generation capacity: | 33 MW |
Outage size: | 4 MW |
Event type: | Planned |
Event start: | 17-10-2024 00:01 |
Event end: | 01-05-2025 00:00 |
Source: | Active - Planned - EC Mielec ECM |
Outage information
Unit | Dychów H2 |
Achievable generation capacity: | 30 MW |
Outage size: | 30 MW |
Event type: | Planned |
Event start: | 12-10-2024 07:00 |
Event end: | 13-10-2024 22:00 |
Source: | Active - Planned - Dychów H2 |
Outage information
Unit | Dychów H1 |
Achievable generation capacity: | 30 MW |
Outage size: | 30 MW |
Event type: | Planned |
Event start: | 12-10-2024 07:00 |
Event end: | 13-10-2024 22:00 |
Source: | Active - Planned - Dychów H1 |
Outage information
Unit | Porąbka Żar H3 |
Achievable generation capacity: | 137 MW |
Outage size: | 137 MW |
Event type: | Planned |
Event start: | 30-09-2024 23:46 |
Event end: | 21-10-2024 23:45 |
Source: | Active - Planned - Porąbka Żar H3 |
Outage information
Unit | Porąbka Żar H3 |
Achievable generation capacity: | 137 MW |
Outage size: | 137 MW |
Event type: | Planned |
Event start: | 22-10-2024 00:01 |
Event end: | 21-11-2025 23:45 |
Source: | Active - Planned - Porąbka Żar H3 |
Outage information
Unit | Turów B11 |
Achievable generation capacity: | 444 MW |
Outage size: | 444 MW |
Event type: | Planned |
Event start: | 25-09-2024 00:00 |
Event end: | 15-11-2024 00:00 |
Source: | Active - Planned - Turów B11 |
Outage information
Unit | Rybnik B5 |
Achievable generation capacity: | 209 MW |
Outage size: | 209 MW |
Event type: | Planned |
Event start: | 19-10-2024 00:00 |
Event end: | 06-11-2024 00:00 |
Source: | Active - Planned - Rybnik B5 |
Outage information
Unit | Turów B02 |
Achievable generation capacity: | 226 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 11-10-2024 00:00 |
Event end: | 16-10-2024 00:00 |
Source: | Active - Planned - Turów B02 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Planned |
Event start: | 12-10-2024 00:01 |
Event end: | 12-10-2024 10:00 |
Source: | Inactive - Planned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Planned |
Event start: | 12-10-2024 10:01 |
Event end: | 12-10-2024 12:00 |
Source: | Active - Planned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Planned |
Event start: | 12-10-2024 12:01 |
Event end: | 12-10-2024 17:00 |
Source: | Active - Planned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Planned |
Event start: | 12-10-2024 17:01 |
Event end: | 12-10-2024 20:00 |
Source: | Active - Planned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Planned |
Event start: | 12-10-2024 20:01 |
Event end: | 13-10-2024 00:00 |
Source: | Active - Planned - EC Włocławek B1 |
Outage information
Unit | Połaniec B6 |
Achievable generation capacity: | 226 MW |
Outage size: | 226 MW |
Event type: | Unplanned |
Event start: | 12-10-2024 00:01 |
Event end: | 13-10-2024 19:00 |
Source: | Active - Unplanned - Połaniec B6 |
Outage information
Unit | Łaziska 3 B12 |
Achievable generation capacity: | 211 MW |
Outage size: | 211 MW |
Event type: | Planned |
Event start: | 09-10-2024 00:00 |
Event end: | 13-10-2024 00:00 |
Source: | Active - Planned - Łaziska 3 B12 |
Outage information
Unit | Turów B05 |
Achievable generation capacity: | 236 MW |
Outage size: | 104 MW |
Event type: | Unplanned |
Event start: | 27-09-2024 00:00 |
Event end: | 31-10-2024 00:00 |
Source: | Active - Unplanned - Turów B05 |
Outage information
Unit | Łagisza B10 |
Achievable generation capacity: | 430 MW |
Outage size: | 430 MW |
Event type: | Planned |
Event start: | 30-09-2024 00:01 |
Event end: | 02-11-2024 00:00 |
Source: | Active - Planned - Łagisza B10 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Planned |
Event start: | 11-10-2024 20:01 |
Event end: | 12-10-2024 00:00 |
Source: | Inactive - Planned - EC Włocławek B1 |
Outage information
Unit | Dychów H3 |
Achievable generation capacity: | 30 MW |
Outage size: | 30 MW |
Event type: | Planned |
Event start: | 16-10-2024 15:00 |
Event end: | 16-10-2024 22:00 |
Source: | Active - Planned - Dychów H3 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 1 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 19:01 |
Event end: | 13-10-2024 20:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 5 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 13:01 |
Event end: | 13-10-2024 14:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 6 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 12:01 |
Event end: | 13-10-2024 13:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 6 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 11:01 |
Event end: | 13-10-2024 12:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 3 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 04:01 |
Event end: | 13-10-2024 05:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 1 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 03:01 |
Event end: | 13-10-2024 04:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 1 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 02:00 |
Event end: | 13-10-2024 03:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 3 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 15:01 |
Event end: | 13-10-2024 16:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 2 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 16:01 |
Event end: | 13-10-2024 17:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 2 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 17:01 |
Event end: | 13-10-2024 18:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 1 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 18:01 |
Event end: | 13-10-2024 19:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 4 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 14:01 |
Event end: | 13-10-2024 15:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 6 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 10:01 |
Event end: | 13-10-2024 11:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 6 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 09:01 |
Event end: | 13-10-2024 10:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 5 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 08:01 |
Event end: | 13-10-2024 09:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 6 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 07:01 |
Event end: | 13-10-2024 08:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 7 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 06:01 |
Event end: | 13-10-2024 07:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Achievable generation capacity: | 670 MW |
Outage size: | 4 MW |
Event type: | Unplanned |
Event start: | 13-10-2024 05:01 |
Event end: | 13-10-2024 06:00 |
Source: | Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 630 MW |
Event type: | Unplanned |
Event start: | 11-10-2024 23:00 |
Event end: | 15-10-2024 00:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Bełchatów B07 |
Achievable generation capacity: | 357 MW |
Outage size: | 357 MW |
Event type: | Planned |
Event start: | 12-10-2024 00:09 |
Event end: | 13-10-2024 12:00 |
Source: | Active - Planned - Bełchatów B07 |
Outage information
Unit | Połaniec B3 |
Achievable generation capacity: | 226 MW |
Outage size: | 226 MW |
Event type: | Unplanned |
Event start: | 12-10-2024 09:00 |
Event end: | 13-10-2024 22:00 |
Source: | Active - Unplanned - Połaniec B3 |
Outage information
Unit | Połaniec B2 |
Achievable generation capacity: | 227 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 12-10-2024 06:45 |
Event end: | 12-10-2024 15:00 |
Source: | Active - Unplanned - Połaniec B2 |
Outage information
Unit | EC Siekierki WSIK |
Achievable generation capacity: | 160 MW |
Outage size: | 160 MW |
Event type: | Unplanned |
Event start: | 10-10-2024 10:05 |
Event end: | 16-10-2024 00:00 |
Source: | Active - Unplanned - EC Siekierki WSIK |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Planned |
Event start: | 13-10-2024 00:01 |
Event end: | 14-10-2024 00:00 |
Source: | Active - Planned - EC Włocławek B1 |
Outage information
Unit | EC Siekierki WSIB 10 |
Achievable generation capacity: | 102 MW |
Outage size: | 102 MW |
Event type: | Unplanned |
Event start: | 12-10-2024 08:30 |
Event end: | 13-10-2024 00:00 |
Source: | Active - Unplanned - EC Siekierki WSIB 10 |
Outage information
Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
Achievable generation capacity: | 20 MW |
Outage size: | 2 MW |
Event type: | Unplanned |
Event start: | 12-10-2024 07:43 |
Event end: | 12-10-2024 10:51 |
Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Krzyżanów |
The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.
The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.
The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.