Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
April 2025 May 2025
Tue 29 Wed 30 Thu 1 Fri 2 Sat 3 Sun 4 Mon 5 Tue 6 Wed 7 Thu 8 Fri 9 Sat 10 Sun 11 Mon 12
Bełchatów 4680
B02 341
B03 347
B04 349
B05 348
B06 360
B07 357
B08 358
B09 362
B10 361 361 361 361 361 361 361 361 361 361 361 361 361 361 361
B11 358
B12 358
B14 781 781 781 781 781 781 781 781 781 781 781 781 781 781
Chorzów 226
B1 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113
B2 113
Dolna Odra 849
B5 210 210 210
B6 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210
B7 210
B8 219
Dychów 85
H1 28
H2 29
H3 28
EC Białystok 154
BIA_1-01 50
BIA_1-02 52 52 52 52 52 52
BIA_1-03 52
EC Gorzów 138
GOR2 138
EC Mielec 33
ECM 33 24 24 24 24 24 24 24 24 24 24 24 24 24 24
EC Rzeszów 120
ECR 120
EC Siekierki 595
WSIB 07 106
WSIB 08 125 125 125 125 125 125 125 125
WSIB 09 102 102 102 102 102 102 102 102 102 102 102 102 102 102 102
WSIB 10 102 102 102 102 102 102 102 102 102 102 102 102 102 102 102
WSIK 160 120
EC Stalowa Wola 450
Stalowa Wola BGP 450 450 450 450 450 450 450 450 450
EC Włocławek 465
B1 465 465 465 465 465 465 465 465 465 465 465 465 465 465 465
EC Wrotków 231
ECW 231
EC Żerań 299
WZE 299 299 299 299 299 299 299 299 299 299 299 299 299 299 299
EC Żerań 2 497
B20 497
Elektrociepłownia "Zielona Góra" S.A. 188
ZG BPG 188
Eolos Novo Sp. z o.o. 16
FW Czarnożyły 16
Eolos Polska Sp. z o.o. 32
FW Gorzkowice 12
FW Krzyżanów 20 4
EWP European Wind Power Krasin Sp. z o.o. 30
FW Krasin 30
EW Włocławek 168
H01 28
H02 28
H03 28 28 28 28 28 28 28 28 28
H04 28
H05 28
H06 28
Farma Wiatrowa Bogoria Sp. z o.o. 20
FW Bogoria 20 20 20 20 20 20 20 20 20
FW Banie 12 106
FW Banie 12 106
FW Banie 3 81
FW Banie 3 81
FW Banie 4 56
FW Banie 4 56
FW Biały Bór 145
BBFW 145
FW Iława 13
FW Iława 13
FW Marszewo 100
FMA 100
FW Sępopol 44
FW Sępopol 44
Grupa Azoty Zakłady Azotowe „Puławy” SA 128
EC Puławy 128
Jaworzno 2 910
JWCD B7 910 240
Jaworzno 3 1345
B1 225 210
B2 225
B3 225 210 210
B4 225 211 211 211 211 211 211 211 211 211 211 211 211 211 211
B5 220
B6 225
JSW KOKS S.A. 114
EC Koksownia Przyjaźń G1 6
EC Koksownia Przyjaźń G2 15
EC Koksownia Przyjaźń G3 21
EC Koksownia Przyjaźń G4 71
Karolin 212
B2 100
B3 112
Katowice 135
B1 135
KOGENERACJA S.A. 208
WROB1-02 104
WROB1-03 104
Kowalewo Wind Sp. z o.o. 24
FW Piątkowo 24
Kozienice 1 1800
B1 228
B2 228
B3 220
B4 228 213 213 213 213 213 213 213 213 213 213 213 213 213 213
B5 228
B6 228
B7 220 203 203
B8 220
Kozienice 2 2207
B09 566
B10 566
B11 1075
Kraków Łęg 451
KLE_1-01 122 122 122 122 122 122 122 122 122 122 122 122 122 122 122
KLE_1-02 120
KLE_1-03 102 102 102 102 102 102 102 102 102 102 102 102 102 102 102
KLE_1-04 107
Lichnowy Windfarm Sp. z o.o. 20
FW Lichnowy 20
Łagisza 460
B10 460 430 430 430 430 430 430 430 430 430 430 430 430 430 430
Łaziska 3 905
B09 230
B10 225
B11 225
B12 225
Nowa Energia 1 Sp. z o.o. 49
FW Kozłowo 49
Opole 3090
B1 357
B2 358
B3 358 358 358 358 358 358 358 358 358
B4 355
B5 829 829 829 829 829
B6 833
Ostrołęka B 690
B01 230
B02 230
B03 230
PAK-PCE BIOPALIWA I WODÓR 110
Elektrownia Konin 110
PAK-PCE CZŁUCHÓW 73
FW Ględowo 73 2
PAK-PCE FOTOWOLTAIKA 63
PV Brudzew 63
PAK-PCE KAZIMIERZ BISKUPI 18
FW Kazimierz Biskupi 18
PAK-PCE MIŁOSŁAW 10
FW Pałczyn 10
PAK-PCE PRZYRÓW 42
FW Przyrów 42
Park Wiatrowy 12 Sp. z o.o. 45
FW Słupca-Kołaczkowo 45
Park Wiatrowy 1 Sp. z o.o. 42
FW Jarocin-Koźmin 42
Pątnów 474
B9 474 474 474
PGE Gryfino 2050 sp. z o.o. 1366
Gryfino blok 10 683 3 12
Gryfino blok 9 683 6 18
Płock 630
B01 630 90 125 630 630 630
Połaniec 1899
B1 225
B2 242 227 227 227 227 227 227 227 227 227 227 227 227
B3 242
B4 242 86
B5 242 224 224 224 224
B6 242 226 226 226 226
B7 239
B9 225
Porąbka Żar 540
H1 135 138 138
H2 135
H3 135 137 137 137 137 137 137 137 137 137 137 137 137 137 137
H4 135
Rybnik 835
B5 209
B6 209
B7 209
B8 208
Siersza 306
B1 153
B2 153
Skawina 330
Tg3 110 110 110
Tg5 110 110 110
Tg6 110 30 30
Solina 198
H1 68 13 13 13 13 13 13 13 13 13 13 13 13 13 13
H2 68
H3 31 31 31 31 31 31 31 31 31
H4 31
Synthos Dwory 7 170
GT1 72
TG10 19 19 19
TG7 28 27 27 27 27 27 27 27 27 27 27 27 27 27 27
TG8 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
TG9 31
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158 80 80 80 80 80 80 80 80 80 80 80 80 80 80
Turów 1830
B01 226
B02 226
B03 226
B04 236 18 18
B05 236 114 114 114 114 114 114 114 114 114 114 114 114 114 114
B06 236 146 146 146
B11 444 12 12 444 444 444 444 444 444 444 444 444 444
Veolia Energia Łódź EC4 105
B03 105
Windfarm Polska III sp. z o.o. 126
WINDFARM 126
Żarnowiec 716
H1 179
H2 179
H3 179
H4 179
Żydowo 167
H1 55
H2 55
H3 57
Planned 5218 5246 4855 4855 4470 4470 5357 5503 5503 5503 5357 5357 5357 4576
Unplanned 1243 1089 252 252 726 726 252 127 127 179 629 1259 1259 1259
Total outages 6461 6335 5107 5107 5196 5196 5609 5630 5630 5682 5986 6616 6616 5835

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 630 MW
Event type: Unplanned
Event start: 10-05-2025 00:01
Event end: 13-05-2025 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Porąbka Żar H1
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 21-04-2025 00:01
Event end: 30-04-2025 23:45
Source: Active - Planned - Porąbka Żar H1

Outage information

Unit Kraków Łęg KLE_1-03
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Planned
Event start: 15-04-2025 00:01
Event end: 29-05-2025 23:45
Source: Active - Planned - Kraków Łęg KLE_1-03

Outage information

Unit Solina H3
Achievable generation capacity: 31 MW
Outage size: 31 MW
Event type: Planned
Event start: 05-05-2025 00:01
Event end: 14-10-2025 23:45
Source: Active - Planned - Solina H3

Outage information

Unit Synthos Dwory 7 TG8
Achievable generation capacity: 20 MW
Outage size: 20 MW
Event type: Planned
Event start: 22-03-2024 00:01
Event end: 22-03-2027 23:59
Source: Active - Planned - Synthos Dwory 7 TG8

Outage information

Unit Łagisza B10
Achievable generation capacity: 430 MW
Outage size: 430 MW
Event type: Planned
Event start: 01-05-2025 00:01
Event end: 28-09-2025 00:00
Source: Active - Planned - Łagisza B10

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 444 MW
Event type: Planned
Event start: 03-05-2025 00:01
Event end: 19-05-2025 11:00
Source: Active - Planned - Turów B11

Outage information

Unit EC Siekierki WSIB 10
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Planned
Event start: 19-04-2025 00:01
Event end: 26-07-2025 00:00
Source: Active - Planned - EC Siekierki WSIB 10

Outage information

Unit EC Białystok BIA_1-02
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Unplanned
Event start: 08-05-2025 02:01
Event end: 01-08-2025 01:45
Source: Active - Unplanned - EC Białystok BIA_1-02

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 137 MW
Outage size: 137 MW
Event type: Planned
Event start: 22-10-2024 00:01
Event end: 21-11-2025 23:45
Source: Active - Planned - Porąbka Żar H3

Outage information

Unit Opole B3
Achievable generation capacity: 358 MW
Outage size: 358 MW
Event type: Planned
Event start: 05-05-2025 00:00
Event end: 19-05-2025 00:00
Source: Active - Planned - Opole B3

Outage information

Unit TAMEH Polska sp. z o. o. Elektrownia Blachownia
Achievable generation capacity: 158 MW
Outage size: 80 MW
Event type: Planned
Event start: 04-03-2024 12:00
Event end: 31-12-2025 23:59
Source: Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia

Outage information

Unit Połaniec B2
Achievable generation capacity: 227 MW
Outage size: 227 MW
Event type: Planned
Event start: 01-05-2025 00:01
Event end: 14-06-2025 23:00
Source: Active - Planned - Połaniec B2

Outage information

Unit Solina H1
Achievable generation capacity: 68 MW
Outage size: 13 MW
Event type: Unplanned
Event start: 06-02-2025 16:20
Event end: 31-07-2025 23:00
Source: Active - Unplanned - Solina H1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 465 MW
Event type: Planned
Event start: 13-02-2025 00:00
Event end: 20-06-2025 16:00
Source: Active - Planned - EC Włocławek B1

Outage information

Unit EC Siekierki WSIB 09
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Planned
Event start: 01-03-2025 00:01
Event end: 27-08-2025 00:00
Source: Active - Planned - EC Siekierki WSIB 09

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 01-04-2025 00:00
Event end: 01-07-2025 00:00
Source: Active - Planned - Dolna Odra B6

Outage information

Unit Synthos Dwory 7 TG10
Achievable generation capacity: 19 MW
Outage size: 19 MW
Event type: Unplanned
Event start: 12-03-2025 11:31
Event end: 30-04-2025 11:01
Source: Active - Unplanned - Synthos Dwory 7 TG10

Outage information

Unit Bełchatów B10
Achievable generation capacity: 361 MW
Outage size: 361 MW
Event type: Planned
Event start: 22-04-2025 00:00
Event end: 26-05-2025 18:00
Source: Active - Planned - Bełchatów B10

Outage information

Unit Jaworzno 3 B3
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 06-03-2025 00:00
Event end: 01-05-2025 00:00
Source: Active - Planned - Jaworzno 3 B3

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 02-04-2024 13:34
Event end: 30-04-2025 23:59
Source: Active - Planned - Skawina Tg3

Outage information

Unit Kraków Łęg KLE_1-01
Achievable generation capacity: 122 MW
Outage size: 122 MW
Event type: Planned
Event start: 31-03-2025 00:00
Event end: 28-07-2025 23:45
Source: Active - Planned - Kraków Łęg KLE_1-01

Outage information

Unit Synthos Dwory 7 TG7
Achievable generation capacity: 28 MW
Outage size: 27 MW
Event type: Planned
Event start: 04-04-2025 15:00
Event end: 30-09-2025 15:00
Source: Active - Planned - Synthos Dwory 7 TG7

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 114 MW
Event type: Unplanned
Event start: 05-04-2025 00:00
Event end: 24-05-2025 00:00
Source: Active - Unplanned - Turów B05

Outage information

Unit Chorzów B1
Achievable generation capacity: 113 MW
Outage size: 113 MW
Event type: Planned
Event start: 19-04-2025 02:00
Event end: 20-05-2025 16:00
Source: Active - Planned - Chorzów B1

Outage information

Unit EC Stalowa Wola Stalowa Wola BGP
Achievable generation capacity: 450 MW
Outage size: 450 MW
Event type: Planned
Event start: 05-05-2025 00:01
Event end: 11-06-2025 00:00
Source: Active - Planned - EC Stalowa Wola Stalowa Wola BGP

Outage information

Unit EC Mielec ECM
Achievable generation capacity: 33 MW
Outage size: 24 MW
Event type: Planned
Event start: 14-04-2025 00:01
Event end: 01-10-2025 00:00
Source: Active - Planned - EC Mielec ECM

Outage information

Unit Jaworzno 3 B4
Achievable generation capacity: 211 MW
Outage size: 211 MW
Event type: Planned
Event start: 02-12-2024 00:01
Event end: 27-05-2025 00:00
Source: Active - Planned - Jaworzno 3 B4

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 30 MW
Event type: Planned
Event start: 15-04-2025 19:30
Event end: 30-04-2025 23:59
Source: Active - Planned - Skawina Tg6

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 15-04-2025 19:30
Event end: 30-04-2025 23:59
Source: Active - Planned - Skawina Tg5

Outage information

Unit Kozienice 1 B4
Achievable generation capacity: 213 MW
Outage size: 213 MW
Event type: Planned
Event start: 09-04-2025 08:00
Event end: 30-05-2025 18:00
Source: Active - Planned - Kozienice 1 B4

Outage information

Unit Połaniec B6
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Unplanned
Event start: 09-05-2025 00:01
Event end: 12-05-2025 06:00
Source: Active - Unplanned - Połaniec B6

Outage information

Unit Połaniec B5
Achievable generation capacity: 224 MW
Outage size: 224 MW
Event type: Unplanned
Event start: 09-05-2025 00:01
Event end: 12-05-2025 06:00
Source: Active - Unplanned - Połaniec B5

Outage information

Unit EW Włocławek H03
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 05-05-2025 06:01
Event end: 16-05-2025 17:00
Source: Active - Planned - EW Włocławek H03

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 18-12-2024 15:00
Event end: 01-05-2025 00:00
Source: Active - Planned - Dolna Odra B5

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 146 MW
Event type: Planned
Event start: 06-05-2025 14:00
Event end: 06-05-2025 16:00
Source: Active - Planned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 146 MW
Event type: Planned
Event start: 08-05-2025 14:00
Event end: 08-05-2025 16:00
Source: Active - Planned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 146 MW
Event type: Planned
Event start: 07-05-2025 14:00
Event end: 07-05-2025 16:00
Source: Active - Planned - Turów B06

Outage information

Unit Bełchatów B14
Achievable generation capacity: 781 MW
Outage size: 781 MW
Event type: Planned
Event start: 28-04-2025 00:00
Event end: 11-05-2025 18:00
Source: Active - Planned - Bełchatów B14

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 18 MW
Event type: Unplanned
Event start: 25-04-2025 08:00
Event end: 01-05-2025 00:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Łagisza B10
Achievable generation capacity: 430 MW
Outage size: 430 MW
Event type: Unplanned
Event start: 24-04-2025 22:59
Event end: 01-05-2025 00:00
Source: Active - Unplanned - Łagisza B10

Outage information

Unit EC Siekierki WSIB 08
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 23-04-2025 16:53
Event end: 06-05-2025 00:00
Source: Active - Unplanned - EC Siekierki WSIB 08

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 12 MW
Event type: Unplanned
Event start: 25-04-2025 10:15
Event end: 01-05-2025 00:00
Source: Active - Unplanned - Turów B11

Outage information

Unit Połaniec B4
Achievable generation capacity: 226 MW
Outage size: 86 MW
Event type: Planned
Event start: 29-04-2025 06:10
Event end: 29-04-2025 06:15
Source: Active - Planned - Połaniec B4

Outage information

Unit Połaniec B4
Achievable generation capacity: 226 MW
Outage size: 66 MW
Event type: Planned
Event start: 29-04-2025 06:20
Event end: 29-04-2025 06:25
Source: Active - Planned - Połaniec B4

Outage information

Unit Połaniec B4
Achievable generation capacity: 226 MW
Outage size: 46 MW
Event type: Planned
Event start: 29-04-2025 06:30
Event end: 29-04-2025 06:35
Source: Active - Planned - Połaniec B4

Outage information

Unit Połaniec B4
Achievable generation capacity: 226 MW
Outage size: 26 MW
Event type: Planned
Event start: 29-04-2025 06:45
Event end: 29-04-2025 07:00
Source: Active - Planned - Połaniec B4

Outage information

Unit PAK-PCE CZŁUCHÓW FW Ględowo
Achievable generation capacity: 73 MW
Outage size: 2 MW
Event type: Planned
Event start: 29-04-2025 08:00
Event end: 29-04-2025 16:00
Source: Active - Planned - PAK-PCE CZŁUCHÓW FW Ględowo

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 6 MW
Event type: Unplanned
Event start: 29-04-2025 16:00
Event end: 29-04-2025 17:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 3 MW
Event type: Unplanned
Event start: 29-04-2025 17:00
Event end: 29-04-2025 18:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 3 MW
Event type: Unplanned
Event start: 29-04-2025 14:00
Event end: 29-04-2025 16:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit Opole B5
Achievable generation capacity: 829 MW
Outage size: 829 MW
Event type: Planned
Event start: 26-02-2025 00:01
Event end: 03-05-2025 00:00
Source: Active - Planned - Opole B5

Outage information

Unit EC Siekierki WSIK
Achievable generation capacity: 160 MW
Outage size: 120 MW
Event type: Planned
Event start: 29-04-2025 12:00
Event end: 29-04-2025 14:00
Source: Active - Planned - EC Siekierki WSIK

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 834 MW
Outage size: 240 MW
Event type: Planned
Event start: 30-04-2025 16:00
Event end: 30-04-2025 18:00
Source: Active - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Pątnów B9
Achievable generation capacity: 474 MW
Outage size: 474 MW
Event type: Unplanned
Event start: 03-05-2025 00:00
Event end: 04-05-2025 22:00
Source: Active - Unplanned - Pątnów B9

Outage information

Unit Farma Wiatrowa Bogoria Sp. z o.o. FW Bogoria
Achievable generation capacity: 20 MW
Outage size: 20 MW
Event type: Planned
Event start: 05-05-2025 10:00
Event end: 16-05-2025 14:00
Source: Active - Planned - Farma Wiatrowa Bogoria Sp. z o.o. FW Bogoria

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 203 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 28-04-2025 06:00
Event end: 30-04-2025 22:00
Source: Active - Unplanned - Kozienice 1 B7

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 299 MW
Outage size: 299 MW
Event type: Planned
Event start: 10-03-2025 11:00
Event end: 28-07-2025 00:00
Source: Active - Planned - EC Żerań WZE

Outage information

Unit Eolos Polska Sp. z o.o. FW Krzyżanów
Achievable generation capacity: 20 MW
Outage size: 4 MW
Event type: Planned
Event start: 29-04-2025 10:00
Event end: 29-04-2025 14:00
Source: Active - Planned - Eolos Polska Sp. z o.o. FW Krzyżanów

Outage information

Unit Jaworzno 3 B1
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Unplanned
Event start: 26-04-2025 19:05
Event end: 29-04-2025 15:00
Source: Active - Unplanned - Jaworzno 3 B1

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 18 MW
Event type: Unplanned
Event start: 30-04-2025 15:00
Event end: 30-04-2025 16:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 11 MW
Event type: Unplanned
Event start: 30-04-2025 12:00
Event end: 30-04-2025 13:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 17 MW
Event type: Unplanned
Event start: 30-04-2025 18:00
Event end: 30-04-2025 19:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 12 MW
Event type: Unplanned
Event start: 30-04-2025 19:00
Event end: 30-04-2025 20:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 29-04-2025 01:00
Event end: 29-04-2025 02:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 30-04-2025 23:00
Event end: 01-05-2025 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 30-04-2025 00:00
Event end: 30-04-2025 01:00
Source: Active - Unplanned - Płock B01

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.