| Power producer | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Power plant | Unit | Achievable generation capacity (MW) | February 2026 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Wed 11 | Thu 12 | Fri 13 | Sat 14 | Sun 15 | Mon 16 | Tue 17 | Wed 18 | Thu 19 | Fri 20 | Sat 21 | Sun 22 | Mon 23 | Tue 24 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Planned | 3570 | 2945 | 2532 | 2850 | 2629 | 2796 | 2829 | 2629 | 2629 | 2629 | 2629 | 2629 | 2199 | 2199 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Unplanned | 2624 | 2542 | 492 | 303 | 303 | 77 | 32 | 32 | 32 | 32 | 32 | 32 | 32 | 32 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Total outages | 6194 | 5487 | 3024 | 3153 | 2932 | 2873 | 2861 | 2661 | 2661 | 2661 | 2661 | 2661 | 2231 | 2231 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
Outage information
| Unit | Synthos Dwory 7 TG8 |
| Achievable generation capacity: | 20 MW |
| Outage size: | 20 MW |
| Event type: | Planned |
| Event start: | 22-03-2024 00:01 |
| Event end: | 22-03-2027 23:59 |
| Source: | Active - Planned - Synthos Dwory 7 TG8 |
Outage information
| Unit | Łaziska 3 B09 |
| Achievable generation capacity: | 215 MW |
| Outage size: | 215 MW |
| Event type: | Planned |
| Event start: | 02-01-2026 00:01 |
| Event end: | 12-04-2026 00:00 |
| Source: | Active - Planned - Łaziska 3 B09 |
Outage information
| Unit | Jaworzno 3 B2 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 210 MW |
| Event type: | Planned |
| Event start: | 02-01-2026 00:00 |
| Event end: | 02-04-2026 00:00 |
| Source: | Active - Planned - Jaworzno 3 B2 |
Outage information
| Unit | EC Mielec ECM |
| Achievable generation capacity: | 33 MW |
| Outage size: | 4 MW |
| Event type: | Planned |
| Event start: | 01-11-2025 00:00 |
| Event end: | 01-01-2030 00:00 |
| Source: | Active - Planned - EC Mielec ECM |
Outage information
| Unit | TAMEH Polska sp. z o. o. Elektrownia Blachownia |
| Achievable generation capacity: | 158 MW |
| Outage size: | 80 MW |
| Event type: | Planned |
| Event start: | 04-03-2024 12:00 |
| Event end: | 31-12-2026 23:59 |
| Source: | Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Outage information
| Unit | Łaziska 3 B10 |
| Achievable generation capacity: | 211 MW |
| Outage size: | 211 MW |
| Event type: | Planned |
| Event start: | 01-01-2026 00:01 |
| Event end: | 17-04-2026 00:00 |
| Source: | Active - Planned - Łaziska 3 B10 |
Outage information
| Unit | Solina H1 |
| Achievable generation capacity: | 68 MW |
| Outage size: | 13 MW |
| Event type: | Unplanned |
| Event start: | 06-02-2025 16:20 |
| Event end: | 30-06-2026 23:45 |
| Source: | Active - Unplanned - Solina H1 |
Outage information
| Unit | JSW KOKS S.A. EC Koksownia Przyjaźń G2 |
| Achievable generation capacity: | 15 MW |
| Outage size: | 15 MW |
| Event type: | Planned |
| Event start: | 10-01-2026 09:42 |
| Event end: | 30-03-2026 14:00 |
| Source: | Active - Planned - JSW KOKS S.A. EC Koksownia Przyjaźń G2 |
Outage information
| Unit | Porąbka Żar H3 |
| Achievable generation capacity: | 137 MW |
| Outage size: | 137 MW |
| Event type: | Planned |
| Event start: | 22-10-2024 00:01 |
| Event end: | 10-02-2030 23:45 |
| Source: | Active - Planned - Porąbka Żar H3 |
Outage information
| Unit | Synthos Dwory 7 TG10 |
| Achievable generation capacity: | 19 MW |
| Outage size: | 19 MW |
| Event type: | Unplanned |
| Event start: | 12-01-2026 07:28 |
| Event end: | 28-02-2026 15:00 |
| Source: | Active - Unplanned - Synthos Dwory 7 TG10 |
Outage information
| Unit | Jaworzno 3 B3 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 210 MW |
| Event type: | Planned |
| Event start: | 01-12-2025 00:01 |
| Event end: | 10-04-2026 00:00 |
| Source: | Active - Planned - Jaworzno 3 B3 |
Outage information
| Unit | Opole B5 |
| Achievable generation capacity: | 829 MW |
| Outage size: | 829 MW |
| Event type: | Planned |
| Event start: | 09-02-2026 00:01 |
| Event end: | 01-03-2026 00:00 |
| Source: | Active - Planned - Opole B5 |
Outage information
| Unit | Skawina Tg6 |
| Achievable generation capacity: | 110 MW |
| Outage size: | 110 MW |
| Event type: | Planned |
| Event start: | 11-01-2026 21:00 |
| Event end: | 28-02-2026 23:59 |
| Source: | Active - Planned - Skawina Tg6 |
Outage information
| Unit | Żydowo H1 |
| Achievable generation capacity: | 55 MW |
| Outage size: | 55 MW |
| Event type: | Planned |
| Event start: | 16-02-2026 08:00 |
| Event end: | 16-02-2026 10:00 |
| Source: | Active - Planned - Żydowo H1 |
Outage information
| Unit | Żydowo H3 |
| Achievable generation capacity: | 57 MW |
| Outage size: | 57 MW |
| Event type: | Planned |
| Event start: | 16-02-2026 08:00 |
| Event end: | 16-02-2026 10:00 |
| Source: | Active - Planned - Żydowo H3 |
Outage information
| Unit | Skawina Tg5 |
| Achievable generation capacity: | 110 MW |
| Outage size: | 20 MW |
| Event type: | Planned |
| Event start: | 05-02-2026 07:13 |
| Event end: | 28-02-2026 23:59 |
| Source: | Active - Planned - Skawina Tg5 |
Outage information
| Unit | Skawina Tg3 |
| Achievable generation capacity: | 110 MW |
| Outage size: | 110 MW |
| Event type: | Planned |
| Event start: | 05-02-2026 11:13 |
| Event end: | 28-02-2026 23:59 |
| Source: | Active - Planned - Skawina Tg3 |
Outage information
| Unit | Ostrołęka B B01 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 230 MW |
| Event type: | Planned |
| Event start: | 07-02-2026 00:01 |
| Event end: | 12-02-2026 00:00 |
| Source: | Active - Planned - Ostrołęka B B01 |
Outage information
| Unit | Połaniec B2 |
| Achievable generation capacity: | 227 MW |
| Outage size: | 97 MW |
| Event type: | Planned |
| Event start: | 11-02-2026 12:00 |
| Event end: | 11-02-2026 16:30 |
| Source: | Active - Planned - Połaniec B2 |
Outage information
| Unit | EW Włocławek H06 |
| Achievable generation capacity: | 28 MW |
| Outage size: | 28 MW |
| Event type: | Planned |
| Event start: | 21-01-2026 06:01 |
| Event end: | 27-02-2026 17:00 |
| Source: | Active - Planned - EW Włocławek H06 |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 7 MW |
| Event type: | Planned |
| Event start: | 12-02-2026 08:00 |
| Event end: | 12-02-2026 16:00 |
| Source: | Active - Planned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 7 MW |
| Event type: | Planned |
| Event start: | 13-02-2026 08:00 |
| Event end: | 13-02-2026 16:00 |
| Source: | Active - Planned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | Bełchatów B14 |
| Achievable generation capacity: | 781 MW |
| Outage size: | 221 MW |
| Event type: | Planned |
| Event start: | 10-02-2026 00:00 |
| Event end: | 11-02-2026 00:00 |
| Source: | Inactive - Planned - Bełchatów B14 |
Outage information
| Unit | Ostrołęka B B03 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 65 MW |
| Event type: | Planned |
| Event start: | 05-02-2026 00:01 |
| Event end: | 11-02-2026 00:00 |
| Source: | Inactive - Planned - Ostrołęka B B03 |
Outage information
| Unit | Porąbka Żar H1 |
| Achievable generation capacity: | 138 MW |
| Outage size: | 138 MW |
| Event type: | Planned |
| Event start: | 11-02-2026 06:00 |
| Event end: | 11-02-2026 18:00 |
| Source: | Active - Planned - Porąbka Żar H1 |
Outage information
| Unit | Porąbka Żar H4 |
| Achievable generation capacity: | 138 MW |
| Outage size: | 138 MW |
| Event type: | Planned |
| Event start: | 13-02-2026 14:45 |
| Event end: | 13-02-2026 17:00 |
| Source: | Active - Planned - Porąbka Żar H4 |
Outage information
| Unit | Porąbka Żar H2 |
| Achievable generation capacity: | 137 MW |
| Outage size: | 137 MW |
| Event type: | Planned |
| Event start: | 12-02-2026 14:45 |
| Event end: | 12-02-2026 17:00 |
| Source: | Active - Planned - Porąbka Żar H2 |
Outage information
| Unit | Kozienice 2 B11 |
| Achievable generation capacity: | 981 MW |
| Outage size: | 981 MW |
| Event type: | Unplanned |
| Event start: | 07-02-2026 15:17 |
| Event end: | 12-02-2026 22:00 |
| Source: | Active - Unplanned - Kozienice 2 B11 |
Outage information
| Unit | Żydowo H2 |
| Achievable generation capacity: | 55 MW |
| Outage size: | 55 MW |
| Event type: | Planned |
| Event start: | 16-02-2026 08:00 |
| Event end: | 16-02-2026 14:00 |
| Source: | Active - Planned - Żydowo H2 |
Outage information
| Unit | EW Włocławek H03 |
| Achievable generation capacity: | 28 MW |
| Outage size: | 28 MW |
| Event type: | Planned |
| Event start: | 11-02-2026 08:01 |
| Event end: | 11-02-2026 18:00 |
| Source: | Active - Planned - EW Włocławek H03 |
Outage information
| Unit | EW Włocławek H04 |
| Achievable generation capacity: | 28 MW |
| Outage size: | 28 MW |
| Event type: | Planned |
| Event start: | 11-02-2026 08:01 |
| Event end: | 11-02-2026 18:00 |
| Source: | Active - Planned - EW Włocławek H04 |
Outage information
| Unit | EW Włocławek H01 |
| Achievable generation capacity: | 28 MW |
| Outage size: | 28 MW |
| Event type: | Planned |
| Event start: | 12-02-2026 08:01 |
| Event end: | 12-02-2026 18:00 |
| Source: | Active - Planned - EW Włocławek H01 |
Outage information
| Unit | EW Włocławek H02 |
| Achievable generation capacity: | 28 MW |
| Outage size: | 28 MW |
| Event type: | Planned |
| Event start: | 12-02-2026 08:01 |
| Event end: | 12-02-2026 18:00 |
| Source: | Active - Planned - EW Włocławek H02 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 236 MW |
| Event type: | Planned |
| Event start: | 10-02-2026 20:00 |
| Event end: | 13-02-2026 00:00 |
| Source: | Active - Planned - Turów B06 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 130 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 19:00 |
| Event end: | 11-02-2026 20:00 |
| Source: | Active - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 16:00 |
| Event end: | 11-02-2026 17:00 |
| Source: | Active - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 12:00 |
| Event end: | 11-02-2026 13:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 130 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 21:00 |
| Event end: | 11-02-2026 22:00 |
| Source: | Active - Unplanned - Płock B01 |
Outage information
| Unit | Rybnik B8 |
| Achievable generation capacity: | 208 MW |
| Outage size: | 45 MW |
| Event type: | Unplanned |
| Event start: | 05-02-2026 07:08 |
| Event end: | 17-02-2026 00:00 |
| Source: | Active - Unplanned - Rybnik B8 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 01:00 |
| Event end: | 11-02-2026 02:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 14:00 |
| Event end: | 11-02-2026 15:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 18:00 |
| Event end: | 11-02-2026 19:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 03:00 |
| Event end: | 11-02-2026 04:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 12:00 |
| Event end: | 11-02-2026 13:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 15:45 |
| Event end: | 11-02-2026 16:00 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 15:45 |
| Event end: | 11-02-2026 16:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 132 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 00:00 |
| Event end: | 11-02-2026 05:45 |
| Source: | Inactive - Unplanned - Turów B04 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 123 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 00:00 |
| Event end: | 11-02-2026 05:00 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 13 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 07:45 |
| Event end: | 11-02-2026 08:00 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 13 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 08:00 |
| Event end: | 11-02-2026 08:30 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 133 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 00:00 |
| Event end: | 11-02-2026 07:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 85 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 09:15 |
| Event end: | 11-02-2026 09:30 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 112 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 09:15 |
| Event end: | 11-02-2026 09:45 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 112 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 10:00 |
| Event end: | 11-02-2026 10:15 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 10:15 |
| Event end: | 11-02-2026 11:00 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 218 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 06:15 |
| Event end: | 11-02-2026 06:30 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 47 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 11:00 |
| Event end: | 11-02-2026 11:30 |
| Source: | Inactive - Unplanned - Turów B04 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 167 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 11:15 |
| Event end: | 11-02-2026 11:30 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 98 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 06:00 |
| Event end: | 11-02-2026 06:30 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 00:00 |
| Event end: | 11-02-2026 06:15 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 07:15 |
| Event end: | 11-02-2026 07:30 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 69 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 06:00 |
| Event end: | 11-02-2026 07:30 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 57 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 06:15 |
| Event end: | 11-02-2026 07:45 |
| Source: | Inactive - Unplanned - Turów B04 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 80 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 07:30 |
| Event end: | 11-02-2026 07:45 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Żarnowiec H2 |
| Achievable generation capacity: | 178 MW |
| Outage size: | 178 MW |
| Event type: | Planned |
| Event start: | 12-02-2026 09:01 |
| Event end: | 12-02-2026 09:30 |
| Source: | Active - Planned - Żarnowiec H2 |
Outage information
| Unit | Łagisza B10 |
| Achievable generation capacity: | 430 MW |
| Outage size: | 430 MW |
| Event type: | Planned |
| Event start: | 14-02-2026 00:00 |
| Event end: | 23-02-2026 00:00 |
| Source: | Active - Planned - Łagisza B10 |
Outage information
| Unit | Jaworzno 3 B6 |
| Achievable generation capacity: | 211 MW |
| Outage size: | 211 MW |
| Event type: | Unplanned |
| Event start: | 10-02-2026 12:37 |
| Event end: | 13-02-2026 00:00 |
| Source: | Active - Unplanned - Jaworzno 3 B6 |
Outage information
| Unit | Kraków Łęg KLE_1-04 |
| Achievable generation capacity: | 107 MW |
| Outage size: | 107 MW |
| Event type: | Planned |
| Event start: | 10-02-2026 00:01 |
| Event end: | 11-02-2026 00:00 |
| Source: | Inactive - Planned - Kraków Łęg KLE_1-04 |
Outage information
| Unit | Opole B1 |
| Achievable generation capacity: | 357 MW |
| Outage size: | 107 MW |
| Event type: | Planned |
| Event start: | 11-02-2026 12:00 |
| Event end: | 11-02-2026 13:00 |
| Source: | Inactive - Planned - Opole B1 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 100 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 01:00 |
| Event end: | 11-02-2026 02:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 100 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 09:00 |
| Event end: | 11-02-2026 10:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 100 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 05:00 |
| Event end: | 11-02-2026 06:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 100 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 07:00 |
| Event end: | 11-02-2026 08:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 00:00 |
| Event end: | 12-02-2026 01:00 |
| Source: | Active - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 130 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 09:00 |
| Event end: | 12-02-2026 10:00 |
| Source: | Active - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 130 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 12:00 |
| Event end: | 12-02-2026 13:00 |
| Source: | Active - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 130 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 04:00 |
| Event end: | 12-02-2026 05:00 |
| Source: | Active - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 130 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 07:00 |
| Event end: | 12-02-2026 08:00 |
| Source: | Active - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 20:00 |
| Event end: | 12-02-2026 21:00 |
| Source: | Active - Unplanned - Płock B01 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 10 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 14:00 |
| Event end: | 12-02-2026 17:00 |
| Source: | Active - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 10 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 00:00 |
| Event end: | 12-02-2026 13:00 |
| Source: | Active - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 10 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 23:00 |
| Event end: | 13-02-2026 00:00 |
| Source: | Active - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | Łagisza B10 |
| Achievable generation capacity: | 430 MW |
| Outage size: | 150 MW |
| Event type: | Planned |
| Event start: | 11-02-2026 00:45 |
| Event end: | 11-02-2026 02:00 |
| Source: | Inactive - Planned - Łagisza B10 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 07:00 |
| Event end: | 11-02-2026 08:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 09:00 |
| Event end: | 11-02-2026 10:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Łagisza B10 |
| Achievable generation capacity: | 430 MW |
| Outage size: | 150 MW |
| Event type: | Planned |
| Event start: | 11-02-2026 06:15 |
| Event end: | 11-02-2026 08:00 |
| Source: | Inactive - Planned - Łagisza B10 |
Outage information
| Unit | Bełchatów B14 |
| Achievable generation capacity: | 781 MW |
| Outage size: | 221 MW |
| Event type: | Planned |
| Event start: | 14-02-2026 00:00 |
| Event end: | 15-02-2026 00:00 |
| Source: | Active - Planned - Bełchatów B14 |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 11 MW |
| Event type: | Planned |
| Event start: | 12-02-2026 14:00 |
| Event end: | 12-02-2026 14:15 |
| Source: | Active - Planned - Opole B3 |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 94 MW |
| Event type: | Planned |
| Event start: | 12-02-2026 15:30 |
| Event end: | 12-02-2026 15:45 |
| Source: | Active - Planned - Opole B3 |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 139 MW |
| Event type: | Planned |
| Event start: | 12-02-2026 16:00 |
| Event end: | 12-02-2026 16:30 |
| Source: | Active - Planned - Opole B3 |
Outage information
| Unit | Jaworzno 2 JWCD B7 |
| Achievable generation capacity: | 834 MW |
| Outage size: | 415 MW |
| Event type: | Unplanned |
| Event start: | 13-02-2026 02:00 |
| Event end: | 13-02-2026 06:00 |
| Source: | Active - Unplanned - Jaworzno 2 JWCD B7 |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 09-02-2026 16:00 |
| Event end: | 12-02-2026 08:00 |
| Source: | Active - Unplanned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | Połaniec B7 |
| Achievable generation capacity: | 221 MW |
| Outage size: | 221 MW |
| Event type: | Unplanned |
| Event start: | 10-02-2026 17:15 |
| Event end: | 12-02-2026 22:00 |
| Source: | Active - Unplanned - Połaniec B7 |
Outage information
| Unit | Opole B4 |
| Achievable generation capacity: | 355 MW |
| Outage size: | 355 MW |
| Event type: | Planned |
| Event start: | 10-02-2026 08:00 |
| Event end: | 11-02-2026 08:00 |
| Source: | Inactive - Planned - Opole B4 |
Outage information
| Unit | Połaniec B3 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Unplanned |
| Event start: | 14-02-2026 00:01 |
| Event end: | 15-02-2026 19:00 |
| Source: | Active - Unplanned - Połaniec B3 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 15:00 |
| Event end: | 12-02-2026 16:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 12:00 |
| Event end: | 12-02-2026 13:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 23:00 |
| Event end: | 13-02-2026 00:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 01:00 |
| Event end: | 12-02-2026 02:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 04:00 |
| Event end: | 12-02-2026 05:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 10:00 |
| Event end: | 12-02-2026 11:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 06:00 |
| Event end: | 12-02-2026 07:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 17:00 |
| Event end: | 12-02-2026 18:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 16:45 |
| Event end: | 12-02-2026 17:00 |
| Source: | Active - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 112 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 19:30 |
| Event end: | 12-02-2026 20:00 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 98 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 15:15 |
| Event end: | 12-02-2026 15:45 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 43 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 08:15 |
| Event end: | 12-02-2026 09:30 |
| Source: | Active - Unplanned - Turów B02 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 112 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 20:15 |
| Event end: | 12-02-2026 20:30 |
| Source: | Active - Unplanned - Turów B02 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 15:45 |
| Event end: | 12-02-2026 16:00 |
| Source: | Active - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 98 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 08:30 |
| Event end: | 12-02-2026 08:45 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 56 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 07:00 |
| Event end: | 12-02-2026 08:15 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 43 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 07:00 |
| Event end: | 12-02-2026 07:15 |
| Source: | Active - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 56 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 17:00 |
| Event end: | 12-02-2026 19:00 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 98 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 10:15 |
| Event end: | 12-02-2026 10:30 |
| Source: | Active - Unplanned - Turów B02 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 247 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 00:00 |
| Event end: | 12-02-2026 05:30 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 16:45 |
| Event end: | 12-02-2026 17:00 |
| Source: | Active - Unplanned - Turów B03 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 09:15 |
| Event end: | 12-02-2026 09:30 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 133 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 00:00 |
| Event end: | 12-02-2026 08:00 |
| Source: | Active - Unplanned - Turów B05 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 133 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 22:15 |
| Event end: | 13-02-2026 00:00 |
| Source: | Active - Unplanned - Turów B05 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 20:30 |
| Event end: | 13-02-2026 00:00 |
| Source: | Active - Unplanned - Turów B03 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 243 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 22:00 |
| Event end: | 13-02-2026 00:00 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 132 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 22:00 |
| Event end: | 13-02-2026 00:00 |
| Source: | Active - Unplanned - Turów B04 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 123 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 00:00 |
| Event end: | 12-02-2026 06:30 |
| Source: | Active - Unplanned - Turów B03 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 139 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 11:30 |
| Event end: | 12-02-2026 11:45 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 10:15 |
| Event end: | 12-02-2026 10:30 |
| Source: | Active - Unplanned - Turów B03 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 132 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 00:00 |
| Event end: | 12-02-2026 06:00 |
| Source: | Active - Unplanned - Turów B04 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 191 MW |
| Event type: | Unplanned |
| Event start: | 12-02-2026 05:45 |
| Event end: | 12-02-2026 06:00 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 10 MW |
| Event type: | Unplanned |
| Event start: | 10-02-2026 22:03 |
| Event end: | 11-02-2026 12:19 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 188 MW |
| Event type: | Planned |
| Event start: | 13-02-2026 06:45 |
| Event end: | 13-02-2026 07:15 |
| Source: | Active - Planned - Opole B3 |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 162 MW |
| Event type: | Planned |
| Event start: | 13-02-2026 09:00 |
| Event end: | 13-02-2026 09:15 |
| Source: | Active - Planned - Opole B3 |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 132 MW |
| Event type: | Planned |
| Event start: | 13-02-2026 07:30 |
| Event end: | 13-02-2026 07:45 |
| Source: | Active - Planned - Opole B3 |
Outage information
| Unit | Eolos Novo Sp. z o.o. FW Czarnożyły |
| Achievable generation capacity: | 16 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 11-02-2026 08:10 |
| Event end: | 11-02-2026 13:14 |
| Source: | Inactive - Planned - Eolos Novo Sp. z o.o. FW Czarnożyły |
Outage information
| Unit | Połaniec B9 |
| Achievable generation capacity: | 225 MW |
| Outage size: | 105 MW |
| Event type: | Unplanned |
| Event start: | 11-02-2026 11:30 |
| Event end: | 11-02-2026 18:00 |
| Source: | Active - Unplanned - Połaniec B9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 200 MW |
| Event type: | Planned |
| Event start: | 17-02-2026 12:00 |
| Event end: | 17-02-2026 19:00 |
| Source: | Active - Planned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.
The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.
The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.