Power producer
Power plant Unit Achievable generation capacity
(MW)
March 2026
Tue 10 Wed 11 Thu 12 Fri 13 Sat 14 Sun 15 Mon 16 Tue 17 Wed 18 Thu 19 Fri 20 Sat 21 Sun 22 Mon 23
Bełchatów 4680
B02 341 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B03 347 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B04 349 n/a n/a n/a n/a n/a 349 349 349 349 349 349 349 349 349
B05 348 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B06 360 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B07 357 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B08 358 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B09 362 362 362 362 362 362 362 362 n/a n/a n/a n/a n/a n/a n/a
B10 361 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B11 358 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B12 358 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B14 781 n/a 221 n/a n/a n/a n/a 781 781 781 781 781 781 781 781
Chorzów 226 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B1 113 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B2 113 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Dolna Odra 429 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B6 210 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B7 219 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Dychów 85 n/a n/a n/a n/a n/a n/a
H1 28 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H2 29 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H3 28 n/a n/a n/a n/a n/a n/a 30 30 30 30 30 30 30 30
EC Białystok 154 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
BIA_1-01 50 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
BIA_1-02 52 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
BIA_1-03 52 52 52 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EC Gorzów 138 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
GOR2 138 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EC Mielec 33
ECM 33 4 4 4 4 4 4 4 4 4 4 4 4 4 4
EC Rzeszów 94 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
ECR 94 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EC Siekierki 539 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
WSIB 07 91 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
WSIB 08 109 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
WSIB 09 91 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
WSIB 10 91 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
WSIK 157 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EC Stalowa Wola 450 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Stalowa Wola BGP 450 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EC Włocławek 465 n/a n/a n/a n/a n/a n/a n/a
B1 465 479 479 479 479 479 479 479 n/a n/a n/a n/a n/a n/a n/a
EC Wrotków 231 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
ECW 231 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EC Żerań 184 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
WZE 184 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EC Żerań 2 488 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B20 488 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Elektrociepłownia "Zielona Góra" S.A. 188 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
ZG BPG 188 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Eolos Novo Sp. z o.o. 16 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Czarnożyły 16 2 2 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Eolos Polska Sp. z o.o. 32 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Gorzkowice 12 2 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Krzyżanów 20 2 4 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EWP European Wind Power Krasin Sp. z o.o. 30 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Krasin 30 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EW Włocławek 168 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H01 28 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H02 28 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H03 28 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H04 28 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H05 28 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H06 28 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Farma Wiatrowa Bogoria Sp. z o.o. 20 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Bogoria 20 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Banie 12 106 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Banie 12 106 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Banie 3 81 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Banie 3 81 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Banie 4 56 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Banie 4 56 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Biały Bór 145 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
BBFW 145 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Iława 13 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Iława 13 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Marszewo 100 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FMA 100 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Sępopol 44 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Sępopol 44 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Grupa Azoty Zakłady Azotowe „Puławy” SA 128 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EC Puławy 128 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Jaworzno 2 910 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
JWCD B7 910 260 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Jaworzno 3 1345
B1 225 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B2 225 210 210 210 210 210 210 210 210 210 210 210 210 210 210
B3 225 210 210 210 210 210 210 210 210 210 210 210 210 210 210
B4 225 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B5 220 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B6 225 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
JSW KOKS S.A. 114
EC Koksownia Przyjaźń G1 6 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EC Koksownia Przyjaźń G2 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
EC Koksownia Przyjaźń G3 21 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
EC Koksownia Przyjaźń G4 71 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Karolin 317
B2 100 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B3 112 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B4 105 50 50 50 50 50 50 50 50 50 50 50 50 50 50
Katowice 135 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B1 135 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
KOGENERACJA S.A. 385 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
CZN_1S01 177 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
WROB1-02 104 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
WROB1-03 104 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Kowalewo Wind Sp. z o.o. 24 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Piątkowo 24 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Kozienice 1 1800 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B1 228 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B2 228 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B3 220 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B4 228 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B5 228 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B6 228 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B7 220 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B8 220 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Kozienice 2 2207 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B09 566 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B10 566 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B11 1075 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Kraków Łęg 451 n/a n/a n/a n/a n/a n/a n/a n/a
KLE_1-01 122 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
KLE_1-02 120 n/a n/a n/a n/a n/a n/a n/a n/a 120 120 120 120 120 120
KLE_1-03 102 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
KLE_1-04 107 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Lichnowy Windfarm Sp. z o.o. 20 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Lichnowy 20 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Łagisza 460 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B10 460 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Łaziska 3 905
B09 230 215 215 215 215 215 215 215 215 215 215 215 215 215 215
B10 225 211 211 211 211 211 211 211 211 211 211 211 211 211 211
B11 225 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B12 225 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Mashav Management Sp. z o.o. 256 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
PEAST 101 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
PSOUT 37 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
PWEST 118 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Nowa Energia 1 Sp. z o.o. 49 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Kozłowo 49 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Opole 3090 n/a n/a n/a n/a n/a n/a n/a n/a n/a
B1 357 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B2 358 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B3 358 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B4 355 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 355 355 355 355
B5 829 n/a 90 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B6 833 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Ostrołęka B 625 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B01 230 230 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B02 230 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B03 165 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
PAK-PCE BIOPALIWA I WODÓR 110 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Elektrownia Konin 110 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
PAK-PCE CZŁUCHÓW 73 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Ględowo 73 2 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
PAK-PCE FOTOWOLTAIKA 63 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
PV Brudzew 63 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
PAK-PCE KAZIMIERZ BISKUPI 18 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Kazimierz Biskupi 18 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
PAK-PCE MIŁOSŁAW 10 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Pałczyn 10 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
PAK-PCE PRZYRÓW 42 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Przyrów 42 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Park Wiatrowy 12 Sp. z o.o. 45 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Słupca-Kołaczkowo 45 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Park Wiatrowy 1 Sp. z o.o. 42 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Jarocin-Koźmin 42 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Park Wiatrowy 9 Sp. z o.o 12 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Jarocin Pilot II 6 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Potarzyca 6 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Pątnów 474 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B9 474 474 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
PGE Gryfino Dolna Odra Sp. z o.o. 1340 n/a n/a n/a n/a n/a n/a n/a n/a
Gryfino blok 10 670 670 670 670 670 670 670 n/a n/a n/a n/a n/a n/a n/a n/a
Gryfino blok 9 670 n/a n/a n/a 670 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Płock 630 n/a n/a n/a n/a n/a n/a n/a n/a
B01 630 135 135 120 n/a 630 630 630 n/a n/a n/a n/a n/a n/a n/a
Polenergia Farma Wiatrowa 1 Sp. z o.o. 48 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Gawłowice 48 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Polenergia Farma Wiatrowa 3 Sp. z o.o. 121 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Dębsk 121 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Polenergia Farma Wiatrowa Mycielin Sp. z o.o. 46 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Mycielin 46 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Polenergia Farma Wiatrowa Szymankowo Sp. z o.o. 38 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FW Szymankowo 38 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Polenergia FF Strzelino Sp. z o.o. 45 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FF Strzelino 45 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Polenergia FF Sulechów Sp. z o.o. 20 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
FF Sulechów 20 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Połaniec 1899
B1 225 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B2 242 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B3 242 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B4 242 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B5 242 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B6 242 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B7 239 n/a n/a 37 65 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B9 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
Porąbka Żar 540
H1 135 138 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H2 135 n/a n/a 137 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H3 135 137 137 137 137 137 137 137 137 137 137 137 137 137 137
H4 135 n/a 138 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Rybnik 835 n/a n/a n/a
B5 209 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B6 209 45 45 45 45 45 45 45 45 45 45 45 n/a n/a n/a
B7 209 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B8 208 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Siersza 306
B1 153 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B2 153 139 139 139 139 139 139 139 139 139 139 139 139 139 139
Skawina 330
Tg3 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg5 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg6 110 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Solina 198
H1 68 13 13 13 13 13 13 13 13 13 13 13 13 13 13
H2 68 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H3 31 n/a n/a n/a n/a 31 31 n/a n/a n/a n/a n/a n/a n/a n/a
H4 31 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Synthos Dwory 7 170
GT1 72 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
TG10 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
TG7 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28
TG8 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
TG9 31 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158 80 80 80 80 80 80 80 80 80 80 80 80 80 80
Turów 1830 n/a n/a n/a n/a n/a n/a n/a n/a
B01 226 125 125 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B02 226 226 226 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B03 226 125 125 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B04 236 132 132 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B05 236 n/a n/a 236 236 236 236 n/a n/a n/a n/a n/a n/a n/a n/a
B06 236 37 133 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B11 444 66 247 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Veolia Energia Łódź EC4 105 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
B03 105 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Windfarm Polska III sp. z o.o. 126 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
WINDFARM 126 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Żarnowiec 716 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H1 179 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H2 179 n/a n/a n/a 178 178 178 n/a n/a n/a n/a n/a n/a n/a n/a
H3 179 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H4 179 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Żydowo 165 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H1 55 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H2 55 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
H3 55 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Planned 3184 3407 3226 3966 3261 3610 3306 2944 3064 3064 3419 3419 3419 3419
Unplanned 2196 1595 676 556 1186 1186 1186 77 77 77 77 32 32 32
Total outages 5380 5002 3902 4522 4447 4796 4492 3021 3141 3141 3496 3451 3451 3451

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 630 MW
Event type: Unplanned
Event start: 14-03-2026 00:01
Event end: 17-03-2026 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Synthos Dwory 7 TG8
Achievable generation capacity: 20 MW
Outage size: 20 MW
Event type: Planned
Event start: 22-03-2024 00:01
Event end: 22-03-2027 23:59
Source: Active - Planned - Synthos Dwory 7 TG8

Outage information

Unit Łaziska 3 B09
Achievable generation capacity: 215 MW
Outage size: 215 MW
Event type: Planned
Event start: 02-01-2026 00:01
Event end: 12-04-2026 00:00
Source: Active - Planned - Łaziska 3 B09

Outage information

Unit Siersza B2
Achievable generation capacity: 139 MW
Outage size: 139 MW
Event type: Planned
Event start: 01-03-2026 00:00
Event end: 25-05-2026 00:00
Source: Active - Planned - Siersza B2

Outage information

Unit EC Mielec ECM
Achievable generation capacity: 33 MW
Outage size: 4 MW
Event type: Planned
Event start: 01-11-2025 00:00
Event end: 01-01-2030 00:00
Source: Active - Planned - EC Mielec ECM

Outage information

Unit Bełchatów B04
Achievable generation capacity: 349 MW
Outage size: 349 MW
Event type: Planned
Event start: 15-03-2026 00:00
Event end: 29-03-2026 18:00
Source: Active - Planned - Bełchatów B04

Outage information

Unit TAMEH Polska sp. z o. o. Elektrownia Blachownia
Achievable generation capacity: 158 MW
Outage size: 80 MW
Event type: Planned
Event start: 04-03-2024 12:00
Event end: 31-12-2026 23:59
Source: Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia

Outage information

Unit Łaziska 3 B10
Achievable generation capacity: 211 MW
Outage size: 211 MW
Event type: Planned
Event start: 01-01-2026 00:01
Event end: 17-04-2026 00:00
Source: Active - Planned - Łaziska 3 B10

Outage information

Unit Bełchatów B14
Achievable generation capacity: 781 MW
Outage size: 781 MW
Event type: Planned
Event start: 16-03-2026 00:01
Event end: 29-03-2026 18:00
Source: Active - Planned - Bełchatów B14

Outage information

Unit Solina H1
Achievable generation capacity: 68 MW
Outage size: 13 MW
Event type: Unplanned
Event start: 06-02-2025 16:20
Event end: 30-06-2026 23:45
Source: Active - Unplanned - Solina H1

Outage information

Unit JSW KOKS S.A. EC Koksownia Przyjaźń G2
Achievable generation capacity: 15 MW
Outage size: 15 MW
Event type: Planned
Event start: 10-01-2026 09:42
Event end: 30-03-2026 14:00
Source: Active - Planned - JSW KOKS S.A. EC Koksownia Przyjaźń G2

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 137 MW
Outage size: 137 MW
Event type: Planned
Event start: 22-10-2024 00:01
Event end: 10-02-2030 23:45
Source: Active - Planned - Porąbka Żar H3

Outage information

Unit Jaworzno 3 B3
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 01-12-2025 00:01
Event end: 10-04-2026 00:00
Source: Active - Planned - Jaworzno 3 B3

Outage information

Unit Opole B4
Achievable generation capacity: 355 MW
Outage size: 355 MW
Event type: Planned
Event start: 20-03-2026 00:01
Event end: 24-04-2026 00:00
Source: Active - Planned - Opole B4

Outage information

Unit Synthos Dwory 7 TG10
Achievable generation capacity: 19 MW
Outage size: 19 MW
Event type: Unplanned
Event start: 12-01-2026 07:28
Event end: 30-06-2026 15:00
Source: Active - Unplanned - Synthos Dwory 7 TG10

Outage information

Unit PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 670 MW
Event type: Planned
Event start: 13-03-2026 00:00
Event end: 14-03-2026 00:00
Source: Active - Planned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9

Outage information

Unit Połaniec B9
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 27-02-2026 22:00
Event end: 07-04-2026 22:00
Source: Active - Planned - Połaniec B9

Outage information

Unit Bełchatów B09
Achievable generation capacity: 362 MW
Outage size: 362 MW
Event type: Planned
Event start: 02-03-2026 00:00
Event end: 16-03-2026 18:00
Source: Active - Planned - Bełchatów B09

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 20 MW
Event type: Planned
Event start: 20-02-2026 01:01
Event end: 31-03-2026 23:59
Source: Active - Planned - Skawina Tg6

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 21-02-2026 06:01
Event end: 31-03-2026 23:59
Source: Active - Planned - Skawina Tg5

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 05-02-2026 11:13
Event end: 31-03-2026 23:59
Source: Active - Planned - Skawina Tg3

Outage information

Unit Jaworzno 3 B2
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 02-01-2026 00:00
Event end: 09-05-2026 00:00
Source: Active - Planned - Jaworzno 3 B2

Outage information

Unit Karolin B4
Achievable generation capacity: 105 MW
Outage size: 50 MW
Event type: Planned
Event start: 03-03-2026 00:00
Event end: 25-03-2026 23:45
Source: Active - Planned - Karolin B4

Outage information

Unit Synthos Dwory 7 TG7
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 03-03-2026 13:00
Event end: 30-09-2026 23:59
Source: Active - Planned - Synthos Dwory 7 TG7

Outage information

Unit Porąbka Żar H2
Achievable generation capacity: 137 MW
Outage size: 137 MW
Event type: Planned
Event start: 12-03-2026 06:00
Event end: 12-03-2026 18:00
Source: Active - Planned - Porąbka Żar H2

Outage information

Unit Dychów H3
Achievable generation capacity: 30 MW
Outage size: 30 MW
Event type: Planned
Event start: 16-03-2026 00:01
Event end: 27-03-2026 22:00
Source: Active - Planned - Dychów H3

Outage information

Unit Porąbka Żar H1
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 10-03-2026 22:00
Event end: 10-03-2026 23:00
Source: Active - Planned - Porąbka Żar H1

Outage information

Unit EC Białystok BIA_1-03
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Unplanned
Event start: 08-03-2026 02:03
Event end: 11-03-2026 23:45
Source: Active - Unplanned - EC Białystok BIA_1-03

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 11-03-2026 22:00
Event end: 11-03-2026 23:00
Source: Active - Planned - Porąbka Żar H4

Outage information

Unit Rybnik B6
Achievable generation capacity: 209 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 02-03-2026 07:15
Event end: 21-03-2026 00:00
Source: Active - Unplanned - Rybnik B6

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 236 MW
Event type: Planned
Event start: 12-03-2026 00:00
Event end: 16-03-2026 00:00
Source: Active - Planned - Turów B05

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 479 MW
Event type: Unplanned
Event start: 07-03-2026 00:00
Event end: 16-03-2026 08:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit Żarnowiec H2
Achievable generation capacity: 178 MW
Outage size: 178 MW
Event type: Planned
Event start: 13-03-2026 22:01
Event end: 15-03-2026 22:00
Source: Active - Planned - Żarnowiec H2

Outage information

Unit Turów B03
Achievable generation capacity: 226 MW
Outage size: 69 MW
Event type: Unplanned
Event start: 10-03-2026 15:15
Event end: 10-03-2026 15:30
Source: Inactive - Unplanned - Turów B03

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 10-03-2026 00:00
Event end: 10-03-2026 04:45
Source: Inactive - Unplanned - Turów B01

Outage information

Unit Turów B03
Achievable generation capacity: 226 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 10-03-2026 10:00
Event end: 10-03-2026 15:00
Source: Inactive - Unplanned - Turów B03

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 18 MW
Event type: Unplanned
Event start: 10-03-2026 06:15
Event end: 10-03-2026 07:00
Source: Inactive - Unplanned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 121 MW
Event type: Unplanned
Event start: 10-03-2026 22:00
Event end: 10-03-2026 23:00
Source: Active - Unplanned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 56 MW
Event type: Unplanned
Event start: 10-03-2026 21:00
Event end: 10-03-2026 21:15
Source: Inactive - Unplanned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 56 MW
Event type: Unplanned
Event start: 10-03-2026 07:45
Event end: 10-03-2026 08:00
Source: Inactive - Unplanned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 43 MW
Event type: Unplanned
Event start: 10-03-2026 15:30
Event end: 10-03-2026 15:45
Source: Inactive - Unplanned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 98 MW
Event type: Unplanned
Event start: 10-03-2026 15:00
Event end: 10-03-2026 15:15
Source: Inactive - Unplanned - Turów B01

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 19 MW
Event type: Unplanned
Event start: 10-03-2026 16:30
Event end: 10-03-2026 17:00
Source: Inactive - Unplanned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 19 MW
Event type: Unplanned
Event start: 10-03-2026 21:15
Event end: 10-03-2026 22:00
Source: Inactive - Unplanned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 19 MW
Event type: Unplanned
Event start: 10-03-2026 04:45
Event end: 10-03-2026 05:00
Source: Inactive - Unplanned - Turów B06

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 66 MW
Event type: Unplanned
Event start: 10-03-2026 07:45
Event end: 10-03-2026 08:15
Source: Inactive - Unplanned - Turów B11

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 37 MW
Event type: Unplanned
Event start: 10-03-2026 09:00
Event end: 10-03-2026 09:15
Source: Inactive - Unplanned - Turów B06

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 10-03-2026 16:00
Event end: 10-03-2026 17:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 10-03-2026 09:00
Event end: 10-03-2026 10:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 10-03-2026 06:00
Event end: 10-03-2026 07:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 10-03-2026 01:00
Event end: 10-03-2026 02:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 10-03-2026 12:00
Event end: 10-03-2026 13:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Pątnów B9
Achievable generation capacity: 474 MW
Outage size: 474 MW
Event type: Unplanned
Event start: 08-03-2026 09:28
Event end: 10-03-2026 06:00
Source: Inactive - Unplanned - Pątnów B9

Outage information

Unit KOGENERACJA S.A. WROB1-03
Achievable generation capacity: 104 MW
Outage size: 104 MW
Event type: Unplanned
Event start: 09-03-2026 09:40
Event end: 10-03-2026 00:00
Source: Inactive - Unplanned - KOGENERACJA S.A. WROB1-03

Outage information

Unit Bełchatów B14
Achievable generation capacity: 781 MW
Outage size: 221 MW
Event type: Planned
Event start: 11-03-2026 00:00
Event end: 12-03-2026 00:00
Source: Active - Planned - Bełchatów B14

Outage information

Unit Połaniec B7
Achievable generation capacity: 221 MW
Outage size: 37 MW
Event type: Planned
Event start: 12-03-2026 15:15
Event end: 12-03-2026 19:30
Source: Active - Planned - Połaniec B7

Outage information

Unit Połaniec B7
Achievable generation capacity: 221 MW
Outage size: 65 MW
Event type: Planned
Event start: 13-03-2026 06:00
Event end: 13-03-2026 12:15
Source: Active - Planned - Połaniec B7

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 11-03-2026 00:00
Event end: 11-03-2026 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 11-03-2026 08:00
Event end: 11-03-2026 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 11-03-2026 12:00
Event end: 11-03-2026 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 11-03-2026 06:00
Event end: 11-03-2026 07:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 11-03-2026 16:00
Event end: 11-03-2026 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 11-03-2026 02:00
Event end: 11-03-2026 03:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 11-03-2026 18:00
Event end: 11-03-2026 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 11-03-2026 20:00
Event end: 11-03-2026 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Ostrołęka B B01
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Unplanned
Event start: 05-03-2026 20:25
Event end: 11-03-2026 00:00
Source: Active - Unplanned - Ostrołęka B B01

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 66 MW
Event type: Unplanned
Event start: 10-03-2026 09:15
Event end: 10-03-2026 09:30
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 75 MW
Event type: Unplanned
Event start: 10-03-2026 15:15
Event end: 10-03-2026 15:30
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 132 MW
Event type: Unplanned
Event start: 10-03-2026 10:00
Event end: 10-03-2026 15:00
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 47 MW
Event type: Unplanned
Event start: 10-03-2026 21:15
Event end: 10-03-2026 21:45
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B03
Achievable generation capacity: 226 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 10-03-2026 00:00
Event end: 10-03-2026 06:30
Source: Inactive - Unplanned - Turów B03

Outage information

Unit Turów B03
Achievable generation capacity: 226 MW
Outage size: 56 MW
Event type: Unplanned
Event start: 10-03-2026 07:45
Event end: 10-03-2026 08:00
Source: Inactive - Unplanned - Turów B03

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 28 MW
Event type: Unplanned
Event start: 10-03-2026 06:30
Event end: 10-03-2026 09:00
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B02
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Planned
Event start: 07-03-2026 00:21
Event end: 12-03-2026 00:00
Source: Active - Planned - Turów B02

Outage information

Unit PAK-PCE CZŁUCHÓW FW Ględowo
Achievable generation capacity: 73 MW
Outage size: 2 MW
Event type: Unplanned
Event start: 09-03-2026 17:54
Event end: 10-03-2026 16:00
Source: Inactive - Unplanned - PAK-PCE CZŁUCHÓW FW Ględowo

Outage information

Unit Opole B5
Achievable generation capacity: 829 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 11-03-2026 00:00
Event end: 12-03-2026 00:00
Source: Active - Unplanned - Opole B5

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 1 MW
Event type: Unplanned
Event start: 11-03-2026 05:00
Event end: 11-03-2026 05:15
Source: Active - Unplanned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 19 MW
Event type: Unplanned
Event start: 11-03-2026 16:45
Event end: 11-03-2026 17:00
Source: Active - Unplanned - Turów B06

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 18 MW
Event type: Unplanned
Event start: 11-03-2026 16:45
Event end: 11-03-2026 17:00
Source: Active - Unplanned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 28 MW
Event type: Unplanned
Event start: 11-03-2026 19:45
Event end: 11-03-2026 20:45
Source: Active - Unplanned - Turów B01

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 131 MW
Event type: Unplanned
Event start: 11-03-2026 22:00
Event end: 11-03-2026 22:15
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 247 MW
Event type: Unplanned
Event start: 11-03-2026 22:45
Event end: 12-03-2026 00:00
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 133 MW
Event type: Unplanned
Event start: 11-03-2026 23:00
Event end: 12-03-2026 00:00
Source: Active - Unplanned - Turów B06

Outage information

Unit Turów B03
Achievable generation capacity: 226 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 11-03-2026 23:00
Event end: 12-03-2026 00:00
Source: Active - Unplanned - Turów B03

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 132 MW
Event type: Unplanned
Event start: 11-03-2026 23:00
Event end: 12-03-2026 00:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 11-03-2026 23:00
Event end: 12-03-2026 00:00
Source: Active - Unplanned - Turów B01

Outage information

Unit Kraków Łęg KLE_1-02
Achievable generation capacity: 120 MW
Outage size: 120 MW
Event type: Planned
Event start: 18-03-2026 00:00
Event end: 16-05-2026 00:00
Source: Active - Planned - Kraków Łęg KLE_1-02

Outage information

Unit PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 670 MW
Event type: Planned
Event start: 10-03-2026 00:06
Event end: 16-03-2026 00:00
Source: Active - Planned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 36 MW
Event type: Unplanned
Event start: 10-03-2026 22:00
Event end: 10-03-2026 22:45
Source: Active - Unplanned - Turów B04

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 36 MW
Event type: Unplanned
Event start: 10-03-2026 16:00
Event end: 10-03-2026 21:00
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Solina H3
Achievable generation capacity: 31 MW
Outage size: 31 MW
Event type: Planned
Event start: 14-03-2026 07:01
Event end: 15-03-2026 23:45
Source: Active - Planned - Solina H3

Outage information

Unit Eolos Novo Sp. z o.o. FW Czarnożyły
Achievable generation capacity: 16 MW
Outage size: 2 MW
Event type: Unplanned
Event start: 10-03-2026 09:55
Event end: 10-03-2026 12:02
Source: Inactive - Unplanned - Eolos Novo Sp. z o.o. FW Czarnożyły

Outage information

Unit Eolos Polska Sp. z o.o. FW Gorzkowice
Achievable generation capacity: 12 MW
Outage size: 2 MW
Event type: Planned
Event start: 09-03-2026 08:23
Event end: 10-03-2026 12:04
Source: Inactive - Planned - Eolos Polska Sp. z o.o. FW Gorzkowice

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 834 MW
Outage size: 260 MW
Event type: Unplanned
Event start: 10-03-2026 15:15
Event end: 10-03-2026 16:15
Source: Inactive - Unplanned - Jaworzno 2 JWCD B7

Outage information

Unit Eolos Polska Sp. z o.o. FW Krzyżanów
Achievable generation capacity: 20 MW
Outage size: 2 MW
Event type: Planned
Event start: 10-03-2026 08:02
Event end: 10-03-2026 15:09
Source: Inactive - Planned - Eolos Polska Sp. z o.o. FW Krzyżanów

Outage information

Unit Eolos Novo Sp. z o.o. FW Czarnożyły
Achievable generation capacity: 16 MW
Outage size: 2 MW
Event type: Planned
Event start: 11-03-2026 08:00
Event end: 11-03-2026 13:00
Source: Active - Planned - Eolos Novo Sp. z o.o. FW Czarnożyły

Outage information

Unit Eolos Polska Sp. z o.o. FW Krzyżanów
Achievable generation capacity: 20 MW
Outage size: 4 MW
Event type: Planned
Event start: 11-03-2026 08:00
Event end: 11-03-2026 16:00
Source: Active - Planned - Eolos Polska Sp. z o.o. FW Krzyżanów

Outage information

Unit Turów B03
Achievable generation capacity: 226 MW
Outage size: 103 MW
Event type: Unplanned
Event start: 10-03-2026 22:45
Event end: 10-03-2026 23:00
Source: Active - Unplanned - Turów B03

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 12-03-2026 00:00
Event end: 12-03-2026 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 12-03-2026 05:00
Event end: 12-03-2026 06:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 12-03-2026 08:00
Event end: 12-03-2026 09:00
Source: Active - Unplanned - Płock B01

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.