Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
September 2024
Sun 8 Mon 9 Tue 10 Wed 11 Thu 12 Fri 13 Sat 14 Sun 15 Mon 16 Tue 17 Wed 18 Thu 19 Fri 20 Sat 21
Bełchatów 5102
B02 370 341 341 341 341 341 341 341 341 341 341 341 341 341 341
B03 380 347
B04 380
B05 380
B06 394
B07 390
B08 390 358 358 358 358 358 358 358 358
B09 390
B10 390 390 390 390 390 390 390 390 390 390 390 390 390 390 390
B11 390
B12 390
B14 858
Chorzów 226
B1 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113
B2 113
Dolna Odra 900
B5 222
B6 222 210
B7 224 210 210 210 210 210 210 210 210 210 210 210 210 210 210
B8 232
Dychów 85
H1 28 30 30 30 30 30 30 30 30 30 30 30 30 30 30
H2 29
H3 28
EC Białystok 154
BIA_1-01 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
BIA_1-02 52
BIA_1-03 52
EC Gorzów 138
GOR2 138
EC Mielec 33
ECM 33 24 24 24 24 24 24 24 24 24 24 24 24 24 24
EC Rzeszów 120
ECR 120 101 101 101 101 101 101 101 101 101 101 101 101 101 101
EC Siekierki 595
WSIB 07 106 106 106 106 106 106 106 106 106 106 106 106 106 106 106
WSIB 08 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125
WSIB 09 102 102 102 102 102 102 102 102 102 102 102 102 102 102 102
WSIB 10 102
WSIK 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160
EC Stalowa Wola 450
Stalowa Wola BGP 450
EC Włocławek 465
B1 465 465 465 465 465 465 465 465
EC Wrotków 231
ECW 231 231 231 231 231 231 231 231 231 231 231 231 231 231 231
EC Żerań 299
WZE 299 299 299 299 299 299 299 299 299 299 299 299 299 299 299
EC Żerań 2 497
B20 497
Elektrociepłownia "Zielona Góra" S.A. 188
ZG BPG 188
Eolos Novo Sp. z o.o. 16
FW Czarnożyły 16
Eolos Polska Sp. z o.o. 32
FW Gorzkowice 12
FW Krzyżanów 20 4 4
EW Włocławek 168
H01 28 28 28
H02 28 28 28
H03 28
H04 28
H05 28
H06 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28
FW Banie 12 106
FW Banie 12 106
FW Banie 3 81
FW Banie 3 81
FW Banie 4 56
FW Banie 4 56
FW Biały Bór 145
BBFW 145
FW Iława 13
FW Iława 13
FW Marszewo 100
FMA 100
FW Sępopol 44
FW Sępopol 44
Grupa Azoty Zakłady Azotowe „Puławy” SA 128
EC Puławy 128
Jaworzno 2 910
JWCD B7 910 834
Jaworzno 3 1345
B1 225 210
B2 225
B3 225
B4 225
B5 220 206 206 206 206 206 206 206 206 206 206 206 206 206 206
B6 225
Karolin 212
B2 100
B3 112
Katowice 135
B1 135
KOGENERACJA S.A. 208
WROB1-02 104 104 104 104 104 104 104 104 104 104 104 104 104 104 104
WROB1-03 104
Kozienice 1 1800
B1 228
B2 228
B3 220
B4 228
B5 228 228 228 228 228 228 228 228 228 228 228 228 228 228
B6 228
B7 220
B8 220
Kozienice 2 2207
B09 566
B10 566
B11 1075
Kraków Łęg 451
KLE_1-01 122
KLE_1-02 120
KLE_1-03 102
KLE_1-04 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107
Łagisza 460
B10 460
Łaziska 3 905
B09 230 215
B10 225
B11 225
B12 225
Opole 3342
B1 386
B2 383
B3 383
B4 380
B5 905
B6 905
Ostrołęka B 690
B01 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230
B02 230
B03 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230
Pątnów 644
B1 222 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B2 222 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B5 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
Pątnów B9 474
B9 474 474 474 474 474 474 474 474 474 474 474 474 474 474 474
PGE Gryfino 2050 sp. z o.o. 1366
Gryfino blok 10 683
Gryfino blok 9 683 64 63
Płock 630
B01 630 180 180
Połaniec 1899
B1 225
B2 242 227
B3 242 226 226 226 226 226
B4 242
B5 242 224 224 224 224 224 224 224
B6 242
B7 239
B9 225
Porąbka Żar 540
H1 135 138 138 138 138 138 138 138 138 138 138 138 138 138 138
H2 135 138 138 138 138 138 138 138 138 138 138 138 138 138 138
H3 135 138 138 138 138 138 138 138 138 138 138 138 138 138 138
H4 135 138 138 138 138 138 138 138 138 138 138 138 138 138 138
Rybnik 900
B5 225
B6 225
B7 225 84 84
B8 225 21
Siersza 306
B1 153 139 139 139 139 139 139 139 139 139 139 139 139 139 139
B2 153
Skawina 330
Tg3 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg5 110 40 40 40 40 40 40 40 40 40 40 40 40 40 40
Tg6 110 110 110
Solina 198
H1 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68
H2 68
H3 31
H4 31
Synthos Dwory 7 170
GT1 72
TG10 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
TG7 28 27 27 27 27 27 27 27 27 27
TG8 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
TG9 31
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158 80 80 80 80 80 80 80 80 80 80 80 80 80 80
Turów 2029
B01 250
B02 250 38 38 38 38 38 38 38
B03 250
B04 261 142 142 142 142 142 142 142 142 142 142 142 142 142
B05 261
B06 261 236 236 236 236 236 236 236 236 236 236 236 236 236
B11 496
Veolia Energia Łódź EC4 105
B03 105 105 105 105 105 105 105 105 105 105 105 105 105 105 105
Windfarm Polska III sp. z o.o. 126
WINDFARM 126
Żarnowiec 716
H1 179
H2 179
H3 179
H4 179
Żydowo 167
H1 55 55 55 55 55 55 55 55 55 55 55 55 55 55
H2 55 55 55 55 55 55 55 55 55 55 55 55 55 55
H3 57 55 55 55 55 55 55 55 55 55 55 55 55 55
Planned 6070 5484 5349 5433 5433 5349 5763 5763 5707 5707 5707 5707 5707 5243
Unplanned 3129 1857 1390 1390 1390 1840 1840 1337 1337 1310 860 860 860 718
Total outages 9199 7341 6739 6823 6823 7189 7603 7100 7044 7017 6567 6567 6567 5961

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned
Event start: 03-06-2024 00:01
Event end: 21-09-2024 00:00
Source: Active - Planned - Kozienice 1 B5

Outage information

Unit Bełchatów B10
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned
Event start: 07-09-2024 00:01
Event end: 26-11-2024 18:00
Source: Active - Planned - Bełchatów B10

Outage information

Unit EC Siekierki WSIB 08
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Planned
Event start: 16-08-2024 00:01
Event end: 14-11-2024 00:00
Source: Active - Planned - EC Siekierki WSIB 08

Outage information

Unit Pątnów B9 B9
Achievable generation capacity: 474 MW
Outage size: 474 MW
Event type: Planned
Event start: 19-08-2024 00:01
Event end: 20-10-2024 00:00
Source: Active - Planned - Pątnów B9 B9

Outage information

Unit Dychów H1
Achievable generation capacity: 30 MW
Outage size: 30 MW
Event type: Planned
Event start: 09-09-2024 00:01
Event end: 04-10-2024 23:45
Source: Active - Planned - Dychów H1

Outage information

Unit TAMEH Polska sp. z o. o. Elektrownia Blachownia
Achievable generation capacity: 158 MW
Outage size: 80 MW
Event type: Planned
Event start: 04-03-2024 12:00
Event end: 31-12-2024 23:59
Source: Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia

Outage information

Unit Synthos Dwory 7 TG8
Achievable generation capacity: 20 MW
Outage size: 20 MW
Event type: Planned
Event start: 22-03-2024 00:01
Event end: 22-03-2027 23:59
Source: Active - Planned - Synthos Dwory 7 TG8

Outage information

Unit Synthos Dwory 7 TG10
Achievable generation capacity: 19 MW
Outage size: 19 MW
Event type: Planned
Event start: 04-04-2024 13:30
Event end: 30-09-2024 12:00
Source: Active - Planned - Synthos Dwory 7 TG10

Outage information

Unit Pątnów B1
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 07-05-2024 08:01
Event end: 01-01-2025 00:00
Source: Active - Unplanned - Pątnów B1

Outage information

Unit EC Mielec ECM
Achievable generation capacity: 33 MW
Outage size: 24 MW
Event type: Planned
Event start: 27-04-2024 09:00
Event end: 01-10-2024 00:00
Source: Active - Planned - EC Mielec ECM

Outage information

Unit EC Białystok BIA_1-01
Achievable generation capacity: 50 MW
Outage size: 50 MW
Event type: Planned
Event start: 01-04-2024 00:01
Event end: 24-09-2024 23:45
Source: Active - Planned - EC Białystok BIA_1-01

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 01-05-2024 00:01
Event end: 30-09-2024 23:45
Source: Active - Planned - Porąbka Żar H4

Outage information

Unit Porąbka Żar H1
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 01-05-2024 00:01
Event end: 30-09-2024 23:45
Source: Active - Planned - Porąbka Żar H1

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 01-05-2024 00:01
Event end: 30-09-2024 23:45
Source: Active - Planned - Porąbka Żar H3

Outage information

Unit Porąbka Żar H2
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 01-05-2024 00:12
Event end: 30-09-2024 23:45
Source: Active - Planned - Porąbka Żar H2

Outage information

Unit Kraków Łęg KLE_1-04
Achievable generation capacity: 107 MW
Outage size: 107 MW
Event type: Planned
Event start: 19-06-2024 00:01
Event end: 15-11-2024 23:59
Source: Active - Planned - Kraków Łęg KLE_1-04

Outage information

Unit Pątnów B2
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 14-06-2024 00:00
Event end: 22-06-2025 00:00
Source: Active - Unplanned - Pątnów B2

Outage information

Unit KOGENERACJA S.A. WROB1-02
Achievable generation capacity: 104 MW
Outage size: 104 MW
Event type: Planned
Event start: 24-06-2024 00:00
Event end: 31-10-2024 23:45
Source: Active - Planned - KOGENERACJA S.A. WROB1-02

Outage information

Unit EC Siekierki WSIB 09
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Planned
Event start: 20-04-2024 01:14
Event end: 19-12-2024 00:00
Source: Active - Planned - EC Siekierki WSIB 09

Outage information

Unit EC Siekierki WSIB 07
Achievable generation capacity: 106 MW
Outage size: 106 MW
Event type: Planned
Event start: 06-07-2024 00:01
Event end: 03-10-2024 00:00
Source: Active - Planned - EC Siekierki WSIB 07

Outage information

Unit EC Siekierki WSIK
Achievable generation capacity: 160 MW
Outage size: 160 MW
Event type: Planned
Event start: 15-07-2024 00:01
Event end: 24-09-2024 00:00
Source: Active - Planned - EC Siekierki WSIK

Outage information

Unit EC Wrotków ECW
Achievable generation capacity: 231 MW
Outage size: 231 MW
Event type: Planned
Event start: 22-04-2024 00:01
Event end: 22-10-2024 23:45
Source: Active - Planned - EC Wrotków ECW

Outage information

Unit Opole B1
Achievable generation capacity: 357 MW
Outage size: 357 MW
Event type: Planned
Event start: 25-08-2024 00:01
Event end: 08-09-2024 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B2
Achievable generation capacity: 358 MW
Outage size: 358 MW
Event type: Planned
Event start: 25-08-2024 00:01
Event end: 08-09-2024 00:00
Source: Inactive - Planned - Opole B2

Outage information

Unit Ostrołęka B B03
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 01-06-2024 00:01
Event end: 01-02-2025 00:00
Source: Active - Planned - Ostrołęka B B03

Outage information

Unit Siersza B1
Achievable generation capacity: 139 MW
Outage size: 139 MW
Event type: Planned
Event start: 02-09-2024 00:00
Event end: 26-11-2024 00:00
Source: Active - Planned - Siersza B1

Outage information

Unit EW Włocławek H06
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 19-08-2024 06:01
Event end: 27-09-2024 17:00
Source: Active - Planned - EW Włocławek H06

Outage information

Unit Ostrołęka B B01
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 03-08-2024 00:01
Event end: 26-09-2024 00:00
Source: Active - Planned - Ostrołęka B B01

Outage information

Unit Veolia Energia Łódź EC4 B03
Achievable generation capacity: 105 MW
Outage size: 105 MW
Event type: Planned
Event start: 21-08-2024 00:00
Event end: 18-10-2024 12:00
Source: Active - Planned - Veolia Energia Łódź EC4 B03

Outage information

Unit Jaworzno 3 B5
Achievable generation capacity: 206 MW
Outage size: 206 MW
Event type: Unplanned
Event start: 01-09-2024 00:00
Event end: 23-09-2024 00:00
Source: Active - Unplanned - Jaworzno 3 B5

Outage information

Unit Rybnik B8
Achievable generation capacity: 208 MW
Outage size: 21 MW
Event type: Planned
Event start: 09-09-2024 17:00
Event end: 09-09-2024 21:30
Source: Active - Planned - Rybnik B8

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 299 MW
Outage size: 299 MW
Event type: Planned
Event start: 01-07-2024 00:01
Event end: 25-11-2024 00:00
Source: Active - Planned - EC Żerań WZE

Outage information

Unit EW Włocławek H01
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 14-09-2024 06:01
Event end: 15-09-2024 17:00
Source: Active - Planned - EW Włocławek H01

Outage information

Unit EW Włocławek H02
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 14-09-2024 06:01
Event end: 15-09-2024 17:00
Source: Active - Planned - EW Włocławek H02

Outage information

Unit Połaniec B5
Achievable generation capacity: 224 MW
Outage size: 224 MW
Event type: Unplanned
Event start: 13-09-2024 00:01
Event end: 17-09-2024 12:00
Source: Active - Unplanned - Połaniec B5

Outage information

Unit Dychów H1
Achievable generation capacity: 30 MW
Outage size: 30 MW
Event type: Planned
Event start: 01-09-2024 00:00
Event end: 09-09-2024 00:00
Source: Active - Planned - Dychów H1

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 104 MW
Event type: Unplanned
Event start: 27-08-2024 02:45
Event end: 08-09-2024 00:00
Source: Inactive - Unplanned - Turów B05

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 39 MW
Event type: Planned
Event start: 11-09-2024 15:31
Event end: 11-09-2024 18:30
Source: Active - Planned - Rybnik B7

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 84 MW
Event type: Planned
Event start: 11-09-2024 12:31
Event end: 11-09-2024 13:00
Source: Active - Planned - Rybnik B7

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 84 MW
Event type: Planned
Event start: 11-09-2024 13:01
Event end: 11-09-2024 15:00
Source: Active - Planned - Rybnik B7

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 39 MW
Event type: Planned
Event start: 11-09-2024 15:01
Event end: 11-09-2024 15:30
Source: Active - Planned - Rybnik B7

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 15 MW
Event type: Planned
Event start: 11-09-2024 08:00
Event end: 11-09-2024 09:30
Source: Active - Planned - Rybnik B7

Outage information

Unit Pątnów B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Planned
Event start: 30-08-2024 11:00
Event end: 01-01-2025 00:00
Source: Active - Planned - Pątnów B5

Outage information

Unit EC Rzeszów ECR
Achievable generation capacity: 101 MW
Outage size: 101 MW
Event type: Planned
Event start: 01-07-2024 00:01
Event end: 03-12-2024 23:45
Source: Active - Planned - EC Rzeszów ECR

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 02-04-2024 13:34
Event end: 01-11-2024 23:59
Source: Active - Planned - Skawina Tg3

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 40 MW
Event type: Planned
Event start: 12-07-2024 13:04
Event end: 30-09-2024 23:59
Source: Active - Planned - Skawina Tg5

Outage information

Unit Chorzów B1
Achievable generation capacity: 113 MW
Outage size: 113 MW
Event type: Planned
Event start: 01-09-2024 00:00
Event end: 30-09-2024 23:00
Source: Active - Planned - Chorzów B1

Outage information

Unit Połaniec B3
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Unplanned
Event start: 13-09-2024 00:01
Event end: 17-09-2024 12:00
Source: Active - Unplanned - Połaniec B3

Outage information

Unit Żydowo H1
Achievable generation capacity: 55 MW
Outage size: 55 MW
Event type: Planned
Event start: 09-09-2024 07:01
Event end: 27-09-2024 20:00
Source: Active - Planned - Żydowo H1

Outage information

Unit Żydowo H2
Achievable generation capacity: 55 MW
Outage size: 55 MW
Event type: Planned
Event start: 09-09-2024 07:01
Event end: 27-09-2024 20:00
Source: Active - Planned - Żydowo H2

Outage information

Unit Żydowo H3
Achievable generation capacity: 57 MW
Outage size: 55 MW
Event type: Planned
Event start: 09-09-2024 07:01
Event end: 27-09-2024 20:00
Source: Active - Planned - Żydowo H3

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 05-09-2024 06:00
Event end: 09-09-2024 00:00
Source: Active - Planned - Dolna Odra B6

Outage information

Unit Bełchatów B03
Achievable generation capacity: 347 MW
Outage size: 347 MW
Event type: Planned
Event start: 07-09-2024 00:00
Event end: 08-09-2024 12:00
Source: Inactive - Planned - Bełchatów B03

Outage information

Unit Bełchatów B08
Achievable generation capacity: 358 MW
Outage size: 358 MW
Event type: Planned
Event start: 14-09-2024 00:00
Event end: 28-09-2024 00:00
Source: Active - Planned - Bełchatów B08

Outage information

Unit Solina H1
Achievable generation capacity: 68 MW
Outage size: 68 MW
Event type: Unplanned
Event start: 04-09-2024 00:00
Event end: 30-09-2024 20:00
Source: Active - Unplanned - Solina H1

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 236 MW
Event type: Planned
Event start: 28-08-2024 00:03
Event end: 21-09-2024 00:00
Source: Active - Planned - Turów B06

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 10 MW
Event type: Planned
Event start: 12-09-2024 08:31
Event end: 12-09-2024 09:00
Source: Active - Planned - Rybnik B7

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 39 MW
Event type: Planned
Event start: 12-09-2024 14:16
Event end: 12-09-2024 19:00
Source: Active - Planned - Rybnik B7

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 31 MW
Event type: Planned
Event start: 12-09-2024 13:46
Event end: 12-09-2024 14:15
Source: Active - Planned - Rybnik B7

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 39 MW
Event type: Planned
Event start: 12-09-2024 13:16
Event end: 12-09-2024 13:45
Source: Active - Planned - Rybnik B7

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 74 MW
Event type: Planned
Event start: 12-09-2024 11:46
Event end: 12-09-2024 13:15
Source: Active - Planned - Rybnik B7

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 69 MW
Event type: Planned
Event start: 12-09-2024 11:01
Event end: 12-09-2024 11:45
Source: Active - Planned - Rybnik B7

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 84 MW
Event type: Planned
Event start: 12-09-2024 10:01
Event end: 12-09-2024 11:00
Source: Active - Planned - Rybnik B7

Outage information

Unit Rybnik B7
Achievable generation capacity: 209 MW
Outage size: 15 MW
Event type: Planned
Event start: 12-09-2024 09:01
Event end: 12-09-2024 10:00
Source: Active - Planned - Rybnik B7

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 142 MW
Event type: Unplanned
Event start: 06-09-2024 11:00
Event end: 21-09-2024 00:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Turów B02
Achievable generation capacity: 226 MW
Outage size: 38 MW
Event type: Unplanned
Event start: 06-09-2024 11:00
Event end: 15-09-2024 00:00
Source: Active - Unplanned - Turów B02

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 24-08-2024 00:01
Event end: 22-11-2024 00:00
Source: Active - Planned - Dolna Odra B7

Outage information

Unit Bełchatów B02
Achievable generation capacity: 341 MW
Outage size: 341 MW
Event type: Planned
Event start: 24-08-2024 00:01
Event end: 22-12-2024 18:00
Source: Active - Planned - Bełchatów B02

Outage information

Unit Bełchatów B07
Achievable generation capacity: 357 MW
Outage size: 357 MW
Event type: Planned
Event start: 06-09-2024 00:00
Event end: 08-09-2024 00:00
Source: Inactive - Planned - Bełchatów B07

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 38 MW
Event type: Unplanned
Event start: 07-09-2024 23:01
Event end: 08-09-2024 00:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 465 MW
Event type: Unplanned
Event start: 06-09-2024 08:01
Event end: 14-09-2024 08:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit Synthos Dwory 7 TG7
Achievable generation capacity: 28 MW
Outage size: 27 MW
Event type: Unplanned
Event start: 06-09-2024 15:00
Event end: 16-09-2024 16:00
Source: Active - Unplanned - Synthos Dwory 7 TG7

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 57 MW
Event type: Unplanned
Event start: 08-09-2024 12:01
Event end: 08-09-2024 13:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 47 MW
Event type: Unplanned
Event start: 08-09-2024 22:01
Event end: 08-09-2024 23:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 28 MW
Event type: Unplanned
Event start: 08-09-2024 08:01
Event end: 08-09-2024 09:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 49 MW
Event type: Unplanned
Event start: 08-09-2024 21:01
Event end: 08-09-2024 22:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 08-09-2024 02:01
Event end: 08-09-2024 03:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 52 MW
Event type: Unplanned
Event start: 08-09-2024 20:01
Event end: 08-09-2024 21:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 36 MW
Event type: Unplanned
Event start: 08-09-2024 01:01
Event end: 08-09-2024 02:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 08-09-2024 19:01
Event end: 08-09-2024 20:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 26 MW
Event type: Unplanned
Event start: 08-09-2024 07:01
Event end: 08-09-2024 08:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 62 MW
Event type: Unplanned
Event start: 08-09-2024 18:01
Event end: 08-09-2024 19:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 63 MW
Event type: Unplanned
Event start: 08-09-2024 17:01
Event end: 08-09-2024 18:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 26 MW
Event type: Unplanned
Event start: 08-09-2024 06:01
Event end: 08-09-2024 07:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 64 MW
Event type: Unplanned
Event start: 08-09-2024 16:01
Event end: 08-09-2024 17:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 64 MW
Event type: Unplanned
Event start: 08-09-2024 15:01
Event end: 08-09-2024 16:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 27 MW
Event type: Unplanned
Event start: 08-09-2024 05:01
Event end: 08-09-2024 06:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 63 MW
Event type: Unplanned
Event start: 08-09-2024 14:01
Event end: 08-09-2024 15:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 61 MW
Event type: Unplanned
Event start: 08-09-2024 13:01
Event end: 08-09-2024 14:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 28 MW
Event type: Unplanned
Event start: 08-09-2024 04:01
Event end: 08-09-2024 05:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 47 MW
Event type: Unplanned
Event start: 08-09-2024 23:01
Event end: 09-09-2024 00:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 48 MW
Event type: Unplanned
Event start: 08-09-2024 11:01
Event end: 08-09-2024 12:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 29 MW
Event type: Unplanned
Event start: 08-09-2024 03:01
Event end: 08-09-2024 04:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 42 MW
Event type: Unplanned
Event start: 08-09-2024 10:01
Event end: 08-09-2024 11:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 37 MW
Event type: Unplanned
Event start: 08-09-2024 09:01
Event end: 08-09-2024 10:00
Source: Inactive - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 165 MW
Event type: Unplanned
Event start: 08-09-2024 18:01
Event end: 08-09-2024 19:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 145 MW
Event type: Unplanned
Event start: 08-09-2024 00:00
Event end: 08-09-2024 01:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 145 MW
Event type: Unplanned
Event start: 08-09-2024 01:01
Event end: 08-09-2024 02:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 08-09-2024 02:01
Event end: 08-09-2024 03:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 08-09-2024 03:01
Event end: 08-09-2024 04:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 08-09-2024 04:01
Event end: 08-09-2024 05:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 08-09-2024 05:01
Event end: 08-09-2024 06:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 08-09-2024 06:01
Event end: 08-09-2024 07:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 08-09-2024 07:01
Event end: 08-09-2024 08:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 08-09-2024 08:01
Event end: 08-09-2024 09:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 08-09-2024 09:01
Event end: 08-09-2024 10:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 08-09-2024 10:01
Event end: 08-09-2024 11:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 165 MW
Event type: Unplanned
Event start: 08-09-2024 11:01
Event end: 08-09-2024 12:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 170 MW
Event type: Unplanned
Event start: 08-09-2024 12:01
Event end: 08-09-2024 13:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 175 MW
Event type: Unplanned
Event start: 08-09-2024 13:01
Event end: 08-09-2024 14:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 175 MW
Event type: Unplanned
Event start: 08-09-2024 14:01
Event end: 08-09-2024 15:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 180 MW
Event type: Unplanned
Event start: 08-09-2024 15:01
Event end: 08-09-2024 16:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 180 MW
Event type: Unplanned
Event start: 08-09-2024 16:01
Event end: 08-09-2024 17:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 180 MW
Event type: Unplanned
Event start: 08-09-2024 17:01
Event end: 08-09-2024 18:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 160 MW
Event type: Unplanned
Event start: 08-09-2024 19:01
Event end: 08-09-2024 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 160 MW
Event type: Unplanned
Event start: 08-09-2024 20:01
Event end: 08-09-2024 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 08-09-2024 21:01
Event end: 08-09-2024 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 150 MW
Event type: Unplanned
Event start: 08-09-2024 22:01
Event end: 08-09-2024 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Połaniec B2
Achievable generation capacity: 227 MW
Outage size: 227 MW
Event type: Unplanned
Event start: 06-09-2024 15:50
Event end: 08-09-2024 19:00
Source: Inactive - Unplanned - Połaniec B2

Outage information

Unit Połaniec B5
Achievable generation capacity: 224 MW
Outage size: 224 MW
Event type: Unplanned
Event start: 06-09-2024 22:23
Event end: 09-09-2024 14:00
Source: Active - Unplanned - Połaniec B5

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 09-09-2024 18:01
Event end: 09-09-2024 19:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 55 MW
Event type: Unplanned
Event start: 09-09-2024 11:01
Event end: 09-09-2024 12:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 24 MW
Event type: Unplanned
Event start: 09-09-2024 22:01
Event end: 09-09-2024 23:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 09-09-2024 10:01
Event end: 09-09-2024 11:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 28 MW
Event type: Unplanned
Event start: 09-09-2024 17:01
Event end: 09-09-2024 18:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 47 MW
Event type: Unplanned
Event start: 09-09-2024 09:01
Event end: 09-09-2024 10:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 28 MW
Event type: Unplanned
Event start: 09-09-2024 20:01
Event end: 09-09-2024 21:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 43 MW
Event type: Unplanned
Event start: 09-09-2024 08:01
Event end: 09-09-2024 09:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 29 MW
Event type: Unplanned
Event start: 09-09-2024 16:01
Event end: 09-09-2024 17:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 36 MW
Event type: Unplanned
Event start: 09-09-2024 06:01
Event end: 09-09-2024 08:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 09-09-2024 15:01
Event end: 09-09-2024 16:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 41 MW
Event type: Unplanned
Event start: 09-09-2024 05:01
Event end: 09-09-2024 06:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 29 MW
Event type: Unplanned
Event start: 09-09-2024 19:01
Event end: 09-09-2024 20:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 36 MW
Event type: Unplanned
Event start: 09-09-2024 04:01
Event end: 09-09-2024 05:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 52 MW
Event type: Unplanned
Event start: 09-09-2024 14:01
Event end: 09-09-2024 15:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 40 MW
Event type: Unplanned
Event start: 09-09-2024 03:01
Event end: 09-09-2024 04:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 25 MW
Event type: Unplanned
Event start: 09-09-2024 21:01
Event end: 09-09-2024 22:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 41 MW
Event type: Unplanned
Event start: 09-09-2024 02:01
Event end: 09-09-2024 03:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 20 MW
Event type: Unplanned
Event start: 09-09-2024 23:01
Event end: 10-09-2024 00:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 58 MW
Event type: Unplanned
Event start: 09-09-2024 13:01
Event end: 09-09-2024 14:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 63 MW
Event type: Unplanned
Event start: 09-09-2024 12:01
Event end: 09-09-2024 13:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 09-09-2024 01:01
Event end: 09-09-2024 02:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 09-09-2024 23:01
Event end: 10-09-2024 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 09-09-2024 22:01
Event end: 09-09-2024 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 09-09-2024 21:01
Event end: 09-09-2024 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 145 MW
Event type: Unplanned
Event start: 09-09-2024 20:01
Event end: 09-09-2024 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 160 MW
Event type: Unplanned
Event start: 09-09-2024 19:01
Event end: 09-09-2024 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 170 MW
Event type: Unplanned
Event start: 09-09-2024 18:01
Event end: 09-09-2024 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 180 MW
Event type: Unplanned
Event start: 09-09-2024 17:01
Event end: 09-09-2024 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 180 MW
Event type: Unplanned
Event start: 09-09-2024 16:01
Event end: 09-09-2024 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 180 MW
Event type: Unplanned
Event start: 09-09-2024 15:01
Event end: 09-09-2024 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 180 MW
Event type: Unplanned
Event start: 09-09-2024 14:01
Event end: 09-09-2024 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 175 MW
Event type: Unplanned
Event start: 09-09-2024 13:01
Event end: 09-09-2024 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 175 MW
Event type: Unplanned
Event start: 09-09-2024 12:01
Event end: 09-09-2024 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 165 MW
Event type: Unplanned
Event start: 09-09-2024 11:01
Event end: 09-09-2024 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 09-09-2024 10:01
Event end: 09-09-2024 11:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 09-09-2024 09:01
Event end: 09-09-2024 10:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 09-09-2024 08:01
Event end: 09-09-2024 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 09-09-2024 07:01
Event end: 09-09-2024 08:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 09-09-2024 06:01
Event end: 09-09-2024 07:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 09-09-2024 05:01
Event end: 09-09-2024 06:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 09-09-2024 04:01
Event end: 09-09-2024 05:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 09-09-2024 03:01
Event end: 09-09-2024 04:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 09-09-2024 02:01
Event end: 09-09-2024 03:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 09-09-2024 00:00
Event end: 09-09-2024 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 07-09-2024 00:01
Event end: 09-09-2024 23:59
Source: Active - Planned - Skawina Tg6

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 834 MW
Outage size: 500 MW
Event type: Planned
Event start: 06-09-2024 10:01
Event end: 08-09-2024 14:22
Source: Inactive - Planned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 834 MW
Outage size: 834 MW
Event type: Unplanned
Event start: 08-09-2024 14:23
Event end: 08-09-2024 19:30
Source: Active - Unplanned - Jaworzno 2 JWCD B7

Outage information

Unit Jaworzno 3 B1
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Unplanned
Event start: 08-09-2024 15:45
Event end: 08-09-2024 23:00
Source: Active - Unplanned - Jaworzno 3 B1

Outage information

Unit Łaziska 3 B09
Achievable generation capacity: 215 MW
Outage size: 215 MW
Event type: Planned
Event start: 04-09-2024 00:00
Event end: 08-09-2024 22:00
Source: Active - Planned - Łaziska 3 B09

Outage information

Unit Eolos Polska Sp. z o.o. FW Krzyżanów
Achievable generation capacity: 20 MW
Outage size: 4 MW
Event type: Planned
Event start: 07-09-2024 13:00
Event end: 09-09-2024 20:00
Source: Active - Planned - Eolos Polska Sp. z o.o. FW Krzyżanów

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.