Generation capacity outages
Generation capacity outages - help- Legend
- no outages
- all outages
- planned
- unplanned
| Power producer | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Power plant | Unit | Achievable generation capacity (MW) | July 2026 | August 2026 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Thu 30 | Fri 31 | Sat 1 | Sun 2 | Mon 3 | Tue 4 | Wed 5 | Thu 6 | Fri 7 | Sat 8 | Sun 9 | Mon 10 | Tue 11 | Wed 12 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Planned | 6988 | 6852 | 6354 | 6667 | 7206 | 7879 | 6780 | 6492 | 5896 | 7136 | 6304 | 5966 | 6198 | 5830 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Unplanned | 4749 | 4084 | 4436 | 4449 | 4636 | 4484 | 5506 | 4005 | 4230 | 4291 | 4739 | 5000 | 6056 | 3766 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Total outages | 11737 | 10936 | 10790 | 11116 | 11842 | 12363 | 12286 | 10497 | 10126 | 11427 | 11043 | 10966 | 12254 | 9596 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
Outage information
| Unit | Synthos Dwory 7 TG8 |
| Achievable generation capacity: | 20 MW |
| Outage size: | 20 MW |
| Event type: | Planned |
| Event start: | 22-03-2024 00:01 |
| Event end: | 22-03-2027 23:59 |
| Source: | Active - Planned - Synthos Dwory 7 TG8 |
Outage information
| Unit | Katowice B1 |
| Achievable generation capacity: | 135 MW |
| Outage size: | 135 MW |
| Event type: | Planned |
| Event start: | 01-07-2026 00:01 |
| Event end: | 10-08-2026 00:00 |
| Source: | Inactive - Planned - Katowice B1 |
Outage information
| Unit | Bełchatów B08 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 358 MW |
| Event type: | Planned |
| Event start: | 12-07-2026 00:00 |
| Event end: | 20-09-2026 18:00 |
| Source: | Active - Planned - Bełchatów B08 |
Outage information
| Unit | TAMEH Polska sp. z o. o. Elektrownia Blachownia |
| Achievable generation capacity: | 158 MW |
| Outage size: | 80 MW |
| Event type: | Planned |
| Event start: | 04-03-2024 12:00 |
| Event end: | 31-12-2026 23:59 |
| Source: | Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Outage information
| Unit | Porąbka Żar H3 |
| Achievable generation capacity: | 137 MW |
| Outage size: | 137 MW |
| Event type: | Planned |
| Event start: | 22-10-2024 00:01 |
| Event end: | 10-02-2030 23:45 |
| Source: | Active - Planned - Porąbka Żar H3 |
Outage information
| Unit | EC Mielec ECM |
| Achievable generation capacity: | 33 MW |
| Outage size: | 24 MW |
| Event type: | Planned |
| Event start: | 01-05-2026 00:01 |
| Event end: | 01-10-2026 00:00 |
| Source: | Active - Planned - EC Mielec ECM |
Outage information
| Unit | EC Wrotków ECW |
| Achievable generation capacity: | 231 MW |
| Outage size: | 231 MW |
| Event type: | Planned |
| Event start: | 03-08-2026 00:00 |
| Event end: | 30-08-2026 00:00 |
| Source: | Active - Planned - EC Wrotków ECW |
Outage information
| Unit | Ostrołęka B B01 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 230 MW |
| Event type: | Planned |
| Event start: | 30-03-2026 00:01 |
| Event end: | 01-08-2026 00:00 |
| Source: | Inactive - Planned - Ostrołęka B B01 |
Outage information
| Unit | Bełchatów B14 |
| Achievable generation capacity: | 781 MW |
| Outage size: | 781 MW |
| Event type: | Planned |
| Event start: | 14-07-2026 00:00 |
| Event end: | 11-12-2026 18:00 |
| Source: | Active - Planned - Bełchatów B14 |
Outage information
| Unit | EW Włocławek H02 |
| Achievable generation capacity: | 28 MW |
| Outage size: | 28 MW |
| Event type: | Planned |
| Event start: | 06-07-2026 06:01 |
| Event end: | 31-07-2026 17:00 |
| Source: | Inactive - Planned - EW Włocławek H02 |
Outage information
| Unit | Solina H1 |
| Achievable generation capacity: | 68 MW |
| Outage size: | 13 MW |
| Event type: | Unplanned |
| Event start: | 06-02-2025 16:20 |
| Event end: | 30-09-2026 23:45 |
| Source: | Active - Unplanned - Solina H1 |
Outage information
| Unit | EC Siekierki WSIB 07 |
| Achievable generation capacity: | 91 MW |
| Outage size: | 91 MW |
| Event type: | Planned |
| Event start: | 30-06-2026 07:00 |
| Event end: | 12-09-2026 00:00 |
| Source: | Active - Planned - EC Siekierki WSIB 07 |
Outage information
| Unit | Kozienice 2 B11 |
| Achievable generation capacity: | 981 MW |
| Outage size: | 981 MW |
| Event type: | Planned |
| Event start: | 04-07-2026 00:20 |
| Event end: | 10-09-2026 00:00 |
| Source: | Active - Planned - Kozienice 2 B11 |
Outage information
| Unit | Jaworzno 2 JWCD B7 |
| Achievable generation capacity: | 834 MW |
| Outage size: | 834 MW |
| Event type: | Planned |
| Event start: | 06-07-2026 00:04 |
| Event end: | 25-09-2026 00:00 |
| Source: | Active - Planned - Jaworzno 2 JWCD B7 |
Outage information
| Unit | EC Żerań 2 B20 |
| Achievable generation capacity: | 488 MW |
| Outage size: | 488 MW |
| Event type: | Unplanned |
| Event start: | 12-05-2026 14:33 |
| Event end: | 15-12-2026 23:59 |
| Source: | Active - Unplanned - EC Żerań 2 B20 |
Outage information
| Unit | EC Białystok BIA_1-03 |
| Achievable generation capacity: | 52 MW |
| Outage size: | 52 MW |
| Event type: | Planned |
| Event start: | 17-07-2026 00:01 |
| Event end: | 03-09-2026 23:45 |
| Source: | Active - Planned - EC Białystok BIA_1-03 |
Outage information
| Unit | Kraków Łęg KLE_1-04 |
| Achievable generation capacity: | 107 MW |
| Outage size: | 107 MW |
| Event type: | Planned |
| Event start: | 18-07-2026 00:00 |
| Event end: | 01-09-2026 00:00 |
| Source: | Active - Planned - Kraków Łęg KLE_1-04 |
Outage information
| Unit | Kozienice 1 B7 |
| Achievable generation capacity: | 203 MW |
| Outage size: | 220 MW |
| Event type: | Unplanned |
| Event start: | 24-06-2026 00:58 |
| Event end: | 22-08-2026 22:00 |
| Source: | Active - Unplanned - Kozienice 1 B7 |
Outage information
| Unit | PAK-PCE BIOPALIWA I WODÓR Elektrownia Konin |
| Achievable generation capacity: | 110 MW |
| Outage size: | 55 MW |
| Event type: | Planned |
| Event start: | 18-07-2026 00:12 |
| Event end: | 12-08-2026 23:59 |
| Source: | Inactive - Planned - PAK-PCE BIOPALIWA I WODÓR Elektrownia Konin |
Outage information
| Unit | EW Włocławek H01 |
| Achievable generation capacity: | 28 MW |
| Outage size: | 28 MW |
| Event type: | Planned |
| Event start: | 03-08-2026 06:01 |
| Event end: | 28-08-2026 17:00 |
| Source: | Active - Planned - EW Włocławek H01 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 236 MW |
| Event type: | Planned |
| Event start: | 21-07-2026 09:49 |
| Event end: | 01-08-2026 00:00 |
| Source: | Inactive - Planned - Turów B04 |
Outage information
| Unit | KOGENERACJA S.A. CZN_1S01 |
| Achievable generation capacity: | 177 MW |
| Outage size: | 60 MW |
| Event type: | Unplanned |
| Event start: | 22-07-2026 00:00 |
| Event end: | 31-07-2026 23:45 |
| Source: | Inactive - Unplanned - KOGENERACJA S.A. CZN_1S01 |
Outage information
| Unit | Veolia Energia Łódź EC4 B03 |
| Achievable generation capacity: | 105 MW |
| Outage size: | 105 MW |
| Event type: | Planned |
| Event start: | 30-06-2026 22:40 |
| Event end: | 30-09-2026 23:55 |
| Source: | Active - Planned - Veolia Energia Łódź EC4 B03 |
Outage information
| Unit | Synthos Dwory 7 TG7 |
| Achievable generation capacity: | 28 MW |
| Outage size: | 28 MW |
| Event type: | Planned |
| Event start: | 24-07-2026 13:16 |
| Event end: | 18-11-2026 13:00 |
| Source: | Active - Planned - Synthos Dwory 7 TG7 |
Outage information
| Unit | Pątnów B9 |
| Achievable generation capacity: | 474 MW |
| Outage size: | 474 MW |
| Event type: | Unplanned |
| Event start: | 25-07-2026 10:00 |
| Event end: | 03-08-2026 06:00 |
| Source: | Inactive - Unplanned - Pątnów B9 |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 42 MW |
| Event type: | Planned |
| Event start: | 30-07-2026 08:00 |
| Event end: | 30-07-2026 19:00 |
| Source: | Inactive - Planned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 42 MW |
| Event type: | Planned |
| Event start: | 31-07-2026 08:00 |
| Event end: | 31-07-2026 19:00 |
| Source: | Inactive - Planned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | Siersza B1 |
| Achievable generation capacity: | 139 MW |
| Outage size: | 139 MW |
| Event type: | Planned |
| Event start: | 18-07-2026 00:00 |
| Event end: | 05-08-2026 00:00 |
| Source: | Inactive - Planned - Siersza B1 |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 31-07-2026 08:00 |
| Event end: | 31-07-2026 08:00 |
| Source: | Inactive - Planned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 25 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 03:00 |
| Event end: | 30-07-2026 04:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 29 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 08:00 |
| Event end: | 30-07-2026 09:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 30 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 01:00 |
| Event end: | 30-07-2026 02:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 65 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 19:00 |
| Event end: | 30-07-2026 20:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 31 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 00:00 |
| Event end: | 30-07-2026 01:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 25 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 03:00 |
| Event end: | 30-07-2026 04:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 29 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 08:00 |
| Event end: | 30-07-2026 09:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 65 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 19:00 |
| Event end: | 30-07-2026 20:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 03:00 |
| Event end: | 30-07-2026 04:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 49 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 08:00 |
| Event end: | 30-07-2026 09:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 00:00 |
| Event end: | 30-07-2026 01:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Porąbka Żar H2 |
| Achievable generation capacity: | 137 MW |
| Outage size: | 137 MW |
| Event type: | Planned |
| Event start: | 03-08-2026 07:30 |
| Event end: | 03-08-2026 08:30 |
| Source: | Inactive - Planned - Porąbka Żar H2 |
Outage information
| Unit | Porąbka Żar H1 |
| Achievable generation capacity: | 138 MW |
| Outage size: | 138 MW |
| Event type: | Planned |
| Event start: | 03-08-2026 07:30 |
| Event end: | 03-08-2026 08:30 |
| Source: | Inactive - Planned - Porąbka Żar H1 |
Outage information
| Unit | Porąbka Żar H4 |
| Achievable generation capacity: | 138 MW |
| Outage size: | 138 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 07:30 |
| Event end: | 04-08-2026 08:30 |
| Source: | Inactive - Planned - Porąbka Żar H4 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 00:00 |
| Event end: | 30-07-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 16:30 |
| Event end: | 30-07-2026 16:45 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 16:30 |
| Event end: | 30-07-2026 16:45 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 17:30 |
| Event end: | 30-07-2026 17:45 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 17:30 |
| Event end: | 30-07-2026 17:45 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 00:00 |
| Event end: | 30-07-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 04:00 |
| Event end: | 30-07-2026 04:15 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 09:00 |
| Event end: | 30-07-2026 09:15 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 09:15 |
| Event end: | 30-07-2026 09:30 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 56 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 04:30 |
| Event end: | 30-07-2026 04:45 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 09:15 |
| Event end: | 30-07-2026 09:30 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 56 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 09:15 |
| Event end: | 30-07-2026 09:30 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 12 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 00:00 |
| Event end: | 30-07-2026 06:00 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | PAK-PCE MIŁOSŁAW FW Pałczyn |
| Achievable generation capacity: | 10 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 30-07-2026 08:00 |
| Event end: | 30-07-2026 08:00 |
| Source: | Inactive - Planned - PAK-PCE MIŁOSŁAW FW Pałczyn |
Outage information
| Unit | PAK-PCE MIŁOSŁAW FW Pałczyn |
| Achievable generation capacity: | 10 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 31-07-2026 08:00 |
| Event end: | 31-07-2026 08:00 |
| Source: | Inactive - Planned - PAK-PCE MIŁOSŁAW FW Pałczyn |
Outage information
| Unit | QWP Rzepin Sp. z o.o. QWP Rzepin |
| Achievable generation capacity: | 58 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 29-07-2026 12:00 |
| Event end: | 30-07-2026 15:30 |
| Source: | Inactive - Unplanned - QWP Rzepin Sp. z o.o. QWP Rzepin |
Outage information
| Unit | QPV 5 Sp. z o.o. QPV 5 |
| Achievable generation capacity: | 15 MW |
| Outage size: | 1 MW |
| Event type: | Unplanned |
| Event start: | 29-06-2026 08:55 |
| Event end: | 01-08-2026 00:00 |
| Source: | Inactive - Unplanned - QPV 5 Sp. z o.o. QPV 5 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 52 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 18:00 |
| Event end: | 31-07-2026 19:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 53 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 17:00 |
| Event end: | 31-07-2026 18:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | Bełchatów B11 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 80 MW |
| Event type: | Unplanned |
| Event start: | 29-07-2026 22:00 |
| Event end: | 30-07-2026 08:00 |
| Source: | Inactive - Unplanned - Bełchatów B11 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 205 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 17:00 |
| Event end: | 31-07-2026 18:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | JSW KOKS S.A. EC Koksownia Przyjaźń G3 |
| Achievable generation capacity: | 21 MW |
| Outage size: | 21 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 03:33 |
| Event end: | 30-07-2026 04:55 |
| Source: | Inactive - Unplanned - JSW KOKS S.A. EC Koksownia Przyjaźń G3 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 89 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 17:00 |
| Event end: | 31-07-2026 18:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Połaniec B5 |
| Achievable generation capacity: | 224 MW |
| Outage size: | 54 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 01:15 |
| Event end: | 30-07-2026 06:30 |
| Source: | Inactive - Unplanned - Połaniec B5 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 4 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 08:00 |
| Event end: | 30-07-2026 18:00 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 04:00 |
| Event end: | 31-07-2026 04:15 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 04:00 |
| Event end: | 31-07-2026 04:30 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 16:45 |
| Event end: | 31-07-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 16:45 |
| Event end: | 31-07-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 16:45 |
| Event end: | 31-07-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 16:45 |
| Event end: | 31-07-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Jaworzno 3 B5 |
| Achievable generation capacity: | 206 MW |
| Outage size: | 206 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 08:37 |
| Event end: | 30-07-2026 08:50 |
| Source: | Inactive - Unplanned - Jaworzno 3 B5 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 30-07-2026 08:39 |
| Event end: | 30-07-2026 14:10 |
| Source: | Inactive - Planned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | Porąbka Żar H1 |
| Achievable generation capacity: | 138 MW |
| Outage size: | 138 MW |
| Event type: | Planned |
| Event start: | 30-07-2026 09:00 |
| Event end: | 30-07-2026 17:10 |
| Source: | Inactive - Planned - Porąbka Żar H1 |
Outage information
| Unit | PAK-PCE MIŁOSŁAW FW Pałczyn |
| Achievable generation capacity: | 10 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 14:36 |
| Event end: | 30-07-2026 18:00 |
| Source: | Inactive - Unplanned - PAK-PCE MIŁOSŁAW FW Pałczyn |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 89 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 21:00 |
| Event end: | 30-07-2026 22:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 18:45 |
| Event end: | 30-07-2026 20:00 |
| Source: | Inactive - Unplanned - Opole B3 |
Outage information
| Unit | Jaworzno 3 B6 |
| Achievable generation capacity: | 211 MW |
| Outage size: | 211 MW |
| Event type: | Unplanned |
| Event start: | 27-07-2026 18:59 |
| Event end: | 31-07-2026 00:00 |
| Source: | Inactive - Unplanned - Jaworzno 3 B6 |
Outage information
| Unit | Połaniec B5 |
| Achievable generation capacity: | 224 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 19:00 |
| Event end: | 30-07-2026 20:30 |
| Source: | Inactive - Unplanned - Połaniec B5 |
Outage information
| Unit | Bełchatów B06 |
| Achievable generation capacity: | 360 MW |
| Outage size: | 140 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 18:45 |
| Event end: | 30-07-2026 21:15 |
| Source: | Inactive - Unplanned - Bełchatów B06 |
Outage information
| Unit | Opole B4 |
| Achievable generation capacity: | 355 MW |
| Outage size: | 187 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 18:30 |
| Event end: | 30-07-2026 18:45 |
| Source: | Inactive - Unplanned - Opole B4 |
Outage information
| Unit | Opole B1 |
| Achievable generation capacity: | 357 MW |
| Outage size: | 189 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 21:00 |
| Event end: | 30-07-2026 22:30 |
| Source: | Inactive - Unplanned - Opole B1 |
Outage information
| Unit | Opole B4 |
| Achievable generation capacity: | 355 MW |
| Outage size: | 355 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 18:47 |
| Event end: | 30-07-2026 20:01 |
| Source: | Inactive - Unplanned - Opole B4 |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 23:00 |
| Event end: | 30-07-2026 23:00 |
| Source: | Inactive - Unplanned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | Opole B1 |
| Achievable generation capacity: | 357 MW |
| Outage size: | 100 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 00:30 |
| Event end: | 31-07-2026 01:00 |
| Source: | Inactive - Unplanned - Opole B1 |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 4 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 01:00 |
| Event end: | 30-07-2026 01:00 |
| Source: | Inactive - Unplanned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 18:01 |
| Event end: | 31-07-2026 08:12 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 4 MW |
| Event type: | Planned |
| Event start: | 31-07-2026 08:13 |
| Event end: | 31-07-2026 16:00 |
| Source: | Inactive - Planned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 03:45 |
| Event end: | 01-08-2026 04:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 03:45 |
| Event end: | 01-08-2026 04:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 16:45 |
| Event end: | 01-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 16:45 |
| Event end: | 01-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 16:45 |
| Event end: | 01-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 16:45 |
| Event end: | 01-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | PAK-PCE KAZIMIERZ BISKUPI FW Kazimierz Biskupi |
| Achievable generation capacity: | 18 MW |
| Outage size: | 3 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 21:30 |
| Event end: | 31-07-2026 10:55 |
| Source: | Inactive - Unplanned - PAK-PCE KAZIMIERZ BISKUPI FW Kazimierz Biskupi |
Outage information
| Unit | Połaniec B6 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Unplanned |
| Event start: | 27-07-2026 07:31 |
| Event end: | 03-08-2026 00:00 |
| Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
| Unit | Połaniec B2 |
| Achievable generation capacity: | 227 MW |
| Outage size: | 227 MW |
| Event type: | Unplanned |
| Event start: | 19-07-2026 23:33 |
| Event end: | 31-07-2026 11:30 |
| Source: | Inactive - Unplanned - Połaniec B2 |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Planned |
| Event start: | 07-08-2026 06:30 |
| Event end: | 07-08-2026 11:30 |
| Source: | Inactive - Planned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 11:01 |
| Event end: | 31-07-2026 15:27 |
| Source: | Inactive - Unplanned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 11:46 |
| Event end: | 31-07-2026 15:50 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | Łagisza B10 |
| Achievable generation capacity: | 430 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 16:54 |
| Event end: | 31-07-2026 23:00 |
| Source: | Inactive - Unplanned - Łagisza B10 |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 4 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 08:00 |
| Event end: | 04-08-2026 16:00 |
| Source: | Inactive - Planned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 4 MW |
| Event type: | Planned |
| Event start: | 05-08-2026 08:00 |
| Event end: | 05-08-2026 16:00 |
| Source: | Inactive - Planned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 4 MW |
| Event type: | Planned |
| Event start: | 06-08-2026 08:00 |
| Event end: | 06-08-2026 16:00 |
| Source: | Inactive - Planned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | Eolos Novo Sp. z o.o. FW Czarnożyły |
| Achievable generation capacity: | 16 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 31-07-2026 08:47 |
| Event end: | 31-07-2026 14:23 |
| Source: | Inactive - Planned - Eolos Novo Sp. z o.o. FW Czarnożyły |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 07-08-2026 08:00 |
| Event end: | 07-08-2026 16:00 |
| Source: | Inactive - Planned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 58 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 18:30 |
| Event end: | 31-07-2026 19:30 |
| Source: | Inactive - Unplanned - Opole B3 |
Outage information
| Unit | Opole B4 |
| Achievable generation capacity: | 355 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 18:30 |
| Event end: | 31-07-2026 20:00 |
| Source: | Inactive - Unplanned - Opole B4 |
Outage information
| Unit | Kozienice 1 B4 |
| Achievable generation capacity: | 213 MW |
| Outage size: | 80 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 18:45 |
| Event end: | 31-07-2026 22:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B4 |
Outage information
| Unit | Połaniec B2 |
| Achievable generation capacity: | 227 MW |
| Outage size: | 60 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 19:10 |
| Event end: | 31-07-2026 19:30 |
| Source: | Inactive - Unplanned - Połaniec B2 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 41 MW |
| Event type: | Unplanned |
| Event start: | 02-08-2026 17:00 |
| Event end: | 02-08-2026 20:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 41 MW |
| Event type: | Unplanned |
| Event start: | 02-08-2026 17:00 |
| Event end: | 02-08-2026 20:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | Kozienice 1 B1 |
| Achievable generation capacity: | 213 MW |
| Outage size: | 70 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 19:40 |
| Event end: | 31-07-2026 21:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B1 |
Outage information
| Unit | Skawina Tg3 |
| Achievable generation capacity: | 110 MW |
| Outage size: | 110 MW |
| Event type: | Planned |
| Event start: | 19-06-2026 03:52 |
| Event end: | 31-08-2026 23:59 |
| Source: | Active - Planned - Skawina Tg3 |
Outage information
| Unit | Skawina Tg6 |
| Achievable generation capacity: | 110 MW |
| Outage size: | 110 MW |
| Event type: | Planned |
| Event start: | 17-07-2026 10:00 |
| Event end: | 28-08-2026 23:59 |
| Source: | Active - Planned - Skawina Tg6 |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 20:48 |
| Event end: | 31-07-2026 20:48 |
| Source: | Inactive - Unplanned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 135 MW |
| Event type: | Unplanned |
| Event start: | 02-08-2026 19:00 |
| Event end: | 02-08-2026 20:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 54 MW |
| Event type: | Unplanned |
| Event start: | 02-08-2026 19:00 |
| Event end: | 02-08-2026 20:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 02-08-2026 17:45 |
| Event end: | 02-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 02-08-2026 16:45 |
| Event end: | 02-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 02-08-2026 16:45 |
| Event end: | 02-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 02-08-2026 17:45 |
| Event end: | 02-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 16:45 |
| Event end: | 03-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 16:45 |
| Event end: | 03-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | KOGENERACJA S.A. WROB1-02 |
| Achievable generation capacity: | 104 MW |
| Outage size: | 104 MW |
| Event type: | Planned |
| Event start: | 02-08-2026 00:00 |
| Event end: | 11-11-2026 00:00 |
| Source: | Active - Planned - KOGENERACJA S.A. WROB1-02 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 11:59 |
| Event end: | 01-08-2026 14:41 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | Ostrołęka B B01 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 230 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 18:14 |
| Event end: | 03-08-2026 00:00 |
| Source: | Inactive - Unplanned - Ostrołęka B B01 |
Outage information
| Unit | Łagisza B10 |
| Achievable generation capacity: | 430 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 17:02 |
| Event end: | 01-08-2026 23:00 |
| Source: | Inactive - Unplanned - Łagisza B10 |
Outage information
| Unit | Połaniec B9 |
| Achievable generation capacity: | 225 MW |
| Outage size: | 106 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 18:20 |
| Event end: | 01-08-2026 22:00 |
| Source: | Inactive - Unplanned - Połaniec B9 |
Outage information
| Unit | Opole B2 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 20 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 19:30 |
| Event end: | 01-08-2026 23:00 |
| Source: | Inactive - Unplanned - Opole B2 |
Outage information
| Unit | Opole B1 |
| Achievable generation capacity: | 357 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 31-07-2026 17:00 |
| Event end: | 01-08-2026 00:19 |
| Source: | Inactive - Unplanned - Opole B1 |
Outage information
| Unit | Kozienice 1 B3 |
| Achievable generation capacity: | 206 MW |
| Outage size: | 50 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 18:30 |
| Event end: | 02-08-2026 00:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B3 |
Outage information
| Unit | Kozienice 1 B8 |
| Achievable generation capacity: | 206 MW |
| Outage size: | 40 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 18:10 |
| Event end: | 02-08-2026 00:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B8 |
Outage information
| Unit | Kozienice 2 B09 |
| Achievable generation capacity: | 534 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 19:30 |
| Event end: | 02-08-2026 00:45 |
| Source: | Inactive - Unplanned - Kozienice 2 B09 |
Outage information
| Unit | Kozienice 2 B10 |
| Achievable generation capacity: | 534 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 19:30 |
| Event end: | 02-08-2026 00:45 |
| Source: | Inactive - Unplanned - Kozienice 2 B10 |
Outage information
| Unit | Kozienice 1 B1 |
| Achievable generation capacity: | 213 MW |
| Outage size: | 55 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 17:35 |
| Event end: | 02-08-2026 00:45 |
| Source: | Inactive - Unplanned - Kozienice 1 B1 |
Outage information
| Unit | Kozienice 1 B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 50 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 17:40 |
| Event end: | 02-08-2026 00:45 |
| Source: | Inactive - Unplanned - Kozienice 1 B6 |
Outage information
| Unit | Kozienice 1 B4 |
| Achievable generation capacity: | 213 MW |
| Outage size: | 80 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 17:00 |
| Event end: | 02-08-2026 00:45 |
| Source: | Inactive - Unplanned - Kozienice 1 B4 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 69 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 17:00 |
| Event end: | 03-08-2026 18:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Kozienice 1 B3 |
| Achievable generation capacity: | 206 MW |
| Outage size: | 206 MW |
| Event type: | Unplanned |
| Event start: | 02-08-2026 18:00 |
| Event end: | 03-08-2026 00:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B3 |
Outage information
| Unit | Kozienice 1 B4 |
| Achievable generation capacity: | 213 MW |
| Outage size: | 213 MW |
| Event type: | Unplanned |
| Event start: | 02-08-2026 18:00 |
| Event end: | 03-08-2026 00:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B4 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 12:42 |
| Event end: | 03-08-2026 08:59 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 49 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 09:00 |
| Event end: | 03-08-2026 10:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Ostrołęka B B03 |
| Achievable generation capacity: | 165 MW |
| Outage size: | 165 MW |
| Event type: | Planned |
| Event start: | 21-07-2026 00:01 |
| Event end: | 03-08-2026 10:00 |
| Source: | Inactive - Planned - Ostrołęka B B03 |
Outage information
| Unit | KOGENERACJA S.A. WROB1-02 |
| Achievable generation capacity: | 104 MW |
| Outage size: | 104 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 18:32 |
| Event end: | 01-08-2026 23:59 |
| Source: | Inactive - Unplanned - KOGENERACJA S.A. WROB1-02 |
Outage information
| Unit | Żydowo H1 |
| Achievable generation capacity: | 55 MW |
| Outage size: | 55 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 08:00 |
| Event end: | 04-08-2026 10:00 |
| Source: | Inactive - Unplanned - Żydowo H1 |
Outage information
| Unit | Żydowo H2 |
| Achievable generation capacity: | 55 MW |
| Outage size: | 55 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 08:00 |
| Event end: | 05-08-2026 10:00 |
| Source: | Inactive - Unplanned - Żydowo H2 |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Planned |
| Event start: | 03-08-2026 06:30 |
| Event end: | 03-08-2026 06:30 |
| Source: | Inactive - Planned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 06:30 |
| Event end: | 04-08-2026 06:30 |
| Source: | Inactive - Planned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Planned |
| Event start: | 05-08-2026 06:30 |
| Event end: | 05-08-2026 06:30 |
| Source: | Inactive - Planned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Planned |
| Event start: | 06-08-2026 06:30 |
| Event end: | 06-08-2026 06:30 |
| Source: | Inactive - Planned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 56 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 16:45 |
| Event end: | 04-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 56 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 16:45 |
| Event end: | 04-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 06:00 |
| Event end: | 03-08-2026 12:15 |
| Source: | Inactive - Unplanned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | Eolos Novo Sp. z o.o. FW Czarnożyły |
| Achievable generation capacity: | 16 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 03-08-2026 09:38 |
| Event end: | 03-08-2026 12:45 |
| Source: | Inactive - Planned - Eolos Novo Sp. z o.o. FW Czarnożyły |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 20 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 17:00 |
| Event end: | 03-08-2026 18:30 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Rybnik B6 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 64 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 10:25 |
| Event end: | 03-08-2026 16:45 |
| Source: | Inactive - Unplanned - Rybnik B6 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 03-08-2026 12:31 |
| Event end: | 03-08-2026 15:02 |
| Source: | Inactive - Planned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | Opole B4 |
| Achievable generation capacity: | 355 MW |
| Outage size: | 355 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 16:54 |
| Event end: | 03-08-2026 17:30 |
| Source: | Inactive - Unplanned - Opole B4 |
Outage information
| Unit | Opole B4 |
| Achievable generation capacity: | 355 MW |
| Outage size: | 180 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 20:15 |
| Event end: | 03-08-2026 20:45 |
| Source: | Inactive - Unplanned - Opole B4 |
Outage information
| Unit | Opole B2 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 50 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 21:15 |
| Event end: | 03-08-2026 22:00 |
| Source: | Inactive - Unplanned - Opole B2 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 93 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 00:00 |
| Event end: | 04-08-2026 09:15 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 93 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 00:00 |
| Event end: | 04-08-2026 09:15 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Połaniec B6 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 00:01 |
| Event end: | 03-08-2026 13:59 |
| Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
| Unit | Opole B1 |
| Achievable generation capacity: | 357 MW |
| Outage size: | 357 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 00:00 |
| Event end: | 03-08-2026 16:00 |
| Source: | Inactive - Unplanned - Opole B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 79 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 22:00 |
| Event end: | 05-08-2026 23:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 21:36 |
| Event end: | 04-08-2026 07:53 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | Połaniec B3 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Unplanned |
| Event start: | 29-07-2026 15:31 |
| Event end: | 04-08-2026 09:30 |
| Source: | Inactive - Unplanned - Połaniec B3 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 135 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 02:00 |
| Event end: | 05-08-2026 03:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 08:00 |
| Event end: | 05-08-2026 09:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 160 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 22:00 |
| Event end: | 05-08-2026 23:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Rybnik B5 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 209 MW |
| Event type: | Planned |
| Event start: | 02-08-2026 19:00 |
| Event end: | 04-08-2026 09:45 |
| Source: | Inactive - Planned - Rybnik B5 |
Outage information
| Unit | EC Gorzów GOR2 |
| Achievable generation capacity: | 138 MW |
| Outage size: | 138 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 07:01 |
| Event end: | 26-08-2026 22:00 |
| Source: | Active - Planned - EC Gorzów GOR2 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 145 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 23:00 |
| Event end: | 05-08-2026 00:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Połaniec B2 |
| Achievable generation capacity: | 227 MW |
| Outage size: | 63 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 09:30 |
| Event end: | 04-08-2026 10:00 |
| Source: | Inactive - Unplanned - Połaniec B2 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 65 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 16:45 |
| Event end: | 04-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | QPV 5 Sp. z o.o. QPV 5 |
| Achievable generation capacity: | 15 MW |
| Outage size: | 6 MW |
| Event type: | Planned |
| Event start: | 06-08-2026 11:00 |
| Event end: | 07-08-2026 13:00 |
| Source: | Inactive - Planned - QPV 5 Sp. z o.o. QPV 5 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 65 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 16:45 |
| Event end: | 04-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Kozienice 1 B4 |
| Achievable generation capacity: | 213 MW |
| Outage size: | 213 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 00:01 |
| Event end: | 04-08-2026 11:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B4 |
Outage information
| Unit | Kozienice 1 B2 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 210 MW |
| Event type: | Unplanned |
| Event start: | 29-07-2026 12:00 |
| Event end: | 04-08-2026 11:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B2 |
Outage information
| Unit | Rybnik B8 |
| Achievable generation capacity: | 208 MW |
| Outage size: | 83 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 00:00 |
| Event end: | 04-08-2026 16:00 |
| Source: | Inactive - Unplanned - Rybnik B8 |
Outage information
| Unit | Rybnik B7 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 8 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 00:00 |
| Event end: | 04-08-2026 16:00 |
| Source: | Inactive - Unplanned - Rybnik B7 |
Outage information
| Unit | Rybnik B6 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 00:00 |
| Event end: | 04-08-2026 16:00 |
| Source: | Inactive - Unplanned - Rybnik B6 |
Outage information
| Unit | Połaniec B7 |
| Achievable generation capacity: | 221 MW |
| Outage size: | 221 MW |
| Event type: | Unplanned |
| Event start: | 12-07-2026 15:00 |
| Event end: | 04-08-2026 11:30 |
| Source: | Inactive - Unplanned - Połaniec B7 |
Outage information
| Unit | Połaniec B5 |
| Achievable generation capacity: | 224 MW |
| Outage size: | 224 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 03:00 |
| Event end: | 04-08-2026 11:30 |
| Source: | Inactive - Unplanned - Połaniec B5 |
Outage information
| Unit | Ostrołęka B B01 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 230 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 19:31 |
| Event end: | 04-08-2026 12:00 |
| Source: | Inactive - Unplanned - Ostrołęka B B01 |
Outage information
| Unit | Bełchatów B11 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 80 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 00:00 |
| Event end: | 04-08-2026 16:30 |
| Source: | Inactive - Unplanned - Bełchatów B11 |
Outage information
| Unit | Kozienice 1 B3 |
| Achievable generation capacity: | 206 MW |
| Outage size: | 206 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 00:01 |
| Event end: | 04-08-2026 12:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B3 |
Outage information
| Unit | Bełchatów B11 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 80 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 19:30 |
| Event end: | 05-08-2026 00:00 |
| Source: | Inactive - Unplanned - Bełchatów B11 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 09:34 |
| Event end: | 04-08-2026 12:02 |
| Source: | Inactive - Planned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 162 MW |
| Event type: | Planned |
| Event start: | 05-08-2026 10:15 |
| Event end: | 05-08-2026 11:15 |
| Source: | Inactive - Planned - Opole B3 |
Outage information
| Unit | Kozienice 1 B5 |
| Achievable generation capacity: | 213 MW |
| Outage size: | 213 MW |
| Event type: | Unplanned |
| Event start: | 29-07-2026 12:00 |
| Event end: | 04-08-2026 15:15 |
| Source: | Inactive - Unplanned - Kozienice 1 B5 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 14:49 |
| Event end: | 04-08-2026 15:44 |
| Source: | Inactive - Planned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | Kozienice 1 B1 |
| Achievable generation capacity: | 213 MW |
| Outage size: | 50 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 15:30 |
| Event end: | 04-08-2026 16:30 |
| Source: | Inactive - Unplanned - Kozienice 1 B1 |
Outage information
| Unit | Kozienice 1 B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 50 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 15:30 |
| Event end: | 04-08-2026 16:30 |
| Source: | Inactive - Unplanned - Kozienice 1 B6 |
Outage information
| Unit | Opole B1 |
| Achievable generation capacity: | 357 MW |
| Outage size: | 357 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 00:00 |
| Event end: | 04-08-2026 16:00 |
| Source: | Inactive - Planned - Opole B1 |
Outage information
| Unit | Skawina Tg5 |
| Achievable generation capacity: | 110 MW |
| Outage size: | 10 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 16:04 |
| Event end: | 31-08-2026 23:59 |
| Source: | Active - Planned - Skawina Tg5 |
Outage information
| Unit | Siersza B1 |
| Achievable generation capacity: | 139 MW |
| Outage size: | 139 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 00:01 |
| Event end: | 07-08-2026 00:00 |
| Source: | Inactive - Unplanned - Siersza B1 |
Outage information
| Unit | Połaniec B4 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 86 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 15:20 |
| Event end: | 04-08-2026 17:00 |
| Source: | Inactive - Unplanned - Połaniec B4 |
Outage information
| Unit | Bełchatów B02 |
| Achievable generation capacity: | 341 MW |
| Outage size: | 341 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 00:00 |
| Event end: | 04-08-2026 18:00 |
| Source: | Inactive - Planned - Bełchatów B02 |
Outage information
| Unit | PAK-PCE KAZIMIERZ BISKUPI FW Kazimierz Biskupi |
| Achievable generation capacity: | 18 MW |
| Outage size: | 3 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 15:07 |
| Event end: | 04-08-2026 17:55 |
| Source: | Inactive - Unplanned - PAK-PCE KAZIMIERZ BISKUPI FW Kazimierz Biskupi |
Outage information
| Unit | Połaniec B7 |
| Achievable generation capacity: | 221 MW |
| Outage size: | 221 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 18:51 |
| Event end: | 05-08-2026 19:00 |
| Source: | Inactive - Unplanned - Połaniec B7 |
Outage information
| Unit | Łagisza B10 |
| Achievable generation capacity: | 430 MW |
| Outage size: | 125 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 19:25 |
| Event end: | 04-08-2026 20:00 |
| Source: | Inactive - Planned - Łagisza B10 |
Outage information
| Unit | Połaniec B6 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Unplanned |
| Event start: | 03-08-2026 14:00 |
| Event end: | 04-08-2026 19:30 |
| Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 00:00 |
| Event end: | 04-08-2026 09:21 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Opole B2 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 20 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 20:15 |
| Event end: | 04-08-2026 20:30 |
| Source: | Inactive - Unplanned - Opole B2 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 158 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 21:00 |
| Event end: | 05-08-2026 09:45 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 40 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 19:20 |
| Event end: | 04-08-2026 23:15 |
| Source: | Inactive - Unplanned - Opole B3 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 54 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 05:00 |
| Event end: | 05-08-2026 06:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 6 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 01:35 |
| Event end: | 05-08-2026 03:12 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 03:13 |
| Event end: | 05-08-2026 04:59 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | Synthos Dwory 7 GT1 |
| Achievable generation capacity: | 72 MW |
| Outage size: | 72 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 20:42 |
| Event end: | 04-08-2026 22:30 |
| Source: | Inactive - Unplanned - Synthos Dwory 7 GT1 |
Outage information
| Unit | PAK-PCE KAZIMIERZ BISKUPI FW Kazimierz Biskupi |
| Achievable generation capacity: | 18 MW |
| Outage size: | 3 MW |
| Event type: | Planned |
| Event start: | 06-08-2026 10:00 |
| Event end: | 06-08-2026 14:00 |
| Source: | Inactive - Planned - PAK-PCE KAZIMIERZ BISKUPI FW Kazimierz Biskupi |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 134 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 10:00 |
| Event end: | 06-08-2026 14:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | PAK-PCE MIŁOSŁAW FW Pałczyn |
| Achievable generation capacity: | 10 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 03:25 |
| Event end: | 05-08-2026 09:33 |
| Source: | Inactive - Unplanned - PAK-PCE MIŁOSŁAW FW Pałczyn |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 6 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 10:20 |
| Event end: | 05-08-2026 10:43 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 15:00 |
| Event end: | 06-08-2026 00:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 15:00 |
| Event end: | 06-08-2026 00:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 158 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 15:00 |
| Event end: | 05-08-2026 16:00 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Kozienice 2 B10 |
| Achievable generation capacity: | 534 MW |
| Outage size: | 154 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 13:00 |
| Event end: | 05-08-2026 15:30 |
| Source: | Inactive - Unplanned - Kozienice 2 B10 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 833 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 13:09 |
| Event end: | 05-08-2026 14:45 |
| Source: | Inactive - Unplanned - Opole B6 |
Outage information
| Unit | Opole B1 |
| Achievable generation capacity: | 357 MW |
| Outage size: | 357 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 00:00 |
| Event end: | 05-08-2026 16:00 |
| Source: | Inactive - Unplanned - Opole B1 |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 16:06 |
| Event end: | 05-08-2026 16:35 |
| Source: | Inactive - Unplanned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | Eolos Novo Sp. z o.o. FW Czarnożyły |
| Achievable generation capacity: | 16 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 01:43 |
| Event end: | 05-08-2026 09:40 |
| Source: | Inactive - Unplanned - Eolos Novo Sp. z o.o. FW Czarnożyły |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 13:28 |
| Event end: | 05-08-2026 16:38 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 10 MW |
| Event type: | Planned |
| Event start: | 05-08-2026 14:11 |
| Event end: | 05-08-2026 17:22 |
| Source: | Inactive - Planned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 500 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 15:30 |
| Event end: | 05-08-2026 18:30 |
| Source: | Inactive - Unplanned - Opole B6 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 390 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 18:40 |
| Event end: | 05-08-2026 19:15 |
| Source: | Inactive - Unplanned - Opole B6 |
Outage information
| Unit | KOGENERACJA S.A. WROB1-03 |
| Achievable generation capacity: | 104 MW |
| Outage size: | 104 MW |
| Event type: | Planned |
| Event start: | 21-07-2026 00:00 |
| Event end: | 05-08-2026 18:00 |
| Source: | Inactive - Planned - KOGENERACJA S.A. WROB1-03 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 330 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 20:00 |
| Event end: | 05-08-2026 21:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Kozienice 2 B10 |
| Achievable generation capacity: | 534 MW |
| Outage size: | 50 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 17:01 |
| Event end: | 05-08-2026 20:00 |
| Source: | Inactive - Unplanned - Kozienice 2 B10 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 50 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 19:50 |
| Event end: | 05-08-2026 20:15 |
| Source: | Inactive - Unplanned - Opole B6 |
Outage information
| Unit | Kozienice 2 B09 |
| Achievable generation capacity: | 534 MW |
| Outage size: | 90 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 17:15 |
| Event end: | 05-08-2026 20:15 |
| Source: | Inactive - Unplanned - Kozienice 2 B09 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 20:39 |
| Event end: | 06-08-2026 18:00 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | Kozienice 1 B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 40 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 17:15 |
| Event end: | 05-08-2026 21:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B6 |
Outage information
| Unit | Łagisza B10 |
| Achievable generation capacity: | 430 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 17:35 |
| Event end: | 05-08-2026 23:00 |
| Source: | Inactive - Unplanned - Łagisza B10 |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 40 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 20:30 |
| Event end: | 06-08-2026 02:00 |
| Source: | Inactive - Unplanned - Opole B3 |
Outage information
| Unit | Opole B4 |
| Achievable generation capacity: | 355 MW |
| Outage size: | 10 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 21:15 |
| Event end: | 06-08-2026 03:00 |
| Source: | Inactive - Unplanned - Opole B4 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 64 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 03:00 |
| Event end: | 06-08-2026 04:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Opole B2 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 20 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 20:30 |
| Event end: | 05-08-2026 23:00 |
| Source: | Inactive - Unplanned - Opole B2 |
Outage information
| Unit | Połaniec B2 |
| Achievable generation capacity: | 227 MW |
| Outage size: | 77 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 15:30 |
| Event end: | 06-08-2026 00:30 |
| Source: | Inactive - Unplanned - Połaniec B2 |
Outage information
| Unit | Połaniec B3 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 96 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 17:00 |
| Event end: | 06-08-2026 00:30 |
| Source: | Inactive - Unplanned - Połaniec B3 |
Outage information
| Unit | Połaniec B4 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 74 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 17:00 |
| Event end: | 06-08-2026 00:30 |
| Source: | Inactive - Unplanned - Połaniec B4 |
Outage information
| Unit | Kozienice 1 B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 40 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 21:30 |
| Event end: | 05-08-2026 23:50 |
| Source: | Inactive - Unplanned - Kozienice 1 B6 |
Outage information
| Unit | Kozienice 1 B1 |
| Achievable generation capacity: | 213 MW |
| Outage size: | 40 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 17:30 |
| Event end: | 06-08-2026 00:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B1 |
Outage information
| Unit | Kozienice 2 B10 |
| Achievable generation capacity: | 534 MW |
| Outage size: | 180 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 23:15 |
| Event end: | 06-08-2026 01:25 |
| Source: | Inactive - Unplanned - Kozienice 2 B10 |
Outage information
| Unit | Połaniec B6 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 72 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 16:30 |
| Event end: | 05-08-2026 23:30 |
| Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
| Unit | Ostrołęka B B02 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 30 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 17:15 |
| Event end: | 06-08-2026 07:00 |
| Source: | Inactive - Unplanned - Ostrołęka B B02 |
Outage information
| Unit | Połaniec B3 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 96 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 02:30 |
| Event end: | 06-08-2026 06:30 |
| Source: | Inactive - Unplanned - Połaniec B3 |
Outage information
| Unit | Ostrołęka B B01 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 70 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 17:15 |
| Event end: | 06-08-2026 07:00 |
| Source: | Inactive - Unplanned - Ostrołęka B B01 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 20 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 02:00 |
| Event end: | 06-08-2026 05:30 |
| Source: | Inactive - Unplanned - Opole B6 |
Outage information
| Unit | Kozienice 2 B09 |
| Achievable generation capacity: | 534 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 20:16 |
| Event end: | 06-08-2026 05:36 |
| Source: | Inactive - Unplanned - Kozienice 2 B09 |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 05-08-2026 20:00 |
| Event end: | 06-08-2026 06:07 |
| Source: | Inactive - Unplanned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | Rybnik B5 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 209 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 19:02 |
| Event end: | 06-08-2026 08:30 |
| Source: | Inactive - Planned - Rybnik B5 |
Outage information
| Unit | Rybnik B8 |
| Achievable generation capacity: | 208 MW |
| Outage size: | 8 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 00:00 |
| Event end: | 06-08-2026 08:30 |
| Source: | Inactive - Unplanned - Rybnik B8 |
Outage information
| Unit | Połaniec B3 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 76 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 08:40 |
| Event end: | 06-08-2026 09:45 |
| Source: | Inactive - Unplanned - Połaniec B3 |
Outage information
| Unit | JSW KOKS S.A. EC Koksownia Przyjaźń G2 |
| Achievable generation capacity: | 15 MW |
| Outage size: | 15 MW |
| Event type: | Unplanned |
| Event start: | 22-07-2026 12:06 |
| Event end: | 06-08-2026 08:53 |
| Source: | Inactive - Unplanned - JSW KOKS S.A. EC Koksownia Przyjaźń G2 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 103 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 10:00 |
| Event end: | 07-08-2026 15:45 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 17:30 |
| Event end: | 08-08-2026 00:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 85 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 09:45 |
| Event end: | 07-08-2026 10:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Połaniec B5 |
| Achievable generation capacity: | 224 MW |
| Outage size: | 224 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 19:01 |
| Event end: | 06-08-2026 09:20 |
| Source: | Inactive - Unplanned - Połaniec B5 |
Outage information
| Unit | Połaniec B6 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 01:01 |
| Event end: | 06-08-2026 09:20 |
| Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
| Unit | Bełchatów B11 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 80 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:30 |
| Event end: | 07-08-2026 00:00 |
| Source: | Inactive - Unplanned - Bełchatów B11 |
Outage information
| Unit | Rybnik B7 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 8 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 08:30 |
| Event end: | 06-08-2026 16:45 |
| Source: | Inactive - Unplanned - Rybnik B7 |
Outage information
| Unit | EC Stalowa Wola Stalowa Wola BGP |
| Achievable generation capacity: | 450 MW |
| Outage size: | 450 MW |
| Event type: | Planned |
| Event start: | 04-08-2026 19:15 |
| Event end: | 06-08-2026 10:00 |
| Source: | Inactive - Planned - EC Stalowa Wola Stalowa Wola BGP |
Outage information
| Unit | Bełchatów B12 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 158 MW |
| Event type: | Planned |
| Event start: | 08-08-2026 20:00 |
| Event end: | 09-08-2026 00:00 |
| Source: | Inactive - Planned - Bełchatów B12 |
Outage information
| Unit | Rybnik B6 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 19:00 |
| Event end: | 06-08-2026 10:30 |
| Source: | Inactive - Unplanned - Rybnik B6 |
Outage information
| Unit | Bełchatów B11 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 80 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 00:00 |
| Event end: | 09-08-2026 00:00 |
| Source: | Inactive - Unplanned - Bełchatów B11 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:00 |
| Event end: | 07-08-2026 00:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 09:45 |
| Event end: | 06-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:00 |
| Event end: | 07-08-2026 00:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:00 |
| Event end: | 07-08-2026 00:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:00 |
| Event end: | 07-08-2026 00:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Mashav Management Sp. z o.o. PEAST |
| Achievable generation capacity: | 101 MW |
| Outage size: | 101 MW |
| Event type: | Planned |
| Event start: | 08-08-2026 06:00 |
| Event end: | 10-08-2026 18:00 |
| Source: | Inactive - Planned - Mashav Management Sp. z o.o. PEAST |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 00:00 |
| Event end: | 06-08-2026 09:30 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 17:00 |
| Event end: | 06-08-2026 22:00 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Mashav Management Sp. z o.o. PWEST |
| Achievable generation capacity: | 118 MW |
| Outage size: | 118 MW |
| Event type: | Planned |
| Event start: | 08-08-2026 06:00 |
| Event end: | 10-08-2026 18:00 |
| Source: | Inactive - Planned - Mashav Management Sp. z o.o. PWEST |
Outage information
| Unit | Mashav Management Sp. z o.o. PSOUT |
| Achievable generation capacity: | 37 MW |
| Outage size: | 37 MW |
| Event type: | Planned |
| Event start: | 08-08-2026 06:00 |
| Event end: | 10-08-2026 18:00 |
| Source: | Inactive - Planned - Mashav Management Sp. z o.o. PSOUT |
Outage information
| Unit | Kozienice 1 B2 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 210 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 19:01 |
| Event end: | 06-08-2026 11:30 |
| Source: | Inactive - Unplanned - Kozienice 1 B2 |
Outage information
| Unit | Kozienice 1 B4 |
| Achievable generation capacity: | 213 MW |
| Outage size: | 213 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 19:01 |
| Event end: | 06-08-2026 11:30 |
| Source: | Inactive - Unplanned - Kozienice 1 B4 |
Outage information
| Unit | Dolna Odra B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 210 MW |
| Event type: | Planned |
| Event start: | 28-07-2026 00:19 |
| Event end: | 06-08-2026 13:00 |
| Source: | Inactive - Planned - Dolna Odra B6 |
Outage information
| Unit | Połaniec B3 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 95 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 10:00 |
| Event end: | 06-08-2026 13:15 |
| Source: | Inactive - Unplanned - Połaniec B3 |
Outage information
| Unit | JSW KOKS S.A. EC Koksownia Przyjaźń G3 |
| Achievable generation capacity: | 21 MW |
| Outage size: | 21 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 10:30 |
| Event end: | 06-08-2026 11:44 |
| Source: | Inactive - Unplanned - JSW KOKS S.A. EC Koksownia Przyjaźń G3 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 14:00 |
| Event end: | 07-08-2026 16:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Kozienice 1 B3 |
| Achievable generation capacity: | 206 MW |
| Outage size: | 206 MW |
| Event type: | Unplanned |
| Event start: | 04-08-2026 19:01 |
| Event end: | 06-08-2026 16:15 |
| Source: | Inactive - Unplanned - Kozienice 1 B3 |
Outage information
| Unit | Dolna Odra B7 |
| Achievable generation capacity: | 219 MW |
| Outage size: | 219 MW |
| Event type: | Planned |
| Event start: | 28-07-2026 00:00 |
| Event end: | 06-08-2026 16:00 |
| Source: | Inactive - Planned - Dolna Odra B7 |
Outage information
| Unit | Połaniec B6 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:01 |
| Event end: | 09-08-2026 00:00 |
| Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
| Unit | Rybnik B7 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 8 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:00 |
| Event end: | 11-08-2026 00:00 |
| Source: | Inactive - Unplanned - Rybnik B7 |
Outage information
| Unit | Połaniec B5 |
| Achievable generation capacity: | 224 MW |
| Outage size: | 224 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:01 |
| Event end: | 07-08-2026 08:00 |
| Source: | Inactive - Unplanned - Połaniec B5 |
Outage information
| Unit | Ostrołęka B B02 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 30 MW |
| Event type: | Planned |
| Event start: | 06-08-2026 16:00 |
| Event end: | 07-08-2026 00:00 |
| Source: | Inactive - Planned - Ostrołęka B B02 |
Outage information
| Unit | Ostrołęka B B01 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 50 MW |
| Event type: | Planned |
| Event start: | 06-08-2026 16:00 |
| Event end: | 07-08-2026 00:00 |
| Source: | Inactive - Planned - Ostrołęka B B01 |
Outage information
| Unit | Opole B1 |
| Achievable generation capacity: | 357 MW |
| Outage size: | 67 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:15 |
| Event end: | 06-08-2026 22:30 |
| Source: | Inactive - Unplanned - Opole B1 |
Outage information
| Unit | Ostrołęka B B03 |
| Achievable generation capacity: | 165 MW |
| Outage size: | 23 MW |
| Event type: | Planned |
| Event start: | 06-08-2026 17:00 |
| Event end: | 07-08-2026 04:00 |
| Source: | Inactive - Planned - Ostrołęka B B03 |
Outage information
| Unit | Ostrołęka B B02 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 30 MW |
| Event type: | Planned |
| Event start: | 07-08-2026 17:00 |
| Event end: | 07-08-2026 22:00 |
| Source: | Inactive - Planned - Ostrołęka B B02 |
Outage information
| Unit | Ostrołęka B B01 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 30 MW |
| Event type: | Planned |
| Event start: | 07-08-2026 00:01 |
| Event end: | 07-08-2026 07:00 |
| Source: | Inactive - Planned - Ostrołęka B B01 |
Outage information
| Unit | Ostrołęka B B02 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 30 MW |
| Event type: | Planned |
| Event start: | 07-08-2026 00:01 |
| Event end: | 07-08-2026 07:00 |
| Source: | Inactive - Planned - Ostrołęka B B02 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Planned |
| Event start: | 27-07-2026 00:00 |
| Event end: | 07-08-2026 00:15 |
| Source: | Inactive - Planned - Turów B03 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 121 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 05:00 |
| Event end: | 07-08-2026 06:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 121 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 09:30 |
| Event end: | 07-08-2026 09:45 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 103 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 04:30 |
| Event end: | 07-08-2026 10:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 07:00 |
| Event end: | 08-08-2026 08:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Kozienice 2 B10 |
| Achievable generation capacity: | 534 MW |
| Outage size: | 534 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 22:30 |
| Event end: | 12-08-2026 00:00 |
| Source: | Inactive - Unplanned - Kozienice 2 B10 |
Outage information
| Unit | Synthos Dwory 7 TG10 |
| Achievable generation capacity: | 19 MW |
| Outage size: | 19 MW |
| Event type: | Unplanned |
| Event start: | 12-01-2026 07:28 |
| Event end: | 08-08-2026 13:00 |
| Source: | Inactive - Unplanned - Synthos Dwory 7 TG10 |
Outage information
| Unit | Dolna Odra B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 210 MW |
| Event type: | Planned |
| Event start: | 08-08-2026 00:00 |
| Event end: | 10-08-2026 00:00 |
| Source: | Inactive - Planned - Dolna Odra B6 |
Outage information
| Unit | Dolna Odra B7 |
| Achievable generation capacity: | 219 MW |
| Outage size: | 219 MW |
| Event type: | Planned |
| Event start: | 08-08-2026 00:00 |
| Event end: | 10-08-2026 00:00 |
| Source: | Inactive - Planned - Dolna Odra B7 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 05:45 |
| Event end: | 08-08-2026 06:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 36 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 17:45 |
| Event end: | 08-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 38 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 17:45 |
| Event end: | 08-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 56 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 22:15 |
| Event end: | 08-08-2026 22:30 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 00:30 |
| Event end: | 08-08-2026 08:30 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 104 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 09:45 |
| Event end: | 08-08-2026 10:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 65 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 17:30 |
| Event end: | 08-08-2026 17:45 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 14 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 00:15 |
| Event end: | 08-08-2026 05:45 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 108 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 08:45 |
| Event end: | 08-08-2026 09:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 93 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 00:30 |
| Event end: | 08-08-2026 00:45 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 112 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 17:00 |
| Event end: | 08-08-2026 17:15 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 08:45 |
| Event end: | 08-08-2026 09:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 89 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 17:00 |
| Event end: | 08-08-2026 17:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 135 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 03:00 |
| Event end: | 07-08-2026 04:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 135 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 05:00 |
| Event end: | 07-08-2026 06:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 140 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 08:00 |
| Event end: | 07-08-2026 09:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 145 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 10:00 |
| Event end: | 07-08-2026 11:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 170 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 16:00 |
| Event end: | 08-08-2026 17:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 140 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 07:00 |
| Event end: | 08-08-2026 08:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 145 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 04:00 |
| Event end: | 08-08-2026 05:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 00:00 |
| Event end: | 08-08-2026 01:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | EC Siekierki WSIB 08 |
| Achievable generation capacity: | 109 MW |
| Outage size: | 109 MW |
| Event type: | Planned |
| Event start: | 11-04-2026 01:04 |
| Event end: | 02-10-2026 00:00 |
| Source: | Active - Planned - EC Siekierki WSIB 08 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 19:08 |
| Event end: | 07-08-2026 11:49 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | Połaniec B3 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 96 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 07:00 |
| Event end: | 07-08-2026 13:15 |
| Source: | Inactive - Unplanned - Połaniec B3 |
Outage information
| Unit | EC Stalowa Wola Stalowa Wola BGP |
| Achievable generation capacity: | 450 MW |
| Outage size: | 450 MW |
| Event type: | Planned |
| Event start: | 30-07-2026 00:00 |
| Event end: | 04-08-2026 10:00 |
| Source: | Inactive - Planned - EC Stalowa Wola Stalowa Wola BGP |
Outage information
| Unit | Ostrołęka B B01 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 20 MW |
| Event type: | Planned |
| Event start: | 07-08-2026 17:00 |
| Event end: | 07-08-2026 22:00 |
| Source: | Inactive - Planned - Ostrołęka B B01 |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Planned |
| Event start: | 07-08-2026 11:30 |
| Event end: | 07-08-2026 15:30 |
| Source: | Inactive - Planned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 46 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 00:00 |
| Event end: | 09-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 46 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 00:00 |
| Event end: | 09-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 00:00 |
| Event end: | 09-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 223 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 00:45 |
| Event end: | 09-08-2026 05:00 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 00:00 |
| Event end: | 09-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 51 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 22:00 |
| Event end: | 09-08-2026 22:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 93 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 18:00 |
| Event end: | 09-08-2026 22:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 00:30 |
| Event end: | 09-08-2026 17:45 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 64 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 17:45 |
| Event end: | 09-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 93 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 17:45 |
| Event end: | 09-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 94 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 00:30 |
| Event end: | 09-08-2026 00:45 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 93 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 18:00 |
| Event end: | 09-08-2026 22:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 51 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 17:45 |
| Event end: | 09-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 223 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 06:00 |
| Event end: | 09-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 133 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 01:00 |
| Event end: | 09-08-2026 05:30 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 00:30 |
| Event end: | 09-08-2026 17:45 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 55 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 06:00 |
| Event end: | 09-08-2026 08:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 89 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 17:15 |
| Event end: | 09-08-2026 17:30 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Ostrołęka B B01 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 230 MW |
| Event type: | Planned |
| Event start: | 08-08-2026 00:01 |
| Event end: | 10-08-2026 00:00 |
| Source: | Inactive - Planned - Ostrołęka B B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 98 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 06:00 |
| Event end: | 10-08-2026 07:45 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 17:15 |
| Event end: | 10-08-2026 17:30 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 09:00 |
| Event end: | 10-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 09:00 |
| Event end: | 10-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 09:00 |
| Event end: | 10-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | EC Siekierki WSIK |
| Achievable generation capacity: | 157 MW |
| Outage size: | 157 MW |
| Event type: | Unplanned |
| Event start: | 24-07-2026 11:50 |
| Event end: | 08-08-2026 00:00 |
| Source: | Inactive - Unplanned - EC Siekierki WSIK |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 05:45 |
| Event end: | 10-08-2026 06:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 104 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 00:00 |
| Event end: | 10-08-2026 05:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 94 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 17:00 |
| Event end: | 10-08-2026 17:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 55 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 05:30 |
| Event end: | 10-08-2026 05:45 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 104 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 00:00 |
| Event end: | 10-08-2026 05:15 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 08:15 |
| Event end: | 10-08-2026 08:30 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 08:15 |
| Event end: | 10-08-2026 08:30 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 124 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 09:30 |
| Event end: | 10-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 64 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 17:30 |
| Event end: | 10-08-2026 17:45 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 133 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 16:30 |
| Event end: | 07-08-2026 16:45 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 96 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 22:00 |
| Event end: | 08-08-2026 00:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 110 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 16:45 |
| Event end: | 07-08-2026 17:15 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 101 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 22:00 |
| Event end: | 08-08-2026 00:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 88 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 16:30 |
| Event end: | 07-08-2026 16:45 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Planned |
| Event start: | 10-08-2026 08:30 |
| Event end: | 10-08-2026 15:30 |
| Source: | Inactive - Planned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Planned |
| Event start: | 11-08-2026 08:00 |
| Event end: | 11-08-2026 15:30 |
| Source: | Inactive - Planned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | PAK-PCE PRZYRÓW FW Przyrów |
| Achievable generation capacity: | 42 MW |
| Outage size: | 3 MW |
| Event type: | Planned |
| Event start: | 12-08-2026 08:30 |
| Event end: | 12-08-2026 15:30 |
| Source: | Inactive - Planned - PAK-PCE PRZYRÓW FW Przyrów |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 12 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 00:00 |
| Event end: | 09-08-2026 08:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 47 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 21:00 |
| Event end: | 09-08-2026 22:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 46 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 12:00 |
| Event end: | 09-08-2026 13:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 09:00 |
| Event end: | 09-08-2026 10:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 41 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 11:00 |
| Event end: | 09-08-2026 12:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 59 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 18:00 |
| Event end: | 09-08-2026 19:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 57 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 19:00 |
| Event end: | 09-08-2026 20:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 50 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 13:00 |
| Event end: | 09-08-2026 14:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 47 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 21:00 |
| Event end: | 09-08-2026 22:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 35 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 10:00 |
| Event end: | 09-08-2026 11:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 58 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 15:00 |
| Event end: | 09-08-2026 17:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | Łaziska 3 B10 |
| Achievable generation capacity: | 211 MW |
| Outage size: | 211 MW |
| Event type: | Planned |
| Event start: | 08-08-2026 00:12 |
| Event end: | 09-08-2026 00:00 |
| Source: | Inactive - Planned - Łaziska 3 B10 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 04:00 |
| Event end: | 09-08-2026 05:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 74 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 17:00 |
| Event end: | 09-08-2026 18:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 69 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 12:00 |
| Event end: | 09-08-2026 13:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 01:00 |
| Event end: | 09-08-2026 02:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 59 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 10:00 |
| Event end: | 09-08-2026 11:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 74 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 14:00 |
| Event end: | 09-08-2026 15:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 54 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 22:00 |
| Event end: | 09-08-2026 23:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 64 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 20:00 |
| Event end: | 09-08-2026 21:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Bełchatów B12 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 358 MW |
| Event type: | Planned |
| Event start: | 26-07-2026 03:00 |
| Event end: | 08-08-2026 04:00 |
| Source: | Inactive - Planned - Bełchatów B12 |
Outage information
| Unit | EC Stalowa Wola Stalowa Wola BGP |
| Achievable generation capacity: | 450 MW |
| Outage size: | 450 MW |
| Event type: | Planned |
| Event start: | 06-08-2026 22:15 |
| Event end: | 08-08-2026 08:00 |
| Source: | Inactive - Planned - EC Stalowa Wola Stalowa Wola BGP |
Outage information
| Unit | EC Siekierki WSIB 09 |
| Achievable generation capacity: | 91 MW |
| Outage size: | 91 MW |
| Event type: | Planned |
| Event start: | 16-05-2026 00:01 |
| Event end: | 08-08-2026 02:38 |
| Source: | Inactive - Planned - EC Siekierki WSIB 09 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 54 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 16:00 |
| Event end: | 08-08-2026 17:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 49 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 20:00 |
| Event end: | 08-08-2026 21:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 22:00 |
| Event end: | 08-08-2026 23:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 54 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 13:00 |
| Event end: | 08-08-2026 14:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 22:00 |
| Event end: | 08-08-2026 23:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 158 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 18:00 |
| Event end: | 09-08-2026 00:00 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 29 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 08:00 |
| Event end: | 10-08-2026 09:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 19 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 05:00 |
| Event end: | 10-08-2026 06:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 55 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 15:00 |
| Event end: | 10-08-2026 16:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 26 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 03:00 |
| Event end: | 10-08-2026 04:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 41 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 00:00 |
| Event end: | 10-08-2026 01:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 40 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 20:00 |
| Event end: | 10-08-2026 21:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 40 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 10:00 |
| Event end: | 10-08-2026 11:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 49 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 12:00 |
| Event end: | 10-08-2026 14:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 34 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 09:00 |
| Event end: | 10-08-2026 10:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 41 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 00:00 |
| Event end: | 10-08-2026 01:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 40 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 20:00 |
| Event end: | 10-08-2026 21:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 26 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 03:00 |
| Event end: | 10-08-2026 04:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 22 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 06:00 |
| Event end: | 10-08-2026 07:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 175 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 20:00 |
| Event end: | 09-08-2026 21:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 165 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 22:00 |
| Event end: | 09-08-2026 23:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 190 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 17:00 |
| Event end: | 09-08-2026 18:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 185 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 13:00 |
| Event end: | 09-08-2026 14:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 145 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 03:00 |
| Event end: | 09-08-2026 04:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 170 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 10:00 |
| Event end: | 09-08-2026 11:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 01:00 |
| Event end: | 09-08-2026 02:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 190 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 15:00 |
| Event end: | 09-08-2026 16:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Unplanned |
| Event start: | 08-08-2026 15:45 |
| Event end: | 08-08-2026 23:41 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 100 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 03:40 |
| Event end: | 09-08-2026 04:30 |
| Source: | Inactive - Unplanned - Opole B6 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 13:00 |
| Event end: | 10-08-2026 14:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 54 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 00:00 |
| Event end: | 10-08-2026 01:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 49 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 02:00 |
| Event end: | 10-08-2026 03:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 69 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 11:00 |
| Event end: | 10-08-2026 12:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 06:00 |
| Event end: | 10-08-2026 07:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 54 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 09:00 |
| Event end: | 10-08-2026 10:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 94 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 15:00 |
| Event end: | 10-08-2026 16:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 04:00 |
| Event end: | 10-08-2026 05:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 18:00 |
| Event end: | 10-08-2026 19:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 236 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 00:45 |
| Event end: | 09-08-2026 11:15 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | EC Żerań WZE |
| Achievable generation capacity: | 184 MW |
| Outage size: | 184 MW |
| Event type: | Planned |
| Event start: | 01-07-2026 09:00 |
| Event end: | 16-09-2026 00:00 |
| Source: | Active - Planned - EC Żerań WZE |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 06:09 |
| Event end: | 09-08-2026 13:30 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 06:00 |
| Event end: | 10-08-2026 07:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 04:00 |
| Event end: | 10-08-2026 05:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 155 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 01:00 |
| Event end: | 10-08-2026 02:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 165 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 09:00 |
| Event end: | 10-08-2026 10:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 26 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 10:00 |
| Event end: | 11-08-2026 12:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 37 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 15:00 |
| Event end: | 11-08-2026 17:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 31 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 13:00 |
| Event end: | 11-08-2026 14:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 19 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 21:00 |
| Event end: | 11-08-2026 22:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 16 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 03:00 |
| Event end: | 11-08-2026 05:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 31 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 19:00 |
| Event end: | 11-08-2026 20:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 19 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 01:00 |
| Event end: | 11-08-2026 03:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 19 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 21:00 |
| Event end: | 11-08-2026 22:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 40 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 17:00 |
| Event end: | 11-08-2026 18:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 31 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 13:00 |
| Event end: | 11-08-2026 14:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 31 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 19:00 |
| Event end: | 11-08-2026 20:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 16 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 08:00 |
| Event end: | 11-08-2026 09:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 00:00 |
| Event end: | 11-08-2026 01:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 34 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 08:00 |
| Event end: | 11-08-2026 09:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 34 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 06:00 |
| Event end: | 11-08-2026 07:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 02:00 |
| Event end: | 11-08-2026 03:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 49 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 16:00 |
| Event end: | 11-08-2026 17:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 34 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 22:00 |
| Event end: | 11-08-2026 23:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 34 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 04:00 |
| Event end: | 11-08-2026 05:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 19:00 |
| Event end: | 11-08-2026 20:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 49 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 12:00 |
| Event end: | 11-08-2026 13:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Ostrołęka B B03 |
| Achievable generation capacity: | 165 MW |
| Outage size: | 165 MW |
| Event type: | Planned |
| Event start: | 09-08-2026 00:00 |
| Event end: | 10-08-2026 07:15 |
| Source: | Inactive - Planned - Ostrołęka B B03 |
Outage information
| Unit | Synthos Dwory 7 TG9 |
| Achievable generation capacity: | 31 MW |
| Outage size: | 31 MW |
| Event type: | Planned |
| Event start: | 08-08-2026 11:00 |
| Event end: | 11-08-2026 15:00 |
| Source: | Inactive - Planned - Synthos Dwory 7 TG9 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 38 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 00:00 |
| Event end: | 11-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 05:45 |
| Event end: | 11-08-2026 06:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 05:15 |
| Event end: | 11-08-2026 05:30 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 133 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 01:00 |
| Event end: | 11-08-2026 05:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 23 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 17:45 |
| Event end: | 11-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 108 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 01:00 |
| Event end: | 11-08-2026 01:15 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 19 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 08:00 |
| Event end: | 11-08-2026 08:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 05:15 |
| Event end: | 11-08-2026 05:30 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 93 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 17:15 |
| Event end: | 11-08-2026 17:30 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 158 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 00:15 |
| Event end: | 11-08-2026 00:30 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 22:00 |
| Event end: | 11-08-2026 23:00 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 64 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 17:30 |
| Event end: | 11-08-2026 17:45 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 06:00 |
| Event end: | 11-08-2026 08:15 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 104 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 09:00 |
| Event end: | 11-08-2026 09:15 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 65 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 23:00 |
| Event end: | 11-08-2026 23:15 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 70 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 17:15 |
| Event end: | 11-08-2026 17:30 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 113 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 00:45 |
| Event end: | 11-08-2026 01:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 93 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 00:30 |
| Event end: | 11-08-2026 00:45 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 65 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 00:15 |
| Event end: | 11-08-2026 00:30 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 17:15 |
| Event end: | 11-08-2026 17:30 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 08:45 |
| Event end: | 11-08-2026 09:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 22:00 |
| Event end: | 11-08-2026 23:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 114 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 17:00 |
| Event end: | 11-08-2026 17:15 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 00:00 |
| Event end: | 11-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 38 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 17:45 |
| Event end: | 11-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 36 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 00:00 |
| Event end: | 11-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 160 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 00:00 |
| Event end: | 11-08-2026 01:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 185 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 12:00 |
| Event end: | 10-08-2026 13:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 05:00 |
| Event end: | 11-08-2026 06:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 200 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 17:00 |
| Event end: | 10-08-2026 18:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 190 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 19:00 |
| Event end: | 10-08-2026 20:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 155 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 03:00 |
| Event end: | 11-08-2026 04:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | EC Siekierki WSIB 09 |
| Achievable generation capacity: | 91 MW |
| Outage size: | 91 MW |
| Event type: | Planned |
| Event start: | 10-08-2026 14:00 |
| Event end: | 11-08-2026 20:00 |
| Source: | Inactive - Planned - EC Siekierki WSIB 09 |
Outage information
| Unit | Połaniec B4 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 56 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 09:25 |
| Event end: | 10-08-2026 10:15 |
| Source: | Inactive - Unplanned - Połaniec B4 |
Outage information
| Unit | Polenergia Farma Wiatrowa 3 Sp. z o.o. FW Dębsk |
| Achievable generation capacity: | 121 MW |
| Outage size: | 113 MW |
| Event type: | Planned |
| Event start: | 09-08-2026 09:00 |
| Event end: | 09-08-2026 16:00 |
| Source: | Inactive - Planned - Polenergia Farma Wiatrowa 3 Sp. z o.o. FW Dębsk |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 158 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 19:00 |
| Event end: | 11-08-2026 00:00 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 18:00 |
| Event end: | 10-08-2026 19:00 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 18:00 |
| Event end: | 10-08-2026 19:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 5 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 18:00 |
| Event end: | 10-08-2026 19:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 18:00 |
| Event end: | 10-08-2026 19:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 18:00 |
| Event end: | 10-08-2026 19:00 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Karolin B3 |
| Achievable generation capacity: | 112 MW |
| Outage size: | 112 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 15:01 |
| Event end: | 13-08-2026 00:00 |
| Source: | Inactive - Unplanned - Karolin B3 |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 28 MW |
| Event type: | Planned |
| Event start: | 11-08-2026 09:00 |
| Event end: | 11-08-2026 10:00 |
| Source: | Inactive - Planned - Opole B3 |
Outage information
| Unit | Ostrołęka B B01 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 230 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 00:01 |
| Event end: | 10-08-2026 18:00 |
| Source: | Inactive - Unplanned - Ostrołęka B B01 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 74 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 20:00 |
| Event end: | 10-08-2026 21:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Łagisza B10 |
| Achievable generation capacity: | 430 MW |
| Outage size: | 120 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 18:30 |
| Event end: | 10-08-2026 21:00 |
| Source: | Inactive - Unplanned - Łagisza B10 |
Outage information
| Unit | Porąbka Żar H1 |
| Achievable generation capacity: | 138 MW |
| Outage size: | 138 MW |
| Event type: | Planned |
| Event start: | 12-08-2026 16:00 |
| Event end: | 12-08-2026 17:00 |
| Source: | Inactive - Planned - Porąbka Żar H1 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
| Achievable generation capacity: | 12 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 10-08-2026 13:29 |
| Event end: | 10-08-2026 15:15 |
| Source: | Inactive - Planned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 31 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 17:00 |
| Event end: | 12-08-2026 18:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 12 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 08:00 |
| Event end: | 12-08-2026 09:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 14 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 10:00 |
| Event end: | 12-08-2026 11:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 17 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 21:00 |
| Event end: | 12-08-2026 22:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 19:00 |
| Event end: | 12-08-2026 20:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 12 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 05:00 |
| Event end: | 12-08-2026 06:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 14:00 |
| Event end: | 12-08-2026 15:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 12 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 02:00 |
| Event end: | 12-08-2026 03:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 18 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 11:00 |
| Event end: | 12-08-2026 12:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 31 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 17:00 |
| Event end: | 12-08-2026 18:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 13:00 |
| Event end: | 12-08-2026 14:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 33 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 15:00 |
| Event end: | 12-08-2026 16:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 12 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 00:00 |
| Event end: | 12-08-2026 01:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 19:00 |
| Event end: | 12-08-2026 20:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 12 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 07:00 |
| Event end: | 12-08-2026 08:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 12 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 09:00 |
| Event end: | 12-08-2026 10:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 12 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 02:00 |
| Event end: | 12-08-2026 03:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | Bełchatów B12 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 20 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 04:00 |
| Event end: | 11-08-2026 07:00 |
| Source: | Inactive - Unplanned - Bełchatów B12 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 44 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 20:00 |
| Event end: | 12-08-2026 21:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 34 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 05:00 |
| Event end: | 12-08-2026 06:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 34 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 22:00 |
| Event end: | 12-08-2026 23:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 34 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 07:00 |
| Event end: | 12-08-2026 08:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 49 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 16:00 |
| Event end: | 12-08-2026 17:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 09:00 |
| Event end: | 12-08-2026 10:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 49 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 14:00 |
| Event end: | 12-08-2026 15:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 01:00 |
| Event end: | 12-08-2026 02:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 65 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 17:15 |
| Event end: | 12-08-2026 17:30 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 18:00 |
| Event end: | 12-08-2026 22:30 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 103 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 16:45 |
| Event end: | 12-08-2026 17:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 93 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 23:30 |
| Event end: | 12-08-2026 23:45 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 112 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 00:00 |
| Event end: | 12-08-2026 01:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 47 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 22:45 |
| Event end: | 12-08-2026 23:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 28 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 17:45 |
| Event end: | 12-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 55 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 05:30 |
| Event end: | 12-08-2026 05:45 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 112 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 17:00 |
| Event end: | 12-08-2026 17:15 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 64 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 00:00 |
| Event end: | 12-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 23 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 17:45 |
| Event end: | 12-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 55 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 05:30 |
| Event end: | 12-08-2026 05:45 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 19 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 08:00 |
| Event end: | 12-08-2026 08:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 08:45 |
| Event end: | 12-08-2026 09:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 133 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 09:15 |
| Event end: | 12-08-2026 16:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 55 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 00:00 |
| Event end: | 12-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 16:15 |
| Event end: | 12-08-2026 17:30 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 27 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 23:00 |
| Event end: | 12-08-2026 23:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 16:15 |
| Event end: | 12-08-2026 17:30 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 9 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 06:00 |
| Event end: | 12-08-2026 08:15 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 108 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 01:00 |
| Event end: | 12-08-2026 01:15 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 104 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 09:00 |
| Event end: | 12-08-2026 09:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 38 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 23:00 |
| Event end: | 12-08-2026 23:15 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 36 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 17:45 |
| Event end: | 12-08-2026 18:00 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 833 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 06:20 |
| Event end: | 11-08-2026 07:45 |
| Source: | Inactive - Unplanned - Opole B6 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 175 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 14:00 |
| Event end: | 11-08-2026 15:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 160 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 10:00 |
| Event end: | 11-08-2026 11:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 165 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 21:00 |
| Event end: | 11-08-2026 22:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 08:00 |
| Event end: | 12-08-2026 09:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 165 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 10:00 |
| Event end: | 12-08-2026 11:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 170 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 20:00 |
| Event end: | 12-08-2026 21:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 140 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 06:00 |
| Event end: | 12-08-2026 07:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 185 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 14:00 |
| Event end: | 12-08-2026 15:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 00:00 |
| Event end: | 12-08-2026 01:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 150 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 02:00 |
| Event end: | 12-08-2026 03:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 180 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 18:00 |
| Event end: | 12-08-2026 19:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 670 MW |
| Event type: | Planned |
| Event start: | 11-08-2026 09:00 |
| Event end: | 11-08-2026 09:37 |
| Source: | Inactive - Planned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | QWP Rzepin Sp. z o.o. QWP Rzepin |
| Achievable generation capacity: | 58 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 10-08-2026 08:00 |
| Event end: | 13-08-2026 15:30 |
| Source: | Inactive - Unplanned - QWP Rzepin Sp. z o.o. QWP Rzepin |
Outage information
| Unit | Bełchatów B05 |
| Achievable generation capacity: | 348 MW |
| Outage size: | 348 MW |
| Event type: | Planned |
| Event start: | 10-08-2026 00:00 |
| Event end: | 11-08-2026 13:00 |
| Source: | Inactive - Planned - Bełchatów B05 |
Outage information
| Unit | Synthos Dwory 7 TG10 |
| Achievable generation capacity: | 19 MW |
| Outage size: | 19 MW |
| Event type: | Planned |
| Event start: | 11-08-2026 13:18 |
| Event end: | 31-12-2026 23:59 |
| Source: | Active - Planned - Synthos Dwory 7 TG10 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 18:13 |
| Event end: | 11-08-2026 13:20 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | Eolos Novo Sp. z o.o. FW Czarnożyły |
| Achievable generation capacity: | 16 MW |
| Outage size: | 8 MW |
| Event type: | Planned |
| Event start: | 11-08-2026 13:24 |
| Event end: | 11-08-2026 15:43 |
| Source: | Inactive - Planned - Eolos Novo Sp. z o.o. FW Czarnożyły |
Outage information
| Unit | Dolna Odra B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 20 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 20:30 |
| Event end: | 11-08-2026 22:45 |
| Source: | Inactive - Unplanned - Dolna Odra B6 |
Outage information
| Unit | Porąbka Żar H1 |
| Achievable generation capacity: | 138 MW |
| Outage size: | 138 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 18:15 |
| Event end: | 11-08-2026 21:15 |
| Source: | Inactive - Unplanned - Porąbka Żar H1 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 140 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 21:00 |
| Event end: | 11-08-2026 22:00 |
| Source: | Inactive - Unplanned - Opole B6 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 12 MW |
| Event type: | Unplanned |
| Event start: | 13-08-2026 00:00 |
| Event end: | 13-08-2026 10:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 12 MW |
| Event type: | Unplanned |
| Event start: | 13-08-2026 00:00 |
| Event end: | 13-08-2026 10:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | JSW KOKS S.A. EC Koksownia Przyjaźń G4 |
| Achievable generation capacity: | 71 MW |
| Outage size: | 71 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 17:56 |
| Event end: | 12-08-2026 02:05 |
| Source: | Inactive - Unplanned - JSW KOKS S.A. EC Koksownia Przyjaźń G4 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 2 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 23:42 |
| Event end: | 12-08-2026 09:59 |
| Source: | Inactive - Unplanned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 479 MW |
| Outage size: | 39 MW |
| Event type: | Unplanned |
| Event start: | 13-08-2026 00:00 |
| Event end: | 13-08-2026 01:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Opole B3 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 15 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 08:15 |
| Event end: | 12-08-2026 08:30 |
| Source: | Inactive - Unplanned - Opole B3 |
Outage information
| Unit | Połaniec B5 |
| Achievable generation capacity: | 224 MW |
| Outage size: | 224 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 23:50 |
| Event end: | 31-08-2026 00:00 |
| Source: | Active - Unplanned - Połaniec B5 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 85 MW |
| Event type: | Unplanned |
| Event start: | 13-08-2026 00:00 |
| Event end: | 13-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B05 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 112 MW |
| Event type: | Unplanned |
| Event start: | 13-08-2026 00:00 |
| Event end: | 13-08-2026 01:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 13-08-2026 00:00 |
| Event end: | 13-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 121 MW |
| Event type: | Unplanned |
| Event start: | 13-08-2026 00:00 |
| Event end: | 13-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B03 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 158 MW |
| Event type: | Unplanned |
| Event start: | 13-08-2026 00:00 |
| Event end: | 13-08-2026 00:15 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 145 MW |
| Event type: | Unplanned |
| Event start: | 13-08-2026 00:00 |
| Event end: | 13-08-2026 01:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Bełchatów B06 |
| Achievable generation capacity: | 360 MW |
| Outage size: | 20 MW |
| Event type: | Unplanned |
| Event start: | 13-08-2026 00:00 |
| Event end: | 13-08-2026 09:00 |
| Source: | Inactive - Unplanned - Bełchatów B06 |
Outage information
| Unit | Rybnik B7 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 209 MW |
| Event type: | Planned |
| Event start: | 11-08-2026 00:04 |
| Event end: | 13-08-2026 00:00 |
| Source: | Inactive - Planned - Rybnik B7 |
Outage information
| Unit | Rybnik B8 |
| Achievable generation capacity: | 208 MW |
| Outage size: | 8 MW |
| Event type: | Unplanned |
| Event start: | 11-08-2026 00:00 |
| Event end: | 12-08-2026 19:15 |
| Source: | Inactive - Unplanned - Rybnik B8 |
Outage information
| Unit | Dolna Odra B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 20 MW |
| Event type: | Unplanned |
| Event start: | 12-08-2026 23:00 |
| Event end: | 13-08-2026 00:00 |
| Source: | Inactive - Unplanned - Dolna Odra B6 |
Outage information
| Unit | Eolos Polska Sp. z o.o. FW Krzyżanów |
| Achievable generation capacity: | 20 MW |
| Outage size: | 2 MW |
| Event type: | Planned |
| Event start: | 12-08-2026 11:57 |
| Event end: | 12-08-2026 18:45 |
| Source: | Inactive - Planned - Eolos Polska Sp. z o.o. FW Krzyżanów |
Outage information
| Unit | Rybnik B5 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:00 |
| Event end: | 13-08-2026 10:15 |
| Source: | Inactive - Unplanned - Rybnik B5 |
Outage information
| Unit | Połaniec B3 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 23:45 |
| Event end: | 31-08-2026 00:00 |
| Source: | Active - Unplanned - Połaniec B3 |
Outage information
| Unit | Ostrołęka B B03 |
| Achievable generation capacity: | 165 MW |
| Outage size: | 165 MW |
| Event type: | Planned |
| Event start: | 11-08-2026 00:00 |
| Event end: | 13-08-2026 15:15 |
| Source: | Inactive - Planned - Ostrołęka B B03 |
Outage information
| Unit | Rybnik B6 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 17:00 |
| Event end: | 14-08-2026 13:00 |
| Source: | Inactive - Unplanned - Rybnik B6 |
Outage information
| Unit | Jaworzno 3 B4 |
| Achievable generation capacity: | 211 MW |
| Outage size: | 211 MW |
| Event type: | Unplanned |
| Event start: | 30-07-2026 19:15 |
| Event end: | 14-08-2026 15:00 |
| Source: | Inactive - Unplanned - Jaworzno 3 B4 |
Outage information
| Unit | KOGENERACJA S.A. CZN_1S01 |
| Achievable generation capacity: | 177 MW |
| Outage size: | 110 MW |
| Event type: | Unplanned |
| Event start: | 01-08-2026 00:00 |
| Event end: | 31-08-2026 23:45 |
| Source: | Active - Unplanned - KOGENERACJA S.A. CZN_1S01 |
Outage information
| Unit | Dolna Odra B7 |
| Achievable generation capacity: | 219 MW |
| Outage size: | 219 MW |
| Event type: | Planned |
| Event start: | 13-08-2026 00:00 |
| Event end: | 15-08-2026 11:00 |
| Source: | Inactive - Planned - Dolna Odra B7 |
Outage information
| Unit | Kozienice 1 B4 |
| Achievable generation capacity: | 213 MW |
| Outage size: | 213 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:30 |
| Event end: | 15-08-2026 13:00 |
| Source: | Inactive - Unplanned - Kozienice 1 B4 |
Outage information
| Unit | Windfarm Polska III sp. z o.o. WINDFARM |
| Achievable generation capacity: | 126 MW |
| Outage size: | 125 MW |
| Event type: | Planned |
| Event start: | 10-08-2026 07:00 |
| Event end: | 17-08-2026 20:00 |
| Source: | Inactive - Planned - Windfarm Polska III sp. z o.o. WINDFARM |
Outage information
| Unit | Kozienice 1 B3 |
| Achievable generation capacity: | 206 MW |
| Outage size: | 206 MW |
| Event type: | Unplanned |
| Event start: | 06-08-2026 22:00 |
| Event end: | 21-08-2026 22:00 |
| Source: | Active - Unplanned - Kozienice 1 B3 |
Outage information
| Unit | EC Siekierki WSIK |
| Achievable generation capacity: | 157 MW |
| Outage size: | 157 MW |
| Event type: | Planned |
| Event start: | 08-08-2026 00:01 |
| Event end: | 21-10-2026 00:00 |
| Source: | Active - Planned - EC Siekierki WSIK |
Outage information
| Unit | Ostrołęka B B02 |
| Achievable generation capacity: | 230 MW |
| Outage size: | 20 MW |
| Event type: | Planned |
| Event start: | 08-08-2026 00:00 |
| Event end: | 17-08-2026 23:15 |
| Source: | Inactive - Planned - Ostrołęka B B02 |
Outage information
| Unit | Połaniec B6 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Unplanned |
| Event start: | 09-08-2026 00:01 |
| Event end: | 18-08-2026 08:30 |
| Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Planned |
| Event start: | 11-08-2026 00:56 |
| Event end: | 24-08-2026 00:00 |
| Source: | Active - Planned - Turów B02 |
Outage information
| Unit | Pątnów B9 |
| Achievable generation capacity: | 474 MW |
| Outage size: | 474 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 23:09 |
| Event end: | 18-08-2026 09:45 |
| Source: | Inactive - Unplanned - Pątnów B9 |
Outage information
| Unit | JSW KOKS S.A. EC Koksownia Przyjaźń G2 |
| Achievable generation capacity: | 15 MW |
| Outage size: | 15 MW |
| Event type: | Unplanned |
| Event start: | 07-08-2026 15:07 |
| Event end: | 18-08-2026 13:13 |
| Source: | Inactive - Unplanned - JSW KOKS S.A. EC Koksownia Przyjaźń G2 |
Outage information
| Unit | EC Siekierki WSIB 10 |
| Achievable generation capacity: | 91 MW |
| Outage size: | 91 MW |
| Event type: | Planned |
| Event start: | 15-06-2026 00:00 |
| Event end: | 02-09-2026 00:00 |
| Source: | Active - Planned - EC Siekierki WSIB 10 |
The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.
The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.
The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.