Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
December 2024
Thu 12 Fri 13 Sat 14 Sun 15 Mon 16 Tue 17 Wed 18 Thu 19 Fri 20 Sat 21 Sun 22 Mon 23 Tue 24 Wed 25
Bełchatów 5102
B02 370 341 341 341 341 341 341 341 341 341 341 341
B03 380 100
B04 380
B05 380
B06 394
B07 390 100
B08 390
B09 390 100
B10 390 361 361 361 361 361 361 361
B11 390 100
B12 390 30
B14 858
Chorzów 226
B1 113
B2 113
Dolna Odra 900
B5 222
B6 222
B7 224 210 210
B8 232
Dychów 85
H1 28 30 30 30 30 30 30 30 30 30 30 30 30 30 30
H2 29
H3 28 30
EC Białystok 154
BIA_1-01 50
BIA_1-02 52
BIA_1-03 52
EC Gorzów 138
GOR2 138
EC Mielec 33
ECM 33 4 4 4 4 4 4 4 4 4 4 4 4 4 4
EC Rzeszów 120
ECR 120 101 101
EC Siekierki 595
WSIB 07 106
WSIB 08 125
WSIB 09 102 17
WSIB 10 102
WSIK 160
EC Stalowa Wola 450
Stalowa Wola BGP 450
EC Włocławek 465
B1 465 5 5
EC Wrotków 231
ECW 231
EC Żerań 299
WZE 299 202 202 202 202 202 202 202 202 202 202 202 202 202 202
EC Żerań 2 497
B20 497
Elektrociepłownia "Zielona Góra" S.A. 188
ZG BPG 188
Eolos Novo Sp. z o.o. 16
FW Czarnożyły 16 2
Eolos Polska Sp. z o.o. 32
FW Gorzkowice 12 2
FW Krzyżanów 20 2
EW Włocławek 168
H01 28
H02 28
H03 28
H04 28
H05 28
H06 28
FW Banie 12 106
FW Banie 12 106
FW Banie 3 81
FW Banie 3 81
FW Banie 4 56
FW Banie 4 56
FW Biały Bór 145
BBFW 145
FW Iława 13
FW Iława 13
FW Marszewo 100
FMA 100
FW Sępopol 44
FW Sępopol 44
Grupa Azoty Zakłady Azotowe „Puławy” SA 128
EC Puławy 128
Jaworzno 2 910
JWCD B7 910 507
Jaworzno 3 1345
B1 225
B2 225
B3 225
B4 225 211 211 211 211 211 211 211 211 211 211 211 211 211 211
B5 220 206 206 206 206 206 206 206 206 206 206 206
B6 225
JSW KOKS S.A. 114
EC Koksownia Przyjaźń G1 6
EC Koksownia Przyjaźń G2 15
EC Koksownia Przyjaźń G3 21
EC Koksownia Przyjaźń G4 71
Karolin 212
B2 100
B3 112
Katowice 135
B1 135
KOGENERACJA S.A. 208
WROB1-02 104
WROB1-03 104
Kozienice 1 1800
B1 228
B2 228
B3 220
B4 228
B5 228 228 228 228 228 228 228 228 228 228 228 228 228 228 228
B6 228
B7 220 203 203
B8 220
Kozienice 2 2207
B09 566 534
B10 566
B11 1075
Kraków Łęg 451
KLE_1-01 122
KLE_1-02 120
KLE_1-03 102
KLE_1-04 107 107 107
Łagisza 460
B10 460
Łaziska 3 905
B09 230
B10 225
B11 225
B12 225
Opole 3342
B1 386
B2 383
B3 383 42
B4 380
B5 905 35
B6 905
Ostrołęka B 690
B01 230
B02 230
B03 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230
Pątnów 644
B1 222 222
B2 222
B5 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
Pątnów B9 474
B9 474
PGE Gryfino 2050 sp. z o.o. 1366
Gryfino blok 10 683 167
Gryfino blok 9 683
Płock 630
B01 630 230 100
Połaniec 1899
B1 225
B2 242
B3 242 226 226 226 226 226 226 226 226
B4 242
B5 242
B6 242 226 226 226 226 226 226 226 226 226 226 226
B7 239 221 221 221 221 221 221 221 221
B9 225
Porąbka Żar 540
H1 135
H2 135
H3 135 137 137 137 137 137 137 137 137 137 137 137 137 137 137
H4 135
Rybnik 900
B5 225
B6 225
B7 225
B8 225
Siersza 306
B1 153 139 139 139 139 139 139 139 139 139 139 139
B2 153
Skawina 330
Tg3 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg5 110 55 55 55 55 55 55 55 55 55 55 55 55 55 55
Tg6 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Solina 198
H1 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68
H2 68
H3 31
H4 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31
Synthos Dwory 7 170
GT1 72
TG10 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
TG7 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28
TG8 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
TG9 31
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158 80 80 80 80 80 80 80 80 80 80 80 80 80 80
Turów 2029
B01 250
B02 250
B03 250
B04 261 142 142 142 142 142 142 142 142 142 142 142 142 142 142
B05 261 94 94 94 94 94 94 94 94 94 94 94 94 94 94
B06 261 236 236 236
B11 496 39 444
Veolia Energia Łódź EC4 105
B03 105
Windfarm Polska III sp. z o.o. 126
WINDFARM 126
Żarnowiec 716
H1 179
H2 179
H3 179
H4 179
Żydowo 167
H1 55
H2 55
H3 57
Planned 3311 3634 3473 2536 2536 2536 2757 2396 2396 2426 2396 1916 1916 1933
Unplanned 1934 1444 736 736 736 736 962 962 962 962 962 530 530 530
Total outages 5245 5078 4209 3272 3272 3272 3719 3358 3358 3388 3358 2446 2446 2463

Outage information

Unit Solina H4
Achievable generation capacity: 31 MW
Outage size: 31 MW
Event type: Planned
Event start: 04-11-2024 00:01
Event end: 14-04-2025 23:45
Source: Active - Planned - Solina H4

Outage information

Unit TAMEH Polska sp. z o. o. Elektrownia Blachownia
Achievable generation capacity: 158 MW
Outage size: 80 MW
Event type: Planned
Event start: 04-03-2024 12:00
Event end: 31-12-2024 23:59
Source: Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia

Outage information

Unit Synthos Dwory 7 TG8
Achievable generation capacity: 20 MW
Outage size: 20 MW
Event type: Planned
Event start: 22-03-2024 00:01
Event end: 22-03-2027 23:59
Source: Active - Planned - Synthos Dwory 7 TG8

Outage information

Unit Ostrołęka B B03
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 01-06-2024 00:01
Event end: 01-02-2025 00:00
Source: Active - Planned - Ostrołęka B B03

Outage information

Unit Jaworzno 3 B4
Achievable generation capacity: 211 MW
Outage size: 211 MW
Event type: Planned
Event start: 02-12-2024 00:00
Event end: 02-03-2025 00:00
Source: Active - Planned - Jaworzno 3 B4

Outage information

Unit Bełchatów B02
Achievable generation capacity: 341 MW
Outage size: 341 MW
Event type: Planned
Event start: 24-08-2024 00:01
Event end: 22-12-2024 18:00
Source: Active - Planned - Bełchatów B02

Outage information

Unit Bełchatów B10
Achievable generation capacity: 361 MW
Outage size: 361 MW
Event type: Planned
Event start: 29-09-2024 00:01
Event end: 18-12-2024 18:00
Source: Active - Planned - Bełchatów B10

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 137 MW
Outage size: 137 MW
Event type: Planned
Event start: 22-10-2024 00:01
Event end: 21-11-2025 23:45
Source: Active - Planned - Porąbka Żar H3

Outage information

Unit EC Mielec ECM
Achievable generation capacity: 33 MW
Outage size: 4 MW
Event type: Planned
Event start: 16-10-2024 15:00
Event end: 01-05-2025 00:00
Source: Active - Planned - EC Mielec ECM

Outage information

Unit EC Siekierki WSIB 09
Achievable generation capacity: 102 MW
Outage size: 17 MW
Event type: Planned
Event start: 25-12-2024 00:01
Event end: 28-02-2025 00:00
Source: Active - Planned - EC Siekierki WSIB 09

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 236 MW
Event type: Planned
Event start: 28-08-2024 00:03
Event end: 15-12-2024 00:00
Source: Active - Planned - Turów B06

Outage information

Unit Solina H1
Achievable generation capacity: 68 MW
Outage size: 68 MW
Event type: Unplanned
Event start: 04-09-2024 00:00
Event end: 31-12-2024 23:45
Source: Active - Unplanned - Solina H1

Outage information

Unit Dychów H1
Achievable generation capacity: 30 MW
Outage size: 30 MW
Event type: Planned
Event start: 02-11-2024 23:00
Event end: 29-12-2024 22:45
Source: Active - Planned - Dychów H1

Outage information

Unit Synthos Dwory 7 TG10
Achievable generation capacity: 19 MW
Outage size: 19 MW
Event type: Planned
Event start: 14-11-2024 10:13
Event end: 03-01-2025 15:00
Source: Active - Planned - Synthos Dwory 7 TG10

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 24-08-2024 00:01
Event end: 14-12-2024 00:00
Source: Active - Planned - Dolna Odra B7

Outage information

Unit Siersza B1
Achievable generation capacity: 139 MW
Outage size: 139 MW
Event type: Planned
Event start: 02-09-2024 00:00
Event end: 23-12-2024 00:00
Source: Active - Planned - Siersza B1

Outage information

Unit Jaworzno 3 B5
Achievable generation capacity: 206 MW
Outage size: 206 MW
Event type: Unplanned
Event start: 01-09-2024 00:00
Event end: 23-12-2024 00:00
Source: Active - Unplanned - Jaworzno 3 B5

Outage information

Unit Połaniec B7
Achievable generation capacity: 221 MW
Outage size: 221 MW
Event type: Planned
Event start: 18-12-2024 00:01
Event end: 05-02-2025 00:00
Source: Active - Planned - Połaniec B7

Outage information

Unit Połaniec B3
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Unplanned
Event start: 18-12-2024 00:01
Event end: 29-12-2024 00:00
Source: Active - Unplanned - Połaniec B3

Outage information

Unit Połaniec B6
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Unplanned
Event start: 30-11-2024 00:01
Event end: 22-12-2024 22:00
Source: Active - Unplanned - Połaniec B6

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 02-04-2024 13:34
Event end: 31-12-2024 23:59
Source: Active - Planned - Skawina Tg3

Outage information

Unit Synthos Dwory 7 TG7
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 04-12-2024 07:30
Event end: 31-12-2024 15:00
Source: Active - Planned - Synthos Dwory 7 TG7

Outage information

Unit Dychów H3
Achievable generation capacity: 30 MW
Outage size: 30 MW
Event type: Planned
Event start: 21-12-2024 08:00
Event end: 21-12-2024 23:00
Source: Active - Planned - Dychów H3

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned
Event start: 03-06-2024 00:00
Event end: 15-02-2025 00:00
Source: Active - Planned - Kozienice 1 B5

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 55 MW
Event type: Planned
Event start: 10-12-2024 08:46
Event end: 31-12-2024 23:59
Source: Active - Planned - Skawina Tg5

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 271 MW
Event type: Planned
Event start: 13-12-2024 12:46
Event end: 13-12-2024 13:00
Source: Active - Planned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 419 MW
Event type: Planned
Event start: 13-12-2024 12:01
Event end: 13-12-2024 12:15
Source: Active - Planned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 394 MW
Event type: Planned
Event start: 13-12-2024 12:16
Event end: 13-12-2024 12:30
Source: Active - Planned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 319 MW
Event type: Planned
Event start: 13-12-2024 12:31
Event end: 13-12-2024 12:45
Source: Active - Planned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 272 MW
Event type: Planned
Event start: 13-12-2024 09:00
Event end: 13-12-2024 09:15
Source: Active - Planned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 271 MW
Event type: Planned
Event start: 13-12-2024 09:16
Event end: 13-12-2024 09:45
Source: Active - Planned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 444 MW
Event type: Planned
Event start: 13-12-2024 09:46
Event end: 13-12-2024 12:00
Source: Active - Planned - Turów B11

Outage information

Unit Pątnów B1
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned
Event start: 10-12-2024 19:00
Event end: 12-12-2024 01:00
Source: Inactive - Planned - Pątnów B1

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 10-12-2024 19:15
Event end: 31-12-2024 23:59
Source: Active - Planned - Skawina Tg6

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 12-12-2024 08:01
Event end: 12-12-2024 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 00:00
Event end: 12-12-2024 01:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 01:01
Event end: 12-12-2024 02:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 02:01
Event end: 12-12-2024 03:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 03:01
Event end: 12-12-2024 04:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 04:01
Event end: 12-12-2024 05:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 05:01
Event end: 12-12-2024 06:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 12-12-2024 06:01
Event end: 12-12-2024 07:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 12-12-2024 07:01
Event end: 12-12-2024 08:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 12-12-2024 09:01
Event end: 12-12-2024 10:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Bełchatów B12
Achievable generation capacity: 358 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 12-12-2024 00:00
Event end: 13-12-2024 00:00
Source: Active - Unplanned - Bełchatów B12

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 09:01
Event end: 12-12-2024 10:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 08:01
Event end: 12-12-2024 09:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 19:01
Event end: 12-12-2024 20:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 00:00
Event end: 12-12-2024 01:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 18:01
Event end: 12-12-2024 19:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 06:01
Event end: 12-12-2024 07:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 07:01
Event end: 12-12-2024 08:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 15:01
Event end: 12-12-2024 16:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 01:01
Event end: 12-12-2024 02:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 20:01
Event end: 12-12-2024 21:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 02:01
Event end: 12-12-2024 03:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 14:01
Event end: 12-12-2024 15:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 03:01
Event end: 12-12-2024 04:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 13:01
Event end: 12-12-2024 14:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 04:01
Event end: 12-12-2024 05:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 21:01
Event end: 12-12-2024 22:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 12:01
Event end: 12-12-2024 13:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 11:01
Event end: 12-12-2024 12:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 05:01
Event end: 12-12-2024 06:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 22:01
Event end: 12-12-2024 23:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 16:01
Event end: 12-12-2024 17:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 10:01
Event end: 12-12-2024 11:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 12-12-2024 17:01
Event end: 12-12-2024 18:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Rzeszów ECR
Achievable generation capacity: 101 MW
Outage size: 101 MW
Event type: Planned
Event start: 08-12-2024 00:01
Event end: 13-12-2024 23:45
Source: Active - Planned - EC Rzeszów ECR

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 39 MW
Event type: Unplanned
Event start: 11-12-2024 16:30
Event end: 12-12-2024 10:00
Source: Active - Unplanned - Turów B11

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 299 MW
Outage size: 202 MW
Event type: Planned
Event start: 08-12-2024 16:01
Event end: 01-01-2025 00:00
Source: Active - Planned - EC Żerań WZE

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 484 MW
Event type: Planned
Event start: 14-12-2024 15:46
Event end: 14-12-2024 16:00
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 534 MW
Event type: Planned
Event start: 14-12-2024 10:01
Event end: 14-12-2024 12:00
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 484 MW
Event type: Planned
Event start: 14-12-2024 12:01
Event end: 14-12-2024 12:15
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 434 MW
Event type: Planned
Event start: 14-12-2024 12:16
Event end: 14-12-2024 12:30
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 374 MW
Event type: Planned
Event start: 14-12-2024 12:31
Event end: 14-12-2024 12:45
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 314 MW
Event type: Planned
Event start: 14-12-2024 12:46
Event end: 14-12-2024 13:00
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 268 MW
Event type: Planned
Event start: 14-12-2024 13:01
Event end: 14-12-2024 13:30
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 534 MW
Event type: Planned
Event start: 14-12-2024 13:31
Event end: 14-12-2024 13:45
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 268 MW
Event type: Planned
Event start: 14-12-2024 16:46
Event end: 14-12-2024 17:00
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 284 MW
Event type: Planned
Event start: 14-12-2024 16:31
Event end: 14-12-2024 16:45
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 354 MW
Event type: Planned
Event start: 14-12-2024 16:16
Event end: 14-12-2024 16:30
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 414 MW
Event type: Planned
Event start: 14-12-2024 16:01
Event end: 14-12-2024 16:15
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 484 MW
Event type: Planned
Event start: 14-12-2024 13:46
Event end: 14-12-2024 14:00
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 534 MW
Event type: Planned
Event start: 14-12-2024 15:31
Event end: 14-12-2024 15:45
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 134 MW
Event type: Planned
Event start: 14-12-2024 15:01
Event end: 14-12-2024 15:30
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 214 MW
Event type: Planned
Event start: 14-12-2024 14:46
Event end: 14-12-2024 15:00
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 284 MW
Event type: Planned
Event start: 14-12-2024 14:31
Event end: 14-12-2024 14:45
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 354 MW
Event type: Planned
Event start: 14-12-2024 14:16
Event end: 14-12-2024 14:30
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 534 MW
Outage size: 414 MW
Event type: Planned
Event start: 14-12-2024 14:01
Event end: 14-12-2024 14:15
Source: Active - Planned - Kozienice 2 B09

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 230 MW
Event type: Unplanned
Event start: 12-12-2024 11:00
Event end: 12-12-2024 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 13:00
Event end: 12-12-2024 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 20:01
Event end: 12-12-2024 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 14:01
Event end: 12-12-2024 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 12-12-2024 21:01
Event end: 12-12-2024 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 15:01
Event end: 12-12-2024 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 17:01
Event end: 12-12-2024 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 18:01
Event end: 12-12-2024 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 16:01
Event end: 12-12-2024 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 12-12-2024 19:01
Event end: 12-12-2024 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 12-12-2024 22:01
Event end: 12-12-2024 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 94 MW
Event type: Unplanned
Event start: 04-12-2024 12:00
Event end: 03-01-2025 00:00
Source: Active - Unplanned - Turów B05

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 142 MW
Event type: Unplanned
Event start: 06-11-2024 19:00
Event end: 05-01-2025 00:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Bełchatów B11
Achievable generation capacity: 358 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 13-12-2024 01:00
Event end: 13-12-2024 06:00
Source: Active - Unplanned - Bełchatów B11

Outage information

Unit Bełchatów B03
Achievable generation capacity: 347 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 13-12-2024 01:00
Event end: 13-12-2024 06:00
Source: Active - Unplanned - Bełchatów B03

Outage information

Unit Bełchatów B07
Achievable generation capacity: 357 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 13-12-2024 01:00
Event end: 13-12-2024 06:00
Source: Active - Unplanned - Bełchatów B07

Outage information

Unit Bełchatów B09
Achievable generation capacity: 362 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 13-12-2024 01:00
Event end: 13-12-2024 06:00
Source: Active - Unplanned - Bełchatów B09

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 167 MW
Event type: Planned
Event start: 14-12-2024 09:00
Event end: 14-12-2024 13:00
Source: Active - Planned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 834 MW
Outage size: 507 MW
Event type: Unplanned
Event start: 12-12-2024 01:01
Event end: 12-12-2024 05:00
Source: Inactive - Unplanned - Jaworzno 2 JWCD B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 203 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 11-12-2024 18:54
Event end: 14-12-2024 00:00
Source: Active - Unplanned - Kozienice 1 B7

Outage information

Unit Eolos Polska Sp. z o.o. FW Krzyżanów
Achievable generation capacity: 20 MW
Outage size: 2 MW
Event type: Planned
Event start: 12-12-2024 10:00
Event end: 12-12-2024 17:00
Source: Active - Planned - Eolos Polska Sp. z o.o. FW Krzyżanów

Outage information

Unit Eolos Novo Sp. z o.o. FW Czarnożyły
Achievable generation capacity: 16 MW
Outage size: 2 MW
Event type: Planned
Event start: 12-12-2024 09:00
Event end: 12-12-2024 13:00
Source: Active - Planned - Eolos Novo Sp. z o.o. FW Czarnożyły

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 13-12-2024 02:01
Event end: 13-12-2024 03:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 13-12-2024 00:00
Event end: 13-12-2024 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 13-12-2024 01:01
Event end: 13-12-2024 02:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 13-12-2024 03:01
Event end: 13-12-2024 04:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 13-12-2024 04:01
Event end: 13-12-2024 05:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 13-12-2024 05:01
Event end: 13-12-2024 06:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 13-12-2024 06:01
Event end: 13-12-2024 07:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 13-12-2024 07:01
Event end: 13-12-2024 08:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 13-12-2024 08:01
Event end: 13-12-2024 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 13-12-2024 09:01
Event end: 13-12-2024 10:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 13-12-2024 23:01
Event end: 14-12-2024 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 13-12-2024 22:01
Event end: 13-12-2024 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 13-12-2024 21:01
Event end: 13-12-2024 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 13-12-2024 20:01
Event end: 13-12-2024 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 13-12-2024 19:01
Event end: 13-12-2024 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 13-12-2024 18:01
Event end: 13-12-2024 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 13-12-2024 17:01
Event end: 13-12-2024 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 13-12-2024 16:01
Event end: 13-12-2024 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 13-12-2024 15:01
Event end: 13-12-2024 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 13-12-2024 14:01
Event end: 13-12-2024 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 13-12-2024 13:01
Event end: 13-12-2024 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 13-12-2024 12:01
Event end: 13-12-2024 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 13-12-2024 11:01
Event end: 13-12-2024 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 95 MW
Event type: Unplanned
Event start: 13-12-2024 10:01
Event end: 13-12-2024 11:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Pątnów B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Planned
Event start: 12-12-2024 01:05
Event end: 01-01-2025 00:00
Source: Active - Planned - Pątnów B5

Outage information

Unit Opole B5
Achievable generation capacity: 829 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 12-12-2024 08:00
Event end: 12-12-2024 10:00
Source: Active - Unplanned - Opole B5

Outage information

Unit Eolos Polska Sp. z o.o. FW Gorzkowice
Achievable generation capacity: 12 MW
Outage size: 2 MW
Event type: Planned
Event start: 12-12-2024 06:29
Event end: 12-12-2024 14:00
Source: Active - Planned - Eolos Polska Sp. z o.o. FW Gorzkowice

Outage information

Unit Opole B3
Achievable generation capacity: 358 MW
Outage size: 42 MW
Event type: Unplanned
Event start: 12-12-2024 08:00
Event end: 12-12-2024 10:00
Source: Active - Unplanned - Opole B3

Outage information

Unit Kraków Łęg KLE_1-04
Achievable generation capacity: 107 MW
Outage size: 107 MW
Event type: Unplanned
Event start: 11-12-2024 18:21
Event end: 13-12-2024 00:00
Source: Active - Unplanned - Kraków Łęg KLE_1-04

Outage information

Unit Kraków Łęg KLE_1-04
Achievable generation capacity: 107 MW
Outage size: 107 MW
Event type: Planned
Event start: 13-12-2024 00:01
Event end: 14-12-2024 00:00
Source: Active - Planned - Kraków Łęg KLE_1-04

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 14:01
Event end: 13-12-2024 15:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 02:01
Event end: 13-12-2024 03:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 13:01
Event end: 13-12-2024 14:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 01:01
Event end: 13-12-2024 02:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 12:01
Event end: 13-12-2024 13:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 00:00
Event end: 13-12-2024 01:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 11:01
Event end: 13-12-2024 12:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 10:01
Event end: 13-12-2024 11:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 23:01
Event end: 14-12-2024 00:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 22:01
Event end: 13-12-2024 23:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 09:01
Event end: 13-12-2024 10:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 21:01
Event end: 13-12-2024 22:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 20:01
Event end: 13-12-2024 21:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 08:01
Event end: 13-12-2024 09:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 19:01
Event end: 13-12-2024 20:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 07:01
Event end: 13-12-2024 08:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 18:01
Event end: 13-12-2024 19:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 17:01
Event end: 13-12-2024 18:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 06:01
Event end: 13-12-2024 07:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 05:01
Event end: 13-12-2024 06:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 16:01
Event end: 13-12-2024 17:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 04:01
Event end: 13-12-2024 05:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 15:01
Event end: 13-12-2024 16:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 13-12-2024 03:01
Event end: 13-12-2024 04:00
Source: Active - Unplanned - EC Włocławek B1

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.