Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
May 2025 June 2025
Sat 24 Sun 25 Mon 26 Tue 27 Wed 28 Thu 29 Fri 30 Sat 31 Sun 1 Mon 2 Tue 3 Wed 4 Thu 5 Fri 6
Bełchatów 4680
B02 341
B03 347
B04 349
B05 348
B06 360 360 360 360 360 360 360 360 360 360 360
B07 357
B08 358
B09 362
B10 361 161
B11 358
B12 358 130
B14 781
Chorzów 226
B1 113 113 113 113
B2 113 113 113 113 113 113 113 113 113 113 113 113
Dolna Odra 849
B5 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210
B6 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210
B7 210 210 210 210 210 210 210
B8 219 219 219 219 219 219 219 219 219
Dychów 85
H1 28
H2 29
H3 28 30 30 30 30 30 30 30 30 30 30 30 30 30 30
EC Białystok 154
BIA_1-01 50 30 30 30 30 30 30 30 30 30 30 30 30 30 30
BIA_1-02 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52
BIA_1-03 52
EC Gorzów 138
GOR2 138
EC Mielec 33
ECM 33 24 24 24 24 24 24 24 24 24 24 24 24 24 24
EC Rzeszów 120
ECR 120
EC Siekierki 595
WSIB 07 106 106 106 106 106 106 106 106 106 106 106 106 106 106 106
WSIB 08 125 125 125 125
WSIB 09 102 102 102 102 102 102 102 102 102 102 102 102 102 102 102
WSIB 10 102 102 102 102 102 102 102 102 102 102 102 102 102 102 102
WSIK 160
EC Stalowa Wola 450
Stalowa Wola BGP 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450
EC Włocławek 465
B1 465 465 465 465 465 465 465 465 465 465 465 465 465 465 465
EC Wrotków 231
ECW 231 231 231 231 231 231
EC Żerań 299
WZE 299 299 299 299 299 299 299 299 299 299 299 299 299 299 299
EC Żerań 2 497
B20 497
Elektrociepłownia "Zielona Góra" S.A. 188
ZG BPG 188 188 188 188 188 188 188 188 188 188 188 188 188 188
Eolos Novo Sp. z o.o. 16
FW Czarnożyły 16
Eolos Polska Sp. z o.o. 32
FW Gorzkowice 12
FW Krzyżanów 20
EWP European Wind Power Krasin Sp. z o.o. 30
FW Krasin 30
EW Włocławek 168
H01 28
H02 28
H03 28
H04 28
H05 28
H06 28
Farma Wiatrowa Bogoria Sp. z o.o. 20
FW Bogoria 20
FW Banie 12 106
FW Banie 12 106
FW Banie 3 81
FW Banie 3 81
FW Banie 4 56
FW Banie 4 56
FW Biały Bór 145
BBFW 145
FW Iława 13
FW Iława 13
FW Marszewo 100
FMA 100 100 100 100 100 100 100 100 100 100 100 100 100
FW Sępopol 44
FW Sępopol 44
Grupa Azoty Zakłady Azotowe „Puławy” SA 128
EC Puławy 128
Jaworzno 2 910
JWCD B7 910
Jaworzno 3 1345
B1 225
B2 225
B3 225
B4 225 211 211 211
B5 220
B6 225
JSW KOKS S.A. 114
EC Koksownia Przyjaźń G1 6
EC Koksownia Przyjaźń G2 15
EC Koksownia Przyjaźń G3 21
EC Koksownia Przyjaźń G4 71
Karolin 212
B2 100
B3 112
Katowice 135
B1 135
KOGENERACJA S.A. 208
WROB1-02 104 104 104 104 104 104 104 104 104 104 104 104 104 104 104
WROB1-03 104
Kowalewo Wind Sp. z o.o. 24
FW Piątkowo 24
Kozienice 1 1800
B1 228 213 213 213 213 213 213
B2 228 210 210 210 210 210 210
B3 220
B4 228 213 213 213 213 213 213 213 213 213 213 213 213 213 213
B5 228 213 213 213 213 213 213
B6 228
B7 220
B8 220
Kozienice 2 2207
B09 566
B10 566
B11 1075
Kraków Łęg 451
KLE_1-01 122 122 122 122 122 122 122 122 122 122 122 122 122 122 122
KLE_1-02 120
KLE_1-03 102 102 102 102 102 102 102
KLE_1-04 107
Lichnowy Windfarm Sp. z o.o. 20
FW Lichnowy 20 20 20
Łagisza 460
B10 460 430 430 430 430 430 430 430 430 430 430 430 430 430 430
Łaziska 3 905
B09 230
B10 225
B11 225
B12 225
Nowa Energia 1 Sp. z o.o. 49
FW Kozłowo 49
Opole 3090
B1 357
B2 358
B3 358
B4 355
B5 829 443
B6 833
Ostrołęka B 690
B01 230
B02 230
B03 230 230 230
PAK-PCE BIOPALIWA I WODÓR 110
Elektrownia Konin 110 55
PAK-PCE CZŁUCHÓW 73
FW Ględowo 73
PAK-PCE FOTOWOLTAIKA 63
PV Brudzew 63
PAK-PCE KAZIMIERZ BISKUPI 18
FW Kazimierz Biskupi 18
PAK-PCE MIŁOSŁAW 10
FW Pałczyn 10
PAK-PCE PRZYRÓW 42
FW Przyrów 42
Park Wiatrowy 12 Sp. z o.o. 45
FW Słupca-Kołaczkowo 45 45
Park Wiatrowy 1 Sp. z o.o. 42
FW Jarocin-Koźmin 42
Pątnów 474
B9 474
PGE Gryfino 2050 sp. z o.o. 1366
Gryfino blok 10 683 2 5 394 394
Gryfino blok 9 683 1 4 670 670 670 670 670
Płock 630
B01 630 135 130
Połaniec 1899
B1 225
B2 242 227 227 227 227 227 227 227 227 227 227 227 227 227 227
B3 242
B4 242
B5 242
B6 242
B7 239
B9 225
Porąbka Żar 540
H1 135 138 138 138 138 138
H2 135 137 137 137 137 137
H3 135 137 137 137 137 137 137 137 137 137 137 137 137 137 137
H4 135 138 138 138 138 138
Rybnik 835
B5 209
B6 209
B7 209
B8 208
Siersza 306
B1 153
B2 153 139 139 139 139 139
Skawina 330
Tg3 110 110 110 110 110 110 110 110 110
Tg5 110 110 110 110 110 110 110 110 110
Tg6 110 20 20 20 20 20 20 20 20
Solina 198
H1 68 13 13 13 13 13 13 13 13 13 13 13 13 13 13
H2 68
H3 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31
H4 31
Synthos Dwory 7 170
GT1 72 72 72
TG10 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
TG7 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28
TG8 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
TG9 31
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158 80 80 80 80 80 80 80 80 80 80 80 80 80 80
Turów 1830
B01 226 226 226 226 226 226 226 226
B02 226
B03 226
B04 236
B05 236 114 114 114 114 114 114 114 114 114 114 114 114 114 114
B06 236 146 146
B11 444 223 223 39 39
Veolia Energia Łódź EC4 105
B03 105
Windfarm Polska III sp. z o.o. 126
WINDFARM 126
Żarnowiec 716
H1 179
H2 179
H3 179
H4 179
Żydowo 167
H1 55
H2 55
H3 57 57
Planned 5561 5400 5657 5401 5297 5354 5195 4969 5290 5403 5403 5403 5403 5215
Unplanned 1216 812 527 218 218 179 179 179 605 605 605 605 605 605
Total outages 6777 6212 6184 5619 5515 5533 5374 5148 5895 6008 6008 6008 6008 5820

Outage information

Unit Kraków Łęg KLE_1-03
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Planned
Event start: 15-04-2025 00:01
Event end: 29-05-2025 23:45
Source: Active - Planned - Kraków Łęg KLE_1-03

Outage information

Unit Elektrociepłownia "Zielona Góra" S.A. ZG BPG
Achievable generation capacity: 188 MW
Outage size: 188 MW
Event type: Planned
Event start: 15-05-2025 00:01
Event end: 05-06-2025 23:45
Source: Active - Planned - Elektrociepłownia "Zielona Góra" S.A. ZG BPG

Outage information

Unit Dychów H3
Achievable generation capacity: 30 MW
Outage size: 30 MW
Event type: Planned
Event start: 21-05-2025 00:01
Event end: 15-06-2025 23:45
Source: Active - Planned - Dychów H3

Outage information

Unit Solina H3
Achievable generation capacity: 31 MW
Outage size: 31 MW
Event type: Planned
Event start: 05-05-2025 00:01
Event end: 14-10-2025 23:45
Source: Active - Planned - Solina H3

Outage information

Unit EC Wrotków ECW
Achievable generation capacity: 231 MW
Outage size: 231 MW
Event type: Planned
Event start: 02-06-2025 00:01
Event end: 03-09-2025 23:45
Source: Active - Planned - EC Wrotków ECW

Outage information

Unit Synthos Dwory 7 TG8
Achievable generation capacity: 20 MW
Outage size: 20 MW
Event type: Planned
Event start: 22-03-2024 00:01
Event end: 22-03-2027 23:59
Source: Active - Planned - Synthos Dwory 7 TG8

Outage information

Unit Siersza B2
Achievable generation capacity: 139 MW
Outage size: 139 MW
Event type: Planned
Event start: 02-06-2025 00:00
Event end: 23-06-2025 00:00
Source: Active - Planned - Siersza B2

Outage information

Unit Łagisza B10
Achievable generation capacity: 430 MW
Outage size: 430 MW
Event type: Planned
Event start: 01-05-2025 00:01
Event end: 28-09-2025 00:00
Source: Active - Planned - Łagisza B10

Outage information

Unit EC Siekierki WSIB 10
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Planned
Event start: 19-04-2025 00:01
Event end: 26-07-2025 00:00
Source: Active - Planned - EC Siekierki WSIB 10

Outage information

Unit EC Białystok BIA_1-02
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Unplanned
Event start: 08-05-2025 02:01
Event end: 01-08-2025 01:45
Source: Active - Unplanned - EC Białystok BIA_1-02

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 137 MW
Outage size: 137 MW
Event type: Planned
Event start: 22-10-2024 00:01
Event end: 21-11-2025 23:45
Source: Active - Planned - Porąbka Żar H3

Outage information

Unit Kozienice 1 B1
Achievable generation capacity: 213 MW
Outage size: 213 MW
Event type: Unplanned
Event start: 01-06-2025 00:01
Event end: 16-06-2025 00:00
Source: Active - Unplanned - Kozienice 1 B1

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 213 MW
Outage size: 213 MW
Event type: Unplanned
Event start: 01-06-2025 00:01
Event end: 16-06-2025 00:00
Source: Active - Unplanned - Kozienice 1 B5

Outage information

Unit TAMEH Polska sp. z o. o. Elektrownia Blachownia
Achievable generation capacity: 158 MW
Outage size: 80 MW
Event type: Planned
Event start: 04-03-2024 12:00
Event end: 31-12-2025 23:59
Source: Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia

Outage information

Unit Bełchatów B06
Achievable generation capacity: 360 MW
Outage size: 360 MW
Event type: Planned
Event start: 01-06-2025 00:00
Event end: 06-07-2025 18:00
Source: Active - Planned - Bełchatów B06

Outage information

Unit Porąbka Żar H1
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 02-06-2025 00:00
Event end: 12-06-2025 23:45
Source: Active - Planned - Porąbka Żar H1

Outage information

Unit Porąbka Żar H2
Achievable generation capacity: 137 MW
Outage size: 137 MW
Event type: Planned
Event start: 02-06-2025 00:00
Event end: 12-06-2025 23:45
Source: Active - Planned - Porąbka Żar H2

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 02-06-2025 00:00
Event end: 12-06-2025 23:45
Source: Active - Planned - Porąbka Żar H4

Outage information

Unit Połaniec B2
Achievable generation capacity: 227 MW
Outage size: 227 MW
Event type: Planned
Event start: 01-05-2025 00:01
Event end: 14-06-2025 23:00
Source: Active - Planned - Połaniec B2

Outage information

Unit Solina H1
Achievable generation capacity: 68 MW
Outage size: 13 MW
Event type: Unplanned
Event start: 06-02-2025 16:20
Event end: 31-07-2025 23:00
Source: Active - Unplanned - Solina H1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 465 MW
Event type: Planned
Event start: 13-02-2025 00:00
Event end: 20-06-2025 16:00
Source: Active - Planned - EC Włocławek B1

Outage information

Unit EC Siekierki WSIB 09
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Planned
Event start: 01-03-2025 00:01
Event end: 27-08-2025 00:00
Source: Active - Planned - EC Siekierki WSIB 09

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 01-04-2025 00:00
Event end: 01-07-2025 00:00
Source: Active - Planned - Dolna Odra B6

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 01-06-2025 00:00
Event end: 01-07-2025 00:00
Source: Active - Planned - Dolna Odra B7

Outage information

Unit Kraków Łęg KLE_1-01
Achievable generation capacity: 122 MW
Outage size: 122 MW
Event type: Planned
Event start: 31-03-2025 00:00
Event end: 28-07-2025 23:45
Source: Active - Planned - Kraków Łęg KLE_1-01

Outage information

Unit EC Stalowa Wola Stalowa Wola BGP
Achievable generation capacity: 450 MW
Outage size: 450 MW
Event type: Planned
Event start: 05-05-2025 00:01
Event end: 11-06-2025 00:00
Source: Active - Planned - EC Stalowa Wola Stalowa Wola BGP

Outage information

Unit EC Mielec ECM
Achievable generation capacity: 33 MW
Outage size: 24 MW
Event type: Planned
Event start: 14-04-2025 00:01
Event end: 01-10-2025 00:00
Source: Active - Planned - EC Mielec ECM

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 20-05-2025 19:00
Event end: 01-01-2026 00:00
Source: Active - Planned - Dolna Odra B5

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 15-04-2025 19:30
Event end: 31-05-2025 23:59
Source: Active - Planned - Skawina Tg5

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 20 MW
Event type: Planned
Event start: 15-04-2025 19:30
Event end: 31-05-2025 23:59
Source: Active - Planned - Skawina Tg6

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 02-04-2024 13:34
Event end: 31-05-2025 23:59
Source: Active - Planned - Skawina Tg3

Outage information

Unit KOGENERACJA S.A. WROB1-02
Achievable generation capacity: 104 MW
Outage size: 104 MW
Event type: Planned
Event start: 06-05-2025 00:00
Event end: 18-06-2025 23:45
Source: Active - Planned - KOGENERACJA S.A. WROB1-02

Outage information

Unit Synthos Dwory 7 TG10
Achievable generation capacity: 19 MW
Outage size: 19 MW
Event type: Planned
Event start: 30-04-2025 11:02
Event end: 31-12-2025 23:59
Source: Active - Planned - Synthos Dwory 7 TG10

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 670 MW
Event type: Planned
Event start: 28-05-2025 00:00
Event end: 02-06-2025 00:00
Source: Active - Planned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit EC Białystok BIA_1-01
Achievable generation capacity: 50 MW
Outage size: 30 MW
Event type: Planned
Event start: 12-05-2025 23:45
Event end: 22-07-2025 23:45
Source: Active - Planned - EC Białystok BIA_1-01

Outage information

Unit Lichnowy Windfarm Sp. z o.o. FW Lichnowy
Achievable generation capacity: 20 MW
Outage size: 20 MW
Event type: Planned
Event start: 26-05-2025 08:00
Event end: 27-05-2025 15:00
Source: Active - Planned - Lichnowy Windfarm Sp. z o.o. FW Lichnowy

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 01-06-2025 00:01
Event end: 16-06-2025 00:00
Source: Active - Planned - Kozienice 1 B2

Outage information

Unit Synthos Dwory 7 GT1
Achievable generation capacity: 72 MW
Outage size: 72 MW
Event type: Planned
Event start: 23-05-2025 22:00
Event end: 25-05-2025 16:00
Source: Active - Planned - Synthos Dwory 7 GT1

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 299 MW
Outage size: 299 MW
Event type: Planned
Event start: 10-03-2025 11:00
Event end: 28-07-2025 00:00
Source: Active - Planned - EC Żerań WZE

Outage information

Unit Ostrołęka B B03
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 24-05-2025 00:01
Event end: 26-05-2025 00:00
Source: Active - Planned - Ostrołęka B B03

Outage information

Unit Żydowo H3
Achievable generation capacity: 57 MW
Outage size: 57 MW
Event type: Planned
Event start: 29-05-2025 07:00
Event end: 29-05-2025 15:00
Source: Active - Planned - Żydowo H3

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 114 MW
Event type: Unplanned
Event start: 19-05-2025 23:30
Event end: 28-06-2025 00:00
Source: Active - Unplanned - Turów B05

Outage information

Unit Kozienice 1 B4
Achievable generation capacity: 213 MW
Outage size: 213 MW
Event type: Planned
Event start: 09-04-2025 08:00
Event end: 20-06-2025 00:00
Source: Active - Planned - Kozienice 1 B4

Outage information

Unit Chorzów B1
Achievable generation capacity: 113 MW
Outage size: 113 MW
Event type: Planned
Event start: 19-04-2025 02:00
Event end: 26-05-2025 10:00
Source: Active - Planned - Chorzów B1

Outage information

Unit Chorzów B2
Achievable generation capacity: 113 MW
Outage size: 113 MW
Event type: Planned
Event start: 27-05-2025 02:00
Event end: 27-06-2025 16:00
Source: Active - Planned - Chorzów B2

Outage information

Unit EC Siekierki WSIB 07
Achievable generation capacity: 106 MW
Outage size: 106 MW
Event type: Planned
Event start: 24-05-2025 00:01
Event end: 19-11-2025 00:00
Source: Active - Planned - EC Siekierki WSIB 07

Outage information

Unit FW Marszewo FMA
Achievable generation capacity: 100 MW
Outage size: 100 MW
Event type: Planned
Event start: 26-05-2025 08:01
Event end: 11-06-2025 15:00
Source: Active - Planned - FW Marszewo FMA

Outage information

Unit EC Siekierki WSIB 08
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 18-05-2025 11:00
Event end: 27-05-2025 00:00
Source: Active - Unplanned - EC Siekierki WSIB 08

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Planned
Event start: 12-05-2025 00:00
Event end: 31-05-2025 00:00
Source: Active - Planned - Turów B01

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 146 MW
Event type: Unplanned
Event start: 24-05-2025 06:00
Event end: 25-05-2025 18:00
Source: Active - Unplanned - Turów B06

Outage information

Unit Bełchatów B10
Achievable generation capacity: 361 MW
Outage size: 161 MW
Event type: Planned
Event start: 24-05-2025 00:00
Event end: 24-05-2025 06:00
Source: Active - Planned - Bełchatów B10

Outage information

Unit Bełchatów B10
Achievable generation capacity: 361 MW
Outage size: 11 MW
Event type: Planned
Event start: 24-05-2025 18:00
Event end: 24-05-2025 22:00
Source: Active - Planned - Bełchatów B10

Outage information

Unit Jaworzno 3 B4
Achievable generation capacity: 211 MW
Outage size: 211 MW
Event type: Planned
Event start: 02-12-2024 00:01
Event end: 26-05-2025 12:45
Source: Active - Planned - Jaworzno 3 B4

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 223 MW
Event type: Unplanned
Event start: 25-05-2025 11:00
Event end: 26-05-2025 11:00
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 39 MW
Event type: Unplanned
Event start: 27-05-2025 11:00
Event end: 28-05-2025 11:00
Source: Active - Unplanned - Turów B11

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 2 MW
Event type: Unplanned
Event start: 24-05-2025 19:00
Event end: 24-05-2025 20:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 1 MW
Event type: Unplanned
Event start: 24-05-2025 20:00
Event end: 24-05-2025 21:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 1 MW
Event type: Unplanned
Event start: 24-05-2025 17:00
Event end: 24-05-2025 18:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 135 MW
Event type: Unplanned
Event start: 24-05-2025 22:00
Event end: 24-05-2025 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Dolna Odra B8
Achievable generation capacity: 219 MW
Outage size: 219 MW
Event type: Planned
Event start: 11-05-2025 00:00
Event end: 01-06-2025 00:00
Source: Active - Planned - Dolna Odra B8

Outage information

Unit Synthos Dwory 7 TG7
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 04-04-2025 15:00
Event end: 26-05-2025 07:59
Source: Active - Planned - Synthos Dwory 7 TG7

Outage information

Unit Synthos Dwory 7 TG7
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 26-05-2025 15:01
Event end: 30-09-2025 23:59
Source: Active - Planned - Synthos Dwory 7 TG7

Outage information

Unit Bełchatów B06
Achievable generation capacity: 360 MW
Outage size: 360 MW
Event type: Planned
Event start: 19-05-2025 00:00
Event end: 28-05-2025 00:00
Source: Active - Planned - Bełchatów B06

Outage information

Unit Opole B5
Achievable generation capacity: 829 MW
Outage size: 443 MW
Event type: Unplanned
Event start: 24-05-2025 00:00
Event end: 24-05-2025 15:00
Source: Active - Unplanned - Opole B5

Outage information

Unit Park Wiatrowy 12 Sp. z o.o. FW Słupca-Kołaczkowo
Achievable generation capacity: 45 MW
Outage size: 45 MW
Event type: Planned
Event start: 26-05-2025 09:00
Event end: 26-05-2025 13:00
Source: Active - Planned - Park Wiatrowy 12 Sp. z o.o. FW Słupca-Kołaczkowo

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 23-05-2025 23:00
Event end: 24-05-2025 00:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Turów B02
Achievable generation capacity: 226 MW
Outage size: 138 MW
Event type: Unplanned
Event start: 23-05-2025 19:00
Event end: 24-05-2025 00:00
Source: Inactive - Unplanned - Turów B02

Outage information

Unit PAK-PCE BIOPALIWA I WODÓR Elektrownia Konin
Achievable generation capacity: 110 MW
Outage size: 55 MW
Event type: Unplanned
Event start: 23-05-2025 18:57
Event end: 24-05-2025 10:00
Source: Active - Unplanned - PAK-PCE BIOPALIWA I WODÓR Elektrownia Konin

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 25-05-2025 04:00
Event end: 25-05-2025 05:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 25-05-2025 00:00
Event end: 25-05-2025 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 1 MW
Event type: Unplanned
Event start: 25-05-2025 23:00
Event end: 26-05-2025 00:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 394 MW
Event type: Planned
Event start: 26-05-2025 02:15
Event end: 26-05-2025 03:45
Source: Active - Planned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 394 MW
Event type: Planned
Event start: 27-05-2025 06:00
Event end: 27-05-2025 07:30
Source: Active - Planned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 4 MW
Event type: Unplanned
Event start: 25-05-2025 10:00
Event end: 25-05-2025 11:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 1 MW
Event type: Unplanned
Event start: 25-05-2025 23:00
Event end: 26-05-2025 00:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 2 MW
Event type: Unplanned
Event start: 25-05-2025 18:00
Event end: 25-05-2025 19:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 255 MW
Event type: Planned
Event start: 26-05-2025 08:15
Event end: 26-05-2025 09:45
Source: Active - Planned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 4 MW
Event type: Unplanned
Event start: 25-05-2025 10:00
Event end: 25-05-2025 11:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 9

Outage information

Unit PGE Gryfino 2050 sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 25-05-2025 17:00
Event end: 25-05-2025 18:00
Source: Active - Unplanned - PGE Gryfino 2050 sp. z o.o. Gryfino blok 10

Outage information

Unit Bełchatów B12
Achievable generation capacity: 358 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 23-05-2025 19:30
Event end: 24-05-2025 10:00
Source: Active - Unplanned - Bełchatów B12

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.