| Power producer | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Power plant | Unit | Achievable generation capacity (MW) | November 2025 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Fri 7 | Sat 8 | Sun 9 | Mon 10 | Tue 11 | Wed 12 | Thu 13 | Fri 14 | Sat 15 | Sun 16 | Mon 17 | Tue 18 | Wed 19 | Thu 20 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Planned | 3932 | 3756 | 3928 | 3816 | 3603 | 3529 | 3760 | 3323 | 3212 | 2760 | 3196 | 3422 | 3422 | 3132 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Unplanned | 2271 | 2422 | 1472 | 860 | 1325 | 281 | 281 | 281 | 281 | 281 | 281 | 281 | 281 | 281 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Total outages | 6203 | 6178 | 5400 | 4676 | 4928 | 3810 | 4041 | 3604 | 3493 | 3041 | 3477 | 3703 | 3703 | 3413 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
Outage information
| Unit | Solina H4 |
| Achievable generation capacity: | 31 MW |
| Outage size: | 31 MW |
| Event type: | Planned |
| Event start: | 20-11-2025 07:01 |
| Event end: | 27-11-2025 23:45 |
| Source: | Active - Planned - Solina H4 |
Outage information
| Unit | Solina H2 |
| Achievable generation capacity: | 68 MW |
| Outage size: | 68 MW |
| Event type: | Planned |
| Event start: | 03-11-2025 00:01 |
| Event end: | 10-11-2025 23:45 |
| Source: | Active - Planned - Solina H2 |
Outage information
| Unit | Synthos Dwory 7 TG8 |
| Achievable generation capacity: | 20 MW |
| Outage size: | 20 MW |
| Event type: | Planned |
| Event start: | 22-03-2024 00:01 |
| Event end: | 22-03-2027 23:59 |
| Source: | Active - Planned - Synthos Dwory 7 TG8 |
Outage information
| Unit | Porąbka Żar H3 |
| Achievable generation capacity: | 137 MW |
| Outage size: | 137 MW |
| Event type: | Planned |
| Event start: | 22-10-2024 00:01 |
| Event end: | 21-11-2025 23:45 |
| Source: | Active - Planned - Porąbka Żar H3 |
Outage information
| Unit | TAMEH Polska sp. z o. o. Elektrownia Blachownia |
| Achievable generation capacity: | 158 MW |
| Outage size: | 80 MW |
| Event type: | Planned |
| Event start: | 04-03-2024 12:00 |
| Event end: | 31-12-2025 23:59 |
| Source: | Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Outage information
| Unit | Bełchatów B12 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 358 MW |
| Event type: | Planned |
| Event start: | 02-08-2025 00:00 |
| Event end: | 20-12-2025 18:00 |
| Source: | Active - Planned - Bełchatów B12 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Planned |
| Event start: | 18-11-2025 00:00 |
| Event end: | 18-12-2025 10:00 |
| Source: | Active - Planned - Turów B02 |
Outage information
| Unit | Jaworzno 3 B6 |
| Achievable generation capacity: | 211 MW |
| Outage size: | 211 MW |
| Event type: | Planned |
| Event start: | 01-11-2025 00:01 |
| Event end: | 20-11-2025 00:00 |
| Source: | Active - Planned - Jaworzno 3 B6 |
Outage information
| Unit | Jaworzno 3 B5 |
| Achievable generation capacity: | 206 MW |
| Outage size: | 206 MW |
| Event type: | Planned |
| Event start: | 01-09-2025 00:01 |
| Event end: | 30-11-2025 00:00 |
| Source: | Active - Planned - Jaworzno 3 B5 |
Outage information
| Unit | Dolna Odra B5 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 210 MW |
| Event type: | Planned |
| Event start: | 20-05-2025 19:00 |
| Event end: | 01-01-2026 00:00 |
| Source: | Active - Planned - Dolna Odra B5 |
Outage information
| Unit | Synthos Dwory 7 TG10 |
| Achievable generation capacity: | 19 MW |
| Outage size: | 19 MW |
| Event type: | Planned |
| Event start: | 30-04-2025 11:02 |
| Event end: | 31-12-2025 23:59 |
| Source: | Active - Planned - Synthos Dwory 7 TG10 |
Outage information
| Unit | Turów B05 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 236 MW |
| Event type: | Planned |
| Event start: | 28-06-2025 00:00 |
| Event end: | 25-11-2025 06:00 |
| Source: | Active - Planned - Turów B05 |
Outage information
| Unit | Opole B1 |
| Achievable generation capacity: | 357 MW |
| Outage size: | 357 MW |
| Event type: | Planned |
| Event start: | 17-11-2025 00:00 |
| Event end: | 01-12-2025 00:00 |
| Source: | Active - Planned - Opole B1 |
Outage information
| Unit | Jaworzno 3 B1 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 210 MW |
| Event type: | Planned |
| Event start: | 28-07-2025 00:00 |
| Event end: | 09-12-2025 00:00 |
| Source: | Active - Planned - Jaworzno 3 B1 |
Outage information
| Unit | Pątnów B9 |
| Achievable generation capacity: | 474 MW |
| Outage size: | 474 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 00:00 |
| Event end: | 11-11-2025 18:00 |
| Source: | Active - Unplanned - Pątnów B9 |
Outage information
| Unit | EC Białystok BIA_1-02 |
| Achievable generation capacity: | 52 MW |
| Outage size: | 52 MW |
| Event type: | Unplanned |
| Event start: | 02-10-2025 07:55 |
| Event end: | 30-11-2025 23:45 |
| Source: | Active - Unplanned - EC Białystok BIA_1-02 |
Outage information
| Unit | EW Włocławek H02 |
| Achievable generation capacity: | 28 MW |
| Outage size: | 28 MW |
| Event type: | Planned |
| Event start: | 28-10-2025 07:01 |
| Event end: | 24-11-2025 17:00 |
| Source: | Active - Planned - EW Włocławek H02 |
Outage information
| Unit | EC Żerań WZE |
| Achievable generation capacity: | 299 MW |
| Outage size: | 299 MW |
| Event type: | Planned |
| Event start: | 01-09-2025 00:01 |
| Event end: | 13-12-2025 00:00 |
| Source: | Active - Planned - EC Żerań WZE |
Outage information
| Unit | Żydowo H1 |
| Achievable generation capacity: | 55 MW |
| Outage size: | 55 MW |
| Event type: | Planned |
| Event start: | 17-11-2025 07:00 |
| Event end: | 17-11-2025 17:00 |
| Source: | Active - Planned - Żydowo H1 |
Outage information
| Unit | Żydowo H1 |
| Achievable generation capacity: | 55 MW |
| Outage size: | 55 MW |
| Event type: | Planned |
| Event start: | 18-11-2025 07:00 |
| Event end: | 18-11-2025 17:00 |
| Source: | Active - Planned - Żydowo H1 |
Outage information
| Unit | Żydowo H1 |
| Achievable generation capacity: | 55 MW |
| Outage size: | 55 MW |
| Event type: | Planned |
| Event start: | 19-11-2025 07:00 |
| Event end: | 19-11-2025 13:00 |
| Source: | Active - Planned - Żydowo H1 |
Outage information
| Unit | Żydowo H2 |
| Achievable generation capacity: | 55 MW |
| Outage size: | 55 MW |
| Event type: | Planned |
| Event start: | 17-11-2025 07:00 |
| Event end: | 17-11-2025 17:00 |
| Source: | Active - Planned - Żydowo H2 |
Outage information
| Unit | Żydowo H2 |
| Achievable generation capacity: | 55 MW |
| Outage size: | 55 MW |
| Event type: | Planned |
| Event start: | 18-11-2025 07:00 |
| Event end: | 18-11-2025 17:00 |
| Source: | Active - Planned - Żydowo H2 |
Outage information
| Unit | Żydowo H2 |
| Achievable generation capacity: | 55 MW |
| Outage size: | 55 MW |
| Event type: | Planned |
| Event start: | 19-11-2025 07:00 |
| Event end: | 19-11-2025 13:00 |
| Source: | Active - Planned - Żydowo H2 |
Outage information
| Unit | Solina H1 |
| Achievable generation capacity: | 68 MW |
| Outage size: | 68 MW |
| Event type: | Planned |
| Event start: | 03-11-2025 07:01 |
| Event end: | 10-11-2025 23:45 |
| Source: | Active - Planned - Solina H1 |
Outage information
| Unit | Synthos Dwory 7 TG7 |
| Achievable generation capacity: | 28 MW |
| Outage size: | 28 MW |
| Event type: | Planned |
| Event start: | 30-10-2025 17:30 |
| Event end: | 14-11-2025 00:00 |
| Source: | Active - Planned - Synthos Dwory 7 TG7 |
Outage information
| Unit | Rybnik B7 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 79 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 00:00 |
| Event end: | 07-11-2025 02:00 |
| Source: | Inactive - Planned - Rybnik B7 |
Outage information
| Unit | Rybnik B7 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 9 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 19:00 |
| Event end: | 07-11-2025 19:30 |
| Source: | Inactive - Planned - Rybnik B7 |
Outage information
| Unit | Rybnik B7 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 49 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 14:30 |
| Event end: | 07-11-2025 15:30 |
| Source: | Inactive - Planned - Rybnik B7 |
Outage information
| Unit | Rybnik B7 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 79 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 22:30 |
| Event end: | 07-11-2025 23:00 |
| Source: | Active - Planned - Rybnik B7 |
Outage information
| Unit | Rybnik B7 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 79 MW |
| Event type: | Planned |
| Event start: | 08-11-2025 00:00 |
| Event end: | 08-11-2025 00:30 |
| Source: | Active - Planned - Rybnik B7 |
Outage information
| Unit | EC Mielec ECM |
| Achievable generation capacity: | 33 MW |
| Outage size: | 4 MW |
| Event type: | Planned |
| Event start: | 01-11-2025 00:00 |
| Event end: | 01-01-2030 00:00 |
| Source: | Active - Planned - EC Mielec ECM |
Outage information
| Unit | Skawina Tg5 |
| Achievable generation capacity: | 110 MW |
| Outage size: | 20 MW |
| Event type: | Planned |
| Event start: | 27-10-2025 16:08 |
| Event end: | 30-11-2025 23:59 |
| Source: | Active - Planned - Skawina Tg5 |
Outage information
| Unit | Skawina Tg3 |
| Achievable generation capacity: | 110 MW |
| Outage size: | 110 MW |
| Event type: | Planned |
| Event start: | 24-10-2025 14:15 |
| Event end: | 30-11-2025 23:59 |
| Source: | Active - Planned - Skawina Tg3 |
Outage information
| Unit | Połaniec B6 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Unplanned |
| Event start: | 03-11-2025 09:36 |
| Event end: | 07-11-2025 19:00 |
| Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
| Unit | EC Siekierki WSIB 07 |
| Achievable generation capacity: | 106 MW |
| Outage size: | 106 MW |
| Event type: | Planned |
| Event start: | 24-05-2025 00:01 |
| Event end: | 30-11-2025 00:00 |
| Source: | Active - Planned - EC Siekierki WSIB 07 |
Outage information
| Unit | Połaniec B4 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Planned |
| Event start: | 20-09-2025 02:54 |
| Event end: | 31-12-2025 23:45 |
| Source: | Active - Planned - Połaniec B4 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 13 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 07:30 |
| Event end: | 07-11-2025 07:45 |
| Source: | Inactive - Planned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 69 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 06:30 |
| Event end: | 07-11-2025 06:45 |
| Source: | Inactive - Planned - Turów B01 |
Outage information
| Unit | Katowice B1 |
| Achievable generation capacity: | 135 MW |
| Outage size: | 135 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 22:01 |
| Event end: | 10-11-2025 10:00 |
| Source: | Active - Planned - Katowice B1 |
Outage information
| Unit | Bełchatów B11 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 38 MW |
| Event type: | Planned |
| Event start: | 06-11-2025 18:00 |
| Event end: | 07-11-2025 00:00 |
| Source: | Inactive - Planned - Bełchatów B11 |
Outage information
| Unit | PAK-PCE BIOPALIWA I WODÓR Elektrownia Konin |
| Achievable generation capacity: | 110 MW |
| Outage size: | 55 MW |
| Event type: | Planned |
| Event start: | 08-11-2025 00:00 |
| Event end: | 12-11-2025 00:00 |
| Source: | Active - Planned - PAK-PCE BIOPALIWA I WODÓR Elektrownia Konin |
Outage information
| Unit | Siersza B1 |
| Achievable generation capacity: | 139 MW |
| Outage size: | 139 MW |
| Event type: | Unplanned |
| Event start: | 05-11-2025 17:28 |
| Event end: | 10-11-2025 00:00 |
| Source: | Active - Unplanned - Siersza B1 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 95 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 13:00 |
| Event end: | 07-11-2025 14:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 04:00 |
| Event end: | 07-11-2025 05:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Veolia Energia Łódź EC4 B03 |
| Achievable generation capacity: | 105 MW |
| Outage size: | 105 MW |
| Event type: | Unplanned |
| Event start: | 05-11-2025 16:48 |
| Event end: | 10-11-2025 12:00 |
| Source: | Active - Unplanned - Veolia Energia Łódź EC4 B03 |
Outage information
| Unit | Jaworzno 2 JWCD B7 |
| Achievable generation capacity: | 834 MW |
| Outage size: | 179 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 06:00 |
| Event end: | 08-11-2025 00:00 |
| Source: | Active - Planned - Jaworzno 2 JWCD B7 |
Outage information
| Unit | Jaworzno 2 JWCD B7 |
| Achievable generation capacity: | 834 MW |
| Outage size: | 229 MW |
| Event type: | Planned |
| Event start: | 06-11-2025 06:00 |
| Event end: | 07-11-2025 06:00 |
| Source: | Inactive - Planned - Jaworzno 2 JWCD B7 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 5 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 04:00 |
| Event end: | 07-11-2025 05:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 15 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 11:00 |
| Event end: | 07-11-2025 12:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 5 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 07:00 |
| Event end: | 07-11-2025 08:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 116 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 05:45 |
| Event end: | 07-11-2025 06:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 123 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 08:30 |
| Event end: | 07-11-2025 09:00 |
| Source: | Inactive - Unplanned - Turów B04 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 247 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 00:00 |
| Event end: | 07-11-2025 05:00 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 104 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 14:15 |
| Event end: | 07-11-2025 14:30 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 133 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 00:00 |
| Event end: | 07-11-2025 07:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 132 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 00:00 |
| Event end: | 07-11-2025 07:00 |
| Source: | Inactive - Unplanned - Turów B04 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 177 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 08:00 |
| Event end: | 07-11-2025 08:15 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 56 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 14:45 |
| Event end: | 07-11-2025 16:00 |
| Source: | Inactive - Unplanned - Turów B06 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 19 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 15:45 |
| Event end: | 07-11-2025 16:00 |
| Source: | Inactive - Unplanned - Turów B04 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 69 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 15:15 |
| Event end: | 07-11-2025 16:00 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 47 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 16:00 |
| Event end: | 07-11-2025 16:15 |
| Source: | Inactive - Unplanned - Turów B02 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 11:15 |
| Event end: | 07-11-2025 14:45 |
| Source: | Inactive - Unplanned - Turów B01 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 16:00 |
| Event end: | 07-11-2025 16:30 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 223 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 05:15 |
| Event end: | 07-11-2025 06:00 |
| Source: | Inactive - Unplanned - Turów B11 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 311 MW |
| Event type: | Planned |
| Event start: | 13-11-2025 09:00 |
| Event end: | 13-11-2025 09:15 |
| Source: | Active - Planned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 294 MW |
| Event type: | Planned |
| Event start: | 13-11-2025 09:30 |
| Event end: | 13-11-2025 09:45 |
| Source: | Active - Planned - EC Włocławek B1 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 433 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 11:45 |
| Event end: | 07-11-2025 12:00 |
| Source: | Inactive - Planned - Opole B6 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 433 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 13:00 |
| Event end: | 07-11-2025 13:30 |
| Source: | Inactive - Planned - Opole B6 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 358 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 12:30 |
| Event end: | 07-11-2025 12:45 |
| Source: | Inactive - Planned - Opole B6 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 416 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 11:15 |
| Event end: | 07-11-2025 11:30 |
| Source: | Inactive - Planned - Opole B6 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 41 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 08:30 |
| Event end: | 07-11-2025 09:00 |
| Source: | Inactive - Planned - Opole B6 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 44 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 10:15 |
| Event end: | 07-11-2025 10:45 |
| Source: | Inactive - Planned - Opole B6 |
Outage information
| Unit | Opole B6 |
| Achievable generation capacity: | 833 MW |
| Outage size: | 23 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 09:45 |
| Event end: | 07-11-2025 10:00 |
| Source: | Inactive - Planned - Opole B6 |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 4 MW |
| Event type: | Planned |
| Event start: | 07-11-2025 08:00 |
| Event end: | 07-11-2025 18:00 |
| Source: | Inactive - Planned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | Skawina Tg6 |
| Achievable generation capacity: | 110 MW |
| Outage size: | 110 MW |
| Event type: | Planned |
| Event start: | 06-11-2025 15:54 |
| Event end: | 30-11-2025 23:59 |
| Source: | Active - Planned - Skawina Tg6 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 06-11-2025 23:00 |
| Event end: | 07-11-2025 00:00 |
| Source: | Inactive - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 09:00 |
| Event end: | 08-11-2025 10:00 |
| Source: | Active - Unplanned - Płock B01 |
Outage information
| Unit | Płock B01 |
| Achievable generation capacity: | 630 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 23:00 |
| Event end: | 09-11-2025 00:00 |
| Source: | Active - Unplanned - Płock B01 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 401 MW |
| Event type: | Unplanned |
| Event start: | 06-11-2025 22:00 |
| Event end: | 07-11-2025 00:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | Bełchatów B14 |
| Achievable generation capacity: | 781 MW |
| Outage size: | 251 MW |
| Event type: | Planned |
| Event start: | 09-11-2025 00:00 |
| Event end: | 10-11-2025 00:00 |
| Source: | Active - Planned - Bełchatów B14 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 5 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 23:00 |
| Event end: | 09-11-2025 00:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 10 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 21:00 |
| Event end: | 08-11-2025 22:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 5 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 00:00 |
| Event end: | 08-11-2025 01:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 5 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 07:00 |
| Event end: | 08-11-2025 08:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 5 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 09:00 |
| Event end: | 08-11-2025 10:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 15 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 13:00 |
| Event end: | 08-11-2025 14:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 5 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 02:00 |
| Event end: | 08-11-2025 03:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 10 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 19:00 |
| Event end: | 08-11-2025 20:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 15 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 15:00 |
| Event end: | 08-11-2025 16:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 5 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 05:00 |
| Event end: | 08-11-2025 06:00 |
| Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 132 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 00:00 |
| Event end: | 08-11-2025 06:15 |
| Source: | Active - Unplanned - Turów B04 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 133 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 00:00 |
| Event end: | 08-11-2025 06:00 |
| Source: | Active - Unplanned - Turów B06 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 112 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 21:15 |
| Event end: | 08-11-2025 21:30 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 37 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 07:00 |
| Event end: | 08-11-2025 08:00 |
| Source: | Active - Unplanned - Turów B06 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 103 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 23:00 |
| Event end: | 08-11-2025 23:15 |
| Source: | Active - Unplanned - Turów B04 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 47 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 07:15 |
| Event end: | 08-11-2025 07:30 |
| Source: | Active - Unplanned - Turów B04 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 133 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 08:45 |
| Event end: | 08-11-2025 14:15 |
| Source: | Active - Unplanned - Turów B06 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 103 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 14:15 |
| Event end: | 08-11-2025 14:30 |
| Source: | Active - Unplanned - Turów B04 |
Outage information
| Unit | Turów B03 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Planned |
| Event start: | 01-11-2025 00:15 |
| Event end: | 16-11-2025 00:00 |
| Source: | Active - Planned - Turów B03 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 131 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 14:45 |
| Event end: | 08-11-2025 15:45 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B02 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 226 MW |
| Event type: | Planned |
| Event start: | 08-11-2025 00:00 |
| Event end: | 16-11-2025 00:00 |
| Source: | Active - Planned - Turów B02 |
Outage information
| Unit | Rybnik B5 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 45 MW |
| Event type: | Unplanned |
| Event start: | 30-10-2025 08:15 |
| Event end: | 07-11-2025 09:10 |
| Source: | Inactive - Unplanned - Rybnik B5 |
Outage information
| Unit | Bełchatów B11 |
| Achievable generation capacity: | 358 MW |
| Outage size: | 155 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 21:00 |
| Event end: | 09-11-2025 00:00 |
| Source: | Active - Unplanned - Bełchatów B11 |
Outage information
| Unit | Siersza B1 |
| Achievable generation capacity: | 139 MW |
| Outage size: | 139 MW |
| Event type: | Planned |
| Event start: | 10-11-2025 00:00 |
| Event end: | 24-11-2025 00:00 |
| Source: | Active - Planned - Siersza B1 |
Outage information
| Unit | Rybnik B5 |
| Achievable generation capacity: | 209 MW |
| Outage size: | 209 MW |
| Event type: | Planned |
| Event start: | 08-11-2025 00:00 |
| Event end: | 12-11-2025 21:00 |
| Source: | Active - Planned - Rybnik B5 |
Outage information
| Unit | Solina H4 |
| Achievable generation capacity: | 31 MW |
| Outage size: | 31 MW |
| Event type: | Planned |
| Event start: | 13-11-2025 07:01 |
| Event end: | 16-11-2025 23:45 |
| Source: | Active - Planned - Solina H4 |
Outage information
| Unit | PAK-PCE BIOPALIWA I WODÓR Elektrownia Konin |
| Achievable generation capacity: | 110 MW |
| Outage size: | 55 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 05:04 |
| Event end: | 07-11-2025 09:07 |
| Source: | Inactive - Unplanned - PAK-PCE BIOPALIWA I WODÓR Elektrownia Konin |
Outage information
| Unit | Synthos Dwory 7 GT1 |
| Achievable generation capacity: | 72 MW |
| Outage size: | 72 MW |
| Event type: | Planned |
| Event start: | 06-11-2025 11:00 |
| Event end: | 10-11-2025 18:00 |
| Source: | Active - Planned - Synthos Dwory 7 GT1 |
Outage information
| Unit | Jaworzno 2 JWCD B7 |
| Achievable generation capacity: | 834 MW |
| Outage size: | 229 MW |
| Event type: | Unplanned |
| Event start: | 08-11-2025 00:00 |
| Event end: | 20-12-2025 00:00 |
| Source: | Active - Unplanned - Jaworzno 2 JWCD B7 |
Outage information
| Unit | Dolna Odra B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 98 MW |
| Event type: | Planned |
| Event start: | 13-11-2025 06:00 |
| Event end: | 13-11-2025 07:15 |
| Source: | Active - Planned - Dolna Odra B6 |
Outage information
| Unit | Dolna Odra B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 97 MW |
| Event type: | Planned |
| Event start: | 13-11-2025 11:45 |
| Event end: | 13-11-2025 12:45 |
| Source: | Active - Planned - Dolna Odra B6 |
Outage information
| Unit | Dolna Odra B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 55 MW |
| Event type: | Planned |
| Event start: | 13-11-2025 15:00 |
| Event end: | 13-11-2025 19:00 |
| Source: | Active - Planned - Dolna Odra B6 |
Outage information
| Unit | Dolna Odra B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 1 MW |
| Event type: | Planned |
| Event start: | 13-11-2025 08:00 |
| Event end: | 13-11-2025 08:45 |
| Source: | Active - Planned - Dolna Odra B6 |
Outage information
| Unit | Dolna Odra B6 |
| Achievable generation capacity: | 210 MW |
| Outage size: | 24 MW |
| Event type: | Planned |
| Event start: | 13-11-2025 10:15 |
| Event end: | 13-11-2025 11:00 |
| Source: | Active - Planned - Dolna Odra B6 |
Outage information
| Unit | EC Siekierki WSIK |
| Achievable generation capacity: | 160 MW |
| Outage size: | 104 MW |
| Event type: | Planned |
| Event start: | 11-11-2025 14:00 |
| Event end: | 15-11-2025 00:00 |
| Source: | Active - Planned - EC Siekierki WSIK |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 401 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 13:55 |
| Event end: | 07-11-2025 15:00 |
| Source: | Inactive - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | EC Włocławek B1 |
| Achievable generation capacity: | 465 MW |
| Outage size: | 10 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 15:00 |
| Event end: | 07-11-2025 16:00 |
| Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 94 MW |
| Event type: | Unplanned |
| Event start: | 09-11-2025 21:15 |
| Event end: | 09-11-2025 21:30 |
| Source: | Active - Unplanned - Turów B06 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 122 MW |
| Event type: | Unplanned |
| Event start: | 09-11-2025 21:45 |
| Event end: | 09-11-2025 22:00 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 09-11-2025 14:45 |
| Event end: | 09-11-2025 15:00 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 132 MW |
| Event type: | Unplanned |
| Event start: | 09-11-2025 00:00 |
| Event end: | 09-11-2025 14:30 |
| Source: | Active - Unplanned - Turów B04 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 09-11-2025 00:00 |
| Event end: | 09-11-2025 14:30 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 117 MW |
| Event type: | Unplanned |
| Event start: | 09-11-2025 14:30 |
| Event end: | 09-11-2025 14:45 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 75 MW |
| Event type: | Unplanned |
| Event start: | 09-11-2025 14:30 |
| Event end: | 09-11-2025 14:45 |
| Source: | Active - Unplanned - Turów B06 |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 7 MW |
| Event type: | Planned |
| Event start: | 12-11-2025 08:00 |
| Event end: | 12-11-2025 18:00 |
| Source: | Active - Planned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 7 MW |
| Event type: | Planned |
| Event start: | 13-11-2025 08:00 |
| Event end: | 13-11-2025 18:00 |
| Source: | Active - Planned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | PAK-PCE CZŁUCHÓW FW Ględowo |
| Achievable generation capacity: | 73 MW |
| Outage size: | 7 MW |
| Event type: | Planned |
| Event start: | 14-11-2025 08:00 |
| Event end: | 14-11-2025 18:00 |
| Source: | Active - Planned - PAK-PCE CZŁUCHÓW FW Ględowo |
Outage information
| Unit | Bełchatów B10 |
| Achievable generation capacity: | 361 MW |
| Outage size: | 30 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 17:00 |
| Event end: | 07-11-2025 21:00 |
| Source: | Inactive - Unplanned - Bełchatów B10 |
Outage information
| Unit | PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
| Achievable generation capacity: | 670 MW |
| Outage size: | 670 MW |
| Event type: | Unplanned |
| Event start: | 07-11-2025 15:56 |
| Event end: | 08-11-2025 12:00 |
| Source: | Active - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 00:00 |
| Event end: | 11-11-2025 07:00 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 69 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 07:15 |
| Event end: | 11-11-2025 07:30 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 89 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 08:45 |
| Event end: | 11-11-2025 09:45 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 74 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 15:30 |
| Event end: | 11-11-2025 16:00 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B01 |
| Achievable generation capacity: | 226 MW |
| Outage size: | 125 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 21:15 |
| Event end: | 12-11-2025 00:00 |
| Source: | Active - Unplanned - Turów B01 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 132 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 23:45 |
| Event end: | 12-11-2025 00:00 |
| Source: | Active - Unplanned - Turów B04 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 37 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 16:00 |
| Event end: | 11-11-2025 21:30 |
| Source: | Active - Unplanned - Turów B06 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 132 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 00:00 |
| Event end: | 11-11-2025 06:45 |
| Source: | Active - Unplanned - Turów B04 |
Outage information
| Unit | Turów B06 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 104 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 01:00 |
| Event end: | 11-11-2025 02:00 |
| Source: | Active - Unplanned - Turów B06 |
Outage information
| Unit | Turów B04 |
| Achievable generation capacity: | 236 MW |
| Outage size: | 113 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 22:45 |
| Event end: | 11-11-2025 23:00 |
| Source: | Active - Unplanned - Turów B04 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 209 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 01:00 |
| Event end: | 11-11-2025 01:15 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 84 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 08:00 |
| Event end: | 11-11-2025 10:00 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 195 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 23:00 |
| Event end: | 11-11-2025 23:30 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 149 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 22:15 |
| Event end: | 11-11-2025 22:30 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 134 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 06:45 |
| Event end: | 11-11-2025 07:00 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Turów B11 |
| Achievable generation capacity: | 444 MW |
| Outage size: | 134 MW |
| Event type: | Unplanned |
| Event start: | 11-11-2025 01:30 |
| Event end: | 11-11-2025 06:00 |
| Source: | Active - Unplanned - Turów B11 |
Outage information
| Unit | Połaniec B5 |
| Achievable generation capacity: | 224 MW |
| Outage size: | 26 MW |
| Event type: | Planned |
| Event start: | 11-11-2025 08:30 |
| Event end: | 11-11-2025 11:30 |
| Source: | Active - Planned - Połaniec B5 |
The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.
The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.
The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.