Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
May 2026
Sun 17 Mon 18 Tue 19 Wed 20 Thu 21 Fri 22 Sat 23 Sun 24 Mon 25 Tue 26 Wed 27 Thu 28 Fri 29 Sat 30
Bełchatów 4680
B02 341 341
B03 347 347 347 347 347 347
B04 349
B05 348
B06 360
B07 357
B08 358
B09 362
B10 361
B11 358
B12 358
B14 781 221
Chorzów 226
B1 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113
B2 113
Dolna Odra 429
B6 210
B7 219
Dychów 85
H1 28
H2 29
H3 28 30 30 30 30 30 30 30 30 30 30 30 30 30 30
EC Białystok 154
BIA_1-01 50 30 30 30 30 30 30 30 30 30 30 30 30 30 30
BIA_1-02 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52
BIA_1-03 52
EC Gorzów 138
GOR2 138
EC Mielec 33
ECM 33 24 24 24 24 24 24 24 24 24 24 24 24 24 24
EC Rzeszów 94
ECR 94
EC Siekierki 539
WSIB 07 91
WSIB 08 109 109 109 109 109 109 109 109 109 109 109 109 109 109 109
WSIB 09 91 91 91 91 91 91 91 91 91 91 91 91 91 91 91
WSIB 10 91
WSIK 157
EC Stalowa Wola 450
Stalowa Wola BGP 450
EC Włocławek 479
B1 479 44 59
EC Wrotków 231
ECW 231
EC Żerań 184
WZE 184 100 100 100 100 100 100 100 100 100 100 100 100 100 100
EC Żerań 2 488
B20 488 488 488 488 488 488 488 488 488 488 488 488 488 488 488
Eolos Novo Sp. z o.o. 16
FW Czarnożyły 16 2
Eolos Polska Sp. z o.o. 32
FW Gorzkowice 12 2
FW Krzyżanów 20
EWP European Wind Power Krasin Sp. z o.o. 30
FW Krasin 30
EW Włocławek 168
H01 28
H02 28
H03 28 28 28 28 28 28 28
H04 28
H05 28
H06 28
Farma Wiatrowa Bogoria Sp. z o.o. 20
FW Bogoria 20 20
FW Banie 12 106
FW Banie 12 106
FW Banie 3 81
FW Banie 3 81
FW Banie 4 56
FW Banie 4 56
FW Biały Bór 145
BBFW 145
FW Iława 13
FW Iława 13
FW Marszewo 100
FMA 100
FW Sępopol 44
FW Sępopol 44
Grupa Azoty Zakłady Azotowe „Puławy” SA 128
EC Puławy 128
Jaworzno 2 910
JWCD B7 910
Jaworzno 3 1345
B1 225
B2 225 210 210 210 210 210 210 210 210 210 210 210 210 210
B3 225 210 210 210 210 210 210 210 210 210
B4 225
B5 220 206 206 206 206 206 206 206 206 206 206 206 206 206 206
B6 225 211 211 211 211 211 211 211 211 211 211 211 211 211 211
JSW KOKS S.A. 114
EC Koksownia Przyjaźń G1 6
EC Koksownia Przyjaźń G2 15
EC Koksownia Przyjaźń G3 21
EC Koksownia Przyjaźń G4 71
Karolin 317
B2 100
B3 112
B4 105
Katowice 135
B1 135
KOGENERACJA S.A. 385
CZN_1S01 177 60 60
WROB1-02 104
WROB1-03 104
Kowalewo Wind Sp. z o.o. 24
FW Piątkowo 24
Kozienice 1 1800
B1 228 213 213 213 213 213 213 213 213 213
B2 228
B3 220 206 206 206 206 206 206 206 206 206 206 206
B4 228 213 213 213 213 213
B5 228 213 213 213 213 213 213 213 213 213
B6 228
B7 220
B8 220
Kozienice 2 2207
B09 566
B10 566
B11 1075
Kraków Łęg 451
KLE_1-01 122
KLE_1-02 120
KLE_1-03 102
KLE_1-04 107
Lichnowy Windfarm Sp. z o.o. 20
FW Lichnowy 20
Łagisza 460
B10 460
Łaziska 3 905
B09 230
B10 225
B11 225
B12 225
Mashav Management Sp. z o.o. 256
PEAST 101
PSOUT 37
PWEST 118
Nowa Energia 1 Sp. z o.o. 49
FW Kozłowo 49
Opole 3090
B1 357
B2 358
B3 358
B4 355
B5 829
B6 833 88 88 88 88
Ostrołęka B 625
B01 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230
B02 230
B03 165 165 165
PAK-PCE BIOPALIWA I WODÓR 110
Elektrownia Konin 110
PAK-PCE CZŁUCHÓW 73
FW Ględowo 73 4 2
PAK-PCE FOTOWOLTAIKA 63
PV Brudzew 63
PAK-PCE KAZIMIERZ BISKUPI 18
FW Kazimierz Biskupi 18 3 3
PAK-PCE MIŁOSŁAW 10
FW Pałczyn 10 2 2 2 2 2
PAK-PCE PRZYRÓW 42
FW Przyrów 42
Park Wiatrowy 12 Sp. z o.o. 45
FW Słupca-Kołaczkowo 45
Park Wiatrowy 1 Sp. z o.o. 42
FW Jarocin-Koźmin 42
Park Wiatrowy 9 Sp. z o.o 12
FW Jarocin Pilot II 6
FW Potarzyca 6
Pątnów 474
B9 474 474 474 474 474 474 474 474 474 474 474 474 474 474 474
PGE Gryfino Dolna Odra Sp. z o.o. 1340
Gryfino blok 10 670 10
Gryfino blok 9 670 10
PGE Zielona Góra S.A. 188
ZG BPG 188 188 188 188 188 188 188 188 188 188 188 188 188 188 188
Płock 630
B01 630 125 155 155
Polenergia Farma Fotowoltaiczna 16 Sp. z o.o. 20
FF16 20
Polenergia Farma Wiatrowa 1 Sp. z o.o. 48
FW Gawłowice 48
Polenergia Farma Wiatrowa 3 Sp. z o.o. 121
FW Dębsk 121 121
Polenergia Farma Wiatrowa Mycielin Sp. z o.o. 46
FW Mycielin 46
Polenergia Farma Wiatrowa Namysłów Sp. z o.o. 47
FW Namysłów 47
Polenergia Farma Wiatrowa Szymankowo Sp. z o.o. 38
FW Szymankowo 38
Polenergia FF Strzelino Sp. z o.o. 45
FF Strzelino 45
Polenergia FF Sulechów Sp. z o.o. 20
FF Sulechów 20
Połaniec 1899
B1 225
B2 242
B3 242 226 226 226 226 226 226 226 226 226 226 226 226 226 226
B4 242
B5 242 224 224 224 224 224 224 224 224 224 224 224 224 224
B6 242
B7 239
B9 225 225 225 225
Porąbka Żar 540
H1 135
H2 135
H3 135 137 137 137 137 137 137 137 137 137 137 137 137 137 137
H4 135 138 138 138 138
QPV 5 Sp. z o.o. 15
QPV 5 15
QPV DS3 Sp. z o.o. 16
QPV DS3 16
QPV Golczewo Sp. z o.o. 80
QPV Golczewo 80
QPV Kalisz Pomorski Sp. z o.o. 60
QPV Kalisz Pomorski 60
QPV KP1 Sp. z o.o. 10
QPV KP1 10
QPV KP2 Sp. z o.o. 12
QPV KP2 12
QPV Rokietnica Sp. z o.o. 31
QPV Rokietnica 31
QPV Stoszowice Sp. z o.o. 12
QPV Stoszowice 12
QPV Zimnodół Sp. z o.o. 35
QPV Zimnodół 35
QWP Linowo Sp. z o.o. 48
QWP Linowo 48
QWP Olszówka Sp. z o.o. 14
QWP Olszówka 14
QWP Rychwał Sp. z o.o. 19
QWP Rychwał 19
QWP Rzepin Sp. z o.o. 58
QWP Rzepin 58
QWP Udanin Sp. z o.o. 51
QWP Udanin 51
QWP Wądroże Sp. z o.o. 23
QWP Wądroże 23
QWP Wisznice Sp. z o.o. 40
QWP Wisznice 40
Rybnik 835
B5 209 68 68 68 68 68 68
B6 209 68 68 68 68 68 68
B7 209
B8 208 208 208 208 208 208 208 208 208
Siersza 306
B1 153 139 139 139 139 139 139
B2 153 139 139 139 139 139 139 139 139 139 139 139 139 139 139
Skawina 330
Tg3 110 110 110
Tg5 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg6 110 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Solina 198
H1 68 13 13 13 13 13 13 13 13 13 13 13 13 13 13
H2 68
H3 31
H4 31
Synthos Dwory 7 170
GT1 72
TG10 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
TG7 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28
TG8 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
TG9 31
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158 80 80 80 80 80 80 80 80 80 80 80 80 80 80
Turów 1830
B01 226 103 74
B02 226 226 226 226 226 226 226 226
B03 226 226 226 226 226 226 226 226 226 226 226 226 226 226 226
B04 236 38 38
B05 236 236 133
B06 236 236 236 236 236 236
B11 444 177 214
Veolia Energia Łódź EC4 105
B03 105 105 105 105 105 105
Windfarm Markowice Sp. z o.o. 26
Windfarm Markowice 26
Windfarm Polska III sp. z o.o. 126
WINDFARM 126
Windfarm Pruszcz Sp. z o.o. 70
Windfarm Pruszcz 70
Żarnowiec 716
H1 179 170 170 170 170 170 170 170 170 170 170 170 170 170 170
H2 179 170 170 170 170 170 170 170 170 170 170 170 170 170 170
H3 179 195 195 195 195 195 195 195 195 195 195 195 195 195 195
H4 179 195 195 195 195 195 195 195 195 195 195 195 195 195 195
Żydowo 165
H1 55
H2 55
H3 55
Planned 5715 5601 5356 5213 5076 4388 4216 3990 3782 3146 3146 2940 2940 2730
Unplanned 3055 3025 2405 2025 2025 1812 1588 1588 1588 1588 1588 1588 1588 1364
Total outages 8770 8626 7761 7238 7101 6200 5804 5578 5370 4734 4734 4528 4528 4094

Outage information

Unit Synthos Dwory 7 TG8
Achievable generation capacity: 20 MW
Outage size: 20 MW
Event type: Planned
Event start: 22-03-2024 00:01
Event end: 22-03-2027 23:59
Source: Active - Planned - Synthos Dwory 7 TG8

Outage information

Unit Żarnowiec H3
Achievable generation capacity: 195 MW
Outage size: 195 MW
Event type: Planned
Event start: 15-04-2026 00:01
Event end: 15-06-2026 23:45
Source: Active - Planned - Żarnowiec H3

Outage information

Unit Żarnowiec H4
Achievable generation capacity: 195 MW
Outage size: 195 MW
Event type: Planned
Event start: 16-04-2026 00:01
Event end: 15-06-2026 23:45
Source: Active - Planned - Żarnowiec H4

Outage information

Unit Żarnowiec H1
Achievable generation capacity: 195 MW
Outage size: 170 MW
Event type: Unplanned
Event start: 16-04-2026 00:01
Event end: 15-06-2026 23:45
Source: Active - Unplanned - Żarnowiec H1

Outage information

Unit Żarnowiec H2
Achievable generation capacity: 195 MW
Outage size: 170 MW
Event type: Unplanned
Event start: 16-04-2026 00:01
Event end: 15-06-2026 23:45
Source: Active - Unplanned - Żarnowiec H2

Outage information

Unit Ostrołęka B B01
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 30-03-2026 00:01
Event end: 01-07-2026 00:00
Source: Active - Planned - Ostrołęka B B01

Outage information

Unit Kozienice 1 B3
Achievable generation capacity: 206 MW
Outage size: 206 MW
Event type: Planned
Event start: 29-03-2026 00:01
Event end: 28-05-2026 00:00
Source: Active - Planned - Kozienice 1 B3

Outage information

Unit Kozienice 1 B1
Achievable generation capacity: 213 MW
Outage size: 213 MW
Event type: Planned
Event start: 26-04-2026 00:01
Event end: 26-05-2026 00:00
Source: Active - Planned - Kozienice 1 B1

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 213 MW
Outage size: 213 MW
Event type: Planned
Event start: 26-04-2026 00:01
Event end: 26-05-2026 00:00
Source: Active - Planned - Kozienice 1 B5

Outage information

Unit Rybnik B8
Achievable generation capacity: 208 MW
Outage size: 208 MW
Event type: Planned
Event start: 04-05-2026 00:00
Event end: 25-05-2026 00:00
Source: Active - Planned - Rybnik B8

Outage information

Unit TAMEH Polska sp. z o. o. Elektrownia Blachownia
Achievable generation capacity: 158 MW
Outage size: 80 MW
Event type: Planned
Event start: 04-03-2024 12:00
Event end: 31-12-2026 23:59
Source: Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia

Outage information

Unit Solina H1
Achievable generation capacity: 68 MW
Outage size: 13 MW
Event type: Unplanned
Event start: 06-02-2025 16:20
Event end: 30-06-2026 23:45
Source: Active - Unplanned - Solina H1

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 137 MW
Outage size: 137 MW
Event type: Planned
Event start: 22-10-2024 00:01
Event end: 10-02-2030 23:45
Source: Active - Planned - Porąbka Żar H3

Outage information

Unit Synthos Dwory 7 TG10
Achievable generation capacity: 19 MW
Outage size: 19 MW
Event type: Unplanned
Event start: 12-01-2026 07:28
Event end: 30-06-2026 15:00
Source: Active - Unplanned - Synthos Dwory 7 TG10

Outage information

Unit Jaworzno 3 B6
Achievable generation capacity: 211 MW
Outage size: 211 MW
Event type: Planned
Event start: 12-05-2026 00:01
Event end: 06-07-2026 00:00
Source: Active - Planned - Jaworzno 3 B6

Outage information

Unit Synthos Dwory 7 TG7
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 03-03-2026 13:00
Event end: 30-09-2026 23:59
Source: Active - Planned - Synthos Dwory 7 TG7

Outage information

Unit Jaworzno 3 B3
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 01-12-2025 00:01
Event end: 26-05-2026 00:00
Source: Active - Planned - Jaworzno 3 B3

Outage information

Unit Veolia Energia Łódź EC4 B03
Achievable generation capacity: 105 MW
Outage size: 105 MW
Event type: Planned
Event start: 03-04-2026 06:17
Event end: 22-05-2026 00:00
Source: Active - Planned - Veolia Energia Łódź EC4 B03

Outage information

Unit Turów B03
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Planned
Event start: 28-03-2026 00:00
Event end: 01-06-2026 00:00
Source: Active - Planned - Turów B03

Outage information

Unit Połaniec B3
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Planned
Event start: 11-04-2026 00:32
Event end: 09-07-2026 23:00
Source: Active - Planned - Połaniec B3

Outage information

Unit EC Siekierki WSIB 08
Achievable generation capacity: 109 MW
Outage size: 109 MW
Event type: Planned
Event start: 11-04-2026 01:04
Event end: 10-10-2026 00:00
Source: Active - Planned - EC Siekierki WSIB 08

Outage information

Unit EC Mielec ECM
Achievable generation capacity: 33 MW
Outage size: 24 MW
Event type: Planned
Event start: 01-05-2026 00:01
Event end: 01-10-2026 00:00
Source: Active - Planned - EC Mielec ECM

Outage information

Unit Chorzów B1
Achievable generation capacity: 113 MW
Outage size: 113 MW
Event type: Planned
Event start: 18-04-2026 02:01
Event end: 02-06-2026 16:00
Source: Active - Planned - Chorzów B1

Outage information

Unit EW Włocławek H03
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 27-04-2026 06:01
Event end: 22-05-2026 17:00
Source: Active - Planned - EW Włocławek H03

Outage information

Unit EC Białystok BIA_1-01
Achievable generation capacity: 50 MW
Outage size: 30 MW
Event type: Planned
Event start: 29-04-2026 16:45
Event end: 17-07-2026 23:45
Source: Active - Planned - EC Białystok BIA_1-01

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 20 MW
Event type: Planned
Event start: 08-04-2026 04:01
Event end: 31-05-2026 23:59
Source: Active - Planned - Skawina Tg6

Outage information

Unit Jaworzno 3 B2
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 02-01-2026 00:00
Event end: 30-05-2026 00:00
Source: Active - Planned - Jaworzno 3 B2

Outage information

Unit Pątnów B9
Achievable generation capacity: 474 MW
Outage size: 474 MW
Event type: Unplanned
Event start: 01-05-2026 00:10
Event end: 01-01-2027 00:00
Source: Active - Unplanned - Pątnów B9

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 184 MW
Outage size: 100 MW
Event type: Planned
Event start: 05-04-2026 00:00
Event end: 23-06-2026 00:00
Source: Active - Planned - EC Żerań WZE

Outage information

Unit PGE Zielona Góra S.A. ZG BPG
Achievable generation capacity: 188 MW
Outage size: 188 MW
Event type: Planned
Event start: 14-05-2026 20:00
Event end: 10-06-2026 10:00
Source: Active - Planned - PGE Zielona Góra S.A. ZG BPG

Outage information

Unit Kozienice 1 B4
Achievable generation capacity: 213 MW
Outage size: 213 MW
Event type: Unplanned
Event start: 10-05-2026 00:30
Event end: 22-05-2026 00:00
Source: Active - Unplanned - Kozienice 1 B4

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 11-05-2026 05:07
Event end: 20-05-2026 23:45
Source: Active - Planned - Porąbka Żar H4

Outage information

Unit EC Siekierki WSIB 09
Achievable generation capacity: 91 MW
Outage size: 91 MW
Event type: Planned
Event start: 16-05-2026 00:01
Event end: 27-07-2026 00:00
Source: Active - Planned - EC Siekierki WSIB 09

Outage information

Unit Jaworzno 3 B5
Achievable generation capacity: 206 MW
Outage size: 206 MW
Event type: Planned
Event start: 12-05-2026 00:01
Event end: 06-07-2026 00:00
Source: Active - Planned - Jaworzno 3 B5

Outage information

Unit EC Białystok BIA_1-02
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Planned
Event start: 12-05-2026 23:45
Event end: 30-06-2026 23:45
Source: Active - Planned - EC Białystok BIA_1-02

Outage information

Unit Połaniec B5
Achievable generation capacity: 224 MW
Outage size: 224 MW
Event type: Unplanned
Event start: 20-04-2026 03:03
Event end: 29-05-2026 23:45
Source: Active - Unplanned - Połaniec B5

Outage information

Unit Bełchatów B02
Achievable generation capacity: 341 MW
Outage size: 341 MW
Event type: Planned
Event start: 14-05-2026 00:10
Event end: 18-05-2026 00:00
Source: Active - Planned - Bełchatów B02

Outage information

Unit Bełchatów B14
Achievable generation capacity: 781 MW
Outage size: 221 MW
Event type: Planned
Event start: 16-05-2026 00:00
Event end: 17-05-2026 00:00
Source: Inactive - Planned - Bełchatów B14

Outage information

Unit Bełchatów B14
Achievable generation capacity: 781 MW
Outage size: 221 MW
Event type: Planned
Event start: 18-05-2026 00:00
Event end: 19-05-2026 00:00
Source: Active - Planned - Bełchatów B14

Outage information

Unit Bełchatów B03
Achievable generation capacity: 347 MW
Outage size: 347 MW
Event type: Planned
Event start: 04-05-2026 00:00
Event end: 21-05-2026 18:00
Source: Active - Planned - Bełchatów B03

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 14-05-2026 19:00
Event end: 31-05-2026 23:59
Source: Active - Planned - Skawina Tg5

Outage information

Unit KOGENERACJA S.A. CZN_1S01
Achievable generation capacity: 177 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 11-05-2026 00:00
Event end: 18-05-2026 23:45
Source: Active - Unplanned - KOGENERACJA S.A. CZN_1S01

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 133 MW
Event type: Unplanned
Event start: 16-05-2026 23:30
Event end: 17-05-2026 00:00
Source: Inactive - Unplanned - Turów B06

Outage information

Unit Polenergia Farma Wiatrowa 3 Sp. z o.o. FW Dębsk
Achievable generation capacity: 121 MW
Outage size: 121 MW
Event type: Planned
Event start: 19-05-2026 08:00
Event end: 19-05-2026 14:00
Source: Active - Planned - Polenergia Farma Wiatrowa 3 Sp. z o.o. FW Dębsk

Outage information

Unit Ostrołęka B B03
Achievable generation capacity: 165 MW
Outage size: 165 MW
Event type: Planned
Event start: 16-05-2026 12:00
Event end: 19-05-2026 00:00
Source: Active - Planned - Ostrołęka B B03

Outage information

Unit Farma Wiatrowa Bogoria Sp. z o.o. FW Bogoria
Achievable generation capacity: 20 MW
Outage size: 20 MW
Event type: Planned
Event start: 19-05-2026 08:00
Event end: 19-05-2026 15:00
Source: Active - Planned - Farma Wiatrowa Bogoria Sp. z o.o. FW Bogoria

Outage information

Unit Siersza B2
Achievable generation capacity: 139 MW
Outage size: 139 MW
Event type: Planned
Event start: 01-03-2026 00:00
Event end: 10-06-2026 00:00
Source: Active - Planned - Siersza B2

Outage information

Unit PAK-PCE KAZIMIERZ BISKUPI FW Kazimierz Biskupi
Achievable generation capacity: 18 MW
Outage size: 3 MW
Event type: Planned
Event start: 21-05-2026 10:00
Event end: 21-05-2026 14:00
Source: Active - Planned - PAK-PCE KAZIMIERZ BISKUPI FW Kazimierz Biskupi

Outage information

Unit PAK-PCE KAZIMIERZ BISKUPI FW Kazimierz Biskupi
Achievable generation capacity: 18 MW
Outage size: 3 MW
Event type: Planned
Event start: 22-05-2026 10:00
Event end: 22-05-2026 16:00
Source: Active - Planned - PAK-PCE KAZIMIERZ BISKUPI FW Kazimierz Biskupi

Outage information

Unit EC Żerań 2 B20
Achievable generation capacity: 488 MW
Outage size: 488 MW
Event type: Unplanned
Event start: 12-05-2026 14:33
Event end: 30-06-2026 23:59
Source: Active - Unplanned - EC Żerań 2 B20

Outage information

Unit Siersza B1
Achievable generation capacity: 139 MW
Outage size: 139 MW
Event type: Planned
Event start: 16-05-2026 00:00
Event end: 23-05-2026 00:00
Source: Active - Planned - Siersza B1

Outage information

Unit Turów B02
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Planned
Event start: 13-05-2026 00:15
Event end: 24-05-2026 00:00
Source: Active - Planned - Turów B02

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 236 MW
Event type: Planned
Event start: 12-05-2026 08:39
Event end: 17-05-2026 10:00
Source: Inactive - Planned - Turów B05

Outage information

Unit PAK-PCE MIŁOSŁAW FW Pałczyn
Achievable generation capacity: 10 MW
Outage size: 2 MW
Event type: Planned
Event start: 18-05-2026 10:00
Event end: 18-05-2026 18:00
Source: Active - Planned - PAK-PCE MIŁOSŁAW FW Pałczyn

Outage information

Unit PAK-PCE MIŁOSŁAW FW Pałczyn
Achievable generation capacity: 10 MW
Outage size: 2 MW
Event type: Planned
Event start: 19-05-2026 10:00
Event end: 19-05-2026 18:00
Source: Active - Planned - PAK-PCE MIŁOSŁAW FW Pałczyn

Outage information

Unit PAK-PCE MIŁOSŁAW FW Pałczyn
Achievable generation capacity: 10 MW
Outage size: 2 MW
Event type: Planned
Event start: 20-05-2026 10:00
Event end: 20-05-2026 18:00
Source: Active - Planned - PAK-PCE MIŁOSŁAW FW Pałczyn

Outage information

Unit PAK-PCE MIŁOSŁAW FW Pałczyn
Achievable generation capacity: 10 MW
Outage size: 2 MW
Event type: Planned
Event start: 21-05-2026 10:00
Event end: 21-05-2026 18:00
Source: Active - Planned - PAK-PCE MIŁOSŁAW FW Pałczyn

Outage information

Unit PAK-PCE MIŁOSŁAW FW Pałczyn
Achievable generation capacity: 10 MW
Outage size: 2 MW
Event type: Planned
Event start: 22-05-2026 10:00
Event end: 22-05-2026 18:00
Source: Active - Planned - PAK-PCE MIŁOSŁAW FW Pałczyn

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 38 MW
Event type: Unplanned
Event start: 17-05-2026 17:30
Event end: 17-05-2026 17:45
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 28 MW
Event type: Unplanned
Event start: 17-05-2026 18:00
Event end: 17-05-2026 23:00
Source: Active - Unplanned - Turów B01

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 11 MW
Event type: Unplanned
Event start: 17-05-2026 00:15
Event end: 17-05-2026 08:00
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 146 MW
Event type: Unplanned
Event start: 17-05-2026 18:15
Event end: 17-05-2026 18:30
Source: Inactive - Unplanned - Turów B05

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 57 MW
Event type: Unplanned
Event start: 17-05-2026 00:00
Event end: 17-05-2026 07:45
Source: Inactive - Unplanned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 177 MW
Event type: Unplanned
Event start: 17-05-2026 16:30
Event end: 17-05-2026 16:45
Source: Inactive - Unplanned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 84 MW
Event type: Unplanned
Event start: 17-05-2026 17:00
Event end: 17-05-2026 17:15
Source: Inactive - Unplanned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 131 MW
Event type: Unplanned
Event start: 17-05-2026 08:00
Event end: 17-05-2026 08:15
Source: Inactive - Unplanned - Turów B11

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 56 MW
Event type: Unplanned
Event start: 18-05-2026 23:00
Event end: 18-05-2026 23:15
Source: Active - Unplanned - Turów B01

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 38 MW
Event type: Unplanned
Event start: 18-05-2026 17:30
Event end: 18-05-2026 17:45
Source: Active - Unplanned - Turów B04

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 74 MW
Event type: Unplanned
Event start: 18-05-2026 17:30
Event end: 18-05-2026 17:45
Source: Active - Unplanned - Turów B01

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 133 MW
Event type: Unplanned
Event start: 18-05-2026 00:00
Event end: 18-05-2026 05:00
Source: Active - Unplanned - Turów B05

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 84 MW
Event type: Unplanned
Event start: 18-05-2026 17:15
Event end: 18-05-2026 17:30
Source: Active - Unplanned - Turów B05

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 113 MW
Event type: Unplanned
Event start: 18-05-2026 23:45
Event end: 19-05-2026 00:00
Source: Active - Unplanned - Turów B05

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 57 MW
Event type: Unplanned
Event start: 18-05-2026 06:00
Event end: 18-05-2026 09:15
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 133 MW
Event type: Unplanned
Event start: 18-05-2026 10:00
Event end: 18-05-2026 16:45
Source: Active - Unplanned - Turów B05

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 103 MW
Event type: Unplanned
Event start: 18-05-2026 17:45
Event end: 18-05-2026 18:00
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 214 MW
Event type: Unplanned
Event start: 18-05-2026 23:45
Event end: 19-05-2026 00:00
Source: Active - Unplanned - Turów B11

Outage information

Unit Rybnik B5
Achievable generation capacity: 209 MW
Outage size: 68 MW
Event type: Unplanned
Event start: 15-05-2026 17:00
Event end: 23-05-2026 00:00
Source: Active - Unplanned - Rybnik B5

Outage information

Unit Rybnik B6
Achievable generation capacity: 209 MW
Outage size: 68 MW
Event type: Unplanned
Event start: 15-05-2026 17:00
Event end: 23-05-2026 00:00
Source: Active - Unplanned - Rybnik B6

Outage information

Unit PAK-PCE CZŁUCHÓW FW Ględowo
Achievable generation capacity: 73 MW
Outage size: 4 MW
Event type: Planned
Event start: 19-05-2026 08:00
Event end: 19-05-2026 16:00
Source: Active - Planned - PAK-PCE CZŁUCHÓW FW Ględowo

Outage information

Unit PAK-PCE CZŁUCHÓW FW Ględowo
Achievable generation capacity: 73 MW
Outage size: 2 MW
Event type: Planned
Event start: 20-05-2026 08:00
Event end: 20-05-2026 16:00
Source: Active - Planned - PAK-PCE CZŁUCHÓW FW Ględowo

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 15-05-2026 13:04
Event end: 18-05-2026 23:59
Source: Active - Unplanned - Skawina Tg3

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 17-05-2026 20:00
Event end: 17-05-2026 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Połaniec B9
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 16-05-2026 03:28
Event end: 19-05-2026 16:00
Source: Active - Unplanned - Połaniec B9

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 44 MW
Event type: Unplanned
Event start: 17-05-2026 04:00
Event end: 17-05-2026 05:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit Opole B6
Achievable generation capacity: 833 MW
Outage size: 88 MW
Event type: Unplanned
Event start: 19-05-2026 00:00
Event end: 23-05-2026 00:00
Source: Active - Unplanned - Opole B6

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 18-05-2026 03:00
Event end: 18-05-2026 04:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 145 MW
Event type: Unplanned
Event start: 18-05-2026 12:00
Event end: 18-05-2026 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 18-05-2026 15:00
Event end: 18-05-2026 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 18-05-2026 01:00
Event end: 18-05-2026 02:00
Source: Active - Unplanned - Płock B01

Outage information

Unit PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10
Achievable generation capacity: 670 MW
Outage size: 10 MW
Event type: Unplanned
Event start: 18-05-2026 17:00
Event end: 18-05-2026 19:00
Source: Active - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 10

Outage information

Unit PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9
Achievable generation capacity: 670 MW
Outage size: 10 MW
Event type: Unplanned
Event start: 18-05-2026 17:00
Event end: 18-05-2026 19:00
Source: Active - Unplanned - PGE Gryfino Dolna Odra Sp. z o.o. Gryfino blok 9

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 103 MW
Event type: Unplanned
Event start: 17-05-2026 00:00
Event end: 17-05-2026 08:00
Source: Inactive - Unplanned - Turów B01

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 236 MW
Event type: Planned
Event start: 17-05-2026 00:22
Event end: 21-05-2026 10:00
Source: Active - Planned - Turów B06

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 44 MW
Event type: Unplanned
Event start: 18-05-2026 00:00
Event end: 18-05-2026 01:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 479 MW
Outage size: 59 MW
Event type: Unplanned
Event start: 18-05-2026 22:00
Event end: 18-05-2026 23:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit Dychów H3
Achievable generation capacity: 30 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 17-05-2026 10:05
Event end: 30-06-2026 23:00
Source: Active - Unplanned - Dychów H3

Outage information

Unit Eolos Novo Sp. z o.o. FW Czarnożyły
Achievable generation capacity: 16 MW
Outage size: 2 MW
Event type: Planned
Event start: 18-05-2026 10:00
Event end: 18-05-2026 11:00
Source: Active - Planned - Eolos Novo Sp. z o.o. FW Czarnożyły

Outage information

Unit Eolos Novo Sp. z o.o. FW Czarnożyły
Achievable generation capacity: 16 MW
Outage size: 2 MW
Event type: Planned
Event start: 18-05-2026 11:01
Event end: 18-05-2026 15:00
Source: Active - Planned - Eolos Novo Sp. z o.o. FW Czarnożyły

Outage information

Unit Eolos Novo Sp. z o.o. FW Czarnożyły
Achievable generation capacity: 16 MW
Outage size: 2 MW
Event type: Planned
Event start: 18-05-2026 15:01
Event end: 18-05-2026 19:00
Source: Active - Planned - Eolos Novo Sp. z o.o. FW Czarnożyły

Outage information

Unit Eolos Polska Sp. z o.o. FW Gorzkowice
Achievable generation capacity: 12 MW
Outage size: 2 MW
Event type: Planned
Event start: 18-05-2026 10:00
Event end: 18-05-2026 15:00
Source: Active - Planned - Eolos Polska Sp. z o.o. FW Gorzkowice

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 150 MW
Event type: Unplanned
Event start: 19-05-2026 11:00
Event end: 19-05-2026 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 19-05-2026 00:00
Event end: 19-05-2026 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 19-05-2026 16:00
Event end: 19-05-2026 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 19-05-2026 02:00
Event end: 19-05-2026 03:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 10 MW
Event type: Unplanned
Event start: 18-05-2026 06:00
Event end: 18-05-2026 09:00
Source: Active - Unplanned - Turów B05

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 10 MW
Event type: Unplanned
Event start: 18-05-2026 18:00
Event end: 18-05-2026 23:00
Source: Active - Unplanned - Turów B05

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.