Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
December 2025
Sat 13 Sun 14 Mon 15 Tue 16 Wed 17 Thu 18 Fri 19 Sat 20 Sun 21 Mon 22 Tue 23 Wed 24 Thu 25 Fri 26
Bełchatów 4680
B02 341 120
B03 347
B04 349 349 349
B05 348
B06 360
B07 357
B08 358
B09 362
B10 361
B11 358
B12 358 358 358 358 358 358 358 358 358
B14 781 251
Chorzów 226
B1 113
B2 113
Dolna Odra 858
B5 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210
B6 210 210 210
B7 219
B8 219
Dychów 85
H1 28
H2 29
H3 28
EC Białystok 154
BIA_1-01 50
BIA_1-02 52 52 52 52 52 52 52 52
BIA_1-03 52
EC Gorzów 138
GOR2 138
EC Mielec 33
ECM 33 4 4 4 4 4 4 4 4 4 4 4 4 4 4
EC Rzeszów 120
ECR 120
EC Siekierki 539
WSIB 07 91
WSIB 08 109 109 109 109 109 109 109
WSIB 09 91
WSIB 10 91
WSIK 157
EC Stalowa Wola 450
Stalowa Wola BGP 450
EC Włocławek 465
B1 465 35
EC Wrotków 231
ECW 231
EC Żerań 184
WZE 184
EC Żerań 2 488
B20 488
Elektrociepłownia "Zielona Góra" S.A. 188
ZG BPG 188
Eolos Novo Sp. z o.o. 16
FW Czarnożyły 16
Eolos Polska Sp. z o.o. 32
FW Gorzkowice 12 2
FW Krzyżanów 20
EWP European Wind Power Krasin Sp. z o.o. 30
FW Krasin 30
EW Włocławek 168
H01 28
H02 28 28 28 28 28 28 28 28
H03 28
H04 28
H05 28
H06 28
Farma Wiatrowa Bogoria Sp. z o.o. 20
FW Bogoria 20
FW Banie 12 106
FW Banie 12 106
FW Banie 3 81
FW Banie 3 81
FW Banie 4 56
FW Banie 4 56
FW Biały Bór 145
BBFW 145
FW Iława 13
FW Iława 13
FW Marszewo 100
FMA 100
FW Sępopol 44
FW Sępopol 44
Grupa Azoty Zakłady Azotowe „Puławy” SA 128
EC Puławy 128
Jaworzno 2 910
JWCD B7 910 229 229 229 229 229 229 229
Jaworzno 3 1345
B1 225 210 210
B2 225 210
B3 225 210 210 210 210 210 210 210 210 210 210 210 210 210 210
B4 225
B5 220 206 206 206 206 206 206 206 206 206 206 206
B6 225
JSW KOKS S.A. 114
EC Koksownia Przyjaźń G1 6
EC Koksownia Przyjaźń G2 15
EC Koksownia Przyjaźń G3 21
EC Koksownia Przyjaźń G4 71
Karolin 317
B2 100
B3 112
B4 105
Katowice 135
B1 135
KOGENERACJA S.A. 385
CZN_1S01 177 177 177
WROB1-02 104
WROB1-03 104 104 104 104
Kowalewo Wind Sp. z o.o. 24
FW Piątkowo 24
Kozienice 1 1800
B1 228
B2 228
B3 220
B4 228
B5 228
B6 228
B7 220
B8 220 63 63 56
Kozienice 2 2207
B09 566
B10 566 42 42 42 42
B11 1075
Kraków Łęg 451
KLE_1-01 122
KLE_1-02 120
KLE_1-03 102
KLE_1-04 107
Lichnowy Windfarm Sp. z o.o. 20
FW Lichnowy 20
Łagisza 460
B10 460
Łaziska 3 905
B09 230
B10 225
B11 225
B12 225
Mashav Management Sp. z o.o. 256
PEAST 101
PSOUT 37
PWEST 118
Nowa Energia 1 Sp. z o.o. 49
FW Kozłowo 49
Opole 3090
B1 357
B2 358
B3 358
B4 355
B5 829
B6 833 500
Ostrołęka B 690
B01 230
B02 230
B03 230
PAK-PCE BIOPALIWA I WODÓR 110
Elektrownia Konin 110
PAK-PCE CZŁUCHÓW 73
FW Ględowo 73
PAK-PCE FOTOWOLTAIKA 63
PV Brudzew 63
PAK-PCE KAZIMIERZ BISKUPI 18
FW Kazimierz Biskupi 18
PAK-PCE MIŁOSŁAW 10
FW Pałczyn 10
PAK-PCE PRZYRÓW 42
FW Przyrów 42
Park Wiatrowy 12 Sp. z o.o. 45
FW Słupca-Kołaczkowo 45
Park Wiatrowy 1 Sp. z o.o. 42
FW Jarocin-Koźmin 42
Pątnów 474
B9 474
PGE Gryfino Dolna Odra Sp. z o.o. 1340
Gryfino blok 10 670
Gryfino blok 9 670
Płock 630
B01 630 100 85
Polenergia Farma Wiatrowa 1 Sp. z o.o. 48
FW Gawłowice 48
Polenergia Farma Wiatrowa Mycielin Sp. z o.o. 46
FW Mycielin 46
Polenergia Farma Wiatrowa Szymankowo Sp. z o.o. 38
FW Szymankowo 38
Polenergia FF Strzelino Sp. z o.o. 45
FF Strzelino 45
Polenergia FF Sulechów Sp. z o.o. 20
FF Sulechów 20
Połaniec 1899
B1 225
B2 242
B3 242
B4 242 226 226 226 226 226 226 226 226 226 226 226 226 226 226
B5 242
B6 242
B7 239
B9 225 225 225 225 225 225 225 225 225
Porąbka Żar 540
H1 135 138
H2 135
H3 135
H4 135 138 138 138 138 138 138 138 138 138 138 138 138 138 138
Rybnik 835
B5 209
B6 209 209 209
B7 209
B8 208 78
Siersza 306
B1 153 139 139 139 139 139 139 139 139 139 139 139 139 139 139
B2 153 139 139 139 139 139 139 139 139 139 139 139
Skawina 330
Tg3 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg5 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg6 110 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Solina 198
H1 68 13 13 13 13 13 13 13 13 13 13 13 13 13 13
H2 68
H3 31
H4 31
Synthos Dwory 7 170
GT1 72
TG10 19
TG7 28
TG8 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
TG9 31
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158 80 80 80 80 80 80 80 80 80 80 80 80 80 80
Turów 1830
B01 226 125
B02 226 226 226 226 226 226
B03 226 226 226 226
B04 236 113 132 132
B05 236 124
B06 236 104 104 75 116 146
B11 444 247 223 247
Veolia Energia Łódź EC4 105
B03 105
Windfarm Polska III sp. z o.o. 126
WINDFARM 126
Żarnowiec 716
H1 179 179 179
H2 179
H3 179
H4 179
Żydowo 167
H1 55 55
H2 55
H3 57
Planned 3469 3580 3075 3023 2655 2649 2204 2079 1612 1612 1612 1267 1267 1267
Unplanned 1538 1273 1222 519 519 519 519 238 13 13 13 13 13 13
Total outages 5007 4853 4297 3542 3174 3168 2723 2317 1625 1625 1625 1280 1280 1280

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 22-11-2025 00:01
Event end: 31-12-2025 23:45
Source: Active - Planned - Porąbka Żar H4

Outage information

Unit Synthos Dwory 7 TG8
Achievable generation capacity: 20 MW
Outage size: 20 MW
Event type: Planned
Event start: 22-03-2024 00:01
Event end: 22-03-2027 23:59
Source: Active - Planned - Synthos Dwory 7 TG8

Outage information

Unit TAMEH Polska sp. z o. o. Elektrownia Blachownia
Achievable generation capacity: 158 MW
Outage size: 80 MW
Event type: Planned
Event start: 04-03-2024 12:00
Event end: 31-12-2025 23:59
Source: Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia

Outage information

Unit Bełchatów B12
Achievable generation capacity: 358 MW
Outage size: 358 MW
Event type: Planned
Event start: 02-08-2025 00:00
Event end: 20-12-2025 18:00
Source: Active - Planned - Bełchatów B12

Outage information

Unit Jaworzno 3 B3
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 01-12-2025 00:01
Event end: 01-03-2026 00:00
Source: Active - Planned - Jaworzno 3 B3

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 20-05-2025 19:00
Event end: 01-01-2026 00:00
Source: Active - Planned - Dolna Odra B5

Outage information

Unit Solina H1
Achievable generation capacity: 68 MW
Outage size: 13 MW
Event type: Unplanned
Event start: 06-02-2025 16:20
Event end: 31-12-2025 23:45
Source: Active - Unplanned - Solina H1

Outage information

Unit EC Mielec ECM
Achievable generation capacity: 33 MW
Outage size: 4 MW
Event type: Planned
Event start: 01-11-2025 00:00
Event end: 01-01-2030 00:00
Source: Active - Planned - EC Mielec ECM

Outage information

Unit Połaniec B4
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Planned
Event start: 20-09-2025 02:54
Event end: 31-12-2025 23:45
Source: Active - Planned - Połaniec B4

Outage information

Unit Jaworzno 3 B5
Achievable generation capacity: 206 MW
Outage size: 206 MW
Event type: Planned
Event start: 01-09-2025 00:01
Event end: 24-12-2025 00:00
Source: Active - Planned - Jaworzno 3 B5

Outage information

Unit EC Białystok BIA_1-02
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Unplanned
Event start: 02-10-2025 07:55
Event end: 19-12-2025 23:45
Source: Active - Unplanned - EC Białystok BIA_1-02

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 24-10-2025 14:15
Event end: 31-12-2025 23:59
Source: Active - Planned - Skawina Tg3

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 20 MW
Event type: Planned
Event start: 02-12-2025 13:15
Event end: 31-12-2025 23:59
Source: Active - Planned - Skawina Tg6

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 02-12-2025 18:35
Event end: 31-12-2025 23:59
Source: Active - Planned - Skawina Tg5

Outage information

Unit EW Włocławek H02
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 28-10-2025 07:01
Event end: 19-12-2025 17:00
Source: Active - Planned - EW Włocławek H02

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Planned
Event start: 10-12-2025 07:00
Event end: 15-12-2025 00:00
Source: Active - Planned - Dolna Odra B6

Outage information

Unit KOGENERACJA S.A. WROB1-03
Achievable generation capacity: 104 MW
Outage size: 104 MW
Event type: Planned
Event start: 09-12-2025 00:00
Event end: 15-12-2025 23:45
Source: Active - Planned - KOGENERACJA S.A. WROB1-03

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 834 MW
Outage size: 229 MW
Event type: Unplanned
Event start: 09-12-2025 07:45
Event end: 20-12-2025 00:00
Source: Active - Unplanned - Jaworzno 2 JWCD B7

Outage information

Unit Rybnik B8
Achievable generation capacity: 208 MW
Outage size: 48 MW
Event type: Planned
Event start: 17-12-2025 11:00
Event end: 17-12-2025 12:15
Source: Active - Planned - Rybnik B8

Outage information

Unit Rybnik B8
Achievable generation capacity: 208 MW
Outage size: 78 MW
Event type: Planned
Event start: 17-12-2025 07:00
Event end: 17-12-2025 08:00
Source: Active - Planned - Rybnik B8

Outage information

Unit Turów B02
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Planned
Event start: 12-12-2025 00:00
Event end: 18-12-2025 00:00
Source: Active - Planned - Turów B02

Outage information

Unit Żydowo H1
Achievable generation capacity: 55 MW
Outage size: 55 MW
Event type: Planned
Event start: 19-12-2025 08:00
Event end: 19-12-2025 16:00
Source: Active - Planned - Żydowo H1

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 206 MW
Outage size: 63 MW
Event type: Planned
Event start: 16-12-2025 12:00
Event end: 16-12-2025 14:45
Source: Active - Planned - Kozienice 1 B8

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 206 MW
Outage size: 63 MW
Event type: Planned
Event start: 15-12-2025 12:00
Event end: 15-12-2025 14:45
Source: Active - Planned - Kozienice 1 B8

Outage information

Unit Siersza B2
Achievable generation capacity: 139 MW
Outage size: 139 MW
Event type: Planned
Event start: 06-12-2025 00:00
Event end: 24-12-2025 00:00
Source: Active - Planned - Siersza B2

Outage information

Unit Siersza B1
Achievable generation capacity: 139 MW
Outage size: 139 MW
Event type: Planned
Event start: 10-11-2025 00:00
Event end: 31-12-2025 00:00
Source: Active - Planned - Siersza B1

Outage information

Unit Rybnik B6
Achievable generation capacity: 209 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 03-12-2025 00:00
Event end: 13-12-2025 00:00
Source: Inactive - Unplanned - Rybnik B6

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 13-12-2025 20:00
Event end: 13-12-2025 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 13-12-2025 22:00
Event end: 13-12-2025 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 13-12-2025 17:00
Event end: 13-12-2025 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 13-12-2025 05:00
Event end: 13-12-2025 06:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Porąbka Żar H1
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Planned
Event start: 13-12-2025 15:00
Event end: 13-12-2025 17:30
Source: Active - Planned - Porąbka Żar H1

Outage information

Unit Bełchatów B14
Achievable generation capacity: 781 MW
Outage size: 251 MW
Event type: Planned
Event start: 14-12-2025 00:00
Event end: 15-12-2025 00:00
Source: Active - Planned - Bełchatów B14

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 13-12-2025 07:00
Event end: 13-12-2025 08:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 13-12-2025 16:00
Event end: 13-12-2025 17:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 13-12-2025 09:00
Event end: 13-12-2025 10:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 13-12-2025 19:00
Event end: 13-12-2025 20:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 13-12-2025 13:00
Event end: 13-12-2025 14:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 13-12-2025 05:00
Event end: 13-12-2025 06:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 13-12-2025 01:00
Event end: 13-12-2025 02:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 13-12-2025 23:00
Event end: 14-12-2025 00:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit Turów B03
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Planned
Event start: 07-12-2025 00:00
Event end: 16-12-2025 00:00
Source: Active - Planned - Turów B03

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 93 MW
Event type: Unplanned
Event start: 13-12-2025 19:15
Event end: 13-12-2025 19:30
Source: Active - Unplanned - Turów B04

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 103 MW
Event type: Unplanned
Event start: 13-12-2025 07:45
Event end: 13-12-2025 08:00
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 113 MW
Event type: Unplanned
Event start: 13-12-2025 06:30
Event end: 13-12-2025 07:00
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 47 MW
Event type: Unplanned
Event start: 13-12-2025 17:15
Event end: 13-12-2025 18:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 103 MW
Event type: Unplanned
Event start: 13-12-2025 14:30
Event end: 13-12-2025 15:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Jaworzno 3 B2
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Unplanned
Event start: 12-12-2025 08:45
Event end: 14-12-2025 00:00
Source: Active - Unplanned - Jaworzno 3 B2

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 247 MW
Event type: Unplanned
Event start: 13-12-2025 00:00
Event end: 13-12-2025 07:45
Source: Inactive - Unplanned - Turów B11

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 27 MW
Event type: Unplanned
Event start: 13-12-2025 18:00
Event end: 13-12-2025 19:00
Source: Active - Unplanned - Turów B06

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 214 MW
Event type: Unplanned
Event start: 13-12-2025 08:00
Event end: 13-12-2025 11:00
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 104 MW
Event type: Unplanned
Event start: 13-12-2025 07:45
Event end: 13-12-2025 08:00
Source: Inactive - Unplanned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 84 MW
Event type: Unplanned
Event start: 13-12-2025 19:15
Event end: 13-12-2025 19:30
Source: Active - Unplanned - Turów B06

Outage information

Unit Bełchatów B04
Achievable generation capacity: 349 MW
Outage size: 349 MW
Event type: Planned
Event start: 15-12-2025 00:00
Event end: 17-12-2025 00:00
Source: Active - Planned - Bełchatów B04

Outage information

Unit KOGENERACJA S.A. CZN_1S01
Achievable generation capacity: 177 MW
Outage size: 177 MW
Event type: Planned
Event start: 12-12-2025 11:00
Event end: 14-12-2025 23:45
Source: Active - Planned - KOGENERACJA S.A. CZN_1S01

Outage information

Unit Bełchatów B02
Achievable generation capacity: 341 MW
Outage size: 120 MW
Event type: Planned
Event start: 16-12-2025 07:00
Event end: 16-12-2025 08:00
Source: Active - Planned - Bełchatów B02

Outage information

Unit Bełchatów B02
Achievable generation capacity: 341 MW
Outage size: 21 MW
Event type: Planned
Event start: 16-12-2025 11:00
Event end: 16-12-2025 11:15
Source: Active - Planned - Bełchatów B02

Outage information

Unit Bełchatów B02
Achievable generation capacity: 341 MW
Outage size: 120 MW
Event type: Planned
Event start: 16-12-2025 20:00
Event end: 16-12-2025 20:15
Source: Active - Planned - Bełchatów B02

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 132 MW
Event type: Unplanned
Event start: 12-12-2025 21:00
Event end: 13-12-2025 00:00
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 133 MW
Event type: Unplanned
Event start: 12-12-2025 06:45
Event end: 13-12-2025 00:00
Source: Inactive - Unplanned - Turów B05

Outage information

Unit EC Siekierki WSIB 08
Achievable generation capacity: 109 MW
Outage size: 109 MW
Event type: Planned
Event start: 15-12-2025 08:00
Event end: 20-12-2025 16:00
Source: Active - Planned - EC Siekierki WSIB 08

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 534 MW
Outage size: 42 MW
Event type: Planned
Event start: 16-12-2025 07:30
Event end: 16-12-2025 16:30
Source: Active - Planned - Kozienice 2 B10

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 534 MW
Outage size: 42 MW
Event type: Planned
Event start: 17-12-2025 07:30
Event end: 17-12-2025 16:30
Source: Active - Planned - Kozienice 2 B10

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 534 MW
Outage size: 42 MW
Event type: Planned
Event start: 18-12-2025 07:30
Event end: 18-12-2025 16:30
Source: Active - Planned - Kozienice 2 B10

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 206 MW
Outage size: 36 MW
Event type: Planned
Event start: 17-12-2025 13:00
Event end: 17-12-2025 13:15
Source: Active - Planned - Kozienice 1 B8

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 206 MW
Outage size: 56 MW
Event type: Planned
Event start: 17-12-2025 13:30
Event end: 17-12-2025 13:45
Source: Active - Planned - Kozienice 1 B8

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 206 MW
Outage size: 36 MW
Event type: Planned
Event start: 17-12-2025 15:45
Event end: 17-12-2025 19:00
Source: Active - Planned - Kozienice 1 B8

Outage information

Unit Jaworzno 3 B1
Achievable generation capacity: 210 MW
Outage size: 210 MW
Event type: Unplanned
Event start: 11-12-2025 20:11
Event end: 15-12-2025 00:00
Source: Active - Unplanned - Jaworzno 3 B1

Outage information

Unit Opole B6
Achievable generation capacity: 833 MW
Outage size: 500 MW
Event type: Planned
Event start: 18-12-2025 07:45
Event end: 18-12-2025 09:00
Source: Active - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 833 MW
Outage size: 500 MW
Event type: Planned
Event start: 18-12-2025 12:00
Event end: 18-12-2025 14:00
Source: Active - Planned - Opole B6

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 56 MW
Event type: Planned
Event start: 16-12-2025 12:30
Event end: 16-12-2025 12:45
Source: Active - Planned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 116 MW
Event type: Planned
Event start: 16-12-2025 12:00
Event end: 16-12-2025 12:15
Source: Active - Planned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 146 MW
Event type: Planned
Event start: 17-12-2025 08:00
Event end: 17-12-2025 12:00
Source: Active - Planned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 26 MW
Event type: Planned
Event start: 17-12-2025 12:45
Event end: 17-12-2025 13:00
Source: Active - Planned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 86 MW
Event type: Planned
Event start: 17-12-2025 12:15
Event end: 17-12-2025 12:30
Source: Active - Planned - Turów B06

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 132 MW
Event type: Unplanned
Event start: 14-12-2025 00:00
Event end: 14-12-2025 12:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 104 MW
Event type: Unplanned
Event start: 14-12-2025 20:45
Event end: 14-12-2025 21:00
Source: Active - Unplanned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 61 MW
Event type: Unplanned
Event start: 14-12-2025 15:00
Event end: 14-12-2025 15:15
Source: Active - Unplanned - Turów B06

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 223 MW
Event type: Unplanned
Event start: 14-12-2025 18:00
Event end: 14-12-2025 19:00
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 104 MW
Event type: Unplanned
Event start: 14-12-2025 12:00
Event end: 14-12-2025 14:00
Source: Active - Unplanned - Turów B06

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 205 MW
Event type: Unplanned
Event start: 14-12-2025 09:00
Event end: 14-12-2025 12:15
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 98 MW
Event type: Unplanned
Event start: 15-12-2025 15:00
Event end: 15-12-2025 15:15
Source: Active - Unplanned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 112 MW
Event type: Unplanned
Event start: 15-12-2025 06:45
Event end: 15-12-2025 08:00
Source: Active - Unplanned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 15-12-2025 10:00
Event end: 15-12-2025 14:00
Source: Active - Unplanned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 226 MW
Outage size: 112 MW
Event type: Unplanned
Event start: 15-12-2025 19:15
Event end: 15-12-2025 19:30
Source: Active - Unplanned - Turów B01

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 99 MW
Event type: Unplanned
Event start: 15-12-2025 21:00
Event end: 15-12-2025 22:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Turów B04
Achievable generation capacity: 236 MW
Outage size: 132 MW
Event type: Unplanned
Event start: 15-12-2025 23:00
Event end: 16-12-2025 00:00
Source: Active - Unplanned - Turów B04

Outage information

Unit Turów B05
Achievable generation capacity: 236 MW
Outage size: 124 MW
Event type: Unplanned
Event start: 15-12-2025 16:45
Event end: 15-12-2025 17:00
Source: Active - Unplanned - Turów B05

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 27 MW
Event type: Unplanned
Event start: 15-12-2025 17:00
Event end: 15-12-2025 18:00
Source: Active - Unplanned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 75 MW
Event type: Unplanned
Event start: 15-12-2025 13:00
Event end: 15-12-2025 14:00
Source: Active - Unplanned - Turów B06

Outage information

Unit Turów B06
Achievable generation capacity: 236 MW
Outage size: 46 MW
Event type: Unplanned
Event start: 15-12-2025 07:15
Event end: 15-12-2025 08:30
Source: Active - Unplanned - Turów B06

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 223 MW
Event type: Unplanned
Event start: 15-12-2025 12:30
Event end: 15-12-2025 13:00
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 223 MW
Event type: Unplanned
Event start: 15-12-2025 09:00
Event end: 15-12-2025 10:30
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 247 MW
Event type: Unplanned
Event start: 15-12-2025 10:45
Event end: 15-12-2025 11:15
Source: Active - Unplanned - Turów B11

Outage information

Unit Turów B11
Achievable generation capacity: 444 MW
Outage size: 247 MW
Event type: Unplanned
Event start: 15-12-2025 23:00
Event end: 16-12-2025 00:00
Source: Active - Unplanned - Turów B11

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 14-12-2025 00:00
Event end: 14-12-2025 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 14-12-2025 08:00
Event end: 14-12-2025 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 14-12-2025 11:00
Event end: 14-12-2025 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 14-12-2025 14:00
Event end: 14-12-2025 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 14-12-2025 03:00
Event end: 14-12-2025 04:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 85 MW
Event type: Unplanned
Event start: 14-12-2025 16:00
Event end: 14-12-2025 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 14-12-2025 23:00
Event end: 15-12-2025 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Połaniec B9
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 12-12-2025 22:57
Event end: 20-12-2025 00:15
Source: Active - Unplanned - Połaniec B9

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 13-12-2025 01:00
Event end: 13-12-2025 02:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Żarnowiec H1
Achievable generation capacity: 179 MW
Outage size: 179 MW
Event type: Planned
Event start: 12-12-2025 22:01
Event end: 14-12-2025 22:00
Source: Active - Planned - Żarnowiec H1

Outage information

Unit Rybnik B6
Achievable generation capacity: 209 MW
Outage size: 209 MW
Event type: Planned
Event start: 13-12-2025 00:06
Event end: 15-12-2025 00:00
Source: Active - Planned - Rybnik B6

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 534 MW
Outage size: 42 MW
Event type: Planned
Event start: 19-12-2025 07:30
Event end: 19-12-2025 16:30
Source: Active - Planned - Kozienice 2 B10

Outage information

Unit Eolos Polska Sp. z o.o. FW Gorzkowice
Achievable generation capacity: 12 MW
Outage size: 2 MW
Event type: Planned
Event start: 13-12-2025 06:16
Event end: 13-12-2025 14:00
Source: Active - Planned - Eolos Polska Sp. z o.o. FW Gorzkowice

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.