Generation capacity outages
Generation capacity outages - help- Legend
- no outages
- all outages
- planned
- unplanned
Power producer | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Power plant | Unit | Achievable generation capacity (MW) | September 2023 | October 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sat 23 | Sun 24 | Mon 25 | Tue 26 | Wed 27 | Thu 28 | Fri 29 | Sat 30 | Sun 1 | Mon 2 | Tue 3 | Wed 4 | Thu 5 | Fri 6 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned | 7030 | 6424 | 6014 | 6016 | 5674 | 5674 | 5450 | 5472 | 5174 | 4724 | 4724 | 4227 | 4227 | 4227 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Unplanned | 4970 | 4133 | 3278 | 3238 | 2163 | 2163 | 2163 | 2007 | 1959 | 1854 | 1224 | 964 | 964 | 964 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total outages | 12000 | 10557 | 9292 | 9254 | 7837 | 7837 | 7613 | 7479 | 7133 | 6578 | 5948 | 5191 | 5191 | 5191 |
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
Outage information
Unit | TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Achievable generation capacity: | 158 MW |
Outage size: | 80 MW |
Event type: | Planned |
Event start: | 04-08-2022 00:00 |
Event end: | 31-12-2023 23:59 |
Source: | Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Outage information
Unit | EC Stalowa Wola Stalowa Wola BGP |
Achievable generation capacity: | 450 MW |
Outage size: | 450 MW |
Event type: | Planned |
Event start: | 23-09-2023 00:01 |
Event end: | 01-10-2023 23:59 |
Source: | Active - Planned - EC Stalowa Wola Stalowa Wola BGP |
Outage information
Unit | Jaworzno 3 B5 |
Achievable generation capacity: | 220 MW |
Outage size: | 220 MW |
Event type: | Planned |
Event start: | 05-07-2023 00:01 |
Event end: | 18-10-2023 00:00 |
Source: | Active - Planned - Jaworzno 3 B5 |
Outage information
Unit | Jaworzno 3 B6 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 16-08-2023 00:01 |
Event end: | 29-11-2023 00:00 |
Source: | Active - Planned - Jaworzno 3 B6 |
Outage information
Unit | Porąbka Żar H2 |
Achievable generation capacity: | 138 MW |
Outage size: | 138 MW |
Event type: | Planned |
Event start: | 27-01-2023 18:31 |
Event end: | 06-12-2023 23:59 |
Source: | Active - Planned - Porąbka Żar H2 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 566 MW |
Outage size: | 566 MW |
Event type: | Planned |
Event start: | 04-09-2023 00:01 |
Event end: | 11-12-2023 00:00 |
Source: | Active - Planned - Kozienice 2 B09 |
Outage information
Unit | Bełchatów B14 |
Achievable generation capacity: | 858 MW |
Outage size: | 858 MW |
Event type: | Planned |
Event start: | 27-05-2023 02:01 |
Event end: | 23-11-2023 18:00 |
Source: | Active - Planned - Bełchatów B14 |
Outage information
Unit | Żarnowiec H3 |
Achievable generation capacity: | 195 MW |
Outage size: | 16 MW |
Event type: | Unplanned |
Event start: | 09-06-2023 22:01 |
Event end: | 30-09-2023 22:00 |
Source: | Active - Unplanned - Żarnowiec H3 |
Outage information
Unit | Katowice B1 |
Achievable generation capacity: | 135 MW |
Outage size: | 135 MW |
Event type: | Planned |
Event start: | 14-06-2023 23:59 |
Event end: | 10-10-2023 00:00 |
Source: | Active - Planned - Katowice B1 |
Outage information
Unit | EC Siekierki WSIB 08 |
Achievable generation capacity: | 125 MW |
Outage size: | 125 MW |
Event type: | Planned |
Event start: | 17-07-2023 00:01 |
Event end: | 07-10-2023 00:00 |
Source: | Active - Planned - EC Siekierki WSIB 08 |
Outage information
Unit | Turów B02 |
Achievable generation capacity: | 250 MW |
Outage size: | 250 MW |
Event type: | Planned |
Event start: | 30-09-2023 00:01 |
Event end: | 19-11-2023 10:00 |
Source: | Active - Planned - Turów B02 |
Outage information
Unit | Żarnowiec H4 |
Achievable generation capacity: | 195 MW |
Outage size: | 16 MW |
Event type: | Unplanned |
Event start: | 26-07-2023 17:48 |
Event end: | 30-09-2023 22:00 |
Source: | Active - Unplanned - Żarnowiec H4 |
Outage information
Unit | EC Żerań WZE |
Achievable generation capacity: | 299 MW |
Outage size: | 200 MW |
Event type: | Planned |
Event start: | 28-07-2023 00:01 |
Event end: | 30-09-2023 00:00 |
Source: | Active - Planned - EC Żerań WZE |
Outage information
Unit | EC Siekierki WSIB 10 |
Achievable generation capacity: | 102 MW |
Outage size: | 102 MW |
Event type: | Planned |
Event start: | 02-05-2023 00:01 |
Event end: | 04-12-2023 00:00 |
Source: | Active - Planned - EC Siekierki WSIB 10 |
Outage information
Unit | KOGENERACJA S.A. WROB1-03 |
Achievable generation capacity: | 104 MW |
Outage size: | 104 MW |
Event type: | Planned |
Event start: | 09-05-2023 00:01 |
Event end: | 15-10-2023 23:59 |
Source: | Active - Planned - KOGENERACJA S.A. WROB1-03 |
Outage information
Unit | Kraków Łęg KLE_1-03 |
Achievable generation capacity: | 102 MW |
Outage size: | 102 MW |
Event type: | Planned |
Event start: | 05-06-2023 00:01 |
Event end: | 01-12-2023 00:00 |
Source: | Active - Planned - Kraków Łęg KLE_1-03 |
Outage information
Unit | Pątnów B5 |
Achievable generation capacity: | 200 MW |
Outage size: | 200 MW |
Event type: | Unplanned |
Event start: | 24-08-2023 00:01 |
Event end: | 01-01-2024 00:00 |
Source: | Active - Unplanned - Pątnów B5 |
Outage information
Unit | Żarnowiec H2 |
Achievable generation capacity: | 195 MW |
Outage size: | 16 MW |
Event type: | Unplanned |
Event start: | 24-08-2023 14:30 |
Event end: | 30-09-2023 22:00 |
Source: | Active - Unplanned - Żarnowiec H2 |
Outage information
Unit | Bełchatów B12 |
Achievable generation capacity: | 390 MW |
Outage size: | 390 MW |
Event type: | Planned |
Event start: | 31-08-2023 02:17 |
Event end: | 17-10-2023 18:00 |
Source: | Active - Planned - Bełchatów B12 |
Outage information
Unit | Żydowo H1 |
Achievable generation capacity: | 55 MW |
Outage size: | 55 MW |
Event type: | Planned |
Event start: | 05-09-2023 07:01 |
Event end: | 23-09-2023 20:00 |
Source: | Active - Planned - Żydowo H1 |
Outage information
Unit | Żydowo H2 |
Achievable generation capacity: | 55 MW |
Outage size: | 55 MW |
Event type: | Planned |
Event start: | 05-09-2023 07:01 |
Event end: | 30-09-2023 20:00 |
Source: | Active - Planned - Żydowo H2 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 630 MW |
Event type: | Unplanned |
Event start: | 31-08-2023 22:43 |
Event end: | 03-10-2023 00:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Chorzów B1 |
Achievable generation capacity: | 113 MW |
Outage size: | 113 MW |
Event type: | Planned |
Event start: | 22-07-2023 02:00 |
Event end: | 30-09-2023 22:00 |
Source: | Active - Planned - Chorzów B1 |
Outage information
Unit | Pątnów B1 |
Achievable generation capacity: | 222 MW |
Outage size: | 222 MW |
Event type: | Unplanned |
Event start: | 02-09-2023 00:01 |
Event end: | 01-01-2024 00:00 |
Source: | Active - Unplanned - Pątnów B1 |
Outage information
Unit | Dychów H3 |
Achievable generation capacity: | 30 MW |
Outage size: | 30 MW |
Event type: | Planned |
Event start: | 17-09-2023 00:01 |
Event end: | 25-09-2023 00:00 |
Source: | Active - Planned - Dychów H3 |
Outage information
Unit | Skawina Tg5 |
Achievable generation capacity: | 110 MW |
Outage size: | 110 MW |
Event type: | Planned |
Event start: | 17-07-2023 00:01 |
Event end: | 26-09-2023 23:59 |
Source: | Active - Planned - Skawina Tg5 |
Outage information
Unit | EC Żerań 2 B20 |
Achievable generation capacity: | 497 MW |
Outage size: | 497 MW |
Event type: | Planned |
Event start: | 10-08-2023 00:01 |
Event end: | 03-10-2023 10:00 |
Source: | Active - Planned - EC Żerań 2 B20 |
Outage information
Unit | Karolin B2 |
Achievable generation capacity: | 100 MW |
Outage size: | 100 MW |
Event type: | Planned |
Event start: | 02-09-2023 00:01 |
Event end: | 19-10-2023 23:59 |
Source: | Active - Planned - Karolin B2 |
Outage information
Unit | EC Białystok BIA_1-03 |
Achievable generation capacity: | 52 MW |
Outage size: | 52 MW |
Event type: | Unplanned |
Event start: | 06-04-2023 00:01 |
Event end: | 27-11-2023 23:59 |
Source: | Active - Unplanned - EC Białystok BIA_1-03 |
Outage information
Unit | Skawina Tg6 |
Achievable generation capacity: | 110 MW |
Outage size: | 110 MW |
Event type: | Planned |
Event start: | 12-09-2023 11:07 |
Event end: | 30-09-2023 23:59 |
Source: | Active - Planned - Skawina Tg6 |
Outage information
Unit | Turów B02 |
Achievable generation capacity: | 250 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 14-09-2023 03:01 |
Event end: | 30-09-2023 00:00 |
Source: | Active - Unplanned - Turów B02 |
Outage information
Unit | Turów B01 |
Achievable generation capacity: | 250 MW |
Outage size: | 15 MW |
Event type: | Unplanned |
Event start: | 14-09-2023 03:01 |
Event end: | 30-09-2023 00:00 |
Source: | Active - Unplanned - Turów B01 |
Outage information
Unit | Dolna Odra B8 |
Achievable generation capacity: | 232 MW |
Outage size: | 232 MW |
Event type: | Planned |
Event start: | 26-09-2023 00:01 |
Event end: | 27-09-2023 00:00 |
Source: | Active - Planned - Dolna Odra B8 |
Outage information
Unit | Dolna Odra B7 |
Achievable generation capacity: | 224 MW |
Outage size: | 224 MW |
Event type: | Planned |
Event start: | 18-09-2023 00:01 |
Event end: | 29-09-2023 00:00 |
Source: | Active - Planned - Dolna Odra B7 |
Outage information
Unit | Porąbka Żar H1 |
Achievable generation capacity: | 138 MW |
Outage size: | 138 MW |
Event type: | Planned |
Event start: | 23-09-2023 05:01 |
Event end: | 23-09-2023 16:00 |
Source: | Active - Planned - Porąbka Żar H1 |
Outage information
Unit | Skawina Tg3 |
Achievable generation capacity: | 110 MW |
Outage size: | 20 MW |
Event type: | Planned |
Event start: | 16-09-2023 02:31 |
Event end: | 30-09-2023 23:59 |
Source: | Active - Planned - Skawina Tg3 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 22-09-2023 00:01 |
Event end: | 23-09-2023 00:00 |
Source: | Inactive - Unplanned - Opole B5 |
Outage information
Unit | EW Włocławek H04 |
Achievable generation capacity: | 28 MW |
Outage size: | 28 MW |
Event type: | Planned |
Event start: | 21-08-2023 07:01 |
Event end: | 29-09-2023 17:00 |
Source: | Active - Planned - EW Włocławek H04 |
Outage information
Unit | Żarnowiec H1 |
Achievable generation capacity: | 195 MW |
Outage size: | 16 MW |
Event type: | Unplanned |
Event start: | 18-09-2023 06:01 |
Event end: | 26-04-2024 00:00 |
Source: | Active - Unplanned - Żarnowiec H1 |
Outage information
Unit | Elektrociepłownia "Zielona Góra" S.A. ZG BPG |
Achievable generation capacity: | 188 MW |
Outage size: | 188 MW |
Event type: | Planned |
Event start: | 22-09-2023 20:01 |
Event end: | 23-09-2023 18:00 |
Source: | Active - Planned - Elektrociepłownia "Zielona Góra" S.A. ZG BPG |
Outage information
Unit | Pątnów B9 B9 |
Achievable generation capacity: | 474 MW |
Outage size: | 474 MW |
Event type: | Unplanned |
Event start: | 20-09-2023 00:01 |
Event end: | 01-01-2024 00:00 |
Source: | Active - Unplanned - Pątnów B9 B9 |
Outage information
Unit | Turów B11 |
Achievable generation capacity: | 496 MW |
Outage size: | 496 MW |
Event type: | Planned |
Event start: | 24-08-2023 00:01 |
Event end: | 20-10-2023 00:00 |
Source: | Active - Planned - Turów B11 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 22-09-2023 23:01 |
Event end: | 23-09-2023 00:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | Siersza B1 |
Achievable generation capacity: | 153 MW |
Outage size: | 153 MW |
Event type: | Unplanned |
Event start: | 07-06-2023 19:17 |
Event end: | 04-10-2023 00:00 |
Source: | Active - Unplanned - Siersza B1 |
Outage information
Unit | Łaziska 3 B09 |
Achievable generation capacity: | 230 MW |
Outage size: | 230 MW |
Event type: | Planned |
Event start: | 05-06-2023 00:01 |
Event end: | 25-09-2023 10:00 |
Source: | Active - Planned - Łaziska 3 B09 |
Outage information
Unit | Łagisza B10 |
Achievable generation capacity: | 460 MW |
Outage size: | 276 MW |
Event type: | Planned |
Event start: | 22-09-2023 18:01 |
Event end: | 23-09-2023 00:00 |
Source: | Inactive - Planned - Łagisza B10 |
Outage information
Unit | Veolia Energia Łódź EC4 B03 |
Achievable generation capacity: | 105 MW |
Outage size: | 105 MW |
Event type: | Planned |
Event start: | 21-09-2023 17:23 |
Event end: | 31-10-2023 23:59 |
Source: | Active - Planned - Veolia Energia Łódź EC4 B03 |
Outage information
Unit | Rybnik B7 |
Achievable generation capacity: | 225 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 21-09-2023 19:31 |
Event end: | 26-09-2023 00:00 |
Source: | Active - Unplanned - Rybnik B7 |
Outage information
Unit | Łaziska 3 B10 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 23-09-2023 06:01 |
Event end: | 23-09-2023 18:00 |
Source: | Active - Planned - Łaziska 3 B10 |
Outage information
Unit | Bełchatów B02 |
Achievable generation capacity: | 370 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 00:01 |
Event end: | 23-09-2023 06:00 |
Source: | Inactive - Unplanned - Bełchatów B02 |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 00:01 |
Event end: | 23-09-2023 06:00 |
Source: | Inactive - Unplanned - Bełchatów B06 |
Outage information
Unit | Bełchatów B07 |
Achievable generation capacity: | 390 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 00:01 |
Event end: | 23-09-2023 06:00 |
Source: | Inactive - Unplanned - Bełchatów B07 |
Outage information
Unit | Bełchatów B11 |
Achievable generation capacity: | 390 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 00:01 |
Event end: | 23-09-2023 06:00 |
Source: | Inactive - Unplanned - Bełchatów B11 |
Outage information
Unit | Bełchatów B09 |
Achievable generation capacity: | 390 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 00:01 |
Event end: | 23-09-2023 06:00 |
Source: | Inactive - Unplanned - Bełchatów B09 |
Outage information
Unit | Bełchatów B10 |
Achievable generation capacity: | 390 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 00:01 |
Event end: | 23-09-2023 06:00 |
Source: | Inactive - Unplanned - Bełchatów B10 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 06:01 |
Event end: | 23-09-2023 07:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 00:01 |
Event end: | 23-09-2023 01:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 01:01 |
Event end: | 23-09-2023 02:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 02:01 |
Event end: | 23-09-2023 03:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 03:01 |
Event end: | 23-09-2023 04:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 04:01 |
Event end: | 23-09-2023 05:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 05:01 |
Event end: | 23-09-2023 06:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 07:01 |
Event end: | 23-09-2023 08:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 08:01 |
Event end: | 23-09-2023 09:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 09:01 |
Event end: | 23-09-2023 10:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 10:01 |
Event end: | 23-09-2023 11:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 11:01 |
Event end: | 23-09-2023 12:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 12:01 |
Event end: | 23-09-2023 13:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 13:01 |
Event end: | 23-09-2023 14:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 14:01 |
Event end: | 23-09-2023 15:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 15:01 |
Event end: | 23-09-2023 16:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 16:01 |
Event end: | 23-09-2023 17:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 17:01 |
Event end: | 23-09-2023 18:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 18:01 |
Event end: | 23-09-2023 19:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 21:01 |
Event end: | 23-09-2023 22:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 19:01 |
Event end: | 23-09-2023 20:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 23:01 |
Event end: | 24-09-2023 00:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 20:01 |
Event end: | 23-09-2023 21:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 22:01 |
Event end: | 23-09-2023 23:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Wrotków ECW |
Achievable generation capacity: | 231 MW |
Outage size: | 231 MW |
Event type: | Planned |
Event start: | 29-05-2023 00:01 |
Event end: | 07-10-2023 23:59 |
Source: | Active - Planned - EC Wrotków ECW |
Outage information
Unit | Kraków Łęg KLE_1-02 |
Achievable generation capacity: | 120 MW |
Outage size: | 105 MW |
Event type: | Unplanned |
Event start: | 19-09-2023 08:01 |
Event end: | 02-10-2023 00:00 |
Source: | Active - Unplanned - Kraków Łęg KLE_1-02 |
Outage information
Unit | Kraków Łęg KLE_1-01 |
Achievable generation capacity: | 122 MW |
Outage size: | 107 MW |
Event type: | Unplanned |
Event start: | 19-09-2023 10:01 |
Event end: | 04-10-2023 00:00 |
Source: | Active - Unplanned - Kraków Łęg KLE_1-01 |
Outage information
Unit | Turów B05 |
Achievable generation capacity: | 261 MW |
Outage size: | 36 MW |
Event type: | Unplanned |
Event start: | 20-09-2023 03:01 |
Event end: | 30-09-2023 00:00 |
Source: | Active - Unplanned - Turów B05 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 29-09-2023 00:01 |
Event end: | 30-09-2023 00:00 |
Source: | Active - Unplanned - Opole B5 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 27-09-2023 00:01 |
Event end: | 28-09-2023 00:00 |
Source: | Active - Unplanned - Opole B5 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 26-09-2023 00:01 |
Event end: | 27-09-2023 00:00 |
Source: | Active - Unplanned - Opole B5 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 28-09-2023 00:01 |
Event end: | 29-09-2023 00:00 |
Source: | Active - Unplanned - Opole B5 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 25-09-2023 00:01 |
Event end: | 26-09-2023 00:00 |
Source: | Active - Unplanned - Opole B5 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 1075 MW |
Event type: | Unplanned |
Event start: | 22-09-2023 22:19 |
Event end: | 26-09-2023 20:00 |
Source: | Active - Unplanned - Kozienice 2 B11 |
Outage information
Unit | Bełchatów B05 |
Achievable generation capacity: | 380 MW |
Outage size: | 380 MW |
Event type: | Planned |
Event start: | 23-09-2023 00:08 |
Event end: | 24-09-2023 12:00 |
Source: | Active - Planned - Bełchatów B05 |
Outage information
Unit | Jaworzno 2 JWCD B7 |
Achievable generation capacity: | 910 MW |
Outage size: | 910 MW |
Event type: | Unplanned |
Event start: | 20-09-2023 22:05 |
Event end: | 23-09-2023 18:00 |
Source: | Active - Unplanned - Jaworzno 2 JWCD B7 |
Outage information
Unit | Eolos Novo Sp. z o.o. FW Czarnożyły |
Achievable generation capacity: | 16 MW |
Outage size: | 2 MW |
Event type: | Unplanned |
Event start: | 22-09-2023 22:56 |
Event end: | 23-09-2023 18:00 |
Source: | Active - Unplanned - Eolos Novo Sp. z o.o. FW Czarnożyły |
Outage information
Unit | Bełchatów B03 |
Achievable generation capacity: | 380 MW |
Outage size: | 10 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 01:16 |
Event end: | 23-09-2023 10:00 |
Source: | Inactive - Unplanned - Bełchatów B03 |
Outage information
Unit | Bełchatów B02 |
Achievable generation capacity: | 370 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 00:01 |
Event end: | 24-09-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B02 |
Outage information
Unit | Bełchatów B03 |
Achievable generation capacity: | 380 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 00:01 |
Event end: | 24-09-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B03 |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 00:01 |
Event end: | 24-09-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B06 |
Outage information
Unit | Bełchatów B07 |
Achievable generation capacity: | 390 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 00:01 |
Event end: | 24-09-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B07 |
Outage information
Unit | Bełchatów B11 |
Achievable generation capacity: | 390 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 00:01 |
Event end: | 24-09-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B11 |
Outage information
Unit | Bełchatów B10 |
Achievable generation capacity: | 390 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 00:01 |
Event end: | 24-09-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B10 |
Outage information
Unit | Bełchatów B09 |
Achievable generation capacity: | 390 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 00:01 |
Event end: | 24-09-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B09 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 07:01 |
Event end: | 24-09-2023 08:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 06:01 |
Event end: | 24-09-2023 07:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 18:01 |
Event end: | 24-09-2023 19:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 05:01 |
Event end: | 24-09-2023 06:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 04:01 |
Event end: | 24-09-2023 05:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 03:01 |
Event end: | 24-09-2023 04:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 02:01 |
Event end: | 24-09-2023 03:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 01:01 |
Event end: | 24-09-2023 02:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 00:01 |
Event end: | 24-09-2023 01:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 19:01 |
Event end: | 24-09-2023 20:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 20:01 |
Event end: | 24-09-2023 21:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 21:01 |
Event end: | 24-09-2023 22:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 22:01 |
Event end: | 24-09-2023 23:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 23:01 |
Event end: | 25-09-2023 00:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 14:01 |
Event end: | 24-09-2023 15:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 13:01 |
Event end: | 24-09-2023 14:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 12:01 |
Event end: | 24-09-2023 13:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 15:01 |
Event end: | 24-09-2023 16:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 11:01 |
Event end: | 24-09-2023 12:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 10:01 |
Event end: | 24-09-2023 11:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 16:01 |
Event end: | 24-09-2023 17:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 09:01 |
Event end: | 24-09-2023 10:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 08:01 |
Event end: | 24-09-2023 09:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 24-09-2023 17:01 |
Event end: | 24-09-2023 18:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 35 MW |
Event type: | Unplanned |
Event start: | 23-09-2023 00:01 |
Event end: | 23-09-2023 09:00 |
Source: | Inactive - Unplanned - Opole B5 |
The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.
The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.
The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.