Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
October 2019
Thu 10 Fri 11 Sat 12 Sun 13 Mon 14 Tue 15 Wed 16 Thu 17 Fri 18 Sat 19 Sun 20 Mon 21 Tue 22 Wed 23
Bełchatów 5102
B02 370 370 370 370 370 370 370 370 370 370 370 370 370 370 370
B03 380 60 155 380 380 380 155 155
B04 380
B05 380
B06 394
B07 390 390 390 390 390 390 390 390 390 390 390 390 390 390 390
B08 390 390 390 390 390 390 390 390 390 390 390 390 390 390 390
B09 390 165
B10 390 60
B11 390 390 390 390 390 390 390 390 390 390 390 390 390 390 390
B12 390 390 390 390 390
B14 858 429
Chorzów 226
B1 113
B2 113
Dolna Odra 1350
B1 222
B2 232
B5 215 15
B6 222 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B7 227
B8 232
Dychów 85
H1 28
H2 29
H3 28
EC Białystok 154
BIA_1-01 50
BIA_1-02 52 52 52
BIA_1-03 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52
EC Gorzów 138
GOR2 138 138 138 138 138 138 138
EC Rzeszów 120
ECR 120 120 120 120 120 120 120 120 120 120 120 120 120
EC Siekierki 591
WSIB 07 102 102 102 102 102 102
WSIB 08 120
WSIB 09 102
WSIB 10 102
WSIK 165 135 135 110 110 110 110 80 80 80 80 80 80 110
EC Wrotków 231
ECW 231 231
EC Żerań 373
WZE 373 200 200 140 140 140 140 140 140 140 100 100 155 255
EW Włocławek 168
H01 28 28
H02 28 28
H03 28 28
H04 28 28
H05 28
H06 28 28 28 28 28 28 28 28 28 28 28
FW Marszewo 100
FMA 100
Jaworzno 3 1345
B1 225 225
B2 225 125
B3 225 225 225 225
B4 225 225 225 225 225
B5 220
B6 225
Karolin 212
B2 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
B3 112
Katowice 135
B1 135
Kozienice 1 1821
B1 228
B2 228 228 228 228 228
B3 225
B4 228
B5 228
B6 228
B7 228 73 73
B8 228
Kozienice 2 2195
B09 560 310 234 234 234 280 210 310 310
B10 560 160
B11 1075 120
Łagisza 700
B10 460 276 460 460 460 460 460 460 460 460 460 460 460 460
B6 120
B7 120
Łaziska 2 250
B1 125
B2 125
Łaziska 3 905
B09 230 230 230
B10 225
B11 225 225
B12 225 225 225 225 225 225
Opole 3342
B1 386 206 206 206 206 206 176 146 161 206 206 206
B2 383
B3 383 203 203
B4 380 200 200 200 200 200
B5 905 543 455 455 475 305 905 237
B6 905 5 400
Ostrołęka B 690
B01 230 230 230 230
B02 230 230 230
B03 230 100
Pątnów 1 1244
B1 222 222 222
B2 222
B3 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
B4 200
B5 200 200 200
B6 200
Pątnów 2 474
B9 474 474 474
Połaniec 1882
B1 225
B2 242 242 130
B3 242 242 242
B4 242
B5 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B6 242
B7 239 70 239
B9 225
Porąbka Żar 540
H1 135
H2 135
H3 135 135 135 135
H4 135 135 135 135 135 135 135
Rybnik 1800
B1 225
B2 225
B3 225
B4 225
B5 225 225 225 225 225 225
B6 225 225 225
B7 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B8 225
Siersza 557
B1 153 153 153 153 153 153
B2 153 150 150 150 150
B3 123
B6 128
Skawina 330
Tg3 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg5 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg6 110
Solina 198
H1 68
H2 68
H3 31
H4 31
Stalowa Wola 3 250
B7 125 125 125 125 125 125 125 125 125 125 125 125 125 125
B8 125
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158
Turów 1488
B01 235 235 235 235 235 235 235 235 235 235 235 235 235 235 235
B02 235
B03 235 235 235 235 235 235 235 235 235 235 235 235 235 235 235
B04 261 157 157
B05 261
B06 261
Veolia Energia Łódź EC4 105
B03 105 105 105 105 105 105 105 105 105 105 105 105 105 105 105
Żarnowiec 716
H1 179
H2 179
H3 179 179
H4 179
Żydowo 167
H1 55
H2 55
H3 57
Planned 5796 5462 6101 6877 5089 5868 6313 7407 6959 5115 5085 4470 5053 6769
Unplanned 1552 1208 1763 1702 1897 2670 2091 1575 1498 1344 1215 3227 1070 1395
Total outages 7348 6670 7864 8579 6986 8538 8404 8982 8457 6459 6300 7697 6123 8164

Outage information

Unit Stalowa Wola 3 B7
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Planned (RA)
Event start: 10-10-2019 19:01
Event end: 13-10-2019 21:59
Source: WPKD

Outage information

Unit EC Siekierki WSIK
Achievable generation capacity: 165 MW
Outage size: 80 MW
Event type: Planned
Event start: 16-10-2019 00:01
Event end: 21-10-2019 23:59
Source: Inactive - Planned - EC Siekierki WSIK

Outage information

Unit EC Siekierki WSIK
Achievable generation capacity: 165 MW
Outage size: 135 MW
Event type: Planned
Event start: 08-10-2019 00:01
Event end: 11-10-2019 23:59
Source: Inactive - Planned - EC Siekierki WSIK

Outage information

Unit EC Siekierki WSIK
Achievable generation capacity: 165 MW
Outage size: 110 MW
Event type: Planned
Event start: 12-10-2019 00:01
Event end: 15-10-2019 23:59
Source: Inactive - Planned - EC Siekierki WSIK

Outage information

Unit Żarnowiec H3
Achievable generation capacity: 179 MW
Outage size: 179 MW
Event type: Planned
Event start: 30-09-2019 22:01
Event end: 10-10-2019 22:00
Source: Inactive - Planned - Żarnowiec H3

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 09-10-2019 23:01
Event end: 10-10-2019 00:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Ostrołęka B B01
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Unplanned
Event start: 07-10-2019 18:33
Event end: 10-10-2019 00:00
Source: Inactive - Unplanned - Ostrołęka B B01

Outage information

Unit Rybnik B5
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 19-10-2019 00:01
Event end: 27-10-2019 22:00
Source: Inactive - Unplanned - Rybnik B5

Outage information

Unit Połaniec B2
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Unplanned
Event start: 04-10-2019 00:06
Event end: 10-10-2019 20:00
Source: Inactive - Unplanned - Połaniec B2

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 183 MW
Event type: Planned
Event start: 10-10-2019 06:01
Event end: 10-10-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 10-10-2019 00:01
Event end: 10-10-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 10-10-2019 23:01
Event end: 11-10-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 65 MW
Event type: Planned
Event start: 10-10-2019 07:01
Event end: 10-10-2019 08:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 20 MW
Event type: Planned
Event start: 10-10-2019 08:01
Event end: 10-10-2019 21:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 10-10-2019 23:01
Event end: 11-10-2019 00:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Planned
Event start: 10-10-2019 22:01
Event end: 10-10-2019 23:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 42 MW
Event type: Planned
Event start: 10-10-2019 21:01
Event end: 10-10-2019 22:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 177 MW
Event type: Planned
Event start: 10-10-2019 06:01
Event end: 10-10-2019 07:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 10-10-2019 00:01
Event end: 10-10-2019 06:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 10-10-2019 22:01
Event end: 10-10-2019 23:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 42 MW
Event type: Planned
Event start: 10-10-2019 21:01
Event end: 10-10-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 71 MW
Event type: Planned
Event start: 10-10-2019 07:01
Event end: 10-10-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 23-09-2019 17:23
Event end: 13-10-2019 06:00
Source: Inactive - Planned - Turów B01

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 310 MW
Event type: Planned
Event start: 09-10-2019 22:01
Event end: 10-10-2019 05:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 09-10-2019 23:01
Event end: 10-10-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Połaniec B3
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Unplanned
Event start: 12-10-2019 06:01
Event end: 13-10-2019 19:00
Source: Inactive - Unplanned - Połaniec B3

Outage information

Unit Stalowa Wola 3 B7
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Planned
Event start: 14-10-2019 00:01
Event end: 23-10-2019 00:00
Source: Inactive - Planned - Stalowa Wola 3 B7

Outage information

Unit Ostrołęka B B03
Achievable generation capacity: 230 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 09-10-2019 16:01
Event end: 10-10-2019 16:00
Source: Inactive - Unplanned - Ostrołęka B B03

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 10-10-2019 07:31
Event end: 10-10-2019 20:00
Source: Inactive - Unplanned - Bełchatów B03

Outage information

Unit Bełchatów B10
Achievable generation capacity: 390 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 10-10-2019 09:31
Event end: 10-10-2019 20:00
Source: Inactive - Unplanned - Bełchatów B10

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 05-10-2019 12:50
Event end: 11-10-2019 23:59
Source: Inactive - Unplanned - EC Żerań WZE

Outage information

Unit Bełchatów B12
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Unplanned
Event start: 09-10-2019 09:56
Event end: 10-10-2019 22:31
Source: Inactive - Unplanned - Bełchatów B12

Outage information

Unit Dolna Odra B5
Achievable generation capacity: 215 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 11-10-2019 08:16
Event end: 11-10-2019 12:00
Source: Inactive - Unplanned - Dolna Odra B5

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 11-10-2019 06:31
Event end: 11-10-2019 09:00
Source: Inactive - Unplanned - Bełchatów B03

Outage information

Unit EW Włocławek H06
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 14-10-2019 07:01
Event end: 29-10-2019 17:00
Source: Inactive - Planned - EW Włocławek H06

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 543 MW
Event type: Planned
Event start: 13-10-2019 06:01
Event end: 13-10-2019 14:00
Source: Inactive - Planned - Opole B5

Outage information

Unit EC Białystok BIA_1-02
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Unplanned
Event start: 08-10-2019 21:01
Event end: 11-10-2019 13:00
Source: Inactive - Unplanned - EC Białystok BIA_1-02

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 93 MW
Event type: Planned
Event start: 12-10-2019 18:01
Event end: 12-10-2019 19:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 146 MW
Event type: Planned
Event start: 12-10-2019 08:01
Event end: 12-10-2019 18:00
Source: Inactive - Planned - Opole B1

Outage information

Unit EC Białystok BIA_1-03
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Planned
Event start: 01-04-2019 07:01
Event end: 14-11-2019 23:45
Source: Inactive - Planned - EC Białystok BIA_1-03

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 276 MW
Event type: Unplanned
Event start: 11-10-2019 21:01
Event end: 11-10-2019 23:59
Source: Inactive - Unplanned - Łagisza B10

Outage information

Unit Turów B04
Achievable generation capacity: 261 MW
Outage size: 157 MW
Event type: Unplanned
Event start: 11-10-2019 20:01
Event end: 12-10-2019 01:35
Source: Inactive - Unplanned - Turów B04

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 6 MW
Event type: Planned
Event start: 14-10-2019 13:01
Event end: 14-10-2019 16:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 63 MW
Event type: Planned
Event start: 14-10-2019 10:01
Event end: 14-10-2019 12:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 184 MW
Event type: Planned
Event start: 14-10-2019 06:01
Event end: 14-10-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 20 MW
Event type: Planned
Event start: 14-10-2019 20:01
Event end: 14-10-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 14-10-2019 00:01
Event end: 14-10-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 120 MW
Event type: Planned
Event start: 14-10-2019 07:01
Event end: 14-10-2019 09:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 28 MW
Event type: Planned
Event start: 14-10-2019 12:01
Event end: 14-10-2019 13:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 131 MW
Event type: Planned
Event start: 14-10-2019 21:01
Event end: 14-10-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 14-10-2019 22:01
Event end: 15-10-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 98 MW
Event type: Planned
Event start: 14-10-2019 09:01
Event end: 14-10-2019 10:00
Source: Inactive - Planned - Opole B1

Outage information

Unit EC Wrotków ECW
Achievable generation capacity: 231 MW
Outage size: 231 MW
Event type: Unplanned
Event start: 12-10-2019 00:01
Event end: 12-10-2019 18:30
Source: Inactive - Unplanned - EC Wrotków ECW

Outage information

Unit Bełchatów B12
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Unplanned
Event start: 13-10-2019 08:40
Event end: 13-10-2019 11:01
Source: Inactive - Unplanned - Bełchatów B12

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 380 MW
Event type: Unplanned
Event start: 12-10-2019 00:08
Event end: 13-10-2019 18:01
Source: Inactive - Unplanned - Bełchatów B03

Outage information

Unit Pątnów 1 B1
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 14-10-2019 06:54
Event end: 15-10-2019 00:00
Source: Inactive - Unplanned - Pątnów 1 B1

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 179 MW
Event type: Planned
Event start: 15-10-2019 14:01
Event end: 15-10-2019 15:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 110 MW
Event type: Planned
Event start: 15-10-2019 09:01
Event end: 15-10-2019 10:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 140 MW
Event type: Planned
Event start: 15-10-2019 15:01
Event end: 15-10-2019 18:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 26 MW
Event type: Planned
Event start: 15-10-2019 10:01
Event end: 15-10-2019 14:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 234 MW
Event type: Planned
Event start: 15-10-2019 06:01
Event end: 15-10-2019 09:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Unplanned
Event start: 15-10-2019 00:01
Event end: 18-10-2019 18:00
Source: Inactive - Unplanned - Kozienice 1 B2

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 380 MW
Event type: Unplanned
Event start: 14-10-2019 05:31
Event end: 14-10-2019 11:31
Source: Inactive - Unplanned - Bełchatów B03

Outage information

Unit EW Włocławek H03
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 17-10-2019 07:01
Event end: 17-10-2019 10:00
Source: Inactive - Planned - EW Włocławek H03

Outage information

Unit EW Włocławek H04
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 17-10-2019 07:01
Event end: 17-10-2019 10:00
Source: Inactive - Planned - EW Włocławek H04

Outage information

Unit EW Włocławek H01
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 17-10-2019 10:30
Event end: 17-10-2019 15:00
Source: Inactive - Planned - EW Włocławek H01

Outage information

Unit EW Włocławek H02
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 17-10-2019 10:30
Event end: 17-10-2019 15:00
Source: Inactive - Planned - EW Włocławek H02

Outage information

Unit Siersza B2
Achievable generation capacity: 153 MW
Outage size: 150 MW
Event type: Unplanned
Event start: 15-10-2019 02:41
Event end: 15-10-2019 03:30
Source: Inactive - Unplanned - Siersza B2

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 234 MW
Event type: Planned
Event start: 16-10-2019 06:01
Event end: 16-10-2019 09:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 26 MW
Event type: Planned
Event start: 16-10-2019 10:01
Event end: 16-10-2019 14:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 179 MW
Event type: Planned
Event start: 16-10-2019 14:01
Event end: 16-10-2019 15:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 140 MW
Event type: Planned
Event start: 16-10-2019 15:01
Event end: 16-10-2019 18:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 110 MW
Event type: Planned
Event start: 16-10-2019 09:01
Event end: 16-10-2019 10:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Jaworzno 3 B3
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 14-10-2019 11:07
Event end: 15-10-2019 13:00
Source: Inactive - Unplanned - Jaworzno 3 B3

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 26 MW
Event type: Planned
Event start: 17-10-2019 10:01
Event end: 17-10-2019 14:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 234 MW
Event type: Planned
Event start: 17-10-2019 06:01
Event end: 17-10-2019 09:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 110 MW
Event type: Planned
Event start: 17-10-2019 09:01
Event end: 17-10-2019 10:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 140 MW
Event type: Planned
Event start: 17-10-2019 15:01
Event end: 17-10-2019 18:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 179 MW
Event type: Planned
Event start: 17-10-2019 14:01
Event end: 17-10-2019 15:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 42 MW
Event type: Planned
Event start: 11-10-2019 21:01
Event end: 11-10-2019 22:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 11-10-2019 22:01
Event end: 11-10-2019 23:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 12-10-2019 22:01
Event end: 12-10-2019 23:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 65 MW
Event type: Planned
Event start: 11-10-2019 07:01
Event end: 11-10-2019 08:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 12-10-2019 23:01
Event end: 13-10-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 42 MW
Event type: Planned
Event start: 11-10-2019 21:01
Event end: 11-10-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Planned
Event start: 11-10-2019 20:01
Event end: 12-10-2019 00:00
Source: Inactive - Planned - Bełchatów B03

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 11-10-2019 23:01
Event end: 12-10-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 11-10-2019 00:01
Event end: 11-10-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 71 MW
Event type: Planned
Event start: 12-10-2019 07:01
Event end: 12-10-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 11-10-2019 00:01
Event end: 11-10-2019 06:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 12-10-2019 00:01
Event end: 12-10-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 183 MW
Event type: Planned
Event start: 11-10-2019 06:01
Event end: 11-10-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 71 MW
Event type: Planned
Event start: 11-10-2019 07:01
Event end: 11-10-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 177 MW
Event type: Planned
Event start: 11-10-2019 06:01
Event end: 11-10-2019 07:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 42 MW
Event type: Planned
Event start: 12-10-2019 21:01
Event end: 12-10-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 183 MW
Event type: Planned
Event start: 12-10-2019 06:01
Event end: 12-10-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 20 MW
Event type: Planned
Event start: 11-10-2019 08:01
Event end: 11-10-2019 21:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 12-10-2019 00:01
Event end: 12-10-2019 06:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Planned
Event start: 11-10-2019 22:01
Event end: 11-10-2019 23:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Planned
Event start: 12-10-2019 22:01
Event end: 12-10-2019 23:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 65 MW
Event type: Planned
Event start: 12-10-2019 07:01
Event end: 12-10-2019 08:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 177 MW
Event type: Planned
Event start: 12-10-2019 06:01
Event end: 12-10-2019 07:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 42 MW
Event type: Planned
Event start: 12-10-2019 21:01
Event end: 12-10-2019 22:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 20 MW
Event type: Planned
Event start: 12-10-2019 08:01
Event end: 12-10-2019 21:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 12-10-2019 23:01
Event end: 13-10-2019 00:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 11-10-2019 23:01
Event end: 12-10-2019 00:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 165 MW
Event type: Unplanned
Event start: 12-10-2019 07:31
Event end: 12-10-2019 14:00
Source: Inactive - Unplanned - Bełchatów B09

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 13-10-2019 00:01
Event end: 13-10-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 13-10-2019 22:01
Event end: 13-10-2019 23:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 168 MW
Event type: Planned
Event start: 13-10-2019 07:01
Event end: 13-10-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 93 MW
Event type: Planned
Event start: 13-10-2019 18:01
Event end: 13-10-2019 19:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 13-10-2019 23:01
Event end: 14-10-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 176 MW
Event type: Planned
Event start: 15-10-2019 00:01
Event end: 15-10-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 146 MW
Event type: Planned
Event start: 15-10-2019 06:01
Event end: 15-10-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 13-10-2019 19:01
Event end: 13-10-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 146 MW
Event type: Planned
Event start: 13-10-2019 08:01
Event end: 13-10-2019 18:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 116 MW
Event type: Planned
Event start: 15-10-2019 08:01
Event end: 15-10-2019 14:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 135 MW
Event type: Planned
Event start: 13-10-2019 15:01
Event end: 13-10-2019 21:00
Source: Inactive - Planned - Turów B01

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 14-10-2019 12:01
Event end: 15-10-2019 00:00
Source: Inactive - Unplanned - Bełchatów B03

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 87 MW
Event type: Planned
Event start: 13-10-2019 07:01
Event end: 13-10-2019 08:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 80 MW
Event type: Planned
Event start: 13-10-2019 08:01
Event end: 13-10-2019 22:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 177 MW
Event type: Planned
Event start: 13-10-2019 06:01
Event end: 13-10-2019 07:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 71 MW
Event type: Planned
Event start: 15-10-2019 21:01
Event end: 15-10-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 42 MW
Event type: Planned
Event start: 15-10-2019 14:01
Event end: 15-10-2019 15:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Planned
Event start: 13-10-2019 22:01
Event end: 13-10-2019 23:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 13-10-2019 00:01
Event end: 13-10-2019 06:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 13-10-2019 23:01
Event end: 14-10-2019 00:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 146 MW
Event type: Planned
Event start: 15-10-2019 22:01
Event end: 16-10-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 20 MW
Event type: Planned
Event start: 16-10-2019 14:01
Event end: 16-10-2019 15:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 71 MW
Event type: Planned
Event start: 16-10-2019 21:01
Event end: 16-10-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 116 MW
Event type: Planned
Event start: 16-10-2019 06:01
Event end: 16-10-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 56 MW
Event type: Planned
Event start: 17-10-2019 08:01
Event end: 17-10-2019 14:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 146 MW
Event type: Planned
Event start: 16-10-2019 00:01
Event end: 16-10-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 116 MW
Event type: Planned
Event start: 16-10-2019 22:01
Event end: 17-10-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 17-10-2019 06:01
Event end: 17-10-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 16-10-2019 08:01
Event end: 16-10-2019 14:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 116 MW
Event type: Planned
Event start: 17-10-2019 00:01
Event end: 17-10-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 6 MW
Event type: Planned
Event start: 17-10-2019 14:01
Event end: 17-10-2019 15:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 455 MW
Event type: Planned
Event start: 15-10-2019 20:01
Event end: 16-10-2019 00:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 63 MW
Event type: Planned
Event start: 17-10-2019 19:01
Event end: 17-10-2019 20:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 17-10-2019 23:01
Event end: 18-10-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 17-10-2019 20:01
Event end: 17-10-2019 23:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Bełchatów B12
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Unplanned
Event start: 15-10-2019 14:53
Event end: 17-10-2019 00:00
Source: Inactive - Unplanned - Bełchatów B12

Outage information

Unit Pątnów 2 B9
Achievable generation capacity: 474 MW
Outage size: 288 MW
Event type: Unplanned
Event start: 15-10-2019 14:40
Event end: 15-10-2019 20:00
Source: Inactive - Unplanned - Pątnów 2 B9

Outage information

Unit Pątnów 2 B9
Achievable generation capacity: 474 MW
Outage size: 474 MW
Event type: Unplanned
Event start: 15-10-2019 20:11
Event end: 16-10-2019 18:00
Source: Inactive - Unplanned - Pątnów 2 B9

Outage information

Unit EC Gorzów GOR2
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Unplanned
Event start: 23-09-2019 00:01
Event end: 15-10-2019 11:15
Source: Inactive - Unplanned - EC Gorzów GOR2

Outage information

Unit Pątnów 1 B1
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 16-10-2019 02:31
Event end: 16-10-2019 10:00
Source: Inactive - Unplanned - Pątnów 1 B1

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 140 MW
Event type: Unplanned
Event start: 12-10-2019 00:01
Event end: 18-10-2019 23:59
Source: Inactive - Unplanned - EC Żerań WZE

Outage information

Unit Jaworzno 3 B4
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 14-10-2019 17:16
Event end: 17-10-2019 12:00
Source: Inactive - Unplanned - Jaworzno 3 B4

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 5 MW
Event type: Planned
Event start: 17-10-2019 09:01
Event end: 17-10-2019 19:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 26 MW
Event type: Planned
Event start: 18-10-2019 10:01
Event end: 18-10-2019 20:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 18-10-2019 00:01
Event end: 18-10-2019 05:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 56 MW
Event type: Planned
Event start: 18-10-2019 08:01
Event end: 18-10-2019 10:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 18-10-2019 06:01
Event end: 18-10-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 131 MW
Event type: Planned
Event start: 18-10-2019 05:01
Event end: 18-10-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 71 MW
Event type: Planned
Event start: 18-10-2019 20:01
Event end: 18-10-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 183 MW
Event type: Planned
Event start: 18-10-2019 21:01
Event end: 18-10-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 18-10-2019 22:01
Event end: 19-10-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 135 MW
Outage size: 135 MW
Event type: Planned
Event start: 04-10-2019 23:46
Event end: 15-10-2019 18:02
Source: Inactive - Planned - Porąbka Żar H4

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 135 MW
Outage size: 135 MW
Event type: Planned
Event start: 04-10-2019 23:46
Event end: 12-10-2019 16:48
Source: Inactive - Planned - Porąbka Żar H3

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 250 MW
Event type: Planned
Event start: 18-10-2019 08:01
Event end: 18-10-2019 09:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 140 MW
Event type: Planned
Event start: 18-10-2019 16:01
Event end: 18-10-2019 20:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 130 MW
Event type: Planned
Event start: 18-10-2019 09:01
Event end: 18-10-2019 10:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 234 MW
Event type: Planned
Event start: 18-10-2019 15:01
Event end: 18-10-2019 16:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 70 MW
Event type: Planned
Event start: 18-10-2019 20:01
Event end: 18-10-2019 21:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 280 MW
Event type: Planned
Event start: 18-10-2019 07:01
Event end: 18-10-2019 08:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 45 MW
Event type: Planned
Event start: 18-10-2019 13:01
Event end: 18-10-2019 14:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 26 MW
Event type: Planned
Event start: 18-10-2019 11:01
Event end: 18-10-2019 13:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 217 MW
Event type: Planned
Event start: 18-10-2019 14:01
Event end: 18-10-2019 15:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit EC Siekierki WSIB 07
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Unplanned
Event start: 13-10-2019 15:00
Event end: 17-10-2019 15:00
Source: Inactive - Unplanned - EC Siekierki WSIB 07

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 52 MW
Event type: Planned
Event start: 16-10-2019 20:01
Event end: 16-10-2019 21:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 455 MW
Event type: Planned
Event start: 16-10-2019 00:01
Event end: 16-10-2019 10:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 79 MW
Event type: Planned
Event start: 16-10-2019 22:01
Event end: 16-10-2019 23:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 105 MW
Event type: Planned
Event start: 16-10-2019 23:01
Event end: 17-10-2019 00:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 290 MW
Event type: Planned
Event start: 16-10-2019 10:01
Event end: 16-10-2019 11:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 16-10-2019 11:01
Event end: 16-10-2019 20:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Łaziska 3 B11
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 17-10-2019 06:45
Event end: 17-10-2019 10:00
Source: Inactive - Unplanned - Łaziska 3 B11

Outage information

Unit Jaworzno 3 B2
Achievable generation capacity: 225 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 17-10-2019 07:01
Event end: 17-10-2019 10:30
Source: Inactive - Unplanned - Jaworzno 3 B2

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 19-10-2019 00:01
Event end: 19-10-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 176 MW
Event type: Planned
Event start: 19-10-2019 22:01
Event end: 20-10-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 71 MW
Event type: Planned
Event start: 19-10-2019 20:01
Event end: 19-10-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 168 MW
Event type: Planned
Event start: 19-10-2019 21:01
Event end: 19-10-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 183 MW
Event type: Planned
Event start: 19-10-2019 06:01
Event end: 19-10-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 71 MW
Event type: Planned
Event start: 19-10-2019 07:01
Event end: 19-10-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 205 MW
Event type: Planned
Event start: 17-10-2019 07:01
Event end: 17-10-2019 08:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 405 MW
Event type: Planned
Event start: 17-10-2019 09:01
Event end: 17-10-2019 15:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 440 MW
Event type: Planned
Event start: 17-10-2019 15:01
Event end: 17-10-2019 16:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 105 MW
Event type: Planned
Event start: 17-10-2019 02:01
Event end: 17-10-2019 05:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 475 MW
Event type: Planned
Event start: 17-10-2019 16:01
Event end: 18-10-2019 00:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 305 MW
Event type: Planned
Event start: 17-10-2019 08:01
Event end: 17-10-2019 09:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Połaniec B7
Achievable generation capacity: 239 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 17-10-2019 12:30
Event end: 17-10-2019 20:15
Source: Inactive - Unplanned - Połaniec B7

Outage information

Unit Siersza B2
Achievable generation capacity: 153 MW
Outage size: 150 MW
Event type: Unplanned
Event start: 17-10-2019 23:55
Event end: 18-10-2019 00:45
Source: Inactive - Unplanned - Siersza B2

Outage information

Unit Jaworzno 3 B3
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 18-10-2019 00:54
Event end: 18-10-2019 03:00
Source: Inactive - Unplanned - Jaworzno 3 B3

Outage information

Unit Ostrołęka B B02
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 17-10-2019 00:01
Event end: 18-10-2019 10:00
Source: Inactive - Planned - Ostrołęka B B02

Outage information

Unit Jaworzno 3 B1
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 18-10-2019 11:10
Event end: 18-10-2019 13:00
Source: Inactive - Unplanned - Jaworzno 3 B1

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 18-10-2019 12:01
Event end: 18-10-2019 14:30
Source: Inactive - Unplanned - Kozienice 2 B11

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 205 MW
Event type: Planned
Event start: 18-10-2019 16:01
Event end: 18-10-2019 18:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 305 MW
Event type: Planned
Event start: 18-10-2019 00:01
Event end: 18-10-2019 07:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 18-10-2019 14:31
Event end: 18-10-2019 19:45
Source: Inactive - Unplanned - Kozienice 2 B11

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 18-10-2019 19:46
Event end: 18-10-2019 22:30
Source: Inactive - Unplanned - Kozienice 2 B11

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 429 MW
Event type: Unplanned
Event start: 19-10-2019 00:01
Event end: 19-10-2019 02:00
Source: Inactive - Unplanned - Bełchatów B14

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 20-10-2019 01:26
Event end: 21-10-2019 23:59
Source: Inactive - Unplanned - EC Żerań WZE

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 141 MW
Event type: Planned
Event start: 20-10-2019 16:01
Event end: 20-10-2019 18:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 176 MW
Event type: Planned
Event start: 20-10-2019 18:01
Event end: 20-10-2019 20:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 20-10-2019 00:01
Event end: 20-10-2019 14:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 176 MW
Event type: Planned
Event start: 20-10-2019 14:01
Event end: 20-10-2019 16:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 146 MW
Event type: Planned
Event start: 20-10-2019 20:01
Event end: 20-10-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Rybnik B6
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 19-10-2019 00:01
Event end: 20-10-2019 16:30
Source: Inactive - Unplanned - Rybnik B6

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 02-09-2019 19:29
Event end: 22-10-2019 23:59
Source: Inactive - Unplanned - Skawina Tg5

Outage information

Unit Pątnów 1 B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 20-10-2019 22:50
Event end: 21-10-2019 09:00
Source: Inactive - Unplanned - Pątnów 1 B5

Outage information

Unit Połaniec B7
Achievable generation capacity: 239 MW
Outage size: 239 MW
Event type: Unplanned
Event start: 21-10-2019 03:00
Event end: 21-10-2019 06:00
Source: Inactive - Unplanned - Połaniec B7

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 400 MW
Event type: Unplanned
Event start: 21-10-2019 07:50
Event end: 21-10-2019 08:30
Source: Inactive - Unplanned - Opole B6

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 21-10-2019 09:05
Event end: 21-10-2019 09:11
Source: Inactive - Unplanned - Opole B5

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Unplanned
Event start: 21-10-2019 09:55
Event end: 21-10-2019 18:00
Source: Inactive - Unplanned - Opole B3

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 31 MW
Event type: Planned
Event start: 22-10-2019 10:01
Event end: 22-10-2019 11:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 27 MW
Event type: Planned
Event start: 22-10-2019 07:01
Event end: 22-10-2019 08:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 310 MW
Event type: Planned
Event start: 22-10-2019 21:01
Event end: 23-10-2019 06:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 27 MW
Event type: Planned
Event start: 22-10-2019 11:01
Event end: 22-10-2019 12:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 34 MW
Event type: Planned
Event start: 22-10-2019 09:01
Event end: 22-10-2019 10:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 54 MW
Event type: Planned
Event start: 22-10-2019 08:01
Event end: 22-10-2019 09:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 43 MW
Event type: Planned
Event start: 22-10-2019 15:01
Event end: 22-10-2019 16:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 54 MW
Event type: Planned
Event start: 23-10-2019 08:01
Event end: 23-10-2019 09:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 64 MW
Event type: Planned
Event start: 23-10-2019 16:01
Event end: 23-10-2019 17:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 73 MW
Event type: Planned
Event start: 23-10-2019 17:01
Event end: 23-10-2019 18:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 27 MW
Event type: Planned
Event start: 23-10-2019 07:01
Event end: 23-10-2019 08:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 64 MW
Event type: Planned
Event start: 22-10-2019 16:01
Event end: 22-10-2019 17:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 34 MW
Event type: Planned
Event start: 23-10-2019 09:01
Event end: 23-10-2019 10:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 31 MW
Event type: Planned
Event start: 23-10-2019 10:01
Event end: 23-10-2019 11:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 73 MW
Event type: Planned
Event start: 22-10-2019 17:01
Event end: 22-10-2019 18:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 27 MW
Event type: Planned
Event start: 23-10-2019 11:01
Event end: 23-10-2019 12:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 228 MW
Outage size: 43 MW
Event type: Planned
Event start: 23-10-2019 15:01
Event end: 23-10-2019 16:00
Source: Inactive - Planned - Kozienice 1 B7

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 905 MW
Event type: Unplanned
Event start: 21-10-2019 09:12
Event end: 21-10-2019 13:31
Source: Inactive - Unplanned - Opole B5

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 210 MW
Event type: Unplanned
Event start: 21-10-2019 06:01
Event end: 21-10-2019 16:00
Source: Inactive - Unplanned - Kozienice 2 B09

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 21-10-2019 15:16
Event end: 21-10-2019 18:00
Source: Inactive - Unplanned - Opole B5

Outage information

Unit Połaniec B2
Achievable generation capacity: 242 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 21-10-2019 17:25
Event end: 21-10-2019 19:00
Source: Inactive - Unplanned - Połaniec B2

Outage information

Unit Łaziska 3 B12
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 19-10-2019 06:01
Event end: 24-10-2019 00:00
Source: Inactive - Planned - Łaziska 3 B12

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 22-10-2019 12:31
Event end: 23-10-2019 07:00
Source: Inactive - Unplanned - EC Żerań WZE

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 255 MW
Event type: Unplanned
Event start: 23-10-2019 07:01
Event end: 23-10-2019 23:59
Source: Inactive - Unplanned - EC Żerań WZE

Outage information

Unit Siersza B2
Achievable generation capacity: 153 MW
Outage size: 150 MW
Event type: Unplanned
Event start: 22-10-2019 20:21
Event end: 22-10-2019 21:00
Source: Inactive - Unplanned - Siersza B2

Outage information

Unit Łaziska 3 B09
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Unplanned
Event start: 22-10-2019 17:00
Event end: 25-10-2019 00:00
Source: Inactive - Unplanned - Łaziska 3 B09

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 560 MW
Outage size: 160 MW
Event type: Unplanned
Event start: 23-10-2019 12:15
Event end: 23-10-2019 13:10
Source: Inactive - Unplanned - Kozienice 2 B10

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 560 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 23-10-2019 13:11
Event end: 23-10-2019 17:00
Source: Inactive - Unplanned - Kozienice 2 B10

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 237 MW
Event type: Planned
Event start: 23-10-2019 21:01
Event end: 23-10-2019 22:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 69 MW
Event type: Planned
Event start: 23-10-2019 20:01
Event end: 23-10-2019 21:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 83 MW
Event type: Planned
Event start: 23-10-2019 07:01
Event end: 23-10-2019 20:00
Source: Inactive - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 128 MW
Event type: Planned
Event start: 23-10-2019 06:01
Event end: 23-10-2019 07:00
Source: Inactive - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Planned
Event start: 23-10-2019 21:01
Event end: 24-10-2019 00:00
Source: Inactive - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 158 MW
Event type: Planned
Event start: 23-10-2019 20:01
Event end: 23-10-2019 21:00
Source: Inactive - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Planned
Event start: 23-10-2019 00:01
Event end: 23-10-2019 06:00
Source: Inactive - Planned - Opole B3

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 19-10-2019 00:01
Event end: 21-10-2019 00:00
Source: Inactive - Unplanned - Bełchatów B03

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 80 MW
Event type: Planned
Event start: 23-10-2019 07:01
Event end: 23-10-2019 20:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 23-10-2019 00:01
Event end: 23-10-2019 06:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Planned
Event start: 23-10-2019 20:01
Event end: 23-10-2019 21:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 23-10-2019 21:01
Event end: 24-10-2019 00:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 125 MW
Event type: Planned
Event start: 23-10-2019 06:01
Event end: 23-10-2019 07:00
Source: Inactive - Planned - Opole B4

Outage information

Unit EC Siekierki WSIK
Achievable generation capacity: 165 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 23-10-2019 00:01
Event end: 27-10-2019 18:00
Source: Inactive - Unplanned - EC Siekierki WSIK

Outage information

Unit EC Rzeszów ECR
Achievable generation capacity: 120 MW
Outage size: 120 MW
Event type: Planned
Event start: 12-10-2019 15:01
Event end: 27-10-2019 11:40
Source: Inactive - Planned - EC Rzeszów ECR

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 460 MW
Event type: Planned
Event start: 12-10-2019 00:09
Event end: 28-10-2019 12:00
Source: Inactive - Planned - Łagisza B10

Outage information

Unit Bełchatów B11
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned
Event start: 06-10-2019 00:04
Event end: 28-10-2019 16:01
Source: Inactive - Planned - Bełchatów B11

Outage information

Unit Veolia Energia Łódź EC4 B03
Achievable generation capacity: 105 MW
Outage size: 105 MW
Event type: Planned
Event start: 18-05-2019 09:38
Event end: 28-10-2019 15:25
Source: Inactive - Planned - Veolia Energia Łódź EC4 B03

Outage information

Unit Ostrołęka B B01
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 21-10-2019 00:01
Event end: 18-11-2019 00:00
Source: Inactive - Planned - Ostrołęka B B01

Outage information

Unit Karolin B2
Achievable generation capacity: 100 MW
Outage size: 100 MW
Event type: Planned
Event start: 07-06-2019 00:00
Event end: 07-11-2019 14:00
Source: Inactive - Planned - Karolin B2

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 13-10-2019 21:34
Event end: 06-11-2019 19:01
Source: Inactive - Planned - Turów B01

Outage information

Unit Siersza B1
Achievable generation capacity: 153 MW
Outage size: 153 MW
Event type: Planned
Event start: 19-10-2019 00:01
Event end: 08-11-2019 14:00
Source: Inactive - Planned - Siersza B1

Outage information

Unit Pątnów 1 B3
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 20-09-2019 07:31
Event end: 09-11-2019 21:35
Source: Inactive - Unplanned - Pątnów 1 B3

Outage information

Unit Rybnik B7
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 01-05-2019 00:01
Event end: 10-12-2019 04:45
Source: Inactive - Planned - Rybnik B7

Outage information

Unit Bełchatów B07
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned
Event start: 14-09-2019 00:01
Event end: 12-12-2019 18:00
Source: Inactive - Planned - Bełchatów B07

Outage information

Unit Bełchatów B08
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned
Event start: 15-09-2019 22:35
Event end: 16-12-2019 06:01
Source: Inactive - Planned - Bełchatów B08

Outage information

Unit Połaniec B5
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 18-07-2019 00:01
Event end: 15-01-2020 02:00
Source: Inactive - Planned - Połaniec B5

Outage information

Unit Bełchatów B02
Achievable generation capacity: 370 MW
Outage size: 370 MW
Event type: Planned
Event start: 28-02-2019 23:50
Event end: 31-01-2020 22:00
Source: Inactive - Planned - Bełchatów B02

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 08-10-2019 23:59
Event end: 31-05-2020 00:00
Source: Inactive - Planned - Skawina Tg3

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned
Event start: 30-09-2019 00:03
Event end: 01-07-2020 09:00
Source: Inactive - Planned - Dolna Odra B6

Outage information

Unit Turów B03
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 01-04-2019 00:15
Event end: 26-07-2020 19:00
Source: Active - Planned - Turów B03

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.