Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
September 2019
Thu 12 Fri 13 Sat 14 Sun 15 Mon 16 Tue 17 Wed 18 Thu 19 Fri 20 Sat 21 Sun 22 Mon 23 Tue 24 Wed 25
Bełchatów 5102
B02 370 370 370 370 370 370 370 370 370 370 370 370 370 370 370
B03 380 150 100
B04 380
B05 380 50
B06 394 170
B07 390 240 390 390 390 390 390 390 390 390 390 390 390 390
B08 390 390 390 390 390 390 390 390 390 390 390 390
B09 390
B10 390 390 390 230 230 390
B11 390 30
B12 390 30
B14 858 858 858 58
Chorzów 226
B1 113
B2 113
Dolna Odra 1350
B1 222
B2 232
B5 215
B6 222 222
B7 227 227 227 227
B8 232
Dychów 85
H1 28
H2 29
H3 28
EC Białystok 154
BIA_1-01 50 30 30 30 30 30
BIA_1-02 52
BIA_1-03 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52
EC Gorzów 138
GOR2 138 138 138 138 138
EC Rzeszów 120
ECR 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
EC Siekierki 591
WSIB 07 102
WSIB 08 120 120 120 120 120 120 120 120 120 120 120 120 120
WSIB 09 102 102 102 102 102 102 102 102
WSIB 10 102 102 102 102 102 102
WSIK 165 110 110 165 165 165 165 165 165 165 165 165 165 165 165
EC Wrotków 231
ECW 231 231 231 231
EC Żerań 373
WZE 373 140 140 140 140 180 220 220 140 140 140 140 140 140 140
EW Włocławek 168
H01 28 28
H02 28 28
H03 28 28
H04 28 28
H05 28
H06 28
FW Marszewo 100
FMA 100
Jaworzno 3 1345
B1 225
B2 225
B3 225
B4 225
B5 220
B6 225
Karolin 212
B2 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
B3 112
Katowice 135
B1 135
Kozienice 1 1821
B1 228
B2 228 72 88
B3 225
B4 228
B5 228 228
B6 228
B7 228
B8 228 50
Kozienice 2 2195
B09 560 250 280 234 250
B10 560
B11 1075 175
Łagisza 700
B10 460 460 460 460 310 290 276 236 155 220
B6 120
B7 120
Łaziska 2 250
B1 125
B2 125
Łaziska 3 905
B09 230
B10 225
B11 225
B12 225
Opole 3342
B1 386 206 206 206 206 206 206 206 206 206 206 206 198 206 206
B2 383 383 50 63
B3 383 83 60
B4 380 40
B5 905 905 272 185 226 543 543 543 543 226 543
B6 905 452 452 543 905 905 905 905 905 905 452 452 452 623
Ostrołęka B 690
B01 230 230 230 230
B02 230
B03 230
Pątnów 1 1244
B1 222 222 222 222
B2 222 222
B3 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
B4 200
B5 200 200 200 200 200
B6 200
Pątnów 2 474
B9 474
Połaniec 1882
B1 225
B2 242 242 242
B3 242
B4 242
B5 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B6 242 242 242
B7 239
B9 225
Porąbka Żar 540
H1 135
H2 135
H3 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135
H4 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135
Rybnik 1800
B1 225 25
B2 225 45 225 225
B3 225 25 90 90
B4 225 90
B5 225
B6 225
B7 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B8 225 225 25
Siersza 557
B1 153
B2 153 153 153 153 153 153
B3 123
B6 128 128 128
Skawina 330
Tg3 110
Tg5 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110
Tg6 110
Solina 198
H1 68
H2 68
H3 31
H4 31
Stalowa Wola 3 250
B7 125
B8 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158 55
Turów 1488
B01 235 201 135 135 135 235 235 235 235 235
B02 235 125 125 125 235
B03 235 235 235 235 235 235 235 235 235 235 235 235 235 235 235
B04 261
B05 261
B06 261 157
Veolia Energia Łódź EC4 105
B03 105 105 105 105 105 105 105 105 105 105 105 105 105 105 105
Żarnowiec 716
H1 179 179
H2 179 179
H3 179
H4 179
Żydowo 167
H1 55
H2 55
H3 57
Planned 11285 6141 7777 7045 5971 5904 5966 6907 10536 7052 6710 8275 4967 7970
Unplanned 750 310 804 1162 1086 2724 2373 1632 1067 1495 1671 2231 1411 2128
Total outages 12035 6451 8581 8207 7057 8628 8339 8539 11603 8547 8381 10506 6378 10098

Outage information

Unit Połaniec B2
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Planned (RB)
Event start: 21-09-2019 04:01
Event end: 22-09-2019 17:00
Source: WPKD

Outage information

Unit Porąbka Żar H3
Achievable generation capacity: 135 MW
Outage size: 135 MW
Event type: Planned
Event start: 26-06-2019 00:01
Event end: 04-10-2019 23:45
Source: Inactive - Planned - Porąbka Żar H3

Outage information

Unit Porąbka Żar H4
Achievable generation capacity: 135 MW
Outage size: 135 MW
Event type: Planned
Event start: 26-06-2019 00:01
Event end: 04-10-2019 23:45
Source: Inactive - Planned - Porąbka Żar H4

Outage information

Unit EC Siekierki WSIK
Achievable generation capacity: 165 MW
Outage size: 110 MW
Event type: Planned
Event start: 16-08-2019 00:01
Event end: 13-09-2019 23:59
Source: Inactive - Planned - EC Siekierki WSIK

Outage information

Unit EC Siekierki WSIK
Achievable generation capacity: 165 MW
Outage size: 165 MW
Event type: Planned
Event start: 14-09-2019 00:01
Event end: 07-10-2019 23:59
Source: Inactive - Planned - EC Siekierki WSIK

Outage information

Unit TAMEH Polska sp. z o. o. Elektrownia Blachownia
Achievable generation capacity: 158 MW
Outage size: 55 MW
Event type: Unplanned
Event start: 01-09-2019 12:06
Event end: 12-09-2019 23:59
Source: Inactive - Unplanned - TAMEH Polska sp. z o. o. Elektrownia Blachownia

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 12-09-2019 00:01
Event end: 12-09-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 131 MW
Event type: Planned
Event start: 15-09-2019 09:01
Event end: 15-09-2019 10:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 15-09-2019 10:01
Event end: 15-09-2019 12:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 73 MW
Event type: Planned
Event start: 14-09-2019 20:01
Event end: 14-09-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 184 MW
Event type: Planned
Event start: 14-09-2019 06:01
Event end: 14-09-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 183 MW
Event type: Planned
Event start: 14-09-2019 21:01
Event end: 14-09-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 12-09-2019 22:01
Event end: 12-09-2019 23:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 12-09-2019 21:01
Event end: 12-09-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 14-09-2019 00:01
Event end: 14-09-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 13-09-2019 22:01
Event end: 14-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 184 MW
Event type: Planned
Event start: 12-09-2019 06:01
Event end: 12-09-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 75 MW
Event type: Planned
Event start: 13-09-2019 07:01
Event end: 13-09-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 65 MW
Event type: Planned
Event start: 12-09-2019 20:01
Event end: 12-09-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 73 MW
Event type: Planned
Event start: 13-09-2019 20:01
Event end: 13-09-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 75 MW
Event type: Planned
Event start: 14-09-2019 07:01
Event end: 14-09-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 15-09-2019 00:01
Event end: 15-09-2019 09:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 14-09-2019 22:01
Event end: 15-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 183 MW
Event type: Planned
Event start: 13-09-2019 21:01
Event end: 13-09-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 75 MW
Event type: Planned
Event start: 12-09-2019 07:01
Event end: 12-09-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 184 MW
Event type: Planned
Event start: 13-09-2019 06:01
Event end: 13-09-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 12-09-2019 23:01
Event end: 13-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 13-09-2019 00:01
Event end: 13-09-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 15-09-2019 13:01
Event end: 16-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 15-09-2019 12:01
Event end: 15-09-2019 13:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Rybnik B4
Achievable generation capacity: 225 MW
Outage size: 90 MW
Event type: Planned
Event start: 11-09-2019 22:01
Event end: 12-09-2019 06:00
Source: Inactive - Planned - Rybnik B4

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 11-09-2019 21:01
Event end: 12-09-2019 00:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Rybnik B1
Achievable generation capacity: 225 MW
Outage size: 25 MW
Event type: Planned
Event start: 12-09-2019 14:01
Event end: 12-09-2019 22:00
Source: Inactive - Planned - Rybnik B1

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 26 MW
Event type: Planned
Event start: 12-09-2019 10:01
Event end: 12-09-2019 14:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 223 MW
Event type: Planned
Event start: 12-09-2019 08:01
Event end: 12-09-2019 09:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 234 MW
Event type: Planned
Event start: 12-09-2019 06:01
Event end: 12-09-2019 08:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 69 MW
Event type: Planned
Event start: 12-09-2019 09:01
Event end: 12-09-2019 10:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 130 MW
Event type: Planned
Event start: 12-09-2019 15:01
Event end: 12-09-2019 16:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 250 MW
Event type: Planned
Event start: 12-09-2019 16:01
Event end: 12-09-2019 17:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 140 MW
Event type: Planned
Event start: 12-09-2019 17:01
Event end: 12-09-2019 18:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Bełchatów B07
Achievable generation capacity: 390 MW
Outage size: 190 MW
Event type: Planned
Event start: 13-09-2019 21:01
Event end: 13-09-2019 23:00
Source: Inactive - Planned - Bełchatów B07

Outage information

Unit Bełchatów B07
Achievable generation capacity: 390 MW
Outage size: 240 MW
Event type: Planned
Event start: 13-09-2019 23:01
Event end: 14-09-2019 00:00
Source: Inactive - Planned - Bełchatów B07

Outage information

Unit Bełchatów B07
Achievable generation capacity: 390 MW
Outage size: 90 MW
Event type: Planned
Event start: 13-09-2019 20:01
Event end: 13-09-2019 21:00
Source: Inactive - Planned - Bełchatów B07

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 26 MW
Event type: Planned
Event start: 13-09-2019 10:01
Event end: 13-09-2019 13:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 280 MW
Event type: Planned
Event start: 13-09-2019 06:01
Event end: 13-09-2019 07:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 69 MW
Event type: Planned
Event start: 13-09-2019 09:01
Event end: 13-09-2019 10:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 240 MW
Event type: Planned
Event start: 13-09-2019 07:01
Event end: 13-09-2019 08:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 190 MW
Event type: Planned
Event start: 13-09-2019 08:01
Event end: 13-09-2019 09:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Połaniec B6
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Unplanned
Event start: 14-09-2019 00:01
Event end: 15-09-2019 19:00
Source: Inactive - Unplanned - Połaniec B6

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Planned
Event start: 11-09-2019 23:01
Event end: 12-09-2019 00:00
Source: Inactive - Planned - Opole B3

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 11-09-2019 23:01
Event end: 12-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit EC Siekierki WSIB 09
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Unplanned
Event start: 11-09-2019 15:34
Event end: 12-09-2019 23:59
Source: Inactive - Unplanned - EC Siekierki WSIB 09

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 105 MW
Event type: Planned
Event start: 12-09-2019 10:01
Event end: 12-09-2019 17:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 407 MW
Event type: Planned
Event start: 12-09-2019 21:01
Event end: 12-09-2019 22:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 12-09-2019 06:01
Event end: 12-09-2019 07:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 12-09-2019 00:01
Event end: 12-09-2019 06:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 12-09-2019 22:01
Event end: 13-09-2019 00:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Pątnów 1 B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 12-09-2019 13:00
Event end: 13-09-2019 00:00
Source: Inactive - Unplanned - Pątnów 1 B5

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 83 MW
Event type: Unplanned
Event start: 12-09-2019 19:01
Event end: 12-09-2019 21:00
Source: Inactive - Unplanned - Opole B3

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 183 MW
Event type: Planned
Event start: 12-09-2019 14:01
Event end: 12-09-2019 15:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 291 MW
Event type: Planned
Event start: 12-09-2019 15:01
Event end: 12-09-2019 16:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 155 MW
Event type: Planned
Event start: 12-09-2019 13:01
Event end: 12-09-2019 14:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 389 MW
Event type: Planned
Event start: 12-09-2019 17:01
Event end: 12-09-2019 18:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 205 MW
Event type: Planned
Event start: 12-09-2019 12:01
Event end: 12-09-2019 13:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 294 MW
Event type: Planned
Event start: 12-09-2019 16:01
Event end: 12-09-2019 17:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 905 MW
Event type: Planned
Event start: 12-09-2019 18:01
Event end: 12-09-2019 20:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 455 MW
Event type: Planned
Event start: 12-09-2019 23:01
Event end: 13-09-2019 00:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 543 MW
Event type: Planned
Event start: 12-09-2019 21:01
Event end: 12-09-2019 22:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 805 MW
Event type: Planned
Event start: 12-09-2019 20:01
Event end: 12-09-2019 21:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 489 MW
Event type: Planned
Event start: 12-09-2019 22:01
Event end: 12-09-2019 23:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Turów B06
Achievable generation capacity: 261 MW
Outage size: 157 MW
Event type: Planned
Event start: 16-09-2019 10:01
Event end: 16-09-2019 18:00
Source: Inactive - Planned - Turów B06

Outage information

Unit Żarnowiec H1
Achievable generation capacity: 179 MW
Outage size: 179 MW
Event type: Unplanned
Event start: 15-09-2019 07:01
Event end: 15-09-2019 19:00
Source: Inactive - Unplanned - Żarnowiec H1

Outage information

Unit Żarnowiec H2
Achievable generation capacity: 179 MW
Outage size: 179 MW
Event type: Unplanned
Event start: 15-09-2019 07:01
Event end: 15-09-2019 19:00
Source: Inactive - Unplanned - Żarnowiec H2

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 13-09-2019 06:01
Event end: 13-09-2019 07:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 13-09-2019 00:01
Event end: 13-09-2019 06:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 13-09-2019 21:01
Event end: 14-09-2019 00:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 17-09-2019 08:01
Event end: 17-09-2019 09:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 17-09-2019 17:01
Event end: 18-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 17-09-2019 16:01
Event end: 17-09-2019 17:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 17-09-2019 09:01
Event end: 17-09-2019 16:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 17-09-2019 00:01
Event end: 17-09-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 18-09-2019 22:01
Event end: 19-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 75 MW
Event type: Planned
Event start: 18-09-2019 07:01
Event end: 18-09-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 73 MW
Event type: Planned
Event start: 18-09-2019 20:01
Event end: 18-09-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 20-09-2019 00:01
Event end: 20-09-2019 05:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 18-09-2019 00:01
Event end: 18-09-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 184 MW
Event type: Planned
Event start: 18-09-2019 06:01
Event end: 18-09-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 183 MW
Event type: Planned
Event start: 20-09-2019 05:01
Event end: 20-09-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 189 MW
Event type: Planned
Event start: 18-09-2019 21:01
Event end: 18-09-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 73 MW
Event type: Planned
Event start: 21-09-2019 20:01
Event end: 21-09-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 20-09-2019 22:01
Event end: 21-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 21-09-2019 22:01
Event end: 22-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 22-09-2019 00:01
Event end: 22-09-2019 09:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 21-09-2019 00:01
Event end: 21-09-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 183 MW
Event type: Planned
Event start: 21-09-2019 21:01
Event end: 21-09-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 75 MW
Event type: Planned
Event start: 21-09-2019 07:01
Event end: 21-09-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 73 MW
Event type: Planned
Event start: 20-09-2019 20:01
Event end: 20-09-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 22-09-2019 09:01
Event end: 22-09-2019 10:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 73 MW
Event type: Planned
Event start: 20-09-2019 06:01
Event end: 20-09-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 184 MW
Event type: Planned
Event start: 21-09-2019 06:01
Event end: 21-09-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 183 MW
Event type: Planned
Event start: 20-09-2019 21:01
Event end: 20-09-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 22-09-2019 13:01
Event end: 23-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 22-09-2019 12:01
Event end: 22-09-2019 13:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 22-09-2019 10:01
Event end: 22-09-2019 12:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 6 MW
Event type: Planned
Event start: 20-09-2019 07:01
Event end: 20-09-2019 20:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 16-09-2019 20:01
Event end: 17-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 20 MW
Event type: Planned
Event start: 16-09-2019 18:01
Event end: 16-09-2019 19:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 75 MW
Event type: Planned
Event start: 16-09-2019 07:01
Event end: 16-09-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 131 MW
Event type: Planned
Event start: 16-09-2019 19:01
Event end: 16-09-2019 20:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 184 MW
Event type: Planned
Event start: 16-09-2019 06:01
Event end: 16-09-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 16-09-2019 00:01
Event end: 16-09-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 460 MW
Event type: Planned
Event start: 23-03-2019 00:40
Event end: 14-09-2019 20:30
Source: Inactive - Planned - Łagisza B10

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 420 MW
Event type: Planned
Event start: 14-09-2019 21:01
Event end: 14-09-2019 22:00
Source: Inactive - Planned - Łagisza B10

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 310 MW
Event type: Planned
Event start: 15-09-2019 00:01
Event end: 15-09-2019 01:00
Source: Inactive - Planned - Łagisza B10

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 397 MW
Event type: Planned
Event start: 14-09-2019 22:01
Event end: 14-09-2019 23:00
Source: Inactive - Planned - Łagisza B10

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 300 MW
Event type: Planned
Event start: 15-09-2019 01:01
Event end: 15-09-2019 02:00
Source: Inactive - Planned - Łagisza B10

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 345 MW
Event type: Planned
Event start: 14-09-2019 23:01
Event end: 15-09-2019 00:00
Source: Inactive - Planned - Łagisza B10

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 454 MW
Event type: Planned
Event start: 14-09-2019 19:01
Event end: 14-09-2019 20:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 271 MW
Event type: Planned
Event start: 14-09-2019 17:01
Event end: 14-09-2019 18:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 385 MW
Event type: Planned
Event start: 14-09-2019 18:01
Event end: 14-09-2019 19:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 14-09-2019 00:01
Event end: 14-09-2019 07:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 14-09-2019 07:01
Event end: 14-09-2019 17:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 543 MW
Event type: Planned
Event start: 14-09-2019 20:01
Event end: 14-09-2019 23:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Pątnów 1 B1
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 14-09-2019 20:03
Event end: 15-09-2019 13:00
Source: Inactive - Unplanned - Pątnów 1 B1

Outage information

Unit EC Siekierki WSIB 10
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Planned
Event start: 19-07-2019 18:50
Event end: 16-09-2019 06:00
Source: Inactive - Planned - EC Siekierki WSIB 10

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 44 MW
Event type: Planned
Event start: 18-09-2019 18:01
Event end: 18-09-2019 21:00
Source: Inactive - Planned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 88 MW
Event type: Planned
Event start: 18-09-2019 08:01
Event end: 18-09-2019 09:00
Source: Inactive - Planned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 68 MW
Event type: Planned
Event start: 18-09-2019 15:01
Event end: 18-09-2019 17:00
Source: Inactive - Planned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 43 MW
Event type: Planned
Event start: 18-09-2019 14:01
Event end: 18-09-2019 15:00
Source: Inactive - Planned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 44 MW
Event type: Planned
Event start: 18-09-2019 07:01
Event end: 18-09-2019 08:00
Source: Inactive - Planned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 56 MW
Event type: Planned
Event start: 18-09-2019 17:01
Event end: 18-09-2019 18:00
Source: Inactive - Planned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 70 MW
Event type: Planned
Event start: 18-09-2019 09:01
Event end: 18-09-2019 10:00
Source: Inactive - Planned - Kozienice 1 B2

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 293 MW
Event type: Planned
Event start: 15-09-2019 02:01
Event end: 15-09-2019 03:00
Source: Inactive - Planned - Łagisza B10

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 310 MW
Event type: Planned
Event start: 15-09-2019 03:01
Event end: 16-09-2019 00:00
Source: Inactive - Planned - Łagisza B10

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 724 MW
Event type: Planned
Event start: 15-09-2019 13:01
Event end: 15-09-2019 14:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 36 MW
Event type: Planned
Event start: 15-09-2019 12:01
Event end: 15-09-2019 13:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 905 MW
Event type: Planned
Event start: 15-09-2019 14:51
Event end: 20-09-2019 08:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Bełchatów B08
Achievable generation capacity: 390 MW
Outage size: 90 MW
Event type: Planned
Event start: 15-09-2019 20:01
Event end: 15-09-2019 21:00
Source: Inactive - Planned - Bełchatów B08

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 290 MW
Event type: Unplanned
Event start: 16-09-2019 00:01
Event end: 16-09-2019 08:30
Source: Inactive - Unplanned - Łagisza B10

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 140 MW
Event type: Planned
Event start: 07-09-2019 00:01
Event end: 16-09-2019 08:00
Source: Inactive - Planned - EC Żerań WZE

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 180 MW
Event type: Unplanned
Event start: 16-09-2019 08:01
Event end: 17-09-2019 15:00
Source: Inactive - Unplanned - EC Żerań WZE

Outage information

Unit Rybnik B3
Achievable generation capacity: 225 MW
Outage size: 90 MW
Event type: Planned
Event start: 18-09-2019 22:01
Event end: 19-09-2019 06:00
Source: Inactive - Planned - Rybnik B3

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 46 MW
Event type: Planned
Event start: 17-09-2019 08:01
Event end: 17-09-2019 10:00
Source: Inactive - Planned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 42 MW
Event type: Planned
Event start: 17-09-2019 15:01
Event end: 17-09-2019 16:00
Source: Inactive - Planned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 72 MW
Event type: Planned
Event start: 17-09-2019 16:01
Event end: 17-09-2019 18:00
Source: Inactive - Planned - Kozienice 1 B2

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 276 MW
Event type: Unplanned
Event start: 16-09-2019 08:31
Event end: 17-09-2019 13:00
Source: Inactive - Unplanned - Łagisza B10

Outage information

Unit Pątnów 1 B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 17-09-2019 01:13
Event end: 17-09-2019 12:00
Source: Inactive - Unplanned - Pątnów 1 B5

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 276 MW
Event type: Unplanned
Event start: 17-09-2019 13:01
Event end: 17-09-2019 18:00
Source: Inactive - Unplanned - Łagisza B10

Outage information

Unit Bełchatów B10
Achievable generation capacity: 390 MW
Outage size: 120 MW
Event type: Planned
Event start: 18-09-2019 20:01
Event end: 19-09-2019 02:00
Source: Inactive - Planned - Bełchatów B10

Outage information

Unit Bełchatów B10
Achievable generation capacity: 390 MW
Outage size: 230 MW
Event type: Planned
Event start: 19-09-2019 22:01
Event end: 20-09-2019 04:00
Source: Inactive - Planned - Bełchatów B10

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 179 MW
Event type: Planned
Event start: 19-09-2019 14:01
Event end: 19-09-2019 15:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 223 MW
Event type: Planned
Event start: 19-09-2019 08:01
Event end: 19-09-2019 09:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 140 MW
Event type: Planned
Event start: 19-09-2019 15:01
Event end: 19-09-2019 18:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 26 MW
Event type: Planned
Event start: 19-09-2019 10:01
Event end: 19-09-2019 14:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 69 MW
Event type: Planned
Event start: 19-09-2019 09:01
Event end: 19-09-2019 10:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 234 MW
Event type: Planned
Event start: 19-09-2019 06:01
Event end: 19-09-2019 08:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 19-09-2019 06:01
Event end: 20-09-2019 00:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 186 MW
Event type: Planned
Event start: 19-09-2019 05:01
Event end: 19-09-2019 06:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 175 MW
Event type: Unplanned
Event start: 17-09-2019 15:31
Event end: 17-09-2019 18:00
Source: Inactive - Unplanned - Kozienice 2 B11

Outage information

Unit Rybnik B3
Achievable generation capacity: 225 MW
Outage size: 25 MW
Event type: Planned
Event start: 17-09-2019 08:01
Event end: 17-09-2019 16:00
Source: Inactive - Planned - Rybnik B3

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 256 MW
Event type: Unplanned
Event start: 17-09-2019 18:01
Event end: 17-09-2019 19:00
Source: Inactive - Unplanned - Łagisza B10

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 265 MW
Event type: Planned
Event start: 17-09-2019 16:01
Event end: 17-09-2019 17:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 92 MW
Event type: Planned
Event start: 17-09-2019 18:01
Event end: 17-09-2019 19:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 185 MW
Event type: Planned
Event start: 17-09-2019 17:01
Event end: 17-09-2019 18:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 272 MW
Event type: Planned
Event start: 17-09-2019 15:01
Event end: 17-09-2019 16:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 185 MW
Event type: Planned
Event start: 18-09-2019 01:01
Event end: 18-09-2019 04:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Kozienice 2 B11
Achievable generation capacity: 1075 MW
Outage size: 175 MW
Event type: Unplanned
Event start: 17-09-2019 19:31
Event end: 17-09-2019 23:00
Source: Inactive - Unplanned - Kozienice 2 B11

Outage information

Unit Pątnów 1 B1
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 18-09-2019 03:48
Event end: 18-09-2019 06:00
Source: Inactive - Unplanned - Pątnów 1 B1

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 236 MW
Event type: Unplanned
Event start: 17-09-2019 19:01
Event end: 18-09-2019 09:30
Source: Inactive - Unplanned - Łagisza B10

Outage information

Unit Bełchatów B10
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Unplanned
Event start: 17-09-2019 00:01
Event end: 18-09-2019 07:31
Source: Inactive - Unplanned - Bełchatów B10

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 18-09-2019 09:31
Event end: 18-09-2019 10:30
Source: Inactive - Unplanned - Łagisza B10

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 180 MW
Event type: Unplanned
Event start: 18-09-2019 10:31
Event end: 18-09-2019 12:00
Source: Inactive - Unplanned - Łagisza B10

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 20-09-2019 00:01
Event end: 20-09-2019 05:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 543 MW
Event type: Planned
Event start: 20-09-2019 06:01
Event end: 21-09-2019 00:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 439 MW
Event type: Planned
Event start: 20-09-2019 05:01
Event end: 20-09-2019 06:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 157 MW
Event type: Planned
Event start: 16-09-2019 15:01
Event end: 16-09-2019 16:00
Source: Inactive - Planned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 137 MW
Event type: Planned
Event start: 16-09-2019 18:01
Event end: 16-09-2019 19:00
Source: Inactive - Planned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 201 MW
Event type: Planned
Event start: 16-09-2019 16:01
Event end: 16-09-2019 17:00
Source: Inactive - Planned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 135 MW
Event type: Planned
Event start: 16-09-2019 19:01
Event end: 20-09-2019 10:00
Source: Inactive - Planned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 170 MW
Event type: Planned
Event start: 16-09-2019 17:01
Event end: 16-09-2019 18:00
Source: Inactive - Planned - Turów B01

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 17-09-2019 15:01
Event end: 18-09-2019 13:00
Source: Inactive - Unplanned - EC Żerań WZE

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 140 MW
Event type: Planned
Event start: 18-09-2019 13:01
Event end: 29-09-2019 23:59
Source: Inactive - Planned - EC Żerań WZE

Outage information

Unit Siersza B2
Achievable generation capacity: 153 MW
Outage size: 153 MW
Event type: Planned
Event start: 14-09-2019 23:59
Event end: 18-09-2019 13:05
Source: Inactive - Planned - Siersza B2

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 250 MW
Event type: Planned
Event start: 20-09-2019 08:01
Event end: 20-09-2019 09:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 130 MW
Event type: Planned
Event start: 20-09-2019 09:01
Event end: 20-09-2019 10:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 140 MW
Event type: Planned
Event start: 20-09-2019 07:01
Event end: 20-09-2019 08:00
Source: Inactive - Planned - Kozienice 2 B09

Outage information

Unit Bełchatów B05
Achievable generation capacity: 380 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 18-09-2019 20:31
Event end: 18-09-2019 23:00
Source: Inactive - Unplanned - Bełchatów B05

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 150 MW
Event type: Unplanned
Event start: 18-09-2019 17:31
Event end: 18-09-2019 22:30
Source: Inactive - Unplanned - Bełchatów B03

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 18-09-2019 12:01
Event end: 19-09-2019 08:00
Source: Inactive - Unplanned - Łagisza B10

Outage information

Unit EC Białystok BIA_1-01
Achievable generation capacity: 50 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 14-09-2019 17:25
Event end: 18-09-2019 23:45
Source: Inactive - Unplanned - EC Białystok BIA_1-01

Outage information

Unit Pątnów 1 B2
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 19-09-2019 07:02
Event end: 20-09-2019 00:00
Source: Inactive - Unplanned - Pątnów 1 B2

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 19-09-2019 08:01
Event end: 19-09-2019 12:00
Source: Inactive - Unplanned - Łagisza B10

Outage information

Unit Pątnów 1 B3
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 28-07-2019 01:01
Event end: 19-09-2019 08:10
Source: Inactive - Unplanned - Pątnów 1 B3

Outage information

Unit Pątnów 1 B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 19-09-2019 08:45
Event end: 19-09-2019 10:00
Source: Inactive - Unplanned - Pątnów 1 B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 543 MW
Event type: Planned
Event start: 21-09-2019 00:01
Event end: 22-09-2019 00:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Rybnik B2
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 20-09-2019 00:01
Event end: 21-09-2019 00:00
Source: Inactive - Unplanned - Rybnik B2

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 170 MW
Event type: Unplanned
Event start: 19-09-2019 00:01
Event end: 19-09-2019 20:00
Source: Inactive - Unplanned - Bełchatów B06

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 19-09-2019 00:01
Event end: 19-09-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 20 MW
Event type: Planned
Event start: 19-09-2019 20:01
Event end: 19-09-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 19-09-2019 22:01
Event end: 20-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 196 MW
Event type: Planned
Event start: 19-09-2019 06:01
Event end: 19-09-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 186 MW
Event type: Planned
Event start: 19-09-2019 07:01
Event end: 19-09-2019 17:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 13 MW
Event type: Planned
Event start: 19-09-2019 18:01
Event end: 19-09-2019 19:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 106 MW
Event type: Planned
Event start: 19-09-2019 17:01
Event end: 19-09-2019 18:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 3 MW
Event type: Planned
Event start: 19-09-2019 19:01
Event end: 19-09-2019 20:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 131 MW
Event type: Planned
Event start: 19-09-2019 21:01
Event end: 19-09-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 40 MW
Event type: Unplanned
Event start: 19-09-2019 19:01
Event end: 19-09-2019 20:30
Source: Inactive - Unplanned - Opole B4

Outage information

Unit Pątnów 1 B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 19-09-2019 22:34
Event end: 20-09-2019 00:00
Source: Inactive - Unplanned - Pątnów 1 B5

Outage information

Unit Pątnów 1 B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 20-09-2019 00:15
Event end: 20-09-2019 00:45
Source: Inactive - Unplanned - Pątnów 1 B5

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 21-09-2019 21:01
Event end: 22-09-2019 00:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 317 MW
Event type: Planned
Event start: 21-09-2019 20:01
Event end: 21-09-2019 21:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 21-09-2019 00:01
Event end: 21-09-2019 07:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 136 MW
Event type: Planned
Event start: 21-09-2019 10:01
Event end: 21-09-2019 11:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 21-09-2019 08:01
Event end: 21-09-2019 10:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 45 MW
Event type: Planned
Event start: 21-09-2019 17:01
Event end: 21-09-2019 20:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 317 MW
Event type: Planned
Event start: 21-09-2019 07:01
Event end: 21-09-2019 08:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 905 MW
Event type: Planned
Event start: 20-09-2019 11:02
Event end: 20-09-2019 13:25
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 126 MW
Event type: Planned
Event start: 20-09-2019 14:01
Event end: 20-09-2019 15:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 20-09-2019 22:01
Event end: 21-09-2019 00:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 505 MW
Event type: Planned
Event start: 20-09-2019 15:01
Event end: 20-09-2019 16:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 20-09-2019 20:01
Event end: 20-09-2019 21:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 370 MW
Event type: Planned
Event start: 20-09-2019 16:01
Event end: 20-09-2019 17:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 317 MW
Event type: Planned
Event start: 20-09-2019 21:01
Event end: 20-09-2019 22:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 121 MW
Event type: Planned
Event start: 20-09-2019 15:01
Event end: 20-09-2019 16:00
Source: Inactive - Planned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 135 MW
Event type: Planned
Event start: 20-09-2019 16:01
Event end: 20-09-2019 17:00
Source: Inactive - Planned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 99 MW
Event type: Planned
Event start: 20-09-2019 10:01
Event end: 20-09-2019 11:00
Source: Inactive - Planned - Turów B01

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 85 MW
Event type: Planned
Event start: 20-09-2019 11:01
Event end: 20-09-2019 15:00
Source: Inactive - Planned - Turów B01

Outage information

Unit Ostrołęka B B01
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Unplanned
Event start: 18-09-2019 20:05
Event end: 20-09-2019 20:14
Source: Inactive - Unplanned - Ostrołęka B B01

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 858 MW
Event type: Unplanned
Event start: 21-09-2019 00:14
Event end: 22-09-2019 00:00
Source: Inactive - Unplanned - Bełchatów B14

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 543 MW
Event type: Planned
Event start: 22-09-2019 00:01
Event end: 23-09-2019 00:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 136 MW
Event type: Planned
Event start: 22-09-2019 10:01
Event end: 22-09-2019 11:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 45 MW
Event type: Planned
Event start: 22-09-2019 17:01
Event end: 22-09-2019 20:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 317 MW
Event type: Planned
Event start: 22-09-2019 07:01
Event end: 22-09-2019 08:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 22-09-2019 00:01
Event end: 22-09-2019 07:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 317 MW
Event type: Planned
Event start: 22-09-2019 20:01
Event end: 22-09-2019 21:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 22-09-2019 21:01
Event end: 23-09-2019 00:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 22-09-2019 08:01
Event end: 22-09-2019 10:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 41 MW
Event type: Planned
Event start: 23-09-2019 15:01
Event end: 23-09-2019 16:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 101 MW
Event type: Planned
Event start: 23-09-2019 12:01
Event end: 23-09-2019 13:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 153 MW
Event type: Planned
Event start: 23-09-2019 01:01
Event end: 23-09-2019 02:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 191 MW
Event type: Planned
Event start: 23-09-2019 00:01
Event end: 23-09-2019 01:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 6 MW
Event type: Planned
Event start: 23-09-2019 05:01
Event end: 23-09-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 123 MW
Event type: Planned
Event start: 23-09-2019 08:01
Event end: 23-09-2019 09:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 71 MW
Event type: Planned
Event start: 23-09-2019 03:01
Event end: 23-09-2019 04:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 23-09-2019 18:01
Event end: 23-09-2019 19:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 108 MW
Event type: Planned
Event start: 23-09-2019 02:01
Event end: 23-09-2019 03:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 6 MW
Event type: Planned
Event start: 23-09-2019 14:01
Event end: 23-09-2019 15:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 41 MW
Event type: Planned
Event start: 23-09-2019 13:01
Event end: 23-09-2019 14:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 23-09-2019 11:01
Event end: 23-09-2019 12:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 198 MW
Event type: Planned
Event start: 23-09-2019 10:01
Event end: 23-09-2019 11:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 23-09-2019 09:01
Event end: 23-09-2019 10:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 78 MW
Event type: Planned
Event start: 23-09-2019 07:01
Event end: 23-09-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 41 MW
Event type: Planned
Event start: 23-09-2019 06:01
Event end: 23-09-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 33 MW
Event type: Planned
Event start: 23-09-2019 04:01
Event end: 23-09-2019 05:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 116 MW
Event type: Planned
Event start: 23-09-2019 16:01
Event end: 23-09-2019 17:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 191 MW
Event type: Planned
Event start: 23-09-2019 17:01
Event end: 23-09-2019 18:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 23-09-2019 19:01
Event end: 23-09-2019 23:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 23-09-2019 23:01
Event end: 24-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 131 MW
Event type: Planned
Event start: 24-09-2019 08:01
Event end: 24-09-2019 09:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 56 MW
Event type: Planned
Event start: 24-09-2019 09:01
Event end: 24-09-2019 10:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 41 MW
Event type: Planned
Event start: 24-09-2019 11:01
Event end: 24-09-2019 12:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 191 MW
Event type: Planned
Event start: 24-09-2019 13:01
Event end: 24-09-2019 14:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 6 MW
Event type: Planned
Event start: 24-09-2019 10:01
Event end: 24-09-2019 11:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 14 MW
Event type: Planned
Event start: 24-09-2019 19:01
Event end: 24-09-2019 20:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 116 MW
Event type: Planned
Event start: 24-09-2019 12:01
Event end: 24-09-2019 13:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 24-09-2019 00:01
Event end: 24-09-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 24-09-2019 20:01
Event end: 25-09-2019 00:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 161 MW
Event type: Planned
Event start: 24-09-2019 22:01
Event end: 24-09-2019 23:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 19 MW
Event type: Planned
Event start: 24-09-2019 16:01
Event end: 24-09-2019 17:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 24-09-2019 23:01
Event end: 25-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 13 MW
Event type: Planned
Event start: 24-09-2019 17:01
Event end: 24-09-2019 18:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 24-09-2019 19:01
Event end: 24-09-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 71 MW
Event type: Planned
Event start: 24-09-2019 18:01
Event end: 24-09-2019 19:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 101 MW
Event type: Planned
Event start: 24-09-2019 15:01
Event end: 24-09-2019 16:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 176 MW
Event type: Planned
Event start: 24-09-2019 14:01
Event end: 24-09-2019 15:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Rybnik B2
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 21-09-2019 00:01
Event end: 21-09-2019 14:00
Source: Inactive - Unplanned - Rybnik B2

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 20-09-2019 17:05
Event end: 21-09-2019 16:50
Source: Inactive - Planned - Turów B01

Outage information

Unit Rybnik B2
Achievable generation capacity: 225 MW
Outage size: 45 MW
Event type: Planned
Event start: 19-09-2019 14:01
Event end: 19-09-2019 22:00
Source: Inactive - Planned - Rybnik B2

Outage information

Unit Siersza B6
Achievable generation capacity: 128 MW
Outage size: 128 MW
Event type: Planned
Event start: 21-09-2019 00:01
Event end: 22-09-2019 12:00
Source: Inactive - Planned - Siersza B6

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 858 MW
Event type: Unplanned
Event start: 22-09-2019 08:31
Event end: 22-09-2019 11:31
Source: Inactive - Unplanned - Bełchatów B14

Outage information

Unit Rybnik B8
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 23-09-2019 01:50
Event end: 23-09-2019 02:08
Source: Inactive - Unplanned - Rybnik B8

Outage information

Unit EW Włocławek H04
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 25-09-2019 07:01
Event end: 25-09-2019 20:00
Source: Inactive - Planned - EW Włocławek H04

Outage information

Unit EW Włocławek H03
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 25-09-2019 07:01
Event end: 25-09-2019 20:00
Source: Inactive - Planned - EW Włocławek H03

Outage information

Unit EW Włocławek H02
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 25-09-2019 07:01
Event end: 25-09-2019 20:00
Source: Inactive - Planned - EW Włocławek H02

Outage information

Unit EW Włocławek H01
Achievable generation capacity: 28 MW
Outage size: 28 MW
Event type: Planned
Event start: 25-09-2019 07:01
Event end: 25-09-2019 20:00
Source: Inactive - Planned - EW Włocławek H01

Outage information

Unit EC Siekierki WSIB 09
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Unplanned
Event start: 20-09-2019 16:32
Event end: 25-09-2019 23:59
Source: Inactive - Unplanned - EC Siekierki WSIB 09

Outage information

Unit Turów B02
Achievable generation capacity: 235 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 22-09-2019 18:01
Event end: 25-09-2019 22:00
Source: Inactive - Unplanned - Turów B02

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 533 MW
Event type: Planned
Event start: 23-09-2019 05:01
Event end: 23-09-2019 06:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 205 MW
Event type: Planned
Event start: 23-09-2019 12:01
Event end: 23-09-2019 13:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 255 MW
Event type: Planned
Event start: 23-09-2019 06:01
Event end: 23-09-2019 07:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 543 MW
Event type: Planned
Event start: 23-09-2019 00:01
Event end: 23-09-2019 05:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Unplanned
Event start: 23-09-2019 05:16
Event end: 23-09-2019 11:31
Source: Inactive - Unplanned - Opole B2

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 23-09-2019 12:16
Event end: 23-09-2019 12:45
Source: Inactive - Unplanned - Bełchatów B03

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 23-09-2019 12:46
Event end: 23-09-2019 14:30
Source: Inactive - Unplanned - Łagisza B10

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 439 MW
Event type: Planned
Event start: 25-09-2019 20:01
Event end: 25-09-2019 21:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 25-09-2019 00:01
Event end: 25-09-2019 20:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 543 MW
Event type: Planned
Event start: 25-09-2019 21:01
Event end: 26-09-2019 00:00
Source: Inactive - Planned - Opole B5

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 23-09-2019 13:05
Event end: 23-09-2019 16:00
Source: Inactive - Unplanned - Opole B3

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 64 MW
Event type: Planned
Event start: 25-09-2019 06:01
Event end: 25-09-2019 07:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 176 MW
Event type: Planned
Event start: 25-09-2019 15:01
Event end: 25-09-2019 16:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 116 MW
Event type: Planned
Event start: 25-09-2019 14:01
Event end: 25-09-2019 15:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 25-09-2019 00:01
Event end: 25-09-2019 06:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 6 MW
Event type: Planned
Event start: 25-09-2019 13:01
Event end: 25-09-2019 14:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 28 MW
Event type: Planned
Event start: 25-09-2019 07:01
Event end: 25-09-2019 08:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 25-09-2019 08:01
Event end: 25-09-2019 13:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 198 MW
Event type: Planned
Event start: 25-09-2019 21:01
Event end: 25-09-2019 22:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 86 MW
Event type: Planned
Event start: 25-09-2019 17:01
Event end: 25-09-2019 20:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 101 MW
Event type: Planned
Event start: 25-09-2019 16:01
Event end: 25-09-2019 17:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 108 MW
Event type: Planned
Event start: 25-09-2019 20:01
Event end: 25-09-2019 21:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 206 MW
Event type: Planned
Event start: 25-09-2019 22:01
Event end: 26-09-2019 00:00
Source: Inactive - Planned - Opole B1

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 23-09-2019 12:46
Event end: 23-09-2019 14:00
Source: Inactive - Unplanned - Bełchatów B03

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 23-09-2019 00:01
Event end: 23-09-2019 06:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 100 MW
Event type: Planned
Event start: 23-09-2019 09:01
Event end: 23-09-2019 10:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 353 MW
Event type: Planned
Event start: 23-09-2019 10:01
Event end: 23-09-2019 14:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 204 MW
Event type: Planned
Event start: 23-09-2019 06:01
Event end: 23-09-2019 09:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 228 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 23-09-2019 07:16
Event end: 23-09-2019 22:00
Source: Inactive - Unplanned - Kozienice 1 B8

Outage information

Unit EC Siekierki WSIB 08
Achievable generation capacity: 120 MW
Outage size: 120 MW
Event type: Planned
Event start: 06-05-2019 00:01
Event end: 23-09-2019 15:48
Source: Inactive - Planned - EC Siekierki WSIB 08

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 135 MW
Event type: Planned
Event start: 23-09-2019 10:01
Event end: 23-09-2019 17:00
Source: Inactive - Planned - Turów B01

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Unplanned
Event start: 24-09-2019 06:13
Event end: 24-09-2019 08:00
Source: Inactive - Unplanned - Kozienice 1 B5

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 24-09-2019 08:01
Event end: 24-09-2019 14:00
Source: Inactive - Unplanned - Opole B2

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 63 MW
Event type: Planned
Event start: 25-09-2019 13:01
Event end: 25-09-2019 16:00
Source: Inactive - Planned - Opole B2

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 227 MW
Outage size: 227 MW
Event type: Unplanned
Event start: 23-09-2019 21:47
Event end: 25-09-2019 03:22
Source: Inactive - Unplanned - Dolna Odra B7

Outage information

Unit Rybnik B8
Achievable generation capacity: 225 MW
Outage size: 25 MW
Event type: Planned
Event start: 25-09-2019 08:01
Event end: 25-09-2019 16:00
Source: Inactive - Planned - Rybnik B8

Outage information

Unit Bełchatów B11
Achievable generation capacity: 390 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 25-09-2019 11:46
Event end: 25-09-2019 20:00
Source: Inactive - Unplanned - Bełchatów B11

Outage information

Unit Bełchatów B10
Achievable generation capacity: 390 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 25-09-2019 11:46
Event end: 25-09-2019 20:00
Source: Inactive - Unplanned - Bełchatów B10

Outage information

Unit Bełchatów B12
Achievable generation capacity: 390 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 25-09-2019 11:46
Event end: 25-09-2019 20:00
Source: Inactive - Unplanned - Bełchatów B12

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Unplanned
Event start: 25-09-2019 03:48
Event end: 25-09-2019 16:46
Source: Inactive - Unplanned - Dolna Odra B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 505 MW
Event type: Planned
Event start: 25-09-2019 19:01
Event end: 25-09-2019 20:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 228 MW
Event type: Planned
Event start: 25-09-2019 18:01
Event end: 25-09-2019 19:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 623 MW
Event type: Planned
Event start: 25-09-2019 16:01
Event end: 25-09-2019 17:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 452 MW
Event type: Planned
Event start: 25-09-2019 17:01
Event end: 25-09-2019 18:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 226 MW
Event type: Planned
Event start: 25-09-2019 20:01
Event end: 26-09-2019 00:00
Source: Inactive - Planned - Opole B6

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 58 MW
Event type: Unplanned
Event start: 25-09-2019 09:01
Event end: 25-09-2019 22:00
Source: Inactive - Unplanned - Bełchatów B14

Outage information

Unit Bełchatów B10
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Unplanned
Event start: 25-09-2019 22:10
Event end: 26-09-2019 08:01
Source: Inactive - Unplanned - Bełchatów B10

Outage information

Unit Turów B02
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Unplanned
Event start: 25-09-2019 22:26
Event end: 26-09-2019 10:07
Source: Inactive - Unplanned - Turów B02

Outage information

Unit EC Gorzów GOR2
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Unplanned
Event start: 22-09-2019 19:26
Event end: 22-09-2019 23:00
Source: Inactive - Unplanned - EC Gorzów GOR2

Outage information

Unit EC Wrotków ECW
Achievable generation capacity: 231 MW
Outage size: 231 MW
Event type: Unplanned
Event start: 23-09-2019 10:31
Event end: 26-09-2019 18:45
Source: Inactive - Unplanned - EC Wrotków ECW

Outage information

Unit EC Gorzów GOR2
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Unplanned
Event start: 22-09-2019 06:35
Event end: 22-09-2019 19:25
Source: Inactive - Unplanned - EC Gorzów GOR2

Outage information

Unit Stalowa Wola 3 B8
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Planned
Event start: 09-09-2019 07:01
Event end: 01-10-2019 11:00
Source: Inactive - Planned - Stalowa Wola 3 B8

Outage information

Unit EC Rzeszów ECR
Achievable generation capacity: 120 MW
Outage size: 120 MW
Event type: Planned
Event start: 03-06-2019 07:01
Event end: 09-10-2019 15:00
Source: Inactive - Planned - EC Rzeszów ECR

Outage information

Unit Turów B01
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 23-09-2019 17:23
Event end: 13-10-2019 06:00
Source: Inactive - Planned - Turów B01

Outage information

Unit EC Białystok BIA_1-03
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Planned
Event start: 01-04-2019 07:01
Event end: 14-11-2019 23:45
Source: Inactive - Planned - EC Białystok BIA_1-03

Outage information

Unit EC Gorzów GOR2
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Unplanned
Event start: 23-09-2019 00:01
Event end: 15-10-2019 11:15
Source: Inactive - Unplanned - EC Gorzów GOR2

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 02-09-2019 19:29
Event end: 22-10-2019 23:59
Source: Inactive - Unplanned - Skawina Tg5

Outage information

Unit Veolia Energia Łódź EC4 B03
Achievable generation capacity: 105 MW
Outage size: 105 MW
Event type: Planned
Event start: 18-05-2019 09:38
Event end: 28-10-2019 15:25
Source: Inactive - Planned - Veolia Energia Łódź EC4 B03

Outage information

Unit Karolin B2
Achievable generation capacity: 100 MW
Outage size: 100 MW
Event type: Planned
Event start: 07-06-2019 00:00
Event end: 07-11-2019 14:00
Source: Inactive - Planned - Karolin B2

Outage information

Unit Pątnów 1 B3
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 20-09-2019 07:31
Event end: 09-11-2019 21:35
Source: Inactive - Unplanned - Pątnów 1 B3

Outage information

Unit Rybnik B7
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 01-05-2019 00:01
Event end: 10-12-2019 04:45
Source: Inactive - Planned - Rybnik B7

Outage information

Unit Bełchatów B07
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned
Event start: 14-09-2019 00:01
Event end: 12-12-2019 18:00
Source: Inactive - Planned - Bełchatów B07

Outage information

Unit Bełchatów B08
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned
Event start: 15-09-2019 22:35
Event end: 16-12-2019 06:01
Source: Inactive - Planned - Bełchatów B08

Outage information

Unit Połaniec B5
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 18-07-2019 00:01
Event end: 15-01-2020 02:00
Source: Inactive - Planned - Połaniec B5

Outage information

Unit Bełchatów B02
Achievable generation capacity: 370 MW
Outage size: 370 MW
Event type: Planned
Event start: 28-02-2019 23:50
Event end: 31-01-2020 22:00
Source: Inactive - Planned - Bełchatów B02

Outage information

Unit Turów B03
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 01-04-2019 00:15
Event end: 26-07-2020 19:00
Source: Active - Planned - Turów B03

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.