Generation capacity outages
Generation capacity outages - help- Legend
- no outages
- all outages
- planned
- unplanned
Power producer | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Power plant | Unit | Achievable generation capacity (MW) | August 2019 | September 2019 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Thu 29 | Fri 30 | Sat 31 | Sun 1 | Mon 2 | Tue 3 | Wed 4 | Thu 5 | Fri 6 | Sat 7 | Sun 8 | Mon 9 | Tue 10 | Wed 11 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned | 8178 | 7527 | 6610 | 5777 | 5246 | 5087 | 7540 | 6624 | 6635 | 8875 | 6135 | 5675 | 8032 | 7711 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Unplanned | 1963 | 2310 | 1214 | 834 | 2249 | 1392 | 1805 | 1457 | 1822 | 2276 | 1942 | 1493 | 1765 | 1216 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total outages | 10141 | 9837 | 7824 | 6611 | 7495 | 6479 | 9345 | 8081 | 8457 | 11151 | 8077 | 7168 | 9797 | 8927 |
- Planned (RS) (WPKD)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 630 MW |
Event type: | Planned (RS) |
Event start: | 05-09-2019 22:04 |
Event end: | 29-09-2019 22:00 |
Source: | WPKD |
Outage information
Unit | Porąbka Żar H3 |
Achievable generation capacity: | 135 MW |
Outage size: | 135 MW |
Event type: | Planned |
Event start: | 26-06-2019 00:01 |
Event end: | 04-10-2019 23:45 |
Source: | Inactive - Planned - Porąbka Żar H3 |
Outage information
Unit | Porąbka Żar H4 |
Achievable generation capacity: | 135 MW |
Outage size: | 135 MW |
Event type: | Planned |
Event start: | 26-06-2019 00:01 |
Event end: | 04-10-2019 23:45 |
Source: | Inactive - Planned - Porąbka Żar H4 |
Outage information
Unit | EC Siekierki WSIK |
Achievable generation capacity: | 165 MW |
Outage size: | 110 MW |
Event type: | Planned |
Event start: | 16-08-2019 00:01 |
Event end: | 13-09-2019 23:59 |
Source: | Inactive - Planned - EC Siekierki WSIK |
Outage information
Unit | Porąbka Żar H1 |
Achievable generation capacity: | 135 MW |
Outage size: | 135 MW |
Event type: | Planned |
Event start: | 21-08-2019 00:01 |
Event end: | 30-08-2019 23:45 |
Source: | Inactive - Planned - Porąbka Żar H1 |
Outage information
Unit | Porąbka Żar H2 |
Achievable generation capacity: | 135 MW |
Outage size: | 135 MW |
Event type: | Unplanned |
Event start: | 21-08-2019 00:01 |
Event end: | 30-08-2019 23:45 |
Source: | Inactive - Unplanned - Porąbka Żar H2 |
Outage information
Unit | EW Włocławek H06 |
Achievable generation capacity: | 28 MW |
Outage size: | 28 MW |
Event type: | Planned |
Event start: | 19-08-2019 07:01 |
Event end: | 03-09-2019 17:00 |
Source: | Inactive - Planned - EW Włocławek H06 |
Outage information
Unit | Skawina Tg6 |
Achievable generation capacity: | 110 MW |
Outage size: | 110 MW |
Event type: | Planned |
Event start: | 24-04-2019 00:01 |
Event end: | 01-09-2019 23:59 |
Source: | Inactive - Planned - Skawina Tg6 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 206 MW |
Event type: | Planned |
Event start: | 29-08-2019 00:01 |
Event end: | 29-08-2019 06:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 6 MW |
Event type: | Planned |
Event start: | 29-08-2019 08:01 |
Event end: | 29-08-2019 20:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 206 MW |
Event type: | Planned |
Event start: | 29-08-2019 22:01 |
Event end: | 30-08-2019 00:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 141 MW |
Event type: | Planned |
Event start: | 29-08-2019 21:01 |
Event end: | 29-08-2019 22:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 28 MW |
Event type: | Planned |
Event start: | 29-08-2019 20:01 |
Event end: | 29-08-2019 21:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 188 MW |
Event type: | Planned |
Event start: | 29-08-2019 06:01 |
Event end: | 29-08-2019 07:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 81 MW |
Event type: | Planned |
Event start: | 29-08-2019 07:01 |
Event end: | 29-08-2019 08:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Kozienice 1 B2 |
Achievable generation capacity: | 228 MW |
Outage size: | 46 MW |
Event type: | Planned |
Event start: | 29-08-2019 08:01 |
Event end: | 29-08-2019 11:00 |
Source: | Inactive - Planned - Kozienice 1 B2 |
Outage information
Unit | Kozienice 1 B2 |
Achievable generation capacity: | 228 MW |
Outage size: | 42 MW |
Event type: | Planned |
Event start: | 29-08-2019 15:01 |
Event end: | 29-08-2019 16:00 |
Source: | Inactive - Planned - Kozienice 1 B2 |
Outage information
Unit | Kozienice 1 B2 |
Achievable generation capacity: | 228 MW |
Outage size: | 72 MW |
Event type: | Planned |
Event start: | 29-08-2019 16:01 |
Event end: | 29-08-2019 18:00 |
Source: | Inactive - Planned - Kozienice 1 B2 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 29-08-2019 22:01 |
Event end: | 30-08-2019 00:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 29-08-2019 00:01 |
Event end: | 29-08-2019 06:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B2 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 29-08-2019 00:01 |
Event end: | 29-08-2019 06:00 |
Source: | Inactive - Planned - Opole B2 |
Outage information
Unit | Łaziska 3 B12 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 31-08-2019 06:01 |
Event end: | 02-09-2019 00:00 |
Source: | Inactive - Planned - Łaziska 3 B12 |
Outage information
Unit | Łaziska 3 B11 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 31-08-2019 06:01 |
Event end: | 02-09-2019 00:00 |
Source: | Inactive - Planned - Łaziska 3 B11 |
Outage information
Unit | Bełchatów B12 |
Achievable generation capacity: | 390 MW |
Outage size: | 150 MW |
Event type: | Unplanned |
Event start: | 29-08-2019 06:01 |
Event end: | 29-08-2019 22:00 |
Source: | Inactive - Unplanned - Bełchatów B12 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 188 MW |
Event type: | Planned |
Event start: | 30-08-2019 06:01 |
Event end: | 30-08-2019 07:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 126 MW |
Event type: | Planned |
Event start: | 30-08-2019 07:01 |
Event end: | 30-08-2019 10:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 206 MW |
Event type: | Planned |
Event start: | 30-08-2019 00:01 |
Event end: | 30-08-2019 06:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 148 MW |
Event type: | Planned |
Event start: | 30-08-2019 21:01 |
Event end: | 30-08-2019 22:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 106 MW |
Event type: | Planned |
Event start: | 30-08-2019 15:01 |
Event end: | 30-08-2019 21:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 101 MW |
Event type: | Planned |
Event start: | 30-08-2019 10:01 |
Event end: | 30-08-2019 11:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 206 MW |
Event type: | Planned |
Event start: | 30-08-2019 22:01 |
Event end: | 31-08-2019 00:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 86 MW |
Event type: | Planned |
Event start: | 30-08-2019 11:01 |
Event end: | 30-08-2019 15:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 30-08-2019 22:01 |
Event end: | 31-08-2019 00:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B2 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 30-08-2019 22:01 |
Event end: | 31-08-2019 00:00 |
Source: | Inactive - Planned - Opole B2 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 30-08-2019 00:01 |
Event end: | 30-08-2019 06:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Kozienice 1 B2 |
Achievable generation capacity: | 228 MW |
Outage size: | 34 MW |
Event type: | Planned |
Event start: | 30-08-2019 10:01 |
Event end: | 30-08-2019 11:00 |
Source: | Inactive - Planned - Kozienice 1 B2 |
Outage information
Unit | Kozienice 1 B2 |
Achievable generation capacity: | 228 MW |
Outage size: | 46 MW |
Event type: | Planned |
Event start: | 30-08-2019 08:01 |
Event end: | 30-08-2019 10:00 |
Source: | Inactive - Planned - Kozienice 1 B2 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 554 MW |
Event type: | Planned |
Event start: | 28-08-2019 23:01 |
Event end: | 29-08-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 30-08-2019 20:01 |
Event end: | 30-08-2019 21:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 407 MW |
Event type: | Planned |
Event start: | 30-08-2019 00:01 |
Event end: | 30-08-2019 06:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 30-08-2019 21:01 |
Event end: | 30-08-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 362 MW |
Event type: | Planned |
Event start: | 30-08-2019 22:01 |
Event end: | 31-08-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 45 MW |
Event type: | Planned |
Event start: | 30-08-2019 06:01 |
Event end: | 30-08-2019 20:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Karolin B3 |
Achievable generation capacity: | 112 MW |
Outage size: | 112 MW |
Event type: | Unplanned |
Event start: | 25-07-2019 17:54 |
Event end: | 08-09-2019 00:00 |
Source: | Inactive - Unplanned - Karolin B3 |
Outage information
Unit | Bełchatów B12 |
Achievable generation capacity: | 390 MW |
Outage size: | 150 MW |
Event type: | Unplanned |
Event start: | 30-08-2019 06:01 |
Event end: | 30-08-2019 22:00 |
Source: | Inactive - Unplanned - Bełchatów B12 |
Outage information
Unit | Opole B2 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 31-08-2019 00:01 |
Event end: | 31-08-2019 06:00 |
Source: | Inactive - Planned - Opole B2 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 31-08-2019 00:01 |
Event end: | 31-08-2019 06:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 362 MW |
Event type: | Planned |
Event start: | 29-08-2019 00:01 |
Event end: | 29-08-2019 06:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 22 MW |
Event type: | Planned |
Event start: | 29-08-2019 08:01 |
Event end: | 29-08-2019 09:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 181 MW |
Event type: | Planned |
Event start: | 29-08-2019 06:01 |
Event end: | 29-08-2019 07:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Turów B04 |
Achievable generation capacity: | 261 MW |
Outage size: | 81 MW |
Event type: | Unplanned |
Event start: | 29-08-2019 10:55 |
Event end: | 29-08-2019 22:00 |
Source: | Inactive - Unplanned - Turów B04 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 362 MW |
Event type: | Planned |
Event start: | 29-08-2019 14:01 |
Event end: | 29-08-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 407 MW |
Event type: | Planned |
Event start: | 29-08-2019 22:01 |
Event end: | 30-08-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 905 MW |
Event type: | Planned |
Event start: | 29-08-2019 09:33 |
Event end: | 29-08-2019 13:05 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Połaniec B6 |
Achievable generation capacity: | 242 MW |
Outage size: | 242 MW |
Event type: | Unplanned |
Event start: | 29-08-2019 01:01 |
Event end: | 30-08-2019 19:00 |
Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
Unit | Pątnów B5 |
Achievable generation capacity: | 200 MW |
Outage size: | 200 MW |
Event type: | Unplanned |
Event start: | 29-08-2019 22:25 |
Event end: | 31-08-2019 00:00 |
Source: | Inactive - Unplanned - Pątnów B5 |
Outage information
Unit | Opole B2 |
Achievable generation capacity: | 383 MW |
Outage size: | 383 MW |
Event type: | Unplanned |
Event start: | 29-08-2019 22:53 |
Event end: | 30-08-2019 02:00 |
Source: | Inactive - Unplanned - Opole B2 |
Outage information
Unit | Kozienice 1 B1 |
Achievable generation capacity: | 228 MW |
Outage size: | 228 MW |
Event type: | Unplanned |
Event start: | 30-08-2019 03:16 |
Event end: | 30-08-2019 05:16 |
Source: | Inactive - Unplanned - Kozienice 1 B1 |
Outage information
Unit | Łaziska 3 B09 |
Achievable generation capacity: | 230 MW |
Outage size: | 230 MW |
Event type: | Unplanned |
Event start: | 28-08-2019 15:15 |
Event end: | 01-09-2019 00:00 |
Source: | Inactive - Unplanned - Łaziska 3 B09 |
Outage information
Unit | EC Żerań WZE |
Achievable generation capacity: | 373 MW |
Outage size: | 205 MW |
Event type: | Unplanned |
Event start: | 23-08-2019 15:01 |
Event end: | 31-08-2019 23:59 |
Source: | Inactive - Unplanned - EC Żerań WZE |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 45 MW |
Event type: | Planned |
Event start: | 31-08-2019 06:01 |
Event end: | 31-08-2019 20:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 31-08-2019 20:01 |
Event end: | 31-08-2019 21:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 362 MW |
Event type: | Planned |
Event start: | 31-08-2019 22:01 |
Event end: | 01-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 31-08-2019 21:01 |
Event end: | 31-08-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 407 MW |
Event type: | Planned |
Event start: | 31-08-2019 00:01 |
Event end: | 31-08-2019 06:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Jaworzno 3 B4 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Unplanned |
Event start: | 29-08-2019 22:51 |
Event end: | 30-08-2019 16:00 |
Source: | Inactive - Unplanned - Jaworzno 3 B4 |
Outage information
Unit | Turów B04 |
Achievable generation capacity: | 261 MW |
Outage size: | 80 MW |
Event type: | Unplanned |
Event start: | 30-08-2019 11:05 |
Event end: | 30-08-2019 22:00 |
Source: | Inactive - Unplanned - Turów B04 |
Outage information
Unit | Rybnik B8 |
Achievable generation capacity: | 225 MW |
Outage size: | 65 MW |
Event type: | Planned |
Event start: | 31-08-2019 08:01 |
Event end: | 31-08-2019 14:00 |
Source: | Inactive - Planned - Rybnik B8 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 01-09-2019 00:01 |
Event end: | 01-09-2019 13:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 181 MW |
Event type: | Planned |
Event start: | 01-09-2019 13:01 |
Event end: | 01-09-2019 14:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 01-09-2019 22:01 |
Event end: | 02-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 136 MW |
Event type: | Planned |
Event start: | 01-09-2019 14:01 |
Event end: | 01-09-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 136 MW |
Event type: | Planned |
Event start: | 02-09-2019 07:01 |
Event end: | 02-09-2019 08:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 02-09-2019 06:01 |
Event end: | 02-09-2019 07:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 02-09-2019 00:01 |
Event end: | 02-09-2019 06:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 136 MW |
Event type: | Planned |
Event start: | 02-09-2019 13:01 |
Event end: | 02-09-2019 16:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 02-09-2019 18:01 |
Event end: | 03-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 45 MW |
Event type: | Planned |
Event start: | 02-09-2019 08:01 |
Event end: | 02-09-2019 13:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Turów B04 |
Achievable generation capacity: | 261 MW |
Outage size: | 157 MW |
Event type: | Unplanned |
Event start: | 31-08-2019 03:01 |
Event end: | 01-09-2019 20:30 |
Source: | Inactive - Unplanned - Turów B04 |
Outage information
Unit | Siersza B1 |
Achievable generation capacity: | 153 MW |
Outage size: | 153 MW |
Event type: | Planned |
Event start: | 31-08-2019 06:01 |
Event end: | 01-09-2019 23:00 |
Source: | Inactive - Planned - Siersza B1 |
Outage information
Unit | Katowice B1 |
Achievable generation capacity: | 135 MW |
Outage size: | 135 MW |
Event type: | Planned |
Event start: | 26-08-2019 00:01 |
Event end: | 01-09-2019 23:05 |
Source: | Inactive - Planned - Katowice B1 |
Outage information
Unit | Turów B05 |
Achievable generation capacity: | 261 MW |
Outage size: | 157 MW |
Event type: | Unplanned |
Event start: | 02-09-2019 00:01 |
Event end: | 02-09-2019 02:00 |
Source: | Inactive - Unplanned - Turów B05 |
Outage information
Unit | EC Wrotków ECW |
Achievable generation capacity: | 231 MW |
Outage size: | 135 MW |
Event type: | Unplanned |
Event start: | 02-09-2019 04:24 |
Event end: | 02-09-2019 07:00 |
Source: | Inactive - Unplanned - EC Wrotków ECW |
Outage information
Unit | Bełchatów B08 |
Achievable generation capacity: | 390 MW |
Outage size: | 170 MW |
Event type: | Unplanned |
Event start: | 02-09-2019 07:01 |
Event end: | 02-09-2019 12:00 |
Source: | Inactive - Unplanned - Bełchatów B08 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 365 MW |
Event type: | Unplanned |
Event start: | 02-09-2019 06:30 |
Event end: | 02-09-2019 08:30 |
Source: | Inactive - Unplanned - Opole B5 |
Outage information
Unit | Pątnów B5 |
Achievable generation capacity: | 200 MW |
Outage size: | 200 MW |
Event type: | Unplanned |
Event start: | 02-09-2019 07:26 |
Event end: | 02-09-2019 11:30 |
Source: | Inactive - Unplanned - Pątnów B5 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 71 MW |
Event type: | Planned |
Event start: | 04-09-2019 10:01 |
Event end: | 04-09-2019 11:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 131 MW |
Event type: | Planned |
Event start: | 04-09-2019 08:01 |
Event end: | 04-09-2019 09:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 176 MW |
Event type: | Planned |
Event start: | 04-09-2019 12:01 |
Event end: | 04-09-2019 13:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 101 MW |
Event type: | Planned |
Event start: | 04-09-2019 13:01 |
Event end: | 04-09-2019 14:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 116 MW |
Event type: | Planned |
Event start: | 04-09-2019 15:01 |
Event end: | 04-09-2019 16:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 56 MW |
Event type: | Planned |
Event start: | 04-09-2019 09:01 |
Event end: | 04-09-2019 10:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 41 MW |
Event type: | Planned |
Event start: | 04-09-2019 14:01 |
Event end: | 04-09-2019 15:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 206 MW |
Event type: | Planned |
Event start: | 04-09-2019 00:01 |
Event end: | 04-09-2019 08:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 161 MW |
Event type: | Planned |
Event start: | 04-09-2019 11:01 |
Event end: | 04-09-2019 12:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 131 MW |
Event type: | Planned |
Event start: | 04-09-2019 21:01 |
Event end: | 04-09-2019 22:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 131 MW |
Event type: | Planned |
Event start: | 04-09-2019 17:01 |
Event end: | 04-09-2019 18:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 56 MW |
Event type: | Planned |
Event start: | 04-09-2019 18:01 |
Event end: | 04-09-2019 21:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 206 MW |
Event type: | Planned |
Event start: | 04-09-2019 22:01 |
Event end: | 05-09-2019 00:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 191 MW |
Event type: | Planned |
Event start: | 04-09-2019 16:01 |
Event end: | 04-09-2019 17:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 03-09-2019 22:01 |
Event end: | 03-09-2019 23:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 498 MW |
Event type: | Planned |
Event start: | 03-09-2019 23:01 |
Event end: | 04-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 45 MW |
Event type: | Planned |
Event start: | 03-09-2019 08:01 |
Event end: | 03-09-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 03-09-2019 00:01 |
Event end: | 03-09-2019 08:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | EC Wrotków ECW |
Achievable generation capacity: | 231 MW |
Outage size: | 195 MW |
Event type: | Unplanned |
Event start: | 02-09-2019 14:10 |
Event end: | 02-09-2019 16:20 |
Source: | Inactive - Unplanned - EC Wrotków ECW |
Outage information
Unit | Łagisza B6 |
Achievable generation capacity: | 120 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 30-08-2019 00:30 |
Event end: | 04-09-2019 15:00 |
Source: | Inactive - Unplanned - Łagisza B6 |
Outage information
Unit | Dolna Odra B7 |
Achievable generation capacity: | 227 MW |
Outage size: | 67 MW |
Event type: | Planned |
Event start: | 03-09-2019 10:01 |
Event end: | 03-09-2019 13:00 |
Source: | Inactive - Planned - Dolna Odra B7 |
Outage information
Unit | Dolna Odra B5 |
Achievable generation capacity: | 215 MW |
Outage size: | 105 MW |
Event type: | Planned |
Event start: | 05-09-2019 22:01 |
Event end: | 06-09-2019 06:00 |
Source: | Inactive - Planned - Dolna Odra B5 |
Outage information
Unit | Kozienice 1 B3 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Unplanned |
Event start: | 03-09-2019 06:19 |
Event end: | 03-09-2019 09:16 |
Source: | Inactive - Unplanned - Kozienice 1 B3 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 210 MW |
Event type: | Unplanned |
Event start: | 02-09-2019 07:01 |
Event end: | 02-09-2019 10:50 |
Source: | Inactive - Unplanned - Kozienice 2 B09 |
Outage information
Unit | Połaniec B4 |
Achievable generation capacity: | 242 MW |
Outage size: | 73 MW |
Event type: | Planned |
Event start: | 05-09-2019 06:01 |
Event end: | 05-09-2019 07:00 |
Source: | Inactive - Planned - Połaniec B4 |
Outage information
Unit | Połaniec B4 |
Achievable generation capacity: | 242 MW |
Outage size: | 146 MW |
Event type: | Planned |
Event start: | 05-09-2019 05:01 |
Event end: | 05-09-2019 06:00 |
Source: | Inactive - Planned - Połaniec B4 |
Outage information
Unit | Ostrołęka B B01 |
Achievable generation capacity: | 230 MW |
Outage size: | 230 MW |
Event type: | Planned |
Event start: | 06-09-2019 06:00 |
Event end: | 09-09-2019 00:01 |
Source: | Inactive - Planned - Ostrołęka B B01 |
Outage information
Unit | Dolna Odra B5 |
Achievable generation capacity: | 215 MW |
Outage size: | 50 MW |
Event type: | Planned |
Event start: | 04-09-2019 07:01 |
Event end: | 04-09-2019 17:00 |
Source: | Inactive - Planned - Dolna Odra B5 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 498 MW |
Event type: | Planned |
Event start: | 04-09-2019 00:01 |
Event end: | 04-09-2019 06:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 04-09-2019 06:01 |
Event end: | 04-09-2019 07:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 04-09-2019 07:01 |
Event end: | 04-09-2019 21:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 04-09-2019 21:01 |
Event end: | 04-09-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 04-09-2019 22:01 |
Event end: | 05-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | EC Żerań WZE |
Achievable generation capacity: | 373 MW |
Outage size: | 320 MW |
Event type: | Unplanned |
Event start: | 03-09-2019 19:35 |
Event end: | 04-09-2019 07:00 |
Source: | Inactive - Unplanned - EC Żerań WZE |
Outage information
Unit | Połaniec B6 |
Achievable generation capacity: | 242 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 03-09-2019 07:46 |
Event end: | 03-09-2019 22:30 |
Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
Unit | EC Białystok BIA_1-01 |
Achievable generation capacity: | 50 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 02-09-2019 12:58 |
Event end: | 03-09-2019 17:35 |
Source: | Inactive - Unplanned - EC Białystok BIA_1-01 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 05-09-2019 06:01 |
Event end: | 05-09-2019 07:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 05-09-2019 00:01 |
Event end: | 05-09-2019 06:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 05-09-2019 22:01 |
Event end: | 06-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 05-09-2019 21:01 |
Event end: | 05-09-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 05-09-2019 07:01 |
Event end: | 05-09-2019 21:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Achievable generation capacity: | 158 MW |
Outage size: | 55 MW |
Event type: | Unplanned |
Event start: | 01-09-2019 12:06 |
Event end: | 12-09-2019 23:59 |
Source: | Inactive - Unplanned - TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 1075 MW |
Event type: | Planned |
Event start: | 15-08-2019 00:01 |
Event end: | 08-09-2019 00:00 |
Source: | Inactive - Planned - Kozienice 2 B11 |
Outage information
Unit | Połaniec B6 |
Achievable generation capacity: | 242 MW |
Outage size: | 80 MW |
Event type: | Unplanned |
Event start: | 04-09-2019 11:31 |
Event end: | 04-09-2019 12:40 |
Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
Unit | Chorzów B1 |
Achievable generation capacity: | 113 MW |
Outage size: | 113 MW |
Event type: | Unplanned |
Event start: | 07-09-2019 00:01 |
Event end: | 09-09-2019 08:00 |
Source: | Inactive - Unplanned - Chorzów B1 |
Outage information
Unit | Kozienice 1 B2 |
Achievable generation capacity: | 228 MW |
Outage size: | 228 MW |
Event type: | Unplanned |
Event start: | 04-09-2019 10:48 |
Event end: | 04-09-2019 14:15 |
Source: | Inactive - Unplanned - Kozienice 1 B2 |
Outage information
Unit | EC Żerań WZE |
Achievable generation capacity: | 373 MW |
Outage size: | 220 MW |
Event type: | Unplanned |
Event start: | 05-09-2019 00:01 |
Event end: | 05-09-2019 15:00 |
Source: | Inactive - Unplanned - EC Żerań WZE |
Outage information
Unit | EC Żerań WZE |
Achievable generation capacity: | 373 MW |
Outage size: | 180 MW |
Event type: | Unplanned |
Event start: | 05-09-2019 15:01 |
Event end: | 06-09-2019 23:59 |
Source: | Inactive - Unplanned - EC Żerań WZE |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 06-09-2019 07:01 |
Event end: | 06-09-2019 21:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 06-09-2019 21:01 |
Event end: | 06-09-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 06-09-2019 00:01 |
Event end: | 06-09-2019 06:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 06-09-2019 06:01 |
Event end: | 06-09-2019 07:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 06-09-2019 22:01 |
Event end: | 07-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Bełchatów B07 |
Achievable generation capacity: | 390 MW |
Outage size: | 390 MW |
Event type: | Unplanned |
Event start: | 04-09-2019 20:02 |
Event end: | 06-09-2019 08:16 |
Source: | Inactive - Unplanned - Bełchatów B07 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 07-09-2019 06:01 |
Event end: | 07-09-2019 07:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 07-09-2019 00:01 |
Event end: | 07-09-2019 06:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 07-09-2019 22:01 |
Event end: | 08-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 45 MW |
Event type: | Planned |
Event start: | 07-09-2019 07:01 |
Event end: | 07-09-2019 19:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 136 MW |
Event type: | Planned |
Event start: | 07-09-2019 19:01 |
Event end: | 07-09-2019 21:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 07-09-2019 21:01 |
Event end: | 07-09-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | EC Wrotków ECW |
Achievable generation capacity: | 231 MW |
Outage size: | 231 MW |
Event type: | Unplanned |
Event start: | 07-09-2019 00:01 |
Event end: | 09-09-2019 03:00 |
Source: | Inactive - Unplanned - EC Wrotków ECW |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 90 MW |
Event type: | Planned |
Event start: | 07-09-2019 20:01 |
Event end: | 07-09-2019 21:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 158 MW |
Event type: | Planned |
Event start: | 07-09-2019 12:01 |
Event end: | 07-09-2019 13:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 83 MW |
Event type: | Planned |
Event start: | 07-09-2019 18:01 |
Event end: | 07-09-2019 20:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 128 MW |
Event type: | Planned |
Event start: | 07-09-2019 08:01 |
Event end: | 07-09-2019 09:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 180 MW |
Event type: | Planned |
Event start: | 07-09-2019 21:01 |
Event end: | 07-09-2019 22:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 07-09-2019 00:01 |
Event end: | 07-09-2019 08:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 83 MW |
Event type: | Planned |
Event start: | 07-09-2019 09:01 |
Event end: | 07-09-2019 12:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 128 MW |
Event type: | Planned |
Event start: | 07-09-2019 17:01 |
Event end: | 07-09-2019 18:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 07-09-2019 13:01 |
Event end: | 07-09-2019 17:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 07-09-2019 22:01 |
Event end: | 08-09-2019 00:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Jaworzno 3 B5 |
Achievable generation capacity: | 220 MW |
Outage size: | 220 MW |
Event type: | Unplanned |
Event start: | 06-09-2019 07:15 |
Event end: | 06-09-2019 14:00 |
Source: | Inactive - Unplanned - Jaworzno 3 B5 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 365 MW |
Event type: | Unplanned |
Event start: | 06-09-2019 20:01 |
Event end: | 06-09-2019 21:30 |
Source: | Inactive - Unplanned - Opole B5 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 65 MW |
Event type: | Planned |
Event start: | 11-09-2019 20:01 |
Event end: | 11-09-2019 21:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 161 MW |
Event type: | Planned |
Event start: | 10-09-2019 14:01 |
Event end: | 10-09-2019 15:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 234 MW |
Event type: | Planned |
Event start: | 10-09-2019 06:01 |
Event end: | 10-09-2019 08:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 69 MW |
Event type: | Planned |
Event start: | 10-09-2019 09:01 |
Event end: | 10-09-2019 10:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 140 MW |
Event type: | Planned |
Event start: | 10-09-2019 15:01 |
Event end: | 10-09-2019 18:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 26 MW |
Event type: | Planned |
Event start: | 10-09-2019 10:01 |
Event end: | 10-09-2019 14:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 223 MW |
Event type: | Planned |
Event start: | 10-09-2019 08:01 |
Event end: | 10-09-2019 09:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Turów B05 |
Achievable generation capacity: | 261 MW |
Outage size: | 118 MW |
Event type: | Unplanned |
Event start: | 07-09-2019 10:01 |
Event end: | 07-09-2019 11:25 |
Source: | Inactive - Unplanned - Turów B05 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 146 MW |
Event type: | Planned |
Event start: | 07-09-2019 01:01 |
Event end: | 07-09-2019 02:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 206 MW |
Event type: | Planned |
Event start: | 07-09-2019 00:01 |
Event end: | 07-09-2019 01:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 126 MW |
Event type: | Planned |
Event start: | 07-09-2019 02:01 |
Event end: | 07-09-2019 11:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 86 MW |
Event type: | Planned |
Event start: | 07-09-2019 12:01 |
Event end: | 07-09-2019 14:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 121 MW |
Event type: | Planned |
Event start: | 07-09-2019 11:01 |
Event end: | 07-09-2019 12:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 106 MW |
Event type: | Planned |
Event start: | 07-09-2019 14:01 |
Event end: | 07-09-2019 21:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Połaniec B6 |
Achievable generation capacity: | 242 MW |
Outage size: | 242 MW |
Event type: | Unplanned |
Event start: | 07-09-2019 10:21 |
Event end: | 07-09-2019 23:31 |
Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 09-09-2019 00:01 |
Event end: | 09-09-2019 06:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 09-09-2019 06:01 |
Event end: | 09-09-2019 07:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 09-09-2019 21:01 |
Event end: | 09-09-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 136 MW |
Event type: | Planned |
Event start: | 09-09-2019 19:01 |
Event end: | 09-09-2019 21:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 09-09-2019 22:01 |
Event end: | 10-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 45 MW |
Event type: | Planned |
Event start: | 09-09-2019 07:01 |
Event end: | 09-09-2019 19:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 08-09-2019 00:01 |
Event end: | 08-09-2019 06:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 425 MW |
Event type: | Planned |
Event start: | 08-09-2019 12:01 |
Event end: | 08-09-2019 13:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 45 MW |
Event type: | Planned |
Event start: | 08-09-2019 07:01 |
Event end: | 08-09-2019 11:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 08-09-2019 22:01 |
Event end: | 09-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 08-09-2019 06:01 |
Event end: | 08-09-2019 07:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 115 MW |
Event type: | Planned |
Event start: | 08-09-2019 11:01 |
Event end: | 08-09-2019 12:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 45 MW |
Event type: | Planned |
Event start: | 08-09-2019 13:01 |
Event end: | 08-09-2019 19:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 317 MW |
Event type: | Planned |
Event start: | 08-09-2019 21:01 |
Event end: | 08-09-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 136 MW |
Event type: | Planned |
Event start: | 08-09-2019 19:01 |
Event end: | 08-09-2019 21:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | EC Gorzów GOR2 |
Achievable generation capacity: | 138 MW |
Outage size: | 138 MW |
Event type: | Unplanned |
Event start: | 08-09-2019 11:22 |
Event end: | 08-09-2019 15:14 |
Source: | Inactive - Unplanned - EC Gorzów GOR2 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 905 MW |
Event type: | Unplanned |
Event start: | 07-09-2019 00:01 |
Event end: | 08-09-2019 20:01 |
Source: | Inactive - Unplanned - Opole B5 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 136 MW |
Event type: | Planned |
Event start: | 10-09-2019 16:01 |
Event end: | 10-09-2019 21:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 10-09-2019 23:01 |
Event end: | 11-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 407 MW |
Event type: | Planned |
Event start: | 10-09-2019 22:01 |
Event end: | 10-09-2019 23:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 10-09-2019 21:01 |
Event end: | 10-09-2019 22:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 10-09-2019 00:01 |
Event end: | 10-09-2019 01:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 09-09-2019 09:53 |
Event end: | 09-09-2019 12:00 |
Source: | Inactive - Unplanned - Opole B5 |
Outage information
Unit | Rybnik B4 |
Achievable generation capacity: | 225 MW |
Outage size: | 90 MW |
Event type: | Planned |
Event start: | 11-09-2019 22:01 |
Event end: | 12-09-2019 06:00 |
Source: | Inactive - Planned - Rybnik B4 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 69 MW |
Event type: | Planned |
Event start: | 11-09-2019 09:01 |
Event end: | 11-09-2019 10:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 161 MW |
Event type: | Planned |
Event start: | 11-09-2019 14:01 |
Event end: | 11-09-2019 15:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 223 MW |
Event type: | Planned |
Event start: | 11-09-2019 08:01 |
Event end: | 11-09-2019 09:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 26 MW |
Event type: | Planned |
Event start: | 11-09-2019 10:01 |
Event end: | 11-09-2019 14:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 140 MW |
Event type: | Planned |
Event start: | 11-09-2019 15:01 |
Event end: | 11-09-2019 18:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 560 MW |
Outage size: | 234 MW |
Event type: | Planned |
Event start: | 11-09-2019 06:01 |
Event end: | 11-09-2019 08:00 |
Source: | Inactive - Planned - Kozienice 2 B09 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 90 MW |
Event type: | Planned |
Event start: | 10-09-2019 21:01 |
Event end: | 10-09-2019 22:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 10-09-2019 00:01 |
Event end: | 10-09-2019 05:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 180 MW |
Event type: | Planned |
Event start: | 10-09-2019 22:01 |
Event end: | 10-09-2019 23:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 195 MW |
Event type: | Planned |
Event start: | 10-09-2019 05:01 |
Event end: | 10-09-2019 06:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 10-09-2019 23:01 |
Event end: | 11-09-2019 00:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 83 MW |
Event type: | Planned |
Event start: | 10-09-2019 07:01 |
Event end: | 10-09-2019 21:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 105 MW |
Event type: | Planned |
Event start: | 10-09-2019 06:01 |
Event end: | 10-09-2019 07:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Kozienice 2 B10 |
Achievable generation capacity: | 560 MW |
Outage size: | 210 MW |
Event type: | Unplanned |
Event start: | 09-09-2019 08:25 |
Event end: | 09-09-2019 15:10 |
Source: | Inactive - Unplanned - Kozienice 2 B10 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 195 MW |
Event type: | Planned |
Event start: | 11-09-2019 05:01 |
Event end: | 11-09-2019 06:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 11-09-2019 00:01 |
Event end: | 11-09-2019 05:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 105 MW |
Event type: | Planned |
Event start: | 11-09-2019 06:01 |
Event end: | 11-09-2019 07:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Połaniec B6 |
Achievable generation capacity: | 242 MW |
Outage size: | 242 MW |
Event type: | Unplanned |
Event start: | 09-09-2019 13:03 |
Event end: | 09-09-2019 17:00 |
Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
Unit | Połaniec B6 |
Achievable generation capacity: | 242 MW |
Outage size: | 42 MW |
Event type: | Unplanned |
Event start: | 09-09-2019 18:01 |
Event end: | 09-09-2019 22:00 |
Source: | Inactive - Unplanned - Połaniec B6 |
Outage information
Unit | EC Siekierki WSIB 09 |
Achievable generation capacity: | 102 MW |
Outage size: | 102 MW |
Event type: | Planned |
Event start: | 13-06-2019 12:00 |
Event end: | 09-09-2019 11:59 |
Source: | Inactive - Planned - EC Siekierki WSIB 09 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 11-09-2019 21:01 |
Event end: | 12-09-2019 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 226 MW |
Event type: | Planned |
Event start: | 11-09-2019 06:01 |
Event end: | 11-09-2019 21:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 452 MW |
Event type: | Planned |
Event start: | 11-09-2019 00:01 |
Event end: | 11-09-2019 06:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Porąbka Żar H2 |
Achievable generation capacity: | 135 MW |
Outage size: | 135 MW |
Event type: | Unplanned |
Event start: | 10-09-2019 09:01 |
Event end: | 10-09-2019 11:00 |
Source: | Inactive - Unplanned - Porąbka Żar H2 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 206 MW |
Event type: | Planned |
Event start: | 10-09-2019 00:01 |
Event end: | 10-09-2019 06:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 86 MW |
Event type: | Planned |
Event start: | 10-09-2019 21:01 |
Event end: | 10-09-2019 22:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 161 MW |
Event type: | Planned |
Event start: | 10-09-2019 22:01 |
Event end: | 10-09-2019 23:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 206 MW |
Event type: | Planned |
Event start: | 10-09-2019 23:01 |
Event end: | 11-09-2019 00:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 65 MW |
Event type: | Planned |
Event start: | 10-09-2019 20:01 |
Event end: | 10-09-2019 21:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 66 MW |
Event type: | Planned |
Event start: | 10-09-2019 16:01 |
Event end: | 10-09-2019 20:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 184 MW |
Event type: | Planned |
Event start: | 10-09-2019 06:01 |
Event end: | 10-09-2019 07:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 75 MW |
Event type: | Planned |
Event start: | 10-09-2019 07:01 |
Event end: | 10-09-2019 08:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 1075 MW |
Event type: | Unplanned |
Event start: | 10-09-2019 09:05 |
Event end: | 10-09-2019 12:30 |
Source: | Inactive - Unplanned - Kozienice 2 B11 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 180 MW |
Event type: | Planned |
Event start: | 11-09-2019 22:01 |
Event end: | 11-09-2019 23:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 90 MW |
Event type: | Planned |
Event start: | 11-09-2019 21:01 |
Event end: | 11-09-2019 22:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 203 MW |
Event type: | Planned |
Event start: | 11-09-2019 23:01 |
Event end: | 12-09-2019 00:00 |
Source: | Inactive - Planned - Opole B3 |
Outage information
Unit | Bełchatów B12 |
Achievable generation capacity: | 390 MW |
Outage size: | 390 MW |
Event type: | Unplanned |
Event start: | 31-08-2019 00:07 |
Event end: | 11-09-2019 16:31 |
Source: | Inactive - Unplanned - Bełchatów B12 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 65 MW |
Event type: | Planned |
Event start: | 11-09-2019 21:01 |
Event end: | 11-09-2019 22:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 161 MW |
Event type: | Planned |
Event start: | 11-09-2019 22:01 |
Event end: | 11-09-2019 23:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 184 MW |
Event type: | Planned |
Event start: | 11-09-2019 06:01 |
Event end: | 11-09-2019 07:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 206 MW |
Event type: | Planned |
Event start: | 11-09-2019 00:01 |
Event end: | 11-09-2019 06:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 85 MW |
Event type: | Planned |
Event start: | 11-09-2019 07:01 |
Event end: | 11-09-2019 08:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 206 MW |
Event type: | Planned |
Event start: | 11-09-2019 23:01 |
Event end: | 12-09-2019 00:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 383 MW |
Event type: | Unplanned |
Event start: | 11-09-2019 13:29 |
Event end: | 11-09-2019 18:12 |
Source: | Inactive - Unplanned - Opole B3 |
Outage information
Unit | Opole B1 |
Achievable generation capacity: | 386 MW |
Outage size: | 66 MW |
Event type: | Planned |
Event start: | 11-09-2019 08:01 |
Event end: | 11-09-2019 19:00 |
Source: | Inactive - Planned - Opole B1 |
Outage information
Unit | Dolna Odra B6 |
Achievable generation capacity: | 222 MW |
Outage size: | 26 MW |
Event type: | Unplanned |
Event start: | 11-09-2019 15:19 |
Event end: | 11-09-2019 23:00 |
Source: | Inactive - Unplanned - Dolna Odra B6 |
Outage information
Unit | EC Siekierki WSIB 09 |
Achievable generation capacity: | 102 MW |
Outage size: | 102 MW |
Event type: | Unplanned |
Event start: | 11-09-2019 15:34 |
Event end: | 12-09-2019 23:59 |
Source: | Inactive - Unplanned - EC Siekierki WSIB 09 |
Outage information
Unit | Siersza B2 |
Achievable generation capacity: | 153 MW |
Outage size: | 150 MW |
Event type: | Unplanned |
Event start: | 11-09-2019 23:01 |
Event end: | 11-09-2019 23:45 |
Source: | Inactive - Unplanned - Siersza B2 |
Outage information
Unit | Łagisza B10 |
Achievable generation capacity: | 460 MW |
Outage size: | 460 MW |
Event type: | Planned |
Event start: | 23-03-2019 00:40 |
Event end: | 14-09-2019 20:30 |
Source: | Inactive - Planned - Łagisza B10 |
Outage information
Unit | EC Siekierki WSIB 10 |
Achievable generation capacity: | 102 MW |
Outage size: | 102 MW |
Event type: | Planned |
Event start: | 19-07-2019 18:50 |
Event end: | 16-09-2019 06:00 |
Source: | Inactive - Planned - EC Siekierki WSIB 10 |
Outage information
Unit | EC Żerań WZE |
Achievable generation capacity: | 373 MW |
Outage size: | 140 MW |
Event type: | Planned |
Event start: | 07-09-2019 00:01 |
Event end: | 16-09-2019 08:00 |
Source: | Inactive - Planned - EC Żerań WZE |
Outage information
Unit | Turów B01 |
Achievable generation capacity: | 235 MW |
Outage size: | 235 MW |
Event type: | Planned |
Event start: | 01-05-2018 00:11 |
Event end: | 16-09-2019 19:10 |
Source: | Inactive - Planned - Turów B01 |
Outage information
Unit | EC Siekierki WSIB 08 |
Achievable generation capacity: | 120 MW |
Outage size: | 120 MW |
Event type: | Planned |
Event start: | 06-05-2019 00:01 |
Event end: | 23-09-2019 15:48 |
Source: | Inactive - Planned - EC Siekierki WSIB 08 |
Outage information
Unit | Stalowa Wola 3 B8 |
Achievable generation capacity: | 125 MW |
Outage size: | 125 MW |
Event type: | Planned |
Event start: | 09-09-2019 07:01 |
Event end: | 01-10-2019 11:00 |
Source: | Inactive - Planned - Stalowa Wola 3 B8 |
Outage information
Unit | EC Rzeszów ECR |
Achievable generation capacity: | 120 MW |
Outage size: | 120 MW |
Event type: | Planned |
Event start: | 03-06-2019 07:01 |
Event end: | 09-10-2019 15:00 |
Source: | Inactive - Planned - EC Rzeszów ECR |
Outage information
Unit | EC Białystok BIA_1-03 |
Achievable generation capacity: | 52 MW |
Outage size: | 52 MW |
Event type: | Planned |
Event start: | 01-04-2019 07:01 |
Event end: | 14-11-2019 23:45 |
Source: | Inactive - Planned - EC Białystok BIA_1-03 |
Outage information
Unit | Skawina Tg5 |
Achievable generation capacity: | 110 MW |
Outage size: | 110 MW |
Event type: | Unplanned |
Event start: | 02-09-2019 19:29 |
Event end: | 22-10-2019 23:59 |
Source: | Inactive - Unplanned - Skawina Tg5 |
Outage information
Unit | Veolia Energia Łódź EC4 B03 |
Achievable generation capacity: | 105 MW |
Outage size: | 105 MW |
Event type: | Planned |
Event start: | 18-05-2019 09:38 |
Event end: | 28-10-2019 15:25 |
Source: | Inactive - Planned - Veolia Energia Łódź EC4 B03 |
Outage information
Unit | Karolin B2 |
Achievable generation capacity: | 100 MW |
Outage size: | 100 MW |
Event type: | Planned |
Event start: | 07-06-2019 00:00 |
Event end: | 07-11-2019 14:00 |
Source: | Inactive - Planned - Karolin B2 |
Outage information
Unit | Rybnik B7 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 01-05-2019 00:01 |
Event end: | 10-12-2019 04:45 |
Source: | Inactive - Planned - Rybnik B7 |
Outage information
Unit | Połaniec B5 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 18-07-2019 00:01 |
Event end: | 15-01-2020 02:00 |
Source: | Inactive - Planned - Połaniec B5 |
Outage information
Unit | Bełchatów B02 |
Achievable generation capacity: | 370 MW |
Outage size: | 370 MW |
Event type: | Planned |
Event start: | 28-02-2019 23:50 |
Event end: | 31-01-2020 22:00 |
Source: | Inactive - Planned - Bełchatów B02 |
Outage information
Unit | Turów B03 |
Achievable generation capacity: | 235 MW |
Outage size: | 235 MW |
Event type: | Planned |
Event start: | 01-04-2019 00:15 |
Event end: | 31-07-2020 00:00 |
Source: | Inactive - Planned - Turów B03 |
The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.
The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.
The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.