Power plant Unit Achievable generation capacity
(MW)
July 2015 August 2015
Tue 28 Wed 29 Thu 30 Fri 31 Sat 1 Sun 2 Mon 3 Tue 4 Wed 5 Thu 6 Fri 7 Sat 8 Sun 9 Mon 10
Bełchatów 5102
B02 370
B03 380 380 380
B04 380
B05 380
B06 394 394 394 394 394
B07 390
B08 390 30
B09 390 390 390 390 390 390 390 390 390 390 390 390 390 390 390
B10 390 130 70 40 8 117 190 370
B11 390
B12 390
B14 858 58 858 858 858
Chorzów 226
B1 113
B2 113
Dolna Odra 1357
B1 222 222 222 222 222 222 222 222 222 222
B2 232 232 232 232 232 232 232 232 232 232 232 232 232 232 232
B5 222
B6 222 222 27
B7 227 57
B8 232 32 232 232 232
Dychów 85
H1 28
H2 29
H3 28
EC Białystok 154
BIA_1-01 50
BIA_1-02 52
BIA_1-03 52
EC Gorzów 138
GOR2 138
EC Rzeszów 120
ECR 120
EC Siekierki 591
WSIB 07 102 102 102 102 102 102 102 102
WSIB 08 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
WSIB 09 102 102 102 102 102 102 102 102 102 102 102 102 102 102 102
WSIB 10 102
WSIK 165
EC Wrotków 231
ECW 231
EC Żerań 373
WZE 373 200 200 200 200 200 200 200 200 200 200 200 200 200 200
EW Włocławek 168
H01 28
H02 28
H03 28
H04 28
H05 28
H06 28
FW Marszewo 100
FMA 100
Jaworzno 3 1345
B1 225 225 225 225 225 225 225
B2 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B3 225 225 225
B4 225
B5 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220
B6 225 225 225 225 225 225 225 225
Karolin 212
B2 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
B3 112 112
Katowice 135
B1 135
Kozienice 1 1821
B1 228 215 215 215 215 215 215 215 215
B2 228 228 228 228 228 228 228 228 228 225 225 90 50 225 225
B3 225 35 35 70
B4 228 48 58 228 228
B5 228 35 38 228 228
B6 228 38 48 228
B7 228 35 39 70
B8 228 48 50
Kozienice 2 2195
B09 560 560 560 560 230 100 100 100 160 260 100 100 100
B10 560 230 230 230 230 230 230 230 230 230 230 230 230 230 230
B11 1075
Łagisza 700
B10 460
B6 120 120 120
B7 120
Łaziska 2 250
B1 125
B2 125
Łaziska 3 905
B09 230
B10 225
B11 225 225 225
B12 225 225 225 225 225 225
Opole 3342
B1 386
B2 383 3 83 53 163 163 163 383 383
B3 383
B4 380 200 200
B5 905
B6 905 543 543 543 543 543 543 543 543 543 543 543 543 543 543
Ostrołęka B 690
B01 230 105
B02 230 200 200 200 200 200 200 200 200 200 200 200 200 200 200
B03 230 226
Pątnów 1 1244
B1 222 200 200
B2 222 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B3 200 200 200
B4 200 200 200 200 200 200 200 200 200 200
B5 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
B6 200 200 200 200
Pątnów 2 474
B9 474 164 464 464 464 464
Połaniec 1882
B1 225 225 225
B2 242 242
B3 242 137
B4 242 242 242 242 242 242 242 242
B5 225
B6 242
B7 239 239 239 239 239 239
B9 225
Porąbka Żar 540
H1 135
H2 135
H3 135
H4 135
Rybnik 1800
B1 225
B2 225
B3 225 225 225
B4 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
B5 225 225 225
B6 225 225 225
B7 225 220 220 220 220 220
B8 225 225 225
Siersza 557
B1 153
B2 153
B3 123 123
B6 128
Skawina 330
Tg3 110
Tg5 110
Tg6 110
Solina 198
H1 68
H2 68
H3 31
H4 31
Stalowa Wola 3 250
B7 125
B8 125 125 125
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158
Turów 1488
B01 235
B02 235 235 235 235 235 235 235 235 25 5 235
B03 235 130 5 5 5
B04 261
B05 261 11 100 261 261 261 261
B06 261
Veolia Energia Łódź EC4 105
B03 105 105 105 105 105 105 105 105 105 105 105 105 105 105 105
Żarnowiec 716
H1 179
H2 179
H3 179
H4 179
Żydowo 167
H1 55
H2 55
H3 57
Planned 5178 4641 4386 4028 4467 5371 4251 4069 4259 4700 5383 6504 6569 5234
Unplanned 1042 905 1125 1715 1110 855 1097 668 715 2410 3341 2742 1657 2492
Total outages 6220 5546 5511 5743 5577 6226 5348 4737 4974 7110 8724 9246 8226 7726

Outage information

Unit Rybnik B8
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned (RB)
Event start: 01-08-2015 00:01
Event end: 03-08-2015 00:00
Source: WPKD

Outage information

Unit Rybnik B6
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned (RB)
Event start: 01-08-2015 00:01
Event end: 03-08-2015 00:00
Source: WPKD

Outage information

Unit Rybnik B5
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned (RB)
Event start: 01-08-2015 00:01
Event end: 03-08-2015 00:00
Source: WPKD

Outage information

Unit Rybnik B4
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned (RK)
Event start: 07-04-2015 00:01
Event end: 04-11-2015 00:00
Source: WPKD

Outage information

Unit Pątnów 1 B2
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned (RK)
Event start: 23-11-2013 00:01
Event end: 30-09-2015 00:00
Source: WPKD

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned (RB)
Event start: 08-08-2015 07:01
Event end: 09-08-2015 15:00
Source: WPKD

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 560 MW
Event type: Planned (WE)
Event start: 25-07-2015 00:10
Event end: 31-07-2015 00:00
Source: WPKD

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned (WE)
Event start: 08-08-2015 00:01
Event end: 10-08-2015 00:00
Source: WPKD

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned (RK)
Event start: 23-03-2015 00:01
Event end: 05-08-2015 00:00
Source: WPKD

Outage information

Unit Jaworzno 3 B2
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned (RS)
Event start: 02-03-2015 00:01
Event end: 20-11-2015 23:00
Source: WPKD

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 858 MW
Event type: Planned (RB)
Event start: 08-08-2015 22:01
Event end: 10-08-2015 00:00
Source: WPKD

Outage information

Unit Bełchatów B09
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned (RK)
Event start: 01-05-2015 06:01
Event end: 06-02-2016 18:00
Source: WPKD

Outage information

Unit EC Żerań WZE
Achievable generation capacity: 373 MW
Outage size: 200 MW
Event type: Planned
Event start: 21-07-2015 00:01
Event end: 31-08-2015 23:59
Source: Inactive - Planned - EC Żerań WZE

Outage information

Unit Jaworzno 3 B5
Achievable generation capacity: 220 MW
Outage size: 220 MW
Event type: Planned
Event start: 13-07-2015 00:00
Event end: 12-12-2015 00:00
Source: Inactive - Planned - Jaworzno 3 B5

Outage information

Unit Karolin B3
Achievable generation capacity: 112 MW
Outage size: 112 MW
Event type: Planned
Event start: 25-07-2015 07:00
Event end: 28-07-2015 23:59
Source: Inactive - Planned - Karolin B3

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 28-07-2015 22:01
Event end: 28-07-2015 23:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Jaworzno 3 B1
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 23-07-2015 10:01
Event end: 29-07-2015 12:00
Source: Inactive - Unplanned - Jaworzno 3 B1

Outage information

Unit Bełchatów B10
Achievable generation capacity: 370 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 28-07-2015 01:31
Event end: 28-07-2015 08:00
Source: Inactive - Unplanned - Bełchatów B10

Outage information

Unit EC Siekierki WSIB 07
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Unplanned
Event start: 28-07-2015 06:20
Event end: 28-07-2015 10:00
Source: Inactive - Unplanned - EC Siekierki WSIB 07

Outage information

Unit Połaniec B1
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 27-07-2015 00:01
Event end: 29-07-2015 22:00
Source: Inactive - Planned - Połaniec B1

Outage information

Unit Turów B03
Achievable generation capacity: 235 MW
Outage size: 130 MW
Event type: Unplanned
Event start: 28-07-2015 06:10
Event end: 28-07-2015 18:00
Source: Inactive - Unplanned - Turów B03

Outage information

Unit Rybnik B3
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 28-07-2015 03:48
Event end: 29-07-2015 00:00
Source: Inactive - Planned - Rybnik B3

Outage information

Unit Rybnik B3
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 29-07-2015 00:01
Event end: 29-07-2015 18:00
Source: Inactive - Unplanned - Rybnik B3

Outage information

Unit Połaniec B7
Achievable generation capacity: 239 MW
Outage size: 239 MW
Event type: Planned
Event start: 27-07-2015 00:01
Event end: 01-08-2015 00:00
Source: Inactive - Planned - Połaniec B7

Outage information

Unit Bełchatów B10
Achievable generation capacity: 370 MW
Outage size: 70 MW
Event type: Planned
Event start: 28-07-2015 08:01
Event end: 30-07-2015 00:00
Source: Inactive - Planned - Bełchatów B10

Outage information

Unit Bełchatów B10
Achievable generation capacity: 370 MW
Outage size: 40 MW
Event type: Planned
Event start: 30-07-2015 00:01
Event end: 31-07-2015 00:00
Source: Inactive - Planned - Bełchatów B10

Outage information

Unit Jaworzno 3 B3
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 30-07-2015 07:01
Event end: 31-07-2015 12:00
Source: Inactive - Unplanned - Jaworzno 3 B3

Outage information

Unit Rybnik B7
Achievable generation capacity: 220 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 30-07-2015 00:11
Event end: 31-07-2015 00:00
Source: Inactive - Unplanned - Rybnik B7

Outage information

Unit Jaworzno 3 B1
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 30-07-2015 13:34
Event end: 31-07-2015 12:00
Source: Inactive - Unplanned - Jaworzno 3 B1

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 3 MW
Event type: Planned
Event start: 01-08-2015 07:01
Event end: 01-08-2015 22:00
Source: Inactive - Planned - Opole B2

Outage information

Unit Turów B02
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 25-07-2015 00:01
Event end: 02-08-2015 22:00
Source: Inactive - Planned - Turów B02

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 230 MW
Event type: Unplanned
Event start: 31-07-2015 10:01
Event end: 31-07-2015 18:00
Source: Inactive - Unplanned - Kozienice 2 B09

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 380 MW
Event type: Unplanned
Event start: 31-07-2015 10:49
Event end: 31-07-2015 12:00
Source: Inactive - Unplanned - Bełchatów B03

Outage information

Unit Bełchatów B08
Achievable generation capacity: 390 MW
Outage size: 30 MW
Event type: Unplanned
Event start: 01-08-2015 09:01
Event end: 01-08-2015 16:00
Source: Inactive - Unplanned - Bełchatów B08

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 83 MW
Event type: Planned
Event start: 02-08-2015 07:01
Event end: 02-08-2015 22:00
Source: Inactive - Planned - Opole B2

Outage information

Unit Łaziska 3 B12
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 22-07-2015 00:01
Event end: 01-08-2015 11:30
Source: Inactive - Unplanned - Łaziska 3 B12

Outage information

Unit Bełchatów B03
Achievable generation capacity: 380 MW
Outage size: 380 MW
Event type: Planned
Event start: 02-08-2015 00:11
Event end: 02-08-2015 14:00
Source: Inactive - Planned - Bełchatów B03

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned
Event start: 02-08-2015 15:00
Event end: 02-08-2015 21:00
Source: Inactive - Planned - Dolna Odra B6

Outage information

Unit Jaworzno 3 B1
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 01-08-2015 21:19
Event end: 03-08-2015 00:00
Source: Inactive - Unplanned - Jaworzno 3 B1

Outage information

Unit Pątnów 1 B3
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 01-08-2015 22:16
Event end: 03-08-2015 00:00
Source: Inactive - Unplanned - Pątnów 1 B3

Outage information

Unit Turów B02
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Planned
Event start: 03-08-2015 08:01
Event end: 03-08-2015 13:00
Source: Inactive - Planned - Turów B02

Outage information

Unit Turów B02
Achievable generation capacity: 235 MW
Outage size: 25 MW
Event type: Planned
Event start: 03-08-2015 14:01
Event end: 04-08-2015 01:00
Source: Inactive - Planned - Turów B02

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 58 MW
Event type: Unplanned
Event start: 03-08-2015 09:01
Event end: 03-08-2015 11:00
Source: Inactive - Unplanned - Bełchatów B14

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 38 MW
Event type: Unplanned
Event start: 03-08-2015 11:01
Event end: 03-08-2015 13:00
Source: Inactive - Unplanned - Bełchatów B14

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 222 MW
Outage size: 27 MW
Event type: Unplanned
Event start: 03-08-2015 11:40
Event end: 03-08-2015 14:30
Source: Inactive - Unplanned - Dolna Odra B6

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 232 MW
Outage size: 57 MW
Event type: Unplanned
Event start: 03-08-2015 11:40
Event end: 03-08-2015 14:30
Source: Inactive - Unplanned - Dolna Odra B7

Outage information

Unit Dolna Odra B8
Achievable generation capacity: 232 MW
Outage size: 32 MW
Event type: Unplanned
Event start: 03-08-2015 11:40
Event end: 03-08-2015 14:30
Source: Inactive - Unplanned - Dolna Odra B8

Outage information

Unit Pątnów 1 B4
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 31-07-2015 22:19
Event end: 04-08-2015 00:00
Source: Inactive - Unplanned - Pątnów 1 B4

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 28 MW
Event type: Unplanned
Event start: 03-08-2015 13:01
Event end: 03-08-2015 15:00
Source: Inactive - Unplanned - Bełchatów B14

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 163 MW
Event type: Planned
Event start: 05-08-2015 23:01
Event end: 06-08-2015 06:00
Source: Inactive - Planned - Opole B2

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 53 MW
Event type: Planned
Event start: 04-08-2015 13:30
Event end: 04-08-2015 16:00
Source: Inactive - Planned - Opole B2

Outage information

Unit Pątnów 1 B5
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Planned
Event start: 20-07-2015 00:01
Event end: 14-08-2015 00:00
Source: Inactive - Planned - Pątnów 1 B5

Outage information

Unit Bełchatów B10
Achievable generation capacity: 370 MW
Outage size: 117 MW
Event type: Planned
Event start: 06-08-2015 04:01
Event end: 06-08-2015 10:00
Source: Inactive - Planned - Bełchatów B10

Outage information

Unit Bełchatów B10
Achievable generation capacity: 370 MW
Outage size: 8 MW
Event type: Planned
Event start: 05-08-2015 20:01
Event end: 06-08-2015 04:00
Source: Inactive - Planned - Bełchatów B10

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 11 MW
Event type: Unplanned
Event start: 04-08-2015 12:35
Event end: 04-08-2015 16:00
Source: Inactive - Unplanned - Turów B05

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 163 MW
Event type: Planned
Event start: 06-08-2015 23:01
Event end: 07-08-2015 06:00
Source: Inactive - Planned - Opole B2

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 261 MW
Event type: Planned
Event start: 06-08-2015 23:01
Event end: 07-08-2015 02:00
Source: Inactive - Planned - Turów B05

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 100 MW
Event type: Planned
Event start: 05-08-2015 09:52
Event end: 05-08-2015 12:00
Source: Inactive - Planned - Turów B05

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 15 MW
Event type: Unplanned
Event start: 05-08-2015 13:35
Event end: 05-08-2015 21:00
Source: Inactive - Unplanned - Turów B05

Outage information

Unit Połaniec B4
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Planned
Event start: 31-07-2015 15:00
Event end: 07-08-2015 00:00
Source: Inactive - Planned - Połaniec B4

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 43 MW
Event type: Unplanned
Event start: 05-08-2015 11:31
Event end: 05-08-2015 16:30
Source: Inactive - Unplanned - Opole B2

Outage information

Unit Ostrołęka B B01
Achievable generation capacity: 221 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 06-08-2015 00:02
Event end: 06-08-2015 01:05
Source: Inactive - Unplanned - Ostrołęka B B01

Outage information

Unit Bełchatów B10
Achievable generation capacity: 370 MW
Outage size: 190 MW
Event type: Planned
Event start: 07-08-2015 20:01
Event end: 08-08-2015 00:00
Source: Inactive - Planned - Bełchatów B10

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 221 MW
Event type: Planned
Event start: 07-08-2015 02:01
Event end: 07-08-2015 04:00
Source: Inactive - Planned - Turów B05

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 221 MW
Event type: Planned
Event start: 07-08-2015 17:01
Event end: 08-08-2015 00:00
Source: Inactive - Planned - Turów B05

Outage information

Unit Pątnów 1 B1
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 06-08-2015 00:34
Event end: 06-08-2015 03:00
Source: Inactive - Unplanned - Pątnów 1 B1

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 20 MW
Event type: Unplanned
Event start: 06-08-2015 11:46
Event end: 06-08-2015 16:00
Source: Inactive - Unplanned - Turów B05

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 06-08-2015 12:01
Event end: 06-08-2015 16:00
Source: Inactive - Unplanned - Opole B2

Outage information

Unit Turów B03
Achievable generation capacity: 235 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 06-08-2015 12:18
Event end: 06-08-2015 14:00
Source: Inactive - Unplanned - Turów B03

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 05-08-2015 00:01
Event end: 06-08-2015 13:00
Source: Inactive - Planned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B6
Achievable generation capacity: 228 MW
Outage size: 38 MW
Event type: Unplanned
Event start: 06-08-2015 14:45
Event end: 06-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B6

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 225 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 06-08-2015 13:01
Event end: 06-08-2015 21:30
Source: Inactive - Unplanned - Kozienice 1 B7

Outage information

Unit Kozienice 1 B4
Achievable generation capacity: 228 MW
Outage size: 48 MW
Event type: Unplanned
Event start: 06-08-2015 13:01
Event end: 06-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B4

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 228 MW
Outage size: 48 MW
Event type: Unplanned
Event start: 06-08-2015 14:01
Event end: 06-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B8

Outage information

Unit Kozienice 1 B3
Achievable generation capacity: 225 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 06-08-2015 15:30
Event end: 06-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B3

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 225 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 06-08-2015 15:30
Event end: 06-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B5

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 03-08-2015 09:01
Event end: 06-08-2015 15:30
Source: Inactive - Unplanned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 160 MW
Event type: Unplanned
Event start: 06-08-2015 15:31
Event end: 06-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 2 B09

Outage information

Unit Pątnów 2 B9
Achievable generation capacity: 464 MW
Outage size: 164 MW
Event type: Unplanned
Event start: 06-08-2015 09:46
Event end: 06-08-2015 21:30
Source: Inactive - Unplanned - Pątnów 2 B9

Outage information

Unit Połaniec B2
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Planned
Event start: 07-08-2015 00:01
Event end: 08-08-2015 00:00
Source: Inactive - Planned - Połaniec B2

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 225 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 06-08-2015 13:01
Event end: 08-08-2015 00:00
Source: Inactive - Unplanned - Kozienice 1 B2

Outage information

Unit Pątnów 1 B1
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 06-08-2015 03:50
Event end: 06-08-2015 05:10
Source: Inactive - Unplanned - Pątnów 1 B1

Outage information

Unit Pątnów 1 B1
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 06-08-2015 05:11
Event end: 07-08-2015 07:00
Source: Inactive - Unplanned - Pątnów 1 B1

Outage information

Unit Rybnik B7
Achievable generation capacity: 220 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 07-08-2015 03:31
Event end: 08-08-2015 00:00
Source: Inactive - Unplanned - Rybnik B7

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 16 MW
Event type: Unplanned
Event start: 07-08-2015 08:01
Event end: 07-08-2015 17:00
Source: Inactive - Unplanned - Turów B05

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 394 MW
Event type: Unplanned
Event start: 07-08-2015 09:45
Event end: 08-08-2015 00:00
Source: Inactive - Unplanned - Bełchatów B06

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 76 MW
Event type: Unplanned
Event start: 07-08-2015 09:46
Event end: 07-08-2015 15:00
Source: Inactive - Unplanned - Opole B2

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 06-08-2015 22:01
Event end: 07-08-2015 09:50
Source: Inactive - Unplanned - Kozienice 2 B09

Outage information

Unit Kozienice 1 B4
Achievable generation capacity: 228 MW
Outage size: 58 MW
Event type: Unplanned
Event start: 07-08-2015 11:46
Event end: 07-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B4

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 225 MW
Outage size: 39 MW
Event type: Unplanned
Event start: 07-08-2015 11:31
Event end: 07-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B7

Outage information

Unit Turów B02
Achievable generation capacity: 235 MW
Outage size: 5 MW
Event type: Planned
Event start: 07-08-2015 11:31
Event end: 07-08-2015 17:00
Source: Inactive - Planned - Turów B02

Outage information

Unit Turów B03
Achievable generation capacity: 235 MW
Outage size: 5 MW
Event type: Planned
Event start: 07-08-2015 11:31
Event end: 07-08-2015 17:00
Source: Inactive - Planned - Turów B03

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 90 MW
Event type: Planned
Event start: 07-08-2015 15:01
Event end: 07-08-2015 22:30
Source: Inactive - Planned - Opole B2

Outage information

Unit Pątnów 2 B9
Achievable generation capacity: 464 MW
Outage size: 278 MW
Event type: Unplanned
Event start: 07-08-2015 05:01
Event end: 07-08-2015 22:00
Source: Inactive - Unplanned - Pątnów 2 B9

Outage information

Unit Kozienice 1 B3
Achievable generation capacity: 225 MW
Outage size: 35 MW
Event type: Unplanned
Event start: 07-08-2015 14:16
Event end: 07-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B3

Outage information

Unit Kozienice 1 B5
Achievable generation capacity: 225 MW
Outage size: 38 MW
Event type: Unplanned
Event start: 07-08-2015 14:46
Event end: 07-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B5

Outage information

Unit Kozienice 1 B6
Achievable generation capacity: 228 MW
Outage size: 48 MW
Event type: Unplanned
Event start: 07-08-2015 14:46
Event end: 07-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B6

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 228 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 07-08-2015 14:16
Event end: 07-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B8

Outage information

Unit EC Siekierki WSIB 07
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Unplanned
Event start: 03-08-2015 08:44
Event end: 08-08-2015 06:00
Source: Inactive - Unplanned - EC Siekierki WSIB 07

Outage information

Unit Pątnów 2 B9
Achievable generation capacity: 464 MW
Outage size: 464 MW
Event type: Planned
Event start: 07-08-2015 22:14
Event end: 10-08-2015 00:00
Source: Inactive - Planned - Pątnów 2 B9

Outage information

Unit Stalowa Wola 3 B8
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Unplanned
Event start: 07-08-2015 21:03
Event end: 08-08-2015 01:55
Source: Inactive - Unplanned - Stalowa Wola 3 B8

Outage information

Unit Dolna Odra B8
Achievable generation capacity: 232 MW
Outage size: 232 MW
Event type: Unplanned
Event start: 07-08-2015 22:51
Event end: 09-08-2015 00:00
Source: Inactive - Unplanned - Dolna Odra B8

Outage information

Unit Dolna Odra B8
Achievable generation capacity: 232 MW
Outage size: 232 MW
Event type: Planned
Event start: 09-08-2015 00:01
Event end: 10-08-2015 00:00
Source: Inactive - Planned - Dolna Odra B8

Outage information

Unit Łaziska 3 B11
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 07-08-2015 17:06
Event end: 08-08-2015 15:00
Source: Inactive - Unplanned - Łaziska 3 B11

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 225 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 08-08-2015 09:31
Event end: 08-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B2

Outage information

Unit Kozienice 1 B6
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned
Event start: 08-08-2015 00:16
Event end: 08-08-2015 05:00
Source: Inactive - Planned - Kozienice 1 B6

Outage information

Unit Kozienice 1 B6
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Unplanned
Event start: 08-08-2015 05:01
Event end: 08-08-2015 08:30
Source: Inactive - Unplanned - Kozienice 1 B6

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 260 MW
Event type: Unplanned
Event start: 07-08-2015 09:51
Event end: 07-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 2 B09

Outage information

Unit Rybnik B7
Achievable generation capacity: 220 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 08-08-2015 00:01
Event end: 09-08-2015 00:00
Source: Inactive - Unplanned - Rybnik B7

Outage information

Unit Pątnów 1 B4
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 06-08-2015 11:32
Event end: 08-08-2015 12:00
Source: Inactive - Unplanned - Pątnów 1 B4

Outage information

Unit Połaniec B7
Achievable generation capacity: 239 MW
Outage size: 239 MW
Event type: Unplanned
Event start: 08-08-2015 18:54
Event end: 08-08-2015 21:00
Source: Inactive - Unplanned - Połaniec B7

Outage information

Unit Ostrołęka B B03
Achievable generation capacity: 226 MW
Outage size: 226 MW
Event type: Unplanned
Event start: 08-08-2015 01:38
Event end: 08-08-2015 12:36
Source: Inactive - Unplanned - Ostrołęka B B03

Outage information

Unit Pątnów 1 B4
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Planned
Event start: 08-08-2015 12:01
Event end: 08-08-2015 22:29
Source: Inactive - Planned - Pątnów 1 B4

Outage information

Unit Pątnów 1 B4
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 09-08-2015 02:01
Event end: 09-08-2015 04:30
Source: Inactive - Unplanned - Pątnów 1 B4

Outage information

Unit Połaniec B3
Achievable generation capacity: 242 MW
Outage size: 137 MW
Event type: Unplanned
Event start: 09-08-2015 02:26
Event end: 09-08-2015 04:30
Source: Inactive - Unplanned - Połaniec B3

Outage information

Unit Kozienice 1 B3
Achievable generation capacity: 225 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 08-08-2015 17:01
Event end: 08-08-2015 19:15
Source: Inactive - Unplanned - Kozienice 1 B3

Outage information

Unit Kozienice 1 B4
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Planned
Event start: 08-08-2015 19:08
Event end: 09-08-2015 22:00
Source: Inactive - Planned - Kozienice 1 B4

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 225 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 08-08-2015 16:31
Event end: 08-08-2015 22:00
Source: Inactive - Unplanned - Kozienice 1 B7

Outage information

Unit Pątnów 2 B9
Achievable generation capacity: 464 MW
Outage size: 464 MW
Event type: Unplanned
Event start: 10-08-2015 04:49
Event end: 10-08-2015 07:00
Source: Inactive - Unplanned - Pątnów 2 B9

Outage information

Unit Siersza B3
Achievable generation capacity: 123 MW
Outage size: 123 MW
Event type: Unplanned
Event start: 10-08-2015 00:45
Event end: 10-08-2015 12:00
Source: Inactive - Unplanned - Siersza B3

Outage information

Unit Łagisza B6
Achievable generation capacity: 120 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 09-08-2015 19:25
Event end: 12-08-2015 00:00
Source: Inactive - Unplanned - Łagisza B6

Outage information

Unit Turów B02
Achievable generation capacity: 235 MW
Outage size: 235 MW
Event type: Unplanned
Event start: 10-08-2015 02:41
Event end: 10-08-2015 10:00
Source: Inactive - Unplanned - Turów B02

Outage information

Unit Jaworzno 3 B6
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 03-08-2015 00:36
Event end: 10-08-2015 00:00
Source: Inactive - Unplanned - Jaworzno 3 B6

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 10-08-2015 04:52
Event end: 10-08-2015 12:00
Source: Inactive - Unplanned - Opole B4

Outage information

Unit Kozienice 1 B2
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 09-08-2015 11:03
Event end: 11-08-2015 00:00
Source: Inactive - Unplanned - Kozienice 1 B2

Outage information

Unit Turów B03
Achievable generation capacity: 235 MW
Outage size: 5 MW
Event type: Unplanned
Event start: 10-08-2015 10:31
Event end: 10-08-2015 17:00
Source: Inactive - Unplanned - Turów B03

Outage information

Unit Rybnik B7
Achievable generation capacity: 220 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 09-08-2015 00:01
Event end: 10-08-2015 20:00
Source: Inactive - Unplanned - Rybnik B7

Outage information

Unit Dolna Odra B1
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned
Event start: 02-08-2015 00:01
Event end: 11-08-2015 06:00
Source: Inactive - Planned - Dolna Odra B1

Outage information

Unit Bełchatów B10
Achievable generation capacity: 370 MW
Outage size: 370 MW
Event type: Unplanned
Event start: 10-08-2015 04:50
Event end: 11-08-2015 09:30
Source: Inactive - Unplanned - Bełchatów B10

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 394 MW
Event type: Planned
Event start: 08-08-2015 00:01
Event end: 12-08-2015 06:00
Source: Inactive - Planned - Bełchatów B06

Outage information

Unit Pątnów 1 B4
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Planned
Event start: 10-08-2015 22:18
Event end: 12-08-2015 17:30
Source: Inactive - Planned - Pątnów 1 B4

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 858 MW
Event type: Planned
Event start: 10-08-2015 00:01
Event end: 13-08-2015 13:45
Source: Inactive - Planned - Bełchatów B14

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 560 MW
Outage size: 100 MW
Event type: Unplanned
Event start: 07-08-2015 22:01
Event end: 15-08-2015 00:00
Source: Inactive - Unplanned - Kozienice 2 B09

Outage information

Unit Pątnów 1 B6
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 08-08-2015 22:04
Event end: 16-08-2015 08:00
Source: Inactive - Unplanned - Pątnów 1 B6

Outage information

Unit EC Siekierki WSIB 09
Achievable generation capacity: 102 MW
Outage size: 102 MW
Event type: Planned
Event start: 04-07-2015 00:01
Event end: 20-09-2015 23:59
Source: Inactive - Planned - EC Siekierki WSIB 09

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 560 MW
Outage size: 230 MW
Event type: Unplanned
Event start: 13-07-2015 06:46
Event end: 29-08-2015 00:00
Source: Inactive - Unplanned - Kozienice 2 B10

Outage information

Unit Veolia Energia Łódź EC4 B03
Achievable generation capacity: 105 MW
Outage size: 105 MW
Event type: Planned
Event start: 25-05-2015 09:54
Event end: 08-10-2015 08:27
Source: Inactive - Planned - Veolia Energia Łódź EC4 B03

Outage information

Unit Dolna Odra B2
Achievable generation capacity: 232 MW
Outage size: 232 MW
Event type: Planned
Event start: 19-07-2015 02:09
Event end: 09-10-2015 03:30
Source: Inactive - Planned - Dolna Odra B2

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 261 MW
Event type: Planned
Event start: 09-08-2015 00:07
Event end: 22-10-2015 18:00
Source: Inactive - Planned - Turów B05

Outage information

Unit EC Siekierki WSIB 08
Achievable generation capacity: 120 MW
Outage size: 120 MW
Event type: Planned
Event start: 21-04-2015 00:01
Event end: 29-11-2015 20:25
Source: Inactive - Planned - EC Siekierki WSIB 08

Outage information

Unit Kozienice 1 B1
Achievable generation capacity: 215 MW
Outage size: 215 MW
Event type: Planned
Event start: 03-08-2015 00:01
Event end: 18-12-2015 05:46
Source: Inactive - Planned - Kozienice 1 B1

Outage information

Unit Ostrołęka B B02
Achievable generation capacity: 200 MW
Outage size: 200 MW
Event type: Planned
Event start: 30-06-2015 00:00
Event end: 29-12-2015 00:00
Source: Inactive - Planned - Ostrołęka B B02

Outage information

Unit Karolin B2
Achievable generation capacity: 100 MW
Outage size: 100 MW
Event type: Planned
Event start: 04-05-2015 00:01
Event end: 20-10-2016 00:00
Source: Inactive - Planned - Karolin B2

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 543 MW
Event type: Planned
Event start: 18-08-2010 03:01
Event end: 18-08-2019 00:00
Source: Inactive - Planned - Opole B6

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.