Generation capacity outages
Generation capacity outages - help- Legend
- no outages
- all outages
- planned
- unplanned
Power producer | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Power plant | Unit | Achievable generation capacity (MW) | March 2024 | April 2024 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Fri 29 | Sat 30 | Sun 31 | Mon 1 | Tue 2 | Wed 3 | Thu 4 | Fri 5 | Sat 6 | Sun 7 | Mon 8 | Tue 9 | Wed 10 | Thu 11 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned | 4205 | 2450 | 3360 | 2837 | 3384 | 3456 | 3456 | 3456 | 3486 | 3486 | 2576 | 2576 | 2607 | 2352 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Unplanned | 2104 | 2266 | 1820 | 1970 | 1720 | 1569 | 1569 | 1569 | 1321 | 1321 | 1321 | 1321 | 1500 | 1305 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total outages | 6309 | 4716 | 5180 | 4807 | 5104 | 5025 | 5025 | 5025 | 4807 | 4807 | 3897 | 3897 | 4107 | 3657 |
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
Outage information
Unit | EC Białystok BIA_1-01 |
Achievable generation capacity: | 50 MW |
Outage size: | 50 MW |
Event type: | Planned |
Event start: | 01-04-2024 00:01 |
Event end: | 13-08-2024 23:45 |
Source: | Active - Planned - EC Białystok BIA_1-01 |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 394 MW |
Event type: | Planned |
Event start: | 30-03-2024 00:01 |
Event end: | 13-04-2024 18:00 |
Source: | Active - Planned - Bełchatów B06 |
Outage information
Unit | Kraków Łęg KLE_1-03 |
Achievable generation capacity: | 102 MW |
Outage size: | 102 MW |
Event type: | Planned |
Event start: | 06-04-2024 00:01 |
Event end: | 13-04-2024 00:00 |
Source: | Active - Planned - Kraków Łęg KLE_1-03 |
Outage information
Unit | Żarnowiec H3 |
Achievable generation capacity: | 195 MW |
Outage size: | 16 MW |
Event type: | Unplanned |
Event start: | 09-06-2023 22:01 |
Event end: | 05-04-2024 22:00 |
Source: | Active - Unplanned - Żarnowiec H3 |
Outage information
Unit | Żarnowiec H1 |
Achievable generation capacity: | 195 MW |
Outage size: | 16 MW |
Event type: | Unplanned |
Event start: | 05-11-2023 22:01 |
Event end: | 30-03-2024 12:00 |
Source: | Active - Unplanned - Żarnowiec H1 |
Outage information
Unit | Solina H3 |
Achievable generation capacity: | 31 MW |
Outage size: | 31 MW |
Event type: | Planned |
Event start: | 10-04-2024 07:01 |
Event end: | 17-04-2024 23:45 |
Source: | Active - Planned - Solina H3 |
Outage information
Unit | Żarnowiec H4 |
Achievable generation capacity: | 195 MW |
Outage size: | 195 MW |
Event type: | Planned |
Event start: | 10-04-2024 07:01 |
Event end: | 29-04-2024 22:00 |
Source: | Active - Planned - Żarnowiec H4 |
Outage information
Unit | Żarnowiec H4 |
Achievable generation capacity: | 195 MW |
Outage size: | 16 MW |
Event type: | Unplanned |
Event start: | 28-12-2023 10:01 |
Event end: | 10-04-2024 07:00 |
Source: | Active - Unplanned - Żarnowiec H4 |
Outage information
Unit | Bełchatów B03 |
Achievable generation capacity: | 380 MW |
Outage size: | 380 MW |
Event type: | Planned |
Event start: | 11-01-2024 00:17 |
Event end: | 10-05-2024 18:00 |
Source: | Active - Planned - Bełchatów B03 |
Outage information
Unit | Żydowo H1 |
Achievable generation capacity: | 55 MW |
Outage size: | 55 MW |
Event type: | Planned |
Event start: | 21-03-2024 07:01 |
Event end: | 31-05-2024 20:00 |
Source: | Active - Planned - Żydowo H1 |
Outage information
Unit | EC Żerań WZE |
Achievable generation capacity: | 299 MW |
Outage size: | 202 MW |
Event type: | Planned |
Event start: | 02-04-2024 00:01 |
Event end: | 28-07-2024 00:00 |
Source: | Active - Planned - EC Żerań WZE |
Outage information
Unit | EC Mielec ECM |
Achievable generation capacity: | 33 MW |
Outage size: | 4 MW |
Event type: | Planned |
Event start: | 20-02-2024 14:01 |
Event end: | 31-12-2024 23:59 |
Source: | Active - Planned - EC Mielec ECM |
Outage information
Unit | Chorzów B2 |
Achievable generation capacity: | 113 MW |
Outage size: | 113 MW |
Event type: | Planned |
Event start: | 20-02-2024 22:00 |
Event end: | 31-03-2024 23:45 |
Source: | Active - Planned - Chorzów B2 |
Outage information
Unit | Pątnów B5 |
Achievable generation capacity: | 200 MW |
Outage size: | 200 MW |
Event type: | Planned |
Event start: | 01-01-2024 00:01 |
Event end: | 01-04-2024 00:00 |
Source: | Active - Planned - Pątnów B5 |
Outage information
Unit | Pątnów B5 |
Achievable generation capacity: | 200 MW |
Outage size: | 200 MW |
Event type: | Unplanned |
Event start: | 01-04-2024 00:01 |
Event end: | 01-01-2025 00:00 |
Source: | Active - Unplanned - Pątnów B5 |
Outage information
Unit | Skawina Tg3 |
Achievable generation capacity: | 110 MW |
Outage size: | 110 MW |
Event type: | Planned |
Event start: | 16-12-2023 14:08 |
Event end: | 01-04-2024 00:00 |
Source: | Active - Planned - Skawina Tg3 |
Outage information
Unit | TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Achievable generation capacity: | 158 MW |
Outage size: | 80 MW |
Event type: | Planned |
Event start: | 04-03-2024 12:00 |
Event end: | 31-12-2024 23:59 |
Source: | Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Outage information
Unit | Jaworzno 2 JWCD B7 |
Achievable generation capacity: | 910 MW |
Outage size: | 910 MW |
Event type: | Planned |
Event start: | 31-03-2024 06:01 |
Event end: | 08-04-2024 00:00 |
Source: | Active - Planned - Jaworzno 2 JWCD B7 |
Outage information
Unit | Kraków Łęg KLE_1-02 |
Achievable generation capacity: | 120 MW |
Outage size: | 120 MW |
Event type: | Planned |
Event start: | 15-03-2024 00:01 |
Event end: | 13-06-2024 00:00 |
Source: | Active - Planned - Kraków Łęg KLE_1-02 |
Outage information
Unit | Turów B01 |
Achievable generation capacity: | 250 MW |
Outage size: | 250 MW |
Event type: | Planned |
Event start: | 09-03-2024 00:07 |
Event end: | 28-04-2024 10:00 |
Source: | Active - Planned - Turów B01 |
Outage information
Unit | Skawina Tg6 |
Achievable generation capacity: | 110 MW |
Outage size: | 110 MW |
Event type: | Planned |
Event start: | 11-03-2024 12:35 |
Event end: | 31-03-2024 23:59 |
Source: | Active - Planned - Skawina Tg6 |
Outage information
Unit | Skawina Tg5 |
Achievable generation capacity: | 110 MW |
Outage size: | 40 MW |
Event type: | Planned |
Event start: | 11-03-2024 07:13 |
Event end: | 31-03-2024 23:59 |
Source: | Active - Planned - Skawina Tg5 |
Outage information
Unit | Pątnów B1 |
Achievable generation capacity: | 222 MW |
Outage size: | 222 MW |
Event type: | Unplanned |
Event start: | 14-03-2024 00:01 |
Event end: | 01-01-2025 00:00 |
Source: | Active - Unplanned - Pątnów B1 |
Outage information
Unit | Bełchatów B10 |
Achievable generation capacity: | 390 MW |
Outage size: | 390 MW |
Event type: | Planned |
Event start: | 18-03-2024 00:01 |
Event end: | 30-03-2024 00:00 |
Source: | Active - Planned - Bełchatów B10 |
Outage information
Unit | EC Wrotków ECW |
Achievable generation capacity: | 231 MW |
Outage size: | 31 MW |
Event type: | Unplanned |
Event start: | 18-03-2024 09:31 |
Event end: | 22-04-2024 00:00 |
Source: | Active - Unplanned - EC Wrotków ECW |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 244 MW |
Event type: | Planned |
Event start: | 29-03-2024 23:01 |
Event end: | 30-03-2024 00:00 |
Source: | Active - Planned - Bełchatów B06 |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 144 MW |
Event type: | Planned |
Event start: | 29-03-2024 20:01 |
Event end: | 29-03-2024 22:00 |
Source: | Active - Planned - Bełchatów B06 |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 194 MW |
Event type: | Planned |
Event start: | 29-03-2024 22:01 |
Event end: | 29-03-2024 23:00 |
Source: | Active - Planned - Bełchatów B06 |
Outage information
Unit | Synthos Dwory 7 TG8 |
Achievable generation capacity: | 20 MW |
Outage size: | 20 MW |
Event type: | Planned |
Event start: | 22-03-2024 00:01 |
Event end: | 22-03-2027 23:59 |
Source: | Active - Planned - Synthos Dwory 7 TG8 |
Outage information
Unit | Synthos Dwory 7 TG7 |
Achievable generation capacity: | 28 MW |
Outage size: | 28 MW |
Event type: | Unplanned |
Event start: | 22-03-2024 00:01 |
Event end: | 15-04-2024 20:00 |
Source: | Active - Unplanned - Synthos Dwory 7 TG7 |
Outage information
Unit | Rybnik B8 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 23-03-2024 00:01 |
Event end: | 01-06-2024 00:00 |
Source: | Active - Planned - Rybnik B8 |
Outage information
Unit | Połaniec B9 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 23-03-2024 00:01 |
Event end: | 18-04-2024 00:00 |
Source: | Active - Planned - Połaniec B9 |
Outage information
Unit | Jaworzno 3 B5 |
Achievable generation capacity: | 220 MW |
Outage size: | 220 MW |
Event type: | Unplanned |
Event start: | 16-01-2024 00:00 |
Event end: | 15-04-2024 00:00 |
Source: | Active - Unplanned - Jaworzno 3 B5 |
Outage information
Unit | Łaziska 3 B10 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Unplanned |
Event start: | 23-03-2024 18:54 |
Event end: | 31-03-2024 00:00 |
Source: | Active - Unplanned - Łaziska 3 B10 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 95 MW |
Event type: | Unplanned |
Event start: | 28-03-2024 23:01 |
Event end: | 29-03-2024 00:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 28-03-2024 23:01 |
Event end: | 29-03-2024 00:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 455 MW |
Event type: | Planned |
Event start: | 28-03-2024 23:01 |
Event end: | 29-03-2024 00:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Synthos Dwory 7 TG10 |
Achievable generation capacity: | 19 MW |
Outage size: | 19 MW |
Event type: | Planned |
Event start: | 26-03-2024 14:00 |
Event end: | 30-09-2024 23:59 |
Source: | Active - Planned - Synthos Dwory 7 TG10 |
Outage information
Unit | Łagisza B10 |
Achievable generation capacity: | 460 MW |
Outage size: | 250 MW |
Event type: | Unplanned |
Event start: | 27-03-2024 11:01 |
Event end: | 02-04-2024 00:00 |
Source: | Active - Unplanned - Łagisza B10 |
Outage information
Unit | Opole B6 |
Achievable generation capacity: | 905 MW |
Outage size: | 455 MW |
Event type: | Planned |
Event start: | 29-03-2024 00:01 |
Event end: | 29-03-2024 04:00 |
Source: | Inactive - Planned - Opole B6 |
Outage information
Unit | Turów B02 |
Achievable generation capacity: | 250 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 27-03-2024 19:01 |
Event end: | 01-04-2024 00:00 |
Source: | Active - Unplanned - Turów B02 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 125 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 15:01 |
Event end: | 29-03-2024 16:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 00:01 |
Event end: | 29-03-2024 01:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 01:01 |
Event end: | 29-03-2024 02:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 02:01 |
Event end: | 29-03-2024 03:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 03:01 |
Event end: | 29-03-2024 04:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 95 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 04:01 |
Event end: | 29-03-2024 05:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 95 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 05:01 |
Event end: | 29-03-2024 06:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 95 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 06:01 |
Event end: | 29-03-2024 07:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 95 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 07:01 |
Event end: | 29-03-2024 08:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 08:01 |
Event end: | 29-03-2024 09:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 09:01 |
Event end: | 29-03-2024 10:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 110 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 10:01 |
Event end: | 29-03-2024 11:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 115 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 11:01 |
Event end: | 29-03-2024 12:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 12:01 |
Event end: | 29-03-2024 13:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 125 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 13:01 |
Event end: | 29-03-2024 14:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 125 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 14:01 |
Event end: | 29-03-2024 15:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 125 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 16:01 |
Event end: | 29-03-2024 17:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 17:01 |
Event end: | 29-03-2024 18:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 115 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 18:01 |
Event end: | 29-03-2024 19:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 115 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 19:01 |
Event end: | 29-03-2024 20:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 110 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 20:01 |
Event end: | 29-03-2024 21:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 110 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 21:01 |
Event end: | 29-03-2024 22:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 110 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 23:01 |
Event end: | 30-03-2024 00:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 110 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 22:01 |
Event end: | 29-03-2024 23:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | EC Żerań WZE |
Achievable generation capacity: | 299 MW |
Outage size: | 105 MW |
Event type: | Planned |
Event start: | 28-03-2024 15:01 |
Event end: | 02-04-2024 00:00 |
Source: | Active - Planned - EC Żerań WZE |
Outage information
Unit | Rybnik B5 |
Achievable generation capacity: | 225 MW |
Outage size: | 25 MW |
Event type: | Unplanned |
Event start: | 28-03-2024 06:46 |
Event end: | 19-04-2024 00:00 |
Source: | Active - Unplanned - Rybnik B5 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 23:01 |
Event end: | 30-03-2024 00:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 01:01 |
Event end: | 29-03-2024 02:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 15:01 |
Event end: | 29-03-2024 16:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 04:01 |
Event end: | 29-03-2024 05:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 09:01 |
Event end: | 29-03-2024 10:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 16:01 |
Event end: | 29-03-2024 17:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 10:01 |
Event end: | 29-03-2024 11:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 05:01 |
Event end: | 29-03-2024 06:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 11:01 |
Event end: | 29-03-2024 12:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 02:01 |
Event end: | 29-03-2024 03:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 12:01 |
Event end: | 29-03-2024 13:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 06:01 |
Event end: | 29-03-2024 07:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 13:01 |
Event end: | 29-03-2024 14:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 07:01 |
Event end: | 29-03-2024 08:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 14:01 |
Event end: | 29-03-2024 15:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 03:01 |
Event end: | 29-03-2024 04:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 08:01 |
Event end: | 29-03-2024 09:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 17:01 |
Event end: | 29-03-2024 18:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 22:01 |
Event end: | 29-03-2024 23:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 18:01 |
Event end: | 29-03-2024 19:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 21:01 |
Event end: | 29-03-2024 22:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 20:01 |
Event end: | 29-03-2024 21:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 19:01 |
Event end: | 29-03-2024 20:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 29-03-2024 00:01 |
Event end: | 29-03-2024 01:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Siekierki WSIK |
Achievable generation capacity: | 160 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 27-03-2024 07:00 |
Event end: | 30-03-2024 00:00 |
Source: | Active - Unplanned - EC Siekierki WSIK |
Outage information
Unit | EC Stalowa Wola Stalowa Wola BGP |
Achievable generation capacity: | 450 MW |
Outage size: | 450 MW |
Event type: | Planned |
Event start: | 02-04-2024 00:01 |
Event end: | 11-04-2024 00:00 |
Source: | Active - Planned - EC Stalowa Wola Stalowa Wola BGP |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 905 MW |
Event type: | Planned |
Event start: | 09-03-2024 00:01 |
Event end: | 29-03-2024 16:00 |
Source: | Active - Planned - Opole B5 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 467 MW |
Event type: | Planned |
Event start: | 29-03-2024 18:01 |
Event end: | 29-03-2024 19:00 |
Source: | Active - Planned - Opole B5 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 624 MW |
Event type: | Planned |
Event start: | 29-03-2024 17:01 |
Event end: | 29-03-2024 18:00 |
Source: | Active - Planned - Opole B5 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 455 MW |
Event type: | Planned |
Event start: | 29-03-2024 19:01 |
Event end: | 30-03-2024 00:00 |
Source: | Active - Planned - Opole B5 |
Outage information
Unit | Opole B5 |
Achievable generation capacity: | 905 MW |
Outage size: | 780 MW |
Event type: | Planned |
Event start: | 29-03-2024 16:01 |
Event end: | 29-03-2024 17:00 |
Source: | Active - Planned - Opole B5 |
Outage information
Unit | Veolia Energia Łódź EC4 B03 |
Achievable generation capacity: | 105 MW |
Outage size: | 105 MW |
Event type: | Unplanned |
Event start: | 28-03-2024 11:50 |
Event end: | 30-04-2024 23:59 |
Source: | Active - Unplanned - Veolia Energia Łódź EC4 B03 |
Outage information
Unit | Synthos Dwory 7 GT1 |
Achievable generation capacity: | 72 MW |
Outage size: | 72 MW |
Event type: | Planned |
Event start: | 03-04-2024 09:00 |
Event end: | 05-04-2024 08:00 |
Source: | Active - Planned - Synthos Dwory 7 GT1 |
Outage information
Unit | Siersza B2 |
Achievable generation capacity: | 153 MW |
Outage size: | 153 MW |
Event type: | Planned |
Event start: | 11-03-2024 00:01 |
Event end: | 29-03-2024 00:01 |
Source: | Inactive - Planned - Siersza B2 |
Outage information
Unit | Eolos Polska Sp. z o.o. FW Gorzkowice |
Achievable generation capacity: | 12 MW |
Outage size: | 2 MW |
Event type: | Planned |
Event start: | 29-03-2024 08:00 |
Event end: | 29-03-2024 15:00 |
Source: | Active - Planned - Eolos Polska Sp. z o.o. FW Gorzkowice |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 23:01 |
Event end: | 31-03-2024 00:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 105 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 01:01 |
Event end: | 30-03-2024 02:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 105 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 02:01 |
Event end: | 30-03-2024 03:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 03:01 |
Event end: | 30-03-2024 04:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 04:01 |
Event end: | 30-03-2024 05:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 05:01 |
Event end: | 30-03-2024 06:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 06:01 |
Event end: | 30-03-2024 07:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 07:01 |
Event end: | 30-03-2024 08:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 110 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 08:01 |
Event end: | 30-03-2024 09:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 115 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 09:01 |
Event end: | 30-03-2024 10:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 125 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 10:01 |
Event end: | 30-03-2024 11:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 135 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 11:01 |
Event end: | 30-03-2024 12:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 105 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 00:01 |
Event end: | 30-03-2024 01:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 140 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 12:01 |
Event end: | 30-03-2024 13:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 140 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 13:01 |
Event end: | 30-03-2024 14:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 145 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 14:01 |
Event end: | 30-03-2024 15:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 145 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 15:01 |
Event end: | 30-03-2024 16:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 145 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 16:01 |
Event end: | 30-03-2024 17:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 140 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 17:01 |
Event end: | 30-03-2024 18:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 130 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 18:01 |
Event end: | 30-03-2024 19:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 130 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 19:01 |
Event end: | 30-03-2024 20:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 125 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 20:01 |
Event end: | 30-03-2024 21:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 21:01 |
Event end: | 30-03-2024 22:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 120 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 22:01 |
Event end: | 30-03-2024 23:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 02:01 |
Event end: | 30-03-2024 03:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 06:01 |
Event end: | 30-03-2024 07:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 05:01 |
Event end: | 30-03-2024 06:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 04:01 |
Event end: | 30-03-2024 05:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 03:01 |
Event end: | 30-03-2024 04:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 00:01 |
Event end: | 30-03-2024 01:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 40 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 01:01 |
Event end: | 30-03-2024 02:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 23:01 |
Event end: | 31-03-2024 00:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 22:01 |
Event end: | 30-03-2024 23:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 21:01 |
Event end: | 30-03-2024 22:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 20:01 |
Event end: | 30-03-2024 21:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 19:01 |
Event end: | 30-03-2024 20:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 18:01 |
Event end: | 30-03-2024 19:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 55 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 17:01 |
Event end: | 30-03-2024 18:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 55 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 16:01 |
Event end: | 30-03-2024 17:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 15:01 |
Event end: | 30-03-2024 16:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 14:01 |
Event end: | 30-03-2024 15:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 13:01 |
Event end: | 30-03-2024 14:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 55 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 12:01 |
Event end: | 30-03-2024 13:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 55 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 11:01 |
Event end: | 30-03-2024 12:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 10:01 |
Event end: | 30-03-2024 11:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 09:01 |
Event end: | 30-03-2024 10:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 08:01 |
Event end: | 30-03-2024 09:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 45 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 07:01 |
Event end: | 30-03-2024 08:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Żerań 2 B20 |
Achievable generation capacity: | 497 MW |
Outage size: | 232 MW |
Event type: | Unplanned |
Event start: | 27-03-2024 00:01 |
Event end: | 06-04-2024 00:00 |
Source: | Active - Unplanned - EC Żerań 2 B20 |
Outage information
Unit | Turów B04 |
Achievable generation capacity: | 261 MW |
Outage size: | 151 MW |
Event type: | Unplanned |
Event start: | 28-03-2024 13:31 |
Event end: | 03-04-2024 00:00 |
Source: | Active - Unplanned - Turów B04 |
Outage information
Unit | Pątnów B2 |
Achievable generation capacity: | 222 MW |
Outage size: | 222 MW |
Event type: | Unplanned |
Event start: | 20-03-2024 00:01 |
Event end: | 30-03-2024 00:00 |
Source: | Active - Unplanned - Pątnów B2 |
Outage information
Unit | Pątnów B9 B9 |
Achievable generation capacity: | 474 MW |
Outage size: | 474 MW |
Event type: | Unplanned |
Event start: | 30-03-2024 07:01 |
Event end: | 01-01-2025 00:00 |
Source: | Active - Unplanned - Pątnów B9 B9 |
The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.
The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.
The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.