Generation capacity outages
Generation capacity outages - help- Legend
- no outages
- all outages
- planned
- unplanned
Power producer | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Power plant | Unit | Achievable generation capacity (MW) | February 2023 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Thu 9 | Fri 10 | Sat 11 | Sun 12 | Mon 13 | Tue 14 | Wed 15 | Thu 16 | Fri 17 | Sat 18 | Sun 19 | Mon 20 | Tue 21 | Wed 22 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Unplanned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
- Planned (WIT)
Outage information
Unit | Kozienice 1 B7 |
Achievable generation capacity: | 220 MW |
Outage size: | 220 MW |
Event type: | Planned |
Event start: | 16-01-2023 00:01 |
Event end: | 17-03-2023 00:00 |
Source: | Active - Planned - Kozienice 1 B7 |
Outage information
Unit | Bełchatów B11 |
Achievable generation capacity: | 390 MW |
Outage size: | 390 MW |
Event type: | Planned |
Event start: | 19-02-2023 00:01 |
Event end: | 26-03-2023 18:00 |
Source: | Active - Planned - Bełchatów B11 |
Outage information
Unit | Opole B3 |
Achievable generation capacity: | 383 MW |
Outage size: | 383 MW |
Event type: | Planned |
Event start: | 17-02-2023 00:01 |
Event end: | 27-02-2023 00:00 |
Source: | Active - Planned - Opole B3 |
Outage information
Unit | Pątnów B5 |
Achievable generation capacity: | 200 MW |
Outage size: | 200 MW |
Event type: | Unplanned |
Event start: | 07-12-2022 00:01 |
Event end: | 01-01-2024 00:00 |
Source: | Active - Unplanned - Pątnów B5 |
Outage information
Unit | Opole B4 |
Achievable generation capacity: | 380 MW |
Outage size: | 380 MW |
Event type: | Planned |
Event start: | 27-12-2022 00:01 |
Event end: | 06-04-2023 00:00 |
Source: | Active - Planned - Opole B4 |
Outage information
Unit | TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Achievable generation capacity: | 158 MW |
Outage size: | 80 MW |
Event type: | Planned |
Event start: | 04-08-2022 00:00 |
Event end: | 31-12-2023 23:59 |
Source: | Active - Planned - TAMEH Polska sp. z o. o. Elektrownia Blachownia |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 465 MW |
Event type: | Unplanned |
Event start: | 15-02-2023 00:01 |
Event end: | 23-02-2023 12:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | Bełchatów B07 |
Achievable generation capacity: | 390 MW |
Outage size: | 390 MW |
Event type: | Planned |
Event start: | 07-01-2023 01:26 |
Event end: | 07-05-2023 18:00 |
Source: | Active - Planned - Bełchatów B07 |
Outage information
Unit | Pątnów B2 |
Achievable generation capacity: | 222 MW |
Outage size: | 222 MW |
Event type: | Unplanned |
Event start: | 09-01-2023 20:22 |
Event end: | 01-01-2024 00:00 |
Source: | Active - Unplanned - Pątnów B2 |
Outage information
Unit | Pątnów B9 B9 |
Achievable generation capacity: | 474 MW |
Outage size: | 474 MW |
Event type: | Unplanned |
Event start: | 23-01-2023 22:01 |
Event end: | 01-01-2024 00:00 |
Source: | Active - Unplanned - Pątnów B9 B9 |
Outage information
Unit | Porąbka Żar H2 |
Achievable generation capacity: | 138 MW |
Outage size: | 138 MW |
Event type: | Unplanned |
Event start: | 27-01-2023 18:31 |
Event end: | 07-05-2023 23:59 |
Source: | Active - Unplanned - Porąbka Żar H2 |
Outage information
Unit | Dolna Odra B8 |
Achievable generation capacity: | 232 MW |
Outage size: | 232 MW |
Event type: | Planned |
Event start: | 27-01-2023 00:00 |
Event end: | 01-03-2023 00:00 |
Source: | Active - Planned - Dolna Odra B8 |
Outage information
Unit | EC Żerań 2 B20 |
Achievable generation capacity: | 497 MW |
Outage size: | 217 MW |
Event type: | Planned |
Event start: | 30-01-2023 11:55 |
Event end: | 01-04-2023 00:00 |
Source: | Active - Planned - EC Żerań 2 B20 |
Outage information
Unit | Żydowo H1 |
Achievable generation capacity: | 55 MW |
Outage size: | 55 MW |
Event type: | Planned |
Event start: | 13-02-2023 08:01 |
Event end: | 13-02-2023 09:00 |
Source: | Active - Planned - Żydowo H1 |
Outage information
Unit | Żydowo H3 |
Achievable generation capacity: | 57 MW |
Outage size: | 57 MW |
Event type: | Planned |
Event start: | 13-02-2023 08:01 |
Event end: | 13-02-2023 09:00 |
Source: | Active - Planned - Żydowo H3 |
Outage information
Unit | Żydowo H1 |
Achievable generation capacity: | 55 MW |
Outage size: | 55 MW |
Event type: | Planned |
Event start: | 20-02-2023 08:01 |
Event end: | 20-02-2023 10:00 |
Source: | Active - Planned - Żydowo H1 |
Outage information
Unit | Żydowo H2 |
Achievable generation capacity: | 55 MW |
Outage size: | 55 MW |
Event type: | Planned |
Event start: | 20-02-2023 08:01 |
Event end: | 20-02-2023 10:00 |
Source: | Active - Planned - Żydowo H2 |
Outage information
Unit | Żydowo H3 |
Achievable generation capacity: | 57 MW |
Outage size: | 57 MW |
Event type: | Planned |
Event start: | 20-02-2023 08:01 |
Event end: | 20-02-2023 10:00 |
Source: | Active - Planned - Żydowo H3 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 125 MW |
Event type: | Planned |
Event start: | 09-02-2023 07:01 |
Event end: | 09-02-2023 10:00 |
Source: | Inactive - Planned - Kozienice 2 B11 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 325 MW |
Event type: | Planned |
Event start: | 09-02-2023 10:01 |
Event end: | 09-02-2023 14:00 |
Source: | Inactive - Planned - Kozienice 2 B11 |
Outage information
Unit | Turów B01 |
Achievable generation capacity: | 250 MW |
Outage size: | 250 MW |
Event type: | Planned |
Event start: | 04-02-2023 00:14 |
Event end: | 12-02-2023 00:00 |
Source: | Active - Planned - Turów B01 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 09-02-2023 14:01 |
Event end: | 09-02-2023 15:00 |
Source: | Active - Planned - Kozienice 2 B11 |
Outage information
Unit | Bełchatów B02 |
Achievable generation capacity: | 370 MW |
Outage size: | 370 MW |
Event type: | Planned |
Event start: | 05-02-2023 00:46 |
Event end: | 18-02-2023 18:00 |
Source: | Active - Planned - Bełchatów B02 |
Outage information
Unit | Skawina Tg5 |
Achievable generation capacity: | 110 MW |
Outage size: | 40 MW |
Event type: | Planned |
Event start: | 05-02-2023 21:00 |
Event end: | 28-02-2023 23:59 |
Source: | Active - Planned - Skawina Tg5 |
Outage information
Unit | Skawina Tg6 |
Achievable generation capacity: | 110 MW |
Outage size: | 45 MW |
Event type: | Planned |
Event start: | 05-02-2023 21:00 |
Event end: | 28-02-2023 23:59 |
Source: | Active - Planned - Skawina Tg6 |
Outage information
Unit | Bełchatów B14 |
Achievable generation capacity: | 858 MW |
Outage size: | 138 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 00:01 |
Event end: | 11-02-2023 00:00 |
Source: | Active - Unplanned - Bełchatów B14 |
Outage information
Unit | Połaniec B6 |
Achievable generation capacity: | 242 MW |
Outage size: | 242 MW |
Event type: | Unplanned |
Event start: | 05-02-2023 19:01 |
Event end: | 10-02-2023 19:00 |
Source: | Active - Unplanned - Połaniec B6 |
Outage information
Unit | Dolna Odra B5 |
Achievable generation capacity: | 222 MW |
Outage size: | 222 MW |
Event type: | Planned |
Event start: | 13-02-2023 06:01 |
Event end: | 15-02-2023 22:00 |
Source: | Active - Planned - Dolna Odra B5 |
Outage information
Unit | Skawina Tg3 |
Achievable generation capacity: | 110 MW |
Outage size: | 110 MW |
Event type: | Planned |
Event start: | 07-02-2023 00:01 |
Event end: | 14-02-2023 23:59 |
Source: | Active - Planned - Skawina Tg3 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 23:01 |
Event end: | 09-02-2023 00:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 81 MW |
Event type: | Planned |
Event start: | 10-02-2023 07:01 |
Event end: | 10-02-2023 13:00 |
Source: | Active - Planned - Kozienice 2 B11 |
Outage information
Unit | Turów B03 |
Achievable generation capacity: | 250 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 22:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Turów B03 |
Outage information
Unit | Turów B03 |
Achievable generation capacity: | 250 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 22:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Turów B03 |
Outage information
Unit | Turów B03 |
Achievable generation capacity: | 250 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 22:01 |
Event end: | 11-02-2023 06:00 |
Source: | Active - Unplanned - Turów B03 |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 394 MW |
Event type: | Planned |
Event start: | 11-02-2023 00:01 |
Event end: | 18-02-2023 00:00 |
Source: | Active - Planned - Bełchatów B06 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 23:01 |
Event end: | 09-02-2023 00:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | Opole B2 |
Achievable generation capacity: | 383 MW |
Outage size: | 33 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 00:01 |
Event end: | 09-02-2023 00:00 |
Source: | Inactive - Unplanned - Opole B2 |
Outage information
Unit | Dolna Odra B5 |
Achievable generation capacity: | 222 MW |
Outage size: | 222 MW |
Event type: | Planned |
Event start: | 08-02-2023 00:22 |
Event end: | 13-02-2023 06:00 |
Source: | Active - Planned - Dolna Odra B5 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 50 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 00:01 |
Event end: | 09-02-2023 01:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 15:01 |
Event end: | 09-02-2023 16:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 55 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 10:01 |
Event end: | 09-02-2023 11:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 17:01 |
Event end: | 09-02-2023 18:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 14:01 |
Event end: | 09-02-2023 15:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 16:01 |
Event end: | 09-02-2023 17:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 55 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 11:01 |
Event end: | 09-02-2023 12:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 12:01 |
Event end: | 09-02-2023 13:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 23:01 |
Event end: | 10-02-2023 00:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 22:01 |
Event end: | 09-02-2023 23:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 13:01 |
Event end: | 09-02-2023 14:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 21:01 |
Event end: | 09-02-2023 22:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 20:01 |
Event end: | 09-02-2023 21:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 19:01 |
Event end: | 09-02-2023 20:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 18:01 |
Event end: | 09-02-2023 19:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Ostrołęka B B01 |
Achievable generation capacity: | 230 MW |
Outage size: | 230 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 05:01 |
Event end: | 12-02-2023 00:01 |
Source: | Active - Unplanned - Ostrołęka B B01 |
Outage information
Unit | Rybnik B6 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 09-02-2023 00:01 |
Event end: | 11-02-2023 00:00 |
Source: | Active - Planned - Rybnik B6 |
Outage information
Unit | Kozienice 1 B1 |
Achievable generation capacity: | 228 MW |
Outage size: | 228 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 00:01 |
Event end: | 13-02-2023 00:00 |
Source: | Active - Unplanned - Kozienice 1 B1 |
Outage information
Unit | Kozienice 1 B2 |
Achievable generation capacity: | 228 MW |
Outage size: | 88 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 22:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Kozienice 1 B2 |
Outage information
Unit | Kozienice 1 B2 |
Achievable generation capacity: | 228 MW |
Outage size: | 88 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 22:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Kozienice 1 B2 |
Outage information
Unit | Kozienice 1 B3 |
Achievable generation capacity: | 220 MW |
Outage size: | 80 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 22:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Kozienice 1 B3 |
Outage information
Unit | Kozienice 1 B3 |
Achievable generation capacity: | 220 MW |
Outage size: | 80 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 22:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Kozienice 1 B3 |
Outage information
Unit | Kozienice 1 B6 |
Achievable generation capacity: | 228 MW |
Outage size: | 88 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 22:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Kozienice 1 B6 |
Outage information
Unit | Kozienice 1 B6 |
Achievable generation capacity: | 228 MW |
Outage size: | 88 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 22:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Kozienice 1 B6 |
Outage information
Unit | Kozienice 1 B8 |
Achievable generation capacity: | 220 MW |
Outage size: | 80 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 22:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Kozienice 1 B8 |
Outage information
Unit | Kozienice 1 B4 |
Achievable generation capacity: | 228 MW |
Outage size: | 88 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 22:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Kozienice 1 B4 |
Outage information
Unit | Kozienice 1 B4 |
Achievable generation capacity: | 228 MW |
Outage size: | 88 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 22:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Kozienice 1 B4 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 615 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 22:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Kozienice 2 B11 |
Outage information
Unit | Kozienice 2 B10 |
Achievable generation capacity: | 566 MW |
Outage size: | 250 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 22:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Kozienice 2 B10 |
Outage information
Unit | Kozienice 1 B8 |
Achievable generation capacity: | 220 MW |
Outage size: | 80 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 22:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Kozienice 1 B8 |
Outage information
Unit | Kozienice 2 B10 |
Achievable generation capacity: | 566 MW |
Outage size: | 250 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 22:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Kozienice 2 B10 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 615 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 22:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Kozienice 2 B11 |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 00:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Bełchatów B06 |
Outage information
Unit | Bełchatów B10 |
Achievable generation capacity: | 390 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 00:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Bełchatów B10 |
Outage information
Unit | Bełchatów B11 |
Achievable generation capacity: | 390 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 00:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Bełchatów B11 |
Outage information
Unit | Bełchatów B04 |
Achievable generation capacity: | 380 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 00:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Bełchatów B04 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 00:01 |
Event end: | 09-02-2023 01:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 02:01 |
Event end: | 09-02-2023 03:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 05:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 03:01 |
Event end: | 09-02-2023 04:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 06:01 |
Event end: | 09-02-2023 07:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 04:01 |
Event end: | 09-02-2023 05:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 07:01 |
Event end: | 09-02-2023 08:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 01:01 |
Event end: | 09-02-2023 02:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 08:01 |
Event end: | 09-02-2023 09:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 12:01 |
Event end: | 09-02-2023 13:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 09:01 |
Event end: | 09-02-2023 10:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 10:01 |
Event end: | 09-02-2023 11:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 11:01 |
Event end: | 09-02-2023 12:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 13:01 |
Event end: | 09-02-2023 14:00 |
Source: | Inactive - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 14:01 |
Event end: | 09-02-2023 15:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 15:01 |
Event end: | 09-02-2023 16:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 16:01 |
Event end: | 09-02-2023 17:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 17:01 |
Event end: | 09-02-2023 18:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 18:01 |
Event end: | 09-02-2023 19:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 19:01 |
Event end: | 09-02-2023 20:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 20:01 |
Event end: | 09-02-2023 21:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 21:01 |
Event end: | 09-02-2023 22:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 22:01 |
Event end: | 09-02-2023 23:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 23:01 |
Event end: | 10-02-2023 00:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | Bełchatów B05 |
Achievable generation capacity: | 380 MW |
Outage size: | 80 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 19:01 |
Event end: | 09-02-2023 00:00 |
Source: | Inactive - Unplanned - Bełchatów B05 |
Outage information
Unit | Ostrołęka B B02 |
Achievable generation capacity: | 230 MW |
Outage size: | 90 MW |
Event type: | Planned |
Event start: | 08-02-2023 21:01 |
Event end: | 10-02-2023 00:00 |
Source: | Active - Planned - Ostrołęka B B02 |
Outage information
Unit | Bełchatów B09 |
Achievable generation capacity: | 390 MW |
Outage size: | 20 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 19:01 |
Event end: | 09-02-2023 00:00 |
Source: | Inactive - Unplanned - Bełchatów B09 |
Outage information
Unit | Kozienice 2 B09 |
Achievable generation capacity: | 566 MW |
Outage size: | 566 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 19:46 |
Event end: | 13-02-2023 00:00 |
Source: | Active - Unplanned - Kozienice 2 B09 |
Outage information
Unit | Opole B2 |
Achievable generation capacity: | 383 MW |
Outage size: | 383 MW |
Event type: | Planned |
Event start: | 09-02-2023 02:01 |
Event end: | 10-02-2023 00:00 |
Source: | Active - Planned - Opole B2 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 55 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 01:01 |
Event end: | 09-02-2023 02:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 04:01 |
Event end: | 09-02-2023 05:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 02:01 |
Event end: | 09-02-2023 03:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 05:01 |
Event end: | 09-02-2023 06:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 06:01 |
Event end: | 09-02-2023 07:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 03:01 |
Event end: | 09-02-2023 04:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 02:01 |
Event end: | 10-02-2023 03:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 09:01 |
Event end: | 09-02-2023 10:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 00:01 |
Event end: | 10-02-2023 01:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 07:01 |
Event end: | 09-02-2023 08:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 01:01 |
Event end: | 10-02-2023 02:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 08:01 |
Event end: | 09-02-2023 09:00 |
Source: | Inactive - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 05:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 06:01 |
Event end: | 10-02-2023 07:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 07:01 |
Event end: | 10-02-2023 08:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 08:01 |
Event end: | 10-02-2023 09:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 65 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 09:01 |
Event end: | 10-02-2023 10:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 10:01 |
Event end: | 10-02-2023 11:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 11:01 |
Event end: | 10-02-2023 12:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 12:01 |
Event end: | 10-02-2023 13:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 13:01 |
Event end: | 10-02-2023 14:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 14:01 |
Event end: | 10-02-2023 15:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 15:01 |
Event end: | 10-02-2023 16:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 16:01 |
Event end: | 10-02-2023 17:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 17:01 |
Event end: | 10-02-2023 18:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 18:01 |
Event end: | 10-02-2023 19:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 19:01 |
Event end: | 10-02-2023 20:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 20:01 |
Event end: | 10-02-2023 21:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 21:01 |
Event end: | 10-02-2023 22:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 22:01 |
Event end: | 10-02-2023 23:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 70 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 23:01 |
Event end: | 11-02-2023 00:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 04:01 |
Event end: | 10-02-2023 05:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Płock B01 |
Achievable generation capacity: | 630 MW |
Outage size: | 60 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 03:01 |
Event end: | 10-02-2023 04:00 |
Source: | Active - Unplanned - Płock B01 |
Outage information
Unit | Połaniec B5 |
Achievable generation capacity: | 242 MW |
Outage size: | 242 MW |
Event type: | Unplanned |
Event start: | 06-02-2023 17:05 |
Event end: | 09-02-2023 03:00 |
Source: | Inactive - Unplanned - Połaniec B5 |
Outage information
Unit | Bełchatów B12 |
Achievable generation capacity: | 390 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 00:01 |
Event end: | 09-02-2023 06:02 |
Source: | Inactive - Unplanned - Bełchatów B12 |
Outage information
Unit | Bełchatów B10 |
Achievable generation capacity: | 390 MW |
Outage size: | 90 MW |
Event type: | Planned |
Event start: | 12-02-2023 07:01 |
Event end: | 12-02-2023 12:00 |
Source: | Active - Planned - Bełchatów B10 |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 144 MW |
Event type: | Planned |
Event start: | 10-02-2023 21:01 |
Event end: | 10-02-2023 22:00 |
Source: | Active - Planned - Bełchatów B06 |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 94 MW |
Event type: | Planned |
Event start: | 10-02-2023 20:01 |
Event end: | 10-02-2023 21:00 |
Source: | Active - Planned - Bełchatów B06 |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 194 MW |
Event type: | Planned |
Event start: | 10-02-2023 22:01 |
Event end: | 10-02-2023 23:00 |
Source: | Active - Planned - Bełchatów B06 |
Outage information
Unit | Bełchatów B09 |
Achievable generation capacity: | 390 MW |
Outage size: | 90 MW |
Event type: | Planned |
Event start: | 11-02-2023 07:01 |
Event end: | 11-02-2023 12:00 |
Source: | Active - Planned - Bełchatów B09 |
Outage information
Unit | Bełchatów B06 |
Achievable generation capacity: | 394 MW |
Outage size: | 244 MW |
Event type: | Planned |
Event start: | 10-02-2023 23:01 |
Event end: | 11-02-2023 00:00 |
Source: | Active - Planned - Bełchatów B06 |
Outage information
Unit | Kozienice 1 B3 |
Achievable generation capacity: | 220 MW |
Outage size: | 220 MW |
Event type: | Unplanned |
Event start: | 11-02-2023 00:01 |
Event end: | 13-02-2023 00:00 |
Source: | Active - Unplanned - Kozienice 1 B3 |
Outage information
Unit | Kozienice 1 B5 |
Achievable generation capacity: | 228 MW |
Outage size: | 228 MW |
Event type: | Unplanned |
Event start: | 08-02-2023 00:12 |
Event end: | 12-02-2023 18:00 |
Source: | Active - Unplanned - Kozienice 1 B5 |
Outage information
Unit | Kozienice 2 B10 |
Achievable generation capacity: | 566 MW |
Outage size: | 566 MW |
Event type: | Unplanned |
Event start: | 11-02-2023 00:01 |
Event end: | 12-02-2023 18:00 |
Source: | Active - Unplanned - Kozienice 2 B10 |
Outage information
Unit | Łaziska 3 B11 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 21-11-2022 00:01 |
Event end: | 13-05-2023 00:00 |
Source: | Active - Planned - Łaziska 3 B11 |
Outage information
Unit | Łaziska 3 B12 |
Achievable generation capacity: | 225 MW |
Outage size: | 225 MW |
Event type: | Planned |
Event start: | 28-11-2022 00:01 |
Event end: | 09-05-2023 00:00 |
Source: | Active - Planned - Łaziska 3 B12 |
Outage information
Unit | Połaniec B3 |
Achievable generation capacity: | 242 MW |
Outage size: | 242 MW |
Event type: | Unplanned |
Event start: | 06-02-2023 10:21 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Połaniec B3 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 01:01 |
Event end: | 10-02-2023 02:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 00:01 |
Event end: | 10-02-2023 01:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 19:01 |
Event end: | 10-02-2023 20:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 22:01 |
Event end: | 10-02-2023 23:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 23:01 |
Event end: | 11-02-2023 00:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 07:01 |
Event end: | 10-02-2023 08:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 05:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 06:01 |
Event end: | 10-02-2023 07:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 04:01 |
Event end: | 10-02-2023 05:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 03:01 |
Event end: | 10-02-2023 04:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 18:01 |
Event end: | 10-02-2023 19:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 02:01 |
Event end: | 10-02-2023 03:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 17:01 |
Event end: | 10-02-2023 18:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 16:01 |
Event end: | 10-02-2023 17:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 15:01 |
Event end: | 10-02-2023 16:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 14:01 |
Event end: | 10-02-2023 15:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 13:01 |
Event end: | 10-02-2023 14:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 12:01 |
Event end: | 10-02-2023 13:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 11:01 |
Event end: | 10-02-2023 12:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 10:01 |
Event end: | 10-02-2023 11:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 09:01 |
Event end: | 10-02-2023 10:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 08:01 |
Event end: | 10-02-2023 09:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 20:01 |
Event end: | 10-02-2023 21:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | EC Włocławek B1 |
Achievable generation capacity: | 465 MW |
Outage size: | 30 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 21:01 |
Event end: | 10-02-2023 22:00 |
Source: | Active - Unplanned - EC Włocławek B1 |
Outage information
Unit | Bełchatów B05 |
Achievable generation capacity: | 380 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 00:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B05 |
Outage information
Unit | Bełchatów B10 |
Achievable generation capacity: | 390 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 00:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B10 |
Outage information
Unit | Bełchatów B11 |
Achievable generation capacity: | 390 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 00:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B11 |
Outage information
Unit | Bełchatów B04 |
Achievable generation capacity: | 380 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 00:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B04 |
Outage information
Unit | Bełchatów B12 |
Achievable generation capacity: | 390 MW |
Outage size: | 100 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 00:01 |
Event end: | 10-02-2023 06:00 |
Source: | Active - Unplanned - Bełchatów B12 |
Outage information
Unit | Siersza B2 |
Achievable generation capacity: | 153 MW |
Outage size: | 153 MW |
Event type: | Planned |
Event start: | 11-02-2023 06:01 |
Event end: | 13-02-2023 00:00 |
Source: | Active - Planned - Siersza B2 |
Outage information
Unit | Turów B04 |
Achievable generation capacity: | 261 MW |
Outage size: | 141 MW |
Event type: | Unplanned |
Event start: | 11-02-2023 10:01 |
Event end: | 11-02-2023 14:00 |
Source: | Active - Unplanned - Turów B04 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 510 MW |
Event type: | Unplanned |
Event start: | 11-02-2023 22:01 |
Event end: | 12-02-2023 06:00 |
Source: | Active - Unplanned - Kozienice 2 B11 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 510 MW |
Event type: | Unplanned |
Event start: | 10-02-2023 22:01 |
Event end: | 11-02-2023 06:00 |
Source: | Active - Unplanned - Kozienice 2 B11 |
Outage information
Unit | Kozienice 2 B11 |
Achievable generation capacity: | 1075 MW |
Outage size: | 510 MW |
Event type: | Unplanned |
Event start: | 12-02-2023 22:01 |
Event end: | 13-02-2023 06:00 |
Source: | Active - Unplanned - Kozienice 2 B11 |
Outage information
Unit | Połaniec B2 |
Achievable generation capacity: | 242 MW |
Outage size: | 242 MW |
Event type: | Unplanned |
Event start: | 09-02-2023 09:25 |
Event end: | 12-02-2023 19:00 |
Source: | Active - Unplanned - Połaniec B2 |
Outage information
Unit | Porąbka Żar H4 |
Achievable generation capacity: | 138 MW |
Outage size: | 138 MW |
Event type: | Planned |
Event start: | 09-02-2023 12:02 |
Event end: | 09-02-2023 12:15 |
Source: | Inactive - Planned - Porąbka Żar H4 |
Outage information
Unit | Kozienice 1 B2 |
Achievable generation capacity: | 228 MW |
Outage size: | 44 MW |
Event type: | Planned |
Event start: | 10-02-2023 12:01 |
Event end: | 10-02-2023 13:00 |
Source: | Active - Planned - Kozienice 1 B2 |
Outage information
Unit | Porąbka Żar H3 |
Achievable generation capacity: | 138 MW |
Outage size: | 138 MW |
Event type: | Planned |
Event start: | 09-02-2023 12:02 |
Event end: | 09-02-2023 14:30 |
Source: | Inactive - Planned - Porąbka Żar H3 |
Outage information
Unit | Porąbka Żar H4 |
Achievable generation capacity: | 138 MW |
Outage size: | 138 MW |
Event type: | Planned |
Event start: | 09-02-2023 14:15 |
Event end: | 09-02-2023 14:30 |
Source: | Inactive - Planned - Porąbka Żar H4 |
Outage information
Unit | Ostrołęka B B03 |
Achievable generation capacity: | 230 MW |
Outage size: | 230 MW |
Event type: | Planned |
Event start: | 11-02-2023 00:01 |
Event end: | 13-02-2023 00:00 |
Source: | Active - Planned - Ostrołęka B B03 |
The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.
The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.
The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.