Generation capacity outages

Generation capacity outages - help
  • Legend
  • no outages
  • all outages
  • planned
  • unplanned
Power producer
Power plant Unit Achievable generation capacity
(MW)
December 2021
Sat 4 Sun 5 Mon 6 Tue 7 Wed 8 Thu 9 Fri 10 Sat 11 Sun 12 Mon 13 Tue 14 Wed 15 Thu 16 Fri 17
Bełchatów 5102
B02 370 370 370 145
B03 380
B04 380
B05 380
B06 394 90
B07 390 90
B08 390 90
B09 390
B10 390
B11 390
B12 390 390 390
B14 858 120
Chorzów 226
B1 113
B2 113
Dolna Odra 900
B5 222
B6 222 222 222 222 222 222 222 222 222 222 222 222 222 222 222
B7 224 224 224 224 224 224 224 224
B8 232
Dychów 85
H1 28
H2 29
H3 28
EC Białystok 154
BIA_1-01 50
BIA_1-02 52 52 52
BIA_1-03 52
EC Gorzów 138
GOR2 138
EC Rzeszów 120
ECR 120
EC Siekierki 595
WSIB 07 106 106 106 106
WSIB 08 125
WSIB 09 102
WSIB 10 102
WSIK 160
EC Stalowa Wola 450
Stalowa Wola BGP 450 150
EC Włocławek 465
B1 465 45 45 45
EC Wrotków 231
ECW 231 225 225 225 225 225 225 225 225
EC Żerań 299
WZE 299
EW Włocławek 168
H01 28
H02 28
H03 28
H04 28
H05 28
H06 28
FW Biały Bór 145
BBFW 145
FW Marszewo 100
FMA 100
Jaworzno 2 910
JWCD B7 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910
Jaworzno 3 1345
B1 225
B2 225
B3 225
B4 225 225 225
B5 220
B6 225 225 225 225
Karolin 212
B2 100
B3 112
Katowice 135
B1 135
Kozienice 1 1821
B1 228
B2 228
B3 225 225 225
B4 228
B5 228
B6 228 228 228
B7 228 220 220
B8 228 228 228 23 45
Kozienice 2 2195
B09 560 150 566
B10 560 150
B11 1075
Łagisza 700
B10 460 460 460 460
B6 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
B7 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
Łaziska 2 250
B1 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125
B2 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125
Łaziska 3 905
B09 230
B10 225
B11 225
B12 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225
Opole 3342
B1 386 386 386
B2 383 383 383
B3 383 383 383 203 203 203
B4 380 200 200 200 200 200 200 155
B5 905 905 905 905 905 905 905 905 905 905 905 905 905 905 905
B6 905 400 250 300 400
Ostrołęka B 690
B01 230
B02 230 230 230
B03 230 230 230 230 230 230
Pątnów 644
B1 222
B2 222
B5 200
Pątnów B9 474
B9 474 474
Płock 630
B01 630 115 115 115
Połaniec 1882
B1 225 35
B2 242
B3 242 242 242 242 242 242 242 242 242 242 242 242 242 242 242
B4 242
B5 225
B6 242
B7 239 239
B9 225 225 225 225 225 225
Porąbka Żar 540
H1 135 138 138
H2 135
H3 135
H4 135
Rybnik 1350
B3 225 225 225 225 225 225 225 225
B4 225 225 225 225 225 225 225 225
B5 225 225 225 225 225 225 225 225 225 225
B6 225
B7 225 225 225
B8 225
Siersza 557
B1 153
B2 153
B3 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123
B6 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128
Skawina 330
Tg3 110 30 30 30 30 30 30 30 30 30
Tg5 110 30 30 30 30 30 30 30 30 30
Tg6 110 110 110 110 110 110 110 110 110 110
Solina 198
H1 68
H2 68
H3 31
H4 31
Stalowa Wola 3 250
B7 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125
B8 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125
TAMEH Polska sp. z o. o. 158
Elektrownia Blachownia 158
Turów 2029
B01 250 70
B02 250
B03 250 60
B04 261
B05 261 261 261 261 261 261
B06 261 157
B11 496
Veolia Energia Łódź EC4 105
B03 105
Windfarm Polska III sp. z o.o. 126
WINDFARM 126
Żarnowiec 716
H1 179
H2 179
H3 179
H4 179
Żydowo 167
H1 55
H2 55
H3 57
Planned 8981 8689 5303 6858 6325 4933 4766 3205 2980 2585 2585 2585 2585 2585
Unplanned 8072 6830 6459 1710 1048 910 910 1048 910 910 910 910 910 910
Total outages 17053 15519 11762 8568 7373 5843 5676 4253 3890 3495 3495 3495 3495 3495

Outage information

Unit Łagisza B6
Achievable generation capacity: 120 MW
Outage size: 120 MW
Event type: Planned
Event start: 01-01-2021 00:01
Event end: 01-01-2024 00:00
Source: Active - Planned - Łagisza B6

Outage information

Unit Łagisza B7
Achievable generation capacity: 120 MW
Outage size: 120 MW
Event type: Planned
Event start: 01-01-2021 00:01
Event end: 01-01-2024 00:00
Source: Active - Planned - Łagisza B7

Outage information

Unit Siersza B3
Achievable generation capacity: 123 MW
Outage size: 123 MW
Event type: Planned
Event start: 01-01-2021 00:01
Event end: 01-01-2024 00:00
Source: Active - Planned - Siersza B3

Outage information

Unit Siersza B6
Achievable generation capacity: 128 MW
Outage size: 128 MW
Event type: Planned
Event start: 01-01-2021 00:01
Event end: 01-01-2024 00:00
Source: Active - Planned - Siersza B6

Outage information

Unit Łaziska 2 B1
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Planned
Event start: 01-01-2021 00:01
Event end: 01-01-2024 00:00
Source: Active - Planned - Łaziska 2 B1

Outage information

Unit Łaziska 2 B2
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Planned
Event start: 01-01-2021 00:01
Event end: 01-01-2024 00:00
Source: Active - Planned - Łaziska 2 B2

Outage information

Unit Stalowa Wola 3 B8
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Planned
Event start: 01-02-2021 00:01
Event end: 01-01-2024 00:00
Source: Active - Planned - Stalowa Wola 3 B8

Outage information

Unit Stalowa Wola 3 B7
Achievable generation capacity: 125 MW
Outage size: 125 MW
Event type: Planned
Event start: 01-02-2021 00:01
Event end: 01-01-2024 00:00
Source: Active - Planned - Stalowa Wola 3 B7

Outage information

Unit Porąbka Żar H1
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Unplanned
Event start: 08-12-2021 05:01
Event end: 08-12-2021 23:45
Source: Active - Unplanned - Porąbka Żar H1

Outage information

Unit Porąbka Żar H1
Achievable generation capacity: 138 MW
Outage size: 138 MW
Event type: Unplanned
Event start: 11-12-2021 05:01
Event end: 11-12-2021 23:45
Source: Active - Unplanned - Porąbka Żar H1

Outage information

Unit Łaziska 3 B12
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 10-11-2021 06:01
Event end: 20-12-2021 00:00
Source: Active - Planned - Łaziska 3 B12

Outage information

Unit Połaniec B3
Achievable generation capacity: 242 MW
Outage size: 242 MW
Event type: Planned
Event start: 11-09-2021 01:41
Event end: 08-01-2022 19:00
Source: Active - Planned - Połaniec B3

Outage information

Unit Rybnik B5
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 31-07-2021 00:08
Event end: 13-12-2021 00:00
Source: Active - Planned - Rybnik B5

Outage information

Unit Dolna Odra B6
Achievable generation capacity: 222 MW
Outage size: 222 MW
Event type: Planned
Event start: 20-07-2021 06:44
Event end: 21-12-2021 00:00
Source: Active - Planned - Dolna Odra B6

Outage information

Unit Jaworzno 2 JWCD B7
Achievable generation capacity: 910 MW
Outage size: 910 MW
Event type: Unplanned
Event start: 11-06-2021 09:46
Event end: 29-04-2022 08:00
Source: Active - Unplanned - Jaworzno 2 JWCD B7

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 905 MW
Event type: Planned
Event start: 06-12-2021 00:01
Event end: 23-12-2021 00:00
Source: Active - Planned - Opole B5

Outage information

Unit Łagisza B10
Achievable generation capacity: 460 MW
Outage size: 460 MW
Event type: Planned
Event start: 04-12-2021 06:01
Event end: 07-12-2021 00:00
Source: Active - Planned - Łagisza B10

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 03-12-2021 23:01
Event end: 04-12-2021 00:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Turów B05
Achievable generation capacity: 261 MW
Outage size: 261 MW
Event type: Planned
Event start: 26-11-2021 00:01
Event end: 09-12-2021 00:00
Source: Active - Planned - Turów B05

Outage information

Unit Kozienice 1 B3
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Unplanned
Event start: 29-11-2021 00:15
Event end: 05-12-2021 18:00
Source: Active - Unplanned - Kozienice 1 B3

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 80 MW
Event type: Planned
Event start: 04-12-2021 15:01
Event end: 04-12-2021 22:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 05-12-2021 23:01
Event end: 06-12-2021 00:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 125 MW
Event type: Planned
Event start: 05-12-2021 22:01
Event end: 05-12-2021 23:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 04-12-2021 00:01
Event end: 04-12-2021 05:00
Source: Inactive - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 80 MW
Event type: Planned
Event start: 05-12-2021 15:01
Event end: 05-12-2021 22:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 192 MW
Event type: Planned
Event start: 04-12-2021 05:01
Event end: 04-12-2021 06:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 110 MW
Event type: Planned
Event start: 05-12-2021 12:01
Event end: 05-12-2021 15:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 140 MW
Event type: Planned
Event start: 05-12-2021 06:01
Event end: 05-12-2021 12:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 140 MW
Event type: Planned
Event start: 04-12-2021 06:01
Event end: 04-12-2021 12:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 192 MW
Event type: Planned
Event start: 05-12-2021 05:01
Event end: 05-12-2021 06:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 05-12-2021 00:01
Event end: 05-12-2021 05:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 110 MW
Event type: Planned
Event start: 04-12-2021 12:01
Event end: 04-12-2021 15:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 04-12-2021 23:01
Event end: 05-12-2021 00:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 125 MW
Event type: Planned
Event start: 04-12-2021 22:01
Event end: 04-12-2021 23:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 140 MW
Event type: Planned
Event start: 10-12-2021 01:01
Event end: 10-12-2021 06:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 140 MW
Event type: Planned
Event start: 09-12-2021 06:01
Event end: 09-12-2021 12:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 80 MW
Event type: Planned
Event start: 10-12-2021 10:01
Event end: 10-12-2021 14:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 140 MW
Event type: Planned
Event start: 10-12-2021 23:01
Event end: 11-12-2021 00:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 162 MW
Event type: Planned
Event start: 09-12-2021 05:01
Event end: 09-12-2021 06:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 09-12-2021 00:01
Event end: 09-12-2021 05:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 117 MW
Event type: Planned
Event start: 09-12-2021 12:01
Event end: 09-12-2021 13:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 80 MW
Event type: Planned
Event start: 09-12-2021 13:01
Event end: 09-12-2021 22:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Planned
Event start: 09-12-2021 22:01
Event end: 09-12-2021 23:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 09-12-2021 23:01
Event end: 10-12-2021 00:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Planned
Event start: 10-12-2021 00:01
Event end: 10-12-2021 01:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 110 MW
Event type: Planned
Event start: 10-12-2021 06:01
Event end: 10-12-2021 10:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 50 MW
Event type: Planned
Event start: 10-12-2021 14:01
Event end: 10-12-2021 18:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 80 MW
Event type: Planned
Event start: 10-12-2021 18:01
Event end: 10-12-2021 22:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 132 MW
Event type: Planned
Event start: 10-12-2021 22:01
Event end: 10-12-2021 23:00
Source: Active - Planned - Opole B4

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 224 MW
Outage size: 204 MW
Event type: Planned
Event start: 03-12-2021 22:01
Event end: 04-12-2021 00:00
Source: Inactive - Planned - Dolna Odra B7

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 386 MW
Event type: Planned
Event start: 05-12-2021 00:01
Event end: 06-12-2021 00:00
Source: Active - Planned - Opole B1

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 05-12-2021 00:01
Event end: 06-12-2021 00:00
Source: Active - Planned - Opole B2

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 05-12-2021 00:01
Event end: 06-12-2021 00:00
Source: Active - Planned - Opole B3

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Unplanned
Event start: 03-12-2021 06:01
Event end: 05-12-2021 18:00
Source: Active - Unplanned - Kozienice 1 B8

Outage information

Unit Bełchatów B04
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Planned
Event start: 03-12-2021 13:01
Event end: 04-12-2021 00:00
Source: Inactive - Planned - Bełchatów B04

Outage information

Unit Bełchatów B02
Achievable generation capacity: 370 MW
Outage size: 370 MW
Event type: Planned
Event start: 04-12-2021 00:01
Event end: 06-12-2021 00:00
Source: Active - Planned - Bełchatów B02

Outage information

Unit Bełchatów B02
Achievable generation capacity: 370 MW
Outage size: 145 MW
Event type: Unplanned
Event start: 06-12-2021 06:01
Event end: 06-12-2021 12:00
Source: Active - Unplanned - Bełchatów B02

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 400 MW
Event type: Unplanned
Event start: 03-12-2021 22:01
Event end: 04-12-2021 00:00
Source: Inactive - Unplanned - Opole B6

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 03-12-2021 23:01
Event end: 04-12-2021 00:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 03-12-2021 00:01
Event end: 04-12-2021 00:00
Source: Inactive - Unplanned - Bełchatów B14

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 50 MW
Event type: Unplanned
Event start: 03-12-2021 23:01
Event end: 04-12-2021 00:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit Jaworzno 3 B4
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 04-12-2021 06:01
Event end: 06-12-2021 00:00
Source: Active - Planned - Jaworzno 3 B4

Outage information

Unit Rybnik B7
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 04-12-2021 00:01
Event end: 05-12-2021 22:00
Source: Active - Planned - Rybnik B7

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 08-12-2021 12:01
Event end: 09-12-2021 00:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 80 MW
Event type: Planned
Event start: 08-12-2021 08:01
Event end: 08-12-2021 11:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 08-12-2021 00:01
Event end: 08-12-2021 07:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Planned
Event start: 08-12-2021 07:01
Event end: 08-12-2021 08:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Planned
Event start: 08-12-2021 11:01
Event end: 08-12-2021 12:00
Source: Active - Planned - Opole B4

Outage information

Unit EC Wrotków ECW
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 03-12-2021 00:01
Event end: 12-12-2021 00:00
Source: Active - Planned - EC Wrotków ECW

Outage information

Unit Kozienice 1 B7
Achievable generation capacity: 220 MW
Outage size: 220 MW
Event type: Unplanned
Event start: 04-12-2021 06:01
Event end: 05-12-2021 18:00
Source: Active - Unplanned - Kozienice 1 B7

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 110 MW
Event type: Planned
Event start: 07-12-2021 09:01
Event end: 07-12-2021 10:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Planned
Event start: 07-12-2021 00:01
Event end: 07-12-2021 06:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 60 MW
Event type: Planned
Event start: 07-12-2021 10:01
Event end: 07-12-2021 12:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 51 MW
Event type: Planned
Event start: 07-12-2021 12:01
Event end: 07-12-2021 13:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 3 MW
Event type: Planned
Event start: 07-12-2021 13:01
Event end: 07-12-2021 16:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 180 MW
Event type: Planned
Event start: 07-12-2021 06:01
Event end: 07-12-2021 07:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 180 MW
Event type: Planned
Event start: 07-12-2021 17:01
Event end: 07-12-2021 18:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Planned
Event start: 07-12-2021 18:01
Event end: 08-12-2021 00:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 117 MW
Event type: Planned
Event start: 07-12-2021 07:01
Event end: 07-12-2021 09:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 68 MW
Event type: Planned
Event start: 07-12-2021 16:01
Event end: 07-12-2021 17:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 3 MW
Event type: Planned
Event start: 08-12-2021 07:01
Event end: 08-12-2021 17:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 180 MW
Event type: Planned
Event start: 08-12-2021 18:01
Event end: 08-12-2021 19:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Planned
Event start: 08-12-2021 19:01
Event end: 08-12-2021 22:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Planned
Event start: 08-12-2021 00:01
Event end: 08-12-2021 05:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 180 MW
Event type: Planned
Event start: 08-12-2021 05:01
Event end: 08-12-2021 06:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 68 MW
Event type: Planned
Event start: 08-12-2021 06:01
Event end: 08-12-2021 07:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 68 MW
Event type: Planned
Event start: 08-12-2021 17:01
Event end: 08-12-2021 18:00
Source: Active - Planned - Opole B3

Outage information

Unit Rybnik B3
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 04-12-2021 00:01
Event end: 11-12-2021 00:00
Source: Active - Planned - Rybnik B3

Outage information

Unit Rybnik B4
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 04-12-2021 00:01
Event end: 11-12-2021 00:00
Source: Active - Planned - Rybnik B4

Outage information

Unit Ostrołęka B B03
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 04-12-2021 00:00
Event end: 06-12-2021 00:00
Source: Active - Planned - Ostrołęka B B03

Outage information

Unit Kozienice 1 B6
Achievable generation capacity: 228 MW
Outage size: 228 MW
Event type: Unplanned
Event start: 03-12-2021 06:01
Event end: 06-12-2021 00:00
Source: Active - Unplanned - Kozienice 1 B6

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 20:01
Event end: 04-12-2021 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 11:01
Event end: 04-12-2021 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 04-12-2021 03:01
Event end: 04-12-2021 04:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 15:01
Event end: 04-12-2021 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 17:01
Event end: 04-12-2021 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 04-12-2021 02:01
Event end: 04-12-2021 03:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 10:01
Event end: 04-12-2021 11:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 04-12-2021 00:01
Event end: 04-12-2021 01:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 19:01
Event end: 04-12-2021 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 12:01
Event end: 04-12-2021 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 04-12-2021 06:01
Event end: 04-12-2021 07:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 04-12-2021 07:01
Event end: 04-12-2021 08:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 04-12-2021 01:01
Event end: 04-12-2021 02:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 22:01
Event end: 04-12-2021 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 14:01
Event end: 04-12-2021 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 13:01
Event end: 04-12-2021 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 21:01
Event end: 04-12-2021 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 04-12-2021 09:01
Event end: 04-12-2021 10:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 16:01
Event end: 04-12-2021 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 23:01
Event end: 05-12-2021 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 04-12-2021 08:01
Event end: 04-12-2021 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 04-12-2021 04:01
Event end: 04-12-2021 05:00
Source: Inactive - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 04-12-2021 18:01
Event end: 04-12-2021 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 04-12-2021 05:01
Event end: 04-12-2021 06:00
Source: Active - Unplanned - Płock B01

Outage information

Unit EC Siekierki WSIB 07
Achievable generation capacity: 106 MW
Outage size: 106 MW
Event type: Unplanned
Event start: 03-12-2021 04:01
Event end: 06-12-2021 10:00
Source: Active - Unplanned - EC Siekierki WSIB 07

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 566 MW
Outage size: 566 MW
Event type: Unplanned
Event start: 05-12-2021 00:01
Event end: 06-12-2021 00:00
Source: Active - Unplanned - Kozienice 2 B09

Outage information

Unit Bełchatów B06
Achievable generation capacity: 394 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 04-12-2021 00:01
Event end: 04-12-2021 06:00
Source: Active - Unplanned - Bełchatów B06

Outage information

Unit Bełchatów B08
Achievable generation capacity: 390 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 04-12-2021 00:01
Event end: 04-12-2021 06:00
Source: Active - Unplanned - Bełchatów B08

Outage information

Unit Bełchatów B07
Achievable generation capacity: 390 MW
Outage size: 90 MW
Event type: Unplanned
Event start: 04-12-2021 00:01
Event end: 04-12-2021 06:00
Source: Active - Unplanned - Bełchatów B07

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 04:01
Event end: 04-12-2021 05:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 20:01
Event end: 04-12-2021 21:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 21:01
Event end: 04-12-2021 22:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 22:01
Event end: 04-12-2021 23:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 18:01
Event end: 04-12-2021 19:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 17:01
Event end: 04-12-2021 18:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 16:01
Event end: 04-12-2021 17:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 23:01
Event end: 05-12-2021 00:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 15:01
Event end: 04-12-2021 16:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 14:01
Event end: 04-12-2021 15:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 13:01
Event end: 04-12-2021 14:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 12:01
Event end: 04-12-2021 13:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 11:01
Event end: 04-12-2021 12:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 10:01
Event end: 04-12-2021 11:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 09:01
Event end: 04-12-2021 10:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 08:01
Event end: 04-12-2021 09:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 07:01
Event end: 04-12-2021 08:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 06:01
Event end: 04-12-2021 07:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 05:01
Event end: 04-12-2021 06:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 19:01
Event end: 04-12-2021 20:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 03:01
Event end: 04-12-2021 04:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 00:01
Event end: 04-12-2021 01:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 01:01
Event end: 04-12-2021 02:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 04-12-2021 02:01
Event end: 04-12-2021 03:00
Source: Inactive - Unplanned - EC Włocławek B1

Outage information

Unit Połaniec B9
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 29-11-2021 00:19
Event end: 08-12-2021 22:00
Source: Active - Planned - Połaniec B9

Outage information

Unit Połaniec B7
Achievable generation capacity: 239 MW
Outage size: 239 MW
Event type: Unplanned
Event start: 30-11-2021 16:20
Event end: 04-12-2021 19:00
Source: Active - Unplanned - Połaniec B7

Outage information

Unit Bełchatów B14
Achievable generation capacity: 858 MW
Outage size: 120 MW
Event type: Unplanned
Event start: 04-12-2021 06:01
Event end: 04-12-2021 23:00
Source: Active - Unplanned - Bełchatów B14

Outage information

Unit Połaniec B1
Achievable generation capacity: 225 MW
Outage size: 35 MW
Event type: Planned
Event start: 08-12-2021 06:01
Event end: 08-12-2021 14:00
Source: Active - Planned - Połaniec B1

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 400 MW
Event type: Unplanned
Event start: 04-12-2021 22:01
Event end: 05-12-2021 00:00
Source: Active - Unplanned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 250 MW
Event type: Unplanned
Event start: 05-12-2021 00:01
Event end: 06-12-2021 00:00
Source: Active - Unplanned - Opole B6

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 80 MW
Event type: Planned
Event start: 07-12-2021 19:01
Event end: 07-12-2021 20:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 177 MW
Event type: Planned
Event start: 07-12-2021 06:01
Event end: 07-12-2021 07:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 65 MW
Event type: Planned
Event start: 07-12-2021 07:01
Event end: 07-12-2021 08:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 07-12-2021 22:01
Event end: 08-12-2021 00:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Planned
Event start: 07-12-2021 00:01
Event end: 07-12-2021 06:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 177 MW
Event type: Planned
Event start: 07-12-2021 21:01
Event end: 07-12-2021 22:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 87 MW
Event type: Planned
Event start: 07-12-2021 20:01
Event end: 07-12-2021 21:00
Source: Active - Planned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 57 MW
Event type: Planned
Event start: 07-12-2021 18:01
Event end: 07-12-2021 19:00
Source: Active - Planned - Opole B4

Outage information

Unit Jaworzno 3 B6
Achievable generation capacity: 225 MW
Outage size: 225 MW
Event type: Planned
Event start: 04-12-2021 19:01
Event end: 06-12-2021 06:00
Source: Active - Planned - Jaworzno 3 B6

Outage information

Unit Jaworzno 3 B6
Achievable generation capacity: 225 MW
Outage size: 135 MW
Event type: Planned
Event start: 04-12-2021 07:01
Event end: 04-12-2021 09:00
Source: Active - Planned - Jaworzno 3 B6

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 06:01
Event end: 05-12-2021 07:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 05:01
Event end: 05-12-2021 06:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 04:01
Event end: 05-12-2021 05:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 03:01
Event end: 05-12-2021 04:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 02:01
Event end: 05-12-2021 03:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 01:01
Event end: 05-12-2021 02:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 00:01
Event end: 05-12-2021 01:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 23:01
Event end: 06-12-2021 00:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 08:01
Event end: 05-12-2021 09:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 21:01
Event end: 05-12-2021 22:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 20:01
Event end: 05-12-2021 21:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 19:01
Event end: 05-12-2021 20:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 18:01
Event end: 05-12-2021 19:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 17:01
Event end: 05-12-2021 18:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 16:01
Event end: 05-12-2021 17:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 15:01
Event end: 05-12-2021 16:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 14:01
Event end: 05-12-2021 15:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 13:01
Event end: 05-12-2021 14:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 12:01
Event end: 05-12-2021 13:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 11:01
Event end: 05-12-2021 12:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 10:01
Event end: 05-12-2021 11:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 09:01
Event end: 05-12-2021 10:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 22:01
Event end: 05-12-2021 23:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 05-12-2021 07:01
Event end: 05-12-2021 08:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 10:01
Event end: 06-12-2021 11:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 00:01
Event end: 06-12-2021 01:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 01:01
Event end: 06-12-2021 02:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 02:01
Event end: 06-12-2021 03:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 03:01
Event end: 06-12-2021 04:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 04:01
Event end: 06-12-2021 05:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 05:01
Event end: 06-12-2021 06:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 06:01
Event end: 06-12-2021 07:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 07:01
Event end: 06-12-2021 08:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 08:01
Event end: 06-12-2021 09:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 09:01
Event end: 06-12-2021 10:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 11:01
Event end: 06-12-2021 12:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 12:01
Event end: 06-12-2021 13:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 13:01
Event end: 06-12-2021 14:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 14:01
Event end: 06-12-2021 15:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 15:01
Event end: 06-12-2021 16:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 16:01
Event end: 06-12-2021 17:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 17:01
Event end: 06-12-2021 18:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 18:01
Event end: 06-12-2021 19:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 19:01
Event end: 06-12-2021 20:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 20:01
Event end: 06-12-2021 21:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 21:01
Event end: 06-12-2021 22:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 22:01
Event end: 06-12-2021 23:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Włocławek B1
Achievable generation capacity: 465 MW
Outage size: 45 MW
Event type: Unplanned
Event start: 06-12-2021 23:01
Event end: 07-12-2021 00:00
Source: Active - Unplanned - EC Włocławek B1

Outage information

Unit EC Białystok BIA_1-02
Achievable generation capacity: 52 MW
Outage size: 52 MW
Event type: Unplanned
Event start: 03-12-2021 11:15
Event end: 05-12-2021 23:45
Source: Active - Unplanned - EC Białystok BIA_1-02

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 300 MW
Event type: Unplanned
Event start: 06-12-2021 00:01
Event end: 06-12-2021 07:00
Source: Active - Unplanned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 300 MW
Event type: Unplanned
Event start: 06-12-2021 22:01
Event end: 07-12-2021 00:00
Source: Active - Unplanned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 400 MW
Event type: Unplanned
Event start: 07-12-2021 00:01
Event end: 07-12-2021 07:00
Source: Active - Unplanned - Opole B6

Outage information

Unit Opole B6
Achievable generation capacity: 905 MW
Outage size: 400 MW
Event type: Unplanned
Event start: 07-12-2021 22:01
Event end: 08-12-2021 00:00
Source: Active - Unplanned - Opole B6

Outage information

Unit Ostrołęka B B02
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Unplanned
Event start: 01-12-2021 11:13
Event end: 05-12-2021 18:00
Source: Active - Unplanned - Ostrołęka B B02

Outage information

Unit Ostrołęka B B03
Achievable generation capacity: 230 MW
Outage size: 230 MW
Event type: Planned
Event start: 06-12-2021 00:01
Event end: 09-12-2021 00:00
Source: Active - Planned - Ostrołęka B B03

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 05-12-2021 22:01
Event end: 05-12-2021 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 05-12-2021 21:01
Event end: 05-12-2021 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 05-12-2021 20:01
Event end: 05-12-2021 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 05-12-2021 19:01
Event end: 05-12-2021 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 18:01
Event end: 05-12-2021 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 17:01
Event end: 05-12-2021 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 16:01
Event end: 05-12-2021 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 15:01
Event end: 05-12-2021 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 14:01
Event end: 05-12-2021 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 13:01
Event end: 05-12-2021 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 12:01
Event end: 05-12-2021 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 11:01
Event end: 05-12-2021 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 10:01
Event end: 05-12-2021 11:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 03:01
Event end: 05-12-2021 04:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 06:01
Event end: 05-12-2021 07:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 07:01
Event end: 05-12-2021 08:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 04:01
Event end: 05-12-2021 05:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 01:01
Event end: 05-12-2021 02:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 02:01
Event end: 05-12-2021 03:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 05:01
Event end: 05-12-2021 06:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 00:01
Event end: 05-12-2021 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 05-12-2021 23:01
Event end: 06-12-2021 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 08:01
Event end: 05-12-2021 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 05-12-2021 09:01
Event end: 05-12-2021 10:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 06-12-2021 23:01
Event end: 07-12-2021 00:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 06-12-2021 22:01
Event end: 06-12-2021 23:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 06-12-2021 21:01
Event end: 06-12-2021 22:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 06-12-2021 20:01
Event end: 06-12-2021 21:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 06-12-2021 19:01
Event end: 06-12-2021 20:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 06-12-2021 18:01
Event end: 06-12-2021 19:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 06-12-2021 17:01
Event end: 06-12-2021 18:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 06-12-2021 16:01
Event end: 06-12-2021 17:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 06-12-2021 15:01
Event end: 06-12-2021 16:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 06-12-2021 14:01
Event end: 06-12-2021 15:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 06-12-2021 13:01
Event end: 06-12-2021 14:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 06-12-2021 12:01
Event end: 06-12-2021 13:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 06-12-2021 11:01
Event end: 06-12-2021 12:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 06-12-2021 10:01
Event end: 06-12-2021 11:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 06-12-2021 09:01
Event end: 06-12-2021 10:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 06-12-2021 08:01
Event end: 06-12-2021 09:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 105 MW
Event type: Unplanned
Event start: 06-12-2021 07:01
Event end: 06-12-2021 08:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 06-12-2021 06:01
Event end: 06-12-2021 07:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 06-12-2021 05:01
Event end: 06-12-2021 06:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 06-12-2021 04:01
Event end: 06-12-2021 05:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 06-12-2021 03:01
Event end: 06-12-2021 04:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 06-12-2021 02:01
Event end: 06-12-2021 03:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 110 MW
Event type: Unplanned
Event start: 06-12-2021 01:01
Event end: 06-12-2021 02:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Płock B01
Achievable generation capacity: 630 MW
Outage size: 115 MW
Event type: Unplanned
Event start: 06-12-2021 00:01
Event end: 06-12-2021 01:00
Source: Active - Unplanned - Płock B01

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 228 MW
Outage size: 23 MW
Event type: Planned
Event start: 06-12-2021 17:01
Event end: 06-12-2021 20:00
Source: Active - Planned - Kozienice 1 B8

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 203 MW
Event type: Unplanned
Event start: 06-12-2021 10:01
Event end: 07-12-2021 00:00
Source: Active - Unplanned - Opole B3

Outage information

Unit Skawina Tg6
Achievable generation capacity: 110 MW
Outage size: 110 MW
Event type: Planned
Event start: 26-11-2021 11:53
Event end: 13-12-2021 00:00
Source: Active - Planned - Skawina Tg6

Outage information

Unit Skawina Tg5
Achievable generation capacity: 110 MW
Outage size: 30 MW
Event type: Planned
Event start: 26-11-2021 11:50
Event end: 13-12-2021 00:00
Source: Active - Planned - Skawina Tg5

Outage information

Unit Skawina Tg3
Achievable generation capacity: 110 MW
Outage size: 30 MW
Event type: Planned
Event start: 26-11-2021 11:45
Event end: 13-12-2021 00:00
Source: Active - Planned - Skawina Tg3

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 80 MW
Event type: Unplanned
Event start: 06-12-2021 08:01
Event end: 06-12-2021 11:00
Source: Active - Unplanned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 06-12-2021 07:01
Event end: 06-12-2021 08:00
Source: Active - Unplanned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 06-12-2021 00:01
Event end: 06-12-2021 07:00
Source: Active - Unplanned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 200 MW
Event type: Unplanned
Event start: 06-12-2021 12:01
Event end: 07-12-2021 00:00
Source: Active - Unplanned - Opole B4

Outage information

Unit Opole B4
Achievable generation capacity: 380 MW
Outage size: 155 MW
Event type: Unplanned
Event start: 06-12-2021 11:01
Event end: 06-12-2021 12:00
Source: Active - Unplanned - Opole B4

Outage information

Unit Kozienice 1 B8
Achievable generation capacity: 228 MW
Outage size: 45 MW
Event type: Planned
Event start: 07-12-2021 17:01
Event end: 07-12-2021 18:00
Source: Active - Planned - Kozienice 1 B8

Outage information

Unit Kozienice 2 B09
Achievable generation capacity: 566 MW
Outage size: 150 MW
Event type: Unplanned
Event start: 04-12-2021 00:01
Event end: 05-12-2021 00:00
Source: Active - Unplanned - Kozienice 2 B09

Outage information

Unit Kozienice 2 B10
Achievable generation capacity: 566 MW
Outage size: 150 MW
Event type: Unplanned
Event start: 04-12-2021 00:01
Event end: 05-12-2021 00:00
Source: Active - Unplanned - Kozienice 2 B10

Outage information

Unit EC Stalowa Wola Stalowa Wola BGP
Achievable generation capacity: 450 MW
Outage size: 150 MW
Event type: Unplanned
Event start: 03-12-2021 20:00
Event end: 04-12-2021 10:00
Source: Active - Unplanned - EC Stalowa Wola Stalowa Wola BGP

Outage information

Unit Opole B2
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 02-12-2021 21:05
Event end: 05-12-2021 00:00
Source: Active - Planned - Opole B2

Outage information

Unit Opole B1
Achievable generation capacity: 386 MW
Outage size: 386 MW
Event type: Planned
Event start: 25-11-2021 00:01
Event end: 05-12-2021 00:00
Source: Active - Planned - Opole B1

Outage information

Unit Opole B3
Achievable generation capacity: 383 MW
Outage size: 383 MW
Event type: Planned
Event start: 02-12-2021 21:35
Event end: 05-12-2021 00:00
Source: Active - Planned - Opole B3

Outage information

Unit Opole B5
Achievable generation capacity: 905 MW
Outage size: 905 MW
Event type: Planned
Event start: 02-12-2021 00:01
Event end: 06-12-2021 00:00
Source: Active - Planned - Opole B5

Outage information

Unit Turów B03
Achievable generation capacity: 250 MW
Outage size: 60 MW
Event type: Unplanned
Event start: 03-12-2021 19:01
Event end: 04-12-2021 04:00
Source: Inactive - Unplanned - Turów B03

Outage information

Unit Dolna Odra B7
Achievable generation capacity: 224 MW
Outage size: 224 MW
Event type: Planned
Event start: 04-12-2021 00:04
Event end: 11-12-2021 00:00
Source: Active - Planned - Dolna Odra B7

Outage information

Unit Bełchatów B12
Achievable generation capacity: 390 MW
Outage size: 390 MW
Event type: Planned
Event start: 04-12-2021 00:13
Event end: 06-12-2021 00:00
Source: Active - Planned - Bełchatów B12

Outage information

Unit Turów B01
Achievable generation capacity: 250 MW
Outage size: 70 MW
Event type: Unplanned
Event start: 03-12-2021 16:01
Event end: 04-12-2021 02:00
Source: Inactive - Unplanned - Turów B01

Outage information

Unit Turów B06
Achievable generation capacity: 261 MW
Outage size: 157 MW
Event type: Planned
Event start: 03-12-2021 22:01
Event end: 04-12-2021 03:00
Source: Inactive - Planned - Turów B06

Outage information

Unit Pątnów B9 B9
Achievable generation capacity: 474 MW
Outage size: 474 MW
Event type: Unplanned
Event start: 04-12-2021 04:25
Event end: 04-12-2021 07:00
Source: Active - Unplanned - Pątnów B9 B9

The outages report presents information on outages from all Centrally Dispatched Generation Units (JWCD), in a tabular form. Sources of the data are the following: the Transmission System Operator (PKR, PKM and WPKD reports) and the WIT (Urgent Market Messages) system. For the purpose of the outages report, the WIT system information have the highest priority.

The outages report presents data for 14 consecutive days, in a per day view. By default, data ranging from the day N until the day N+13 (where N stands for the current day) is presented. The subsequent and antecedent 14-day time periods are displayed by clicking on "next" and "previous" buttons respectively. Selecting a random day results in displaying data for the 14-day period, starting with the selected day.

The grey field stands for the outage of at least one generation unit in the power plant concerned. The green field stands for full availability of a power plant (lack of information on outages in any of its generation units). The blue field in the report stands for planned outages. The red field stands for unplanned outages (failures). Numeric value in either blue or red field equals the size of an outage in MW. Clicking on the field results in displaying detailed information on the outage, including the name of a unit, achievable generation capacity, outage size, event type, start and end date of the event, as well as the data source. If information on a given outage comes from the WIT system, a link to the adequate WIT message can be found in the "Source" field. Clicking on the link results in redirection to the WIT system page in which all details of the event concerned are presented. The summarized volume of all outages (for all power plants) in a day is presented at the end of the outages report.